Search NASA⌕ Search

SEARCH · Search NASA

Results for “Team”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Report of the Space Shuttle Management Independent Review Team

At the request of the NASA Administrator a team was formed to review the Space Shuttle Program and propose a new management system that could significantly reduce operating costs. Composed of a group of people with broad and extensive experience in spaceflight and related areas, the team received briefings from the NASA organizations and most of the supporting contractors involved in the Shuttle Program. In addition, a number of chief executives from the supporting contractors provided advice and suggestions. The team found that the present management system has functioned reasonably well despite its diffuse structure. The team also determined that the shuttle has become a mature and reliable system, and--in terms of a manned rocket-propelled space launch system--is about as safe as today's technology will provide. In addition, NASA has reduced shuttle operating costs by about 25 percent over the past 3 years. The program, however, remains in a quasi-development mode and yearly costs remain higher than required. Given the current NASA-contractor structure and incentives, it is difficult to establish cost reduction as a primary goal and implement changes to achieve efficiencies. As a result, the team sought to create a management structure and associated environment that enables and motivates the Program to further reduce operational costs. Accordingly, the review team concluded that the NASA Space Shuttle Program should (1) establish a clear set of program goals, placing a greater emphasis on cost-efficient operations and user-friendly payload integration; (2) redefine the management structure, separating development and operations and disengaging NASA from the daily operation of the space shuttle; and (3) provide the necessary environment and conditions within the program to pursue these goals.

Source record↗

Development of a Search and Rescue Simulation to Study the Effects of Prolonged Isolation on Team Decision Making

The goals of this project were to identify and investigate aspects of team and individual decision-making and risk-taking behaviors hypothesized to be most affected by prolonged isolation. A key premise driving our research approach is that effects of stressors that impact individual and team cognitive processes in an isolated, confined, and hazardous environment will be projected onto the performance of a simulation task. To elicit and investigate these team behaviors we developed a search and rescue task concept as a scenario domain that would be relevant for isolated crews. We modified the Distributed Dynamic Decision-making (DDD) simulator, a platform that has been extensively used for empirical research in team processes and taskwork performance, to portray the features of a search and rescue scenario and present the task components incorporated into that scenario. The resulting software is called DD-Search and Rescue (Version 1.0). To support the use of the DDD-Search and Rescue simulator in isolated experiment settings, we wrote a player's manual for teaching team members to operate the simulator and play the scenario. We then developed a research design and experiment plan that would allow quantitative measures of individual and team decision making skills using the DDD-Search and Rescue simulator as the experiment platform. A description of these activities and the associated materials that were produced under this contract are contained in this report.

Entin, Elliot E.↗

The Human Powered Submarine Team of Virginia Tech Propulsion System Design Final Report

The Human Powered Submarine Team has been in existence at Virginia Tech since its conception in 1993. Since then, it has served as a way for engineering students from many different disciplines to implement design conception and realization. The first submarine built was Phantom 1, a two-man submarine made of fiberglass. After construction was complete, Phantom 1 was ready for racing, but, unfortunately, suffered fatal problems come race time. The submarine team slowed down a bit after experiencing racing problems, but was revived in 1995 when design efforts for a new two-man submarine, the Phantom 2 commence. The propulsion system consisted of a chain and gear drive system using an ultra-light helicopter tail rotor for a propeller. Although the team learned valuable lessons as a result of Phantom 1's problems, Phantom 2 still experiences problems at races. After various parts of Phantom 2 are redesigned, it is once again ready for racing and proves that the redesign was well worth the time and effort. In 1997, Phantom 2 not only finishes its first race, held in San Diego, California, but comes in third. This success sparks yet another revival of the submarine team and design for the team's current project, the Phantom 3, a one-man submarine, is started. In 1998, the plug for Phantom 3 is built and the hull is constructed. With so many past problems from which to learn, Phantom 3 promises to be the fastest and best-designed submarine the team has developed thus far. The current speed world-record is 7 knots.

