Search NASA⌕ Search

SEARCH · Search NASA

Results for “TUBING”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Broadband power amplifier tube: Klystron tube 5K70SK-WBT and step tuner VA-1470S

The design concept, the fabrication, and the acceptance testing of a wide band Klystron tube and remotely controlled step tuner for channel selection are discussed. The equipment was developed for the modification of an existing 20 KW Power Amplifier System which was provided to the contractor as GFE. The replacement Klystron covers a total frequency range of 2025 to 2120 MHz and is tuneable to six (6) each channel with a band width of 22 MHz or greater per channel. A 5 MHz overlap is provided between channels. Channels are selected at the control panel located in the front of the Klystron magnet or from one of three remote control stations connected in parallel with the step tuner. Included in this final report are the results of acceptance tests conducted at the vendor's plant and of the integrated system tests.

Cox, H. R.↗

Explosive Tube-to-fitting Joining of Small-diameter Tubes

An effort is currently under way by NASA Marshall Space Flight Center to upgrade the space shuttle main engine through the use of improved materials and processes. Under consideration is the use of the Langley Research Center explosive seam welding process. The objective is to demonstrate the feasibility of joining space shuttle main engine tube to fitting components in an oxygen heat exchanger, using the NASA LaRC explosive seam welding process. It was concluded that LaRC explosive joining is viable for this application; that there is no incompatability of materials; that ultrasonic inspection is the best nondestructive testing method; and that the .500 DIA joint experiences interface problems.

Bement, L. J.↗

In-situ tube burst testing and high-temperature deformation behavior of candidate materials for accident tolerant fuel cladding

The high resistance of cladding to plastic deformation and burst failure is one of the most essential properties of accident tolerant fuel (ATF) for maintaining structural integrity during a loss-of-coolant accident (LOCA) since the deformation and burst behavior governs the cooling efficiency of flow channels and process of fission product release. To simulate and evaluate such deformation and burst process of thin-walled cladding, an in-situ testing and evaluation method has been developed on the basis of visual imaging and image analysis techniques. The method uses a specialized optics system consisted of a high-resolution video camera, light filtering unit, and monochromatic light sources, and the in-situ testing is performed using a 50 mm long pressurized thin-walled tubular specimen set in a programmable furnace. In this study eleven (11) candidate cladding materials for ATF, i.e., 6 FeCrAl alloys and 5 nanostructured steels, were tested using the newly developed method, and the time-dependent images were analyzed to produce detailed deformation and burst data such as true hoop stress, strain (creep) rate, and failure stress. Relatively soft FeCrAl alloys deformed and burst below 800°C while negligible strain rates were measured for higher strength alloys and/or for relatively thick wall specimens.

Gussev, Maxim N.↗