An, Eric↗

Flying Cassini with Virtual Operations Teams

The Cassini Program's challenge is to fly a large, complex mission with a reduced operations budget. A consequence of the reduced budget is elimination of the large, centrally located group traditionally used for uplink operations. Instead, responsibility for completing parts of the uplink function is distributed throughout the Program. A critical strategy employed to handle this challenge is the use of Virtual Uplink Operations Teams. A Virtual Team is comprised of a group of people with the necessary mix of engineering and science expertise who come together for the purpose of building a specific uplink product. These people are drawn from throughout the Cassini Program and participate across a large geographical area (from Germany to the West coast of the USA), covering ten time zones. The participants will often split their time between participating in the Virtual Team and accomplishing their core responsibilities, requiring significant planning and time management. When the particular uplink product task is complete, the Virtual Team disbands and the members turn back to their home organization element for future work assignments. This time-sharing of employees is used on Cassini to build mission planning products, via the Mission Planning Virtual Team, and sequencing products and monitoring of the sequence execution, via the Sequence Virtual Team. This challenging, multitasking approach allows efficient use of personnel in a resource constrained environment.

Dodd, Suzanne↗

Training to Enhance Design Team Performance: A Cure for Tunnel Vision

Design Team performance is a function of the quality and degree of academic training and the cumulative, learned experience of the individual members of the team. Teamwork, leadership, and communications certainly are factors that affect the measure of the performance of the team, but they are not addressed here. This paper focuses on accelerating the learned experience of team members and describes an organizational approach that can significantly increase the effective experience level for any engineering design team. The performance measure of the whole team can be increased by increasing the engineering disciplines' cross awareness of each other and by familiarizing them with their affect at the system level. Discipline engineers know their own discipline well, but typically are not intimately familiar with their technical interaction with and dependencies on all the other disciplines of engineering. These dependencies are design integration functions and are worked out well by the discipline engineers as long as they are involved in the design of types of systems that they have experience with.

Parker, James W.↗

Capabilities of the Materials Contamination Team at Marshall Space Flight Center

The Materials Contamination Team of the Environmental Effects Group, Materials, Processes, and Manufacturing Department, has been recognized for its contribution to space flight, including space transportation, space science and flight projects, such as the reusable solid rocket motor, Chandra X-Ray Observatory, and the International Space Station. The Materials Contamination Team s realm of responsibility encompasses all phases of hardware development including design, manufacturing, assembly, test, transportation, launch-site processing, on-orbit exposure, return, and refurbishment if required. Contamination is a concern in the Space Shuttle with sensitivity bondlines and reactive fluid (liquid oxygen) compatibility as well as for sensitive optics, particularly spacecraft such as Hubble Space Telescope and Chandra X-Ray Observatory. The Materials Contamination Team has a variety of facilities and instrumentation capable of contaminant detection identification, and monitoring. The team addresses material applications dealing with environments, including production facilities, clean rooms, and on-orbit exposure. The team of engineers and technicians also develop and evaluates new surface cleanliness inspection technologies. Databases are maintained by the team for proces! materials as well as outgassing and optical compatibility test results for specific environments.

Burns, H. D.↗

The Joint Agency Commercial Imagery Evaluation Team and Product Characterization Approach

The Joint Agency Commercial Imagery Evaluation (JACIE) team is a collaborative interagency group focused on the characterization of commercial remote sensing data products. The team members - the National Aeronautics and Space Administration (NASA), the National Imagery and Mapping Agency (NIMA), and the U.S. Geological Survey (USGS) - each have a vested interest in the purchase and use of commercial imagery to support government research and operational applications. For both research and applications, commercial products must be well characterized for precision, accuracy, and repeatability. Since commercial systems are built and operated with no government insight or oversight, the JACIE team provides an independent product characterization of delivered image and image-derived end products. End product characterization differs from the systems calibration approach that is typically used with government systems, where detailed system design information is available. The product characterization approach addresses three primary areas of product performance: geopositional accuracy, image quality, and radiometric accuracy. The JACIE team utilizes well-characterized test sites to support characterization activities. To characterize geopositional accuracy, the team utilizes sites containing several "photo-identifiable" targets and compares their precisely known locations with those defined by the commercial image product. In the area of image quality, spatial response is characterized using edge targets and pulse targets to measure edge response and to estimate image modulation transfer function. Additionally, imagery is also characterized using the National Imagery Interpretability Rating Scale, a means of quantifying the ability to identify certain targets (e.g., rail-cars, airplanes) within an image product. Radiometric accuracy is characterized using reflectance-based vicarious calibration methods at several uniform sites. Each JACIE agency performs an aspect of product characterization based on its area of expertise, thus minimizing duplication of effort. The JACIE team collaborated to perform comprehensive characterization of products from Space Imaging Inc.'s IKONOS satellite and from DigitalGlobe's QuickBird satellite and is currently characterizing products from OrbImage s OrbView-3. JACIE assessments have resulted in several improvements to commercial image product quality and have enhanced working relationships between government and industry. Assessment results are presented at an annual JACIE High Spatial Resolution Commercial Imagery Workshop.

Zanoni, Vicki↗

Team Collaboration: Lessons Learned Report

An Agency team collaboration pilot was conducted from July 2002 until June 2003 and then extended for an additional year. The objective of the pilot was to assess the value of collaboration tools and adoption processes as applied to NASA teams. In an effort to share knowledge and experiences, the lessons that have been learned thus far are documented in this report. Overall, the pilot has been successful. An entire system has been piloted - tools, adoption, and support. The pilot consisted of two collaboration tools, a team space and a virtual team meeting capability. Of the two tools that were evaluated, the team meeting tool has been more widely accepted. Though the team space tool has been met with a lesser degree of acceptance, the need for such a tool in the NASA environment has been evidenced. Both adoption techniques and support were carefully developed and implemented in a way that has been well received by the pilot participant community.

Arterberrie, Rhonda Y.↗

Managed Development Environment Successes for MSFC's VIPA Team

This paper outlines the best practices of the Vehicle Design Team for VIPA. VIPA is the Vehicle Integrated Performance Analysis Team at MSFC. This team was created to reconnect the individual engineering disciplines to be able to perform system level technical assessments in support of program decisions. The functions of the VIPA Vehicle Design (VVD) discipline team are to maintain the controlled reference geometry and provide linked, simplified geometry for each of the other discipline analyses. The core of the VVD work, and the approach for VVD s first task of controlling the reference geometry, involves systems engineering, top-down, layout-based CAD modeling within a Product Data Manager (PDM) development environment. The topdown approach allcws for simple contrnl of very large, integrated assemblies and greatly enhances the ability to generate trade configurations and reuse data. The second W D task, model simplification for analysis, is handled within the managed environment through application of the master model concept. In this approach, there is a single controlling, or master, product definition dataset. Connected to this master model are reference datasets with live geometric and expression links. The referenced models can be for drawings, manufacturing, visualization, embedded analysis, or analysis simplification. A discussion of web based interaction, including visualization, between the design and other disciplines is included. Demonstrated examples are cited, including the Space Launch Initiative development cycle, the Saturn V systems integration and verification cycle, an Orbital Space Plane study, and NASA Exploration Office studies of Shuttle derived and clean sheet launch vehicles. The VIPA Team has brought an immense amount of detailed data to bear on program issues. A central piece of that success has been the Managed Development Environment and the VVD Team approach to modeling.

Finckenor, Jeff↗

Relevant Parameter Evolution in Team X Mission Concept Designs

The Advanced Projects Design Team, also known as Team X, is a concurrent engineering team that quickly and cheaply designs space mission architectures including the flight system and subsystems, the trajectory, and ground system. Through the use of ICEMaker, an Excel spreadsheet database, the parameters from each subsystem can be shared and used among the other subsystems. This allows for entire missions to be planned with only a few short design team sessions. Based on the results, the feasibility of the mission concept can be determined. Over the Years since the team was created, the amount of information being shared among subsystems on the database has increased, however many of the parameters are now obsolete. Removal of these unused parameters Will clean UP the database and help to streamline the mission design process. By comparing parameter files from previous Team X mission studies, the parameter usage can be determined. As was initially suspected there are more unused parameters on the database than parameters that are actually used.

Huelman, Brandon N.↗

Mission Reliability Estimation for Repairable Robot Teams

A mission reliability estimation method has been designed to translate mission requirements into choices of robot modules in order to configure a multi-robot team to have high reliability at minimal cost. In order to build cost-effective robot teams for long-term missions, one must be able to compare alternative design paradigms in a principled way by comparing the reliability of different robot models and robot team configurations. Core modules have been created including: a probabilistic module with reliability-cost characteristics, a method for combining the characteristics of multiple modules to determine an overall reliability-cost characteristic, and a method for the generation of legitimate module combinations based on mission specifications and the selection of the best of the resulting combinations from a cost-reliability standpoint. The developed methodology can be used to predict the probability of a mission being completed, given information about the components used to build the robots, as well as information about the mission tasks. In the research for this innovation, sample robot missions were examined and compared to the performance of robot teams with different numbers of robots and different numbers of spare components. Data that a mission designer would need was factored in, such as whether it would be better to have a spare robot versus an equivalent number of spare parts, or if mission cost can be reduced while maintaining reliability using spares. This analytical model was applied to an example robot mission, examining the cost-reliability tradeoffs among different team configurations. Particularly scrutinized were teams using either redundancy (spare robots) or repairability (spare components). Using conservative estimates of the cost-reliability relationship, results show that it is possible to significantly reduce the cost of a robotic mission by using cheaper, lower-reliability components and providing spares. This suggests that the current design paradigm of building a minimal number of highly robust robots may not be the best way to design robots for extended missions.

Trebi-Ollennu, Ashitey↗

TEAMS Model Analyzer

The TEAMS model analyzer is a supporting tool developed to work with models created with TEAMS (Testability, Engineering, and Maintenance System), which was developed by QSI. In an effort to reduce the time spent in the manual process that each TEAMS modeler must perform in the preparation of reporting for model reviews, a new tool has been developed as an aid to models developed in TEAMS. The software allows for the viewing, reporting, and checking of TEAMS models that are checked into the TEAMS model database. The software allows the user to selectively model in a hierarchical tree outline view that displays the components, failure modes, and ports. The reporting features allow the user to quickly gather statistics about the model, and generate an input/output report pertaining to all of the components. Rules can be automatically validated against the model, with a report generated containing resulting inconsistencies. In addition to reducing manual effort, this software also provides an automated process framework for the Verification and Validation (V&V) effort that will follow development of these models. The aid of such an automated tool would have a significant impact on the V&V process.

Tijidjian, Raffi P.↗

NASA Advanced Concepts Office, Earth-To-Orbit Team Design Process and Tools

The Earth-to-Orbit Team (ETO) of the Advanced Concepts Office (ACO) at NASA Marshall Space Flight Center (MSFC) is considered the pre-eminent go-to group for pre-phase A and phase A concept definition. Over the past several years the ETO team has evaluated thousands of launch vehicle concept variations for a significant number of studies including agency-wide efforts such as the Exploration Systems Architecture Study (ESAS), Constellation, Heavy Lift Launch Vehicle (HLLV), Augustine Report, Heavy Lift Propulsion Technology (HLPT), Human Exploration Framework Team (HEFT), and Space Launch System (SLS). The ACO ETO Team is called upon to address many needs in NASA s design community; some of these are defining extremely large trade-spaces, evaluating advanced technology concepts which have not been addressed by a large majority of the aerospace community, and the rapid turn-around of highly time critical actions. It is the time critical actions, those often limited by schedule or little advanced warning, that have forced the five member ETO team to develop a design process robust enough to handle their current output level in order to meet their customer s needs. Based on the number of vehicle concepts evaluated over the past year this output level averages to four completed vehicle concepts per day. Each of these completed vehicle concepts includes a full mass breakdown of the vehicle to a tertiary level of subsystem components and a vehicle trajectory analysis to determine optimized payload delivery to specified orbital parameters, flight environments, and delta v capability. A structural analysis of the vehicle to determine flight loads based on the trajectory output, material properties, and geometry of the concept is also performed. Due to working in this fast-paced and sometimes rapidly changing environment, the ETO Team has developed a finely tuned process to maximize their delivery capabilities. The objective of this paper is to describe the interfaces between the three disciplines used in the design process: weights and sizing, trajectory, and structural analysis. The tools used to perform such analysis are INtegrated Rocket Sizing (INTROS), Program to Optimize Simulated Trajectories (POST), and Launch Vehicle Analysis (LVA) respectively. The methods each discipline uses to streamline their particular part of the design process will also be discussed.

Waters, Eric D.↗

Team LunaCY Outreach Paper

Iowa State University's Lunabotics Club, Team LunaCY, has worked hard to generate enthusiasm for robotics, engineering, and lunar activities. Team LunaCY participated in a variety of different outreach events making a strong impression on Iowa youth. These events led the chair of the mechanical engineering department, Dr. Ted Heindel, to refer to the club's outreach program as "the model that all other engineering clubs should follow." Team LunaCY's outreach activities totaled over 200 hours and captivated over 3000 students and adults throughout the course of this acaden1ic year, reaching out to people all over Iowa and to several special guests. These guests included Vice-President Joe Biden, during a visit to Iowa State University in March 2012, and astronaut Clayton Anderson, during a visit to Iowa State's campus in the fall 2011. Team LunaCY's outreach events created hands on learning opportunities for local youth ranging in age from elementary school children to high school students. The team strove to make a positive impression on Iowa youth and to encourage interest and involvement in scientific fields. The full list of events is shown in Table 1. Three of the major outreach events the team participated in were the FIRST LEGO League, Science Bound, and iExplore STEM Festival.

Heise, James↗

The Application of the NASA Advanced Concepts Office, Launch Vehicle Team Design Process and Tools for Modeling Small Responsive Launch Vehicles

The Advanced Concepts Office (ACO) Launch Vehicle Team at the NASA Marshall Space Flight Center (MSFC) is recognized throughout NASA for launch vehicle conceptual definition and pre-phase A concept design evaluation. The Launch Vehicle Team has been instrumental in defining the vehicle trade space for many of NASA s high level launch system studies from the Exploration Systems Architecture Study (ESAS) through the Augustine Report, Constellation, and now Space Launch System (SLS). The Launch Vehicle Team s approach to rapid turn-around and comparative analysis of multiple launch vehicle architectures has played a large role in narrowing the design options for future vehicle development. Recently the Launch Vehicle Team has been developing versions of their vetted tools used on large launch vehicles and repackaged the process and capability to apply to smaller more responsive launch vehicles. Along this development path the LV Team has evaluated trajectory tools and assumptions against sounding rocket trajectories and air launch systems, begun altering subsystem mass estimating relationships to handle smaller vehicle components, and as an additional development driver, have begun an in-house small launch vehicle study. With the recent interest in small responsive launch systems and the known capability and response time of the ACO LV Team, ACO s launch vehicle assessment capability can be utilized to rapidly evaluate the vast and opportune trade space that small launch vehicles currently encompass. This would provide a great benefit to the customer in order to reduce that large trade space to a select few alternatives that should best fit the customer s payload needs.

Threet, Grady E.↗

NASA Advanced Concepts Office, Earth-To-Orbit Team Design Process and Tools

The Earth-to-Orbit Team (ETO) of the Advanced Concepts Office (ACO) at NASA Marshall Space Flight Center (MSFC) is considered the pre-eminent "go-to" group for pre-phase A and phase A concept definition. Over the past several years the ETO team has evaluated thousands of launch vehicle concept variations for a significant number of studies including agency-wide efforts such as the Exploration Systems Architecture Study (ESAS), Constellation, Heavy Lift Launch Vehicle (HLLV), Augustine Report, Heavy Lift Propulsion Technology (HLPT), Human Exploration Framework Team (HEFT), and Space Launch System (SLS). The ACO ETO Team is called upon to address many needs in NASA's design community; some of these are defining extremely large trade-spaces, evaluating advanced technology concepts which have not been addressed by a large majority of the aerospace community, and the rapid turn-around of highly time critical actions. It is the time critical actions, those often limited by schedule or little advanced warning, that have forced the five member ETO team to develop a design process robust enough to handle their current output level in order to meet their customer's needs. Based on the number of vehicle concepts evaluated over the past year this output level averages to four completed vehicle concepts per day. Each of these completed vehicle concepts includes a full mass breakdown of the vehicle to a tertiary level of subsystem components and a vehicle trajectory analysis to determine optimized payload delivery to specified orbital parameters, flight environments, and delta v capability. A structural analysis of the vehicle to determine flight loads based on the trajectory output, material properties, and geometry of the concept is also performed. Due to working in this fast-paced and sometimes rapidly changing environment, the ETO Team has developed a finely tuned process to maximize their delivery capabilities. The objective of this paper is to describe the interfaces between the three disciplines used in the design process: weights and sizing, trajectory, and structural analysis. The tools used to perform such analysis are INtegrated Rocket Sizing (INTROS), Program to Optimize Simulated Trajectories (POST), and Launch Vehicle Analysis (LVA) respectively. The methods each discipline uses to streamline their particular part of the design process will also be discussed.

Waters, Eric D.↗

Science in a Team Environment (AKA, How to Play Nicely with Others)

So you want to do NASA funded research in a spaceflight analog? There are several things about participating in an HRP managed analog that may be different from the way you normally do work in your laboratory. The purpose of this presentation is to highlight those differences and explain some of the unique aspects of doing this research. Participation in an HRP funded analog study complement, even if initially selected for funding, is not automatic and involves numerous actions from ISSMP, HRP, and the PI. There are steps that have to be taken and processes to follow before approval and ISSMP-FA integration. After the proposal and acceptance process the Investigator works closely with the Flight Analog team to ensure full integration of their study requirements into a compliment. A complement is comprised of a group of studies requiring a common platform and/or scenario that are able to be integrated on a non-interference basis for implementation. Full integration into the analog platform can be broken down into three phases: integration, preparation, and implementation. These phases occur in order with some overlap in the integration and preparation phase. The ISSMP-FA team integrates, plans and implements analog study complements. Properly defining your research requirements and getting them documented is one of the most critical components to ensure successful integration and implementation of your study, but is also one of the most likely to be neglected by PIs. Requirements that are not documented, or that are documented poorly are unlikely to get done, no matter how much you push. The process to document requirements is two-fold, consisting of an initial individual requirements integration and then a compliment requirements integration. Understanding the requirements in detail and early ensures that the science is not compromised by outside influences. This step is vital to the integration, preparation, and implementation phases. The individual requirements integration is the first step in ensuring that the research fits into an available analog platform or allows for the Flight Analog team to provide information on structural study changes for participation in the analog. At this early point investigators need to understand exactly what their requirements are to produce relevant data and convey their must have needs to the Flight Analog team. The fluid nature of analog platforms allow for minor alterations to the operational structure. Participation in analog research requires flexibility from the investigator to ensure implementation of their research into a flight like analog platform. The compliment integration requires plasticity; investigators are asked to work closely with one another and the Flight Analog team to combine research studies into a single study plan. This study plan's ultimate goal is to facilitate multiple study participation with minimal scientific impact to each individual study. The Flight Analogs team works to find the best compromise for all parties while protecting the flight like atmosphere of a particular analog. Additional restrictions, limitations and constraints may be required by the analog in order to make all of the science work. Many studies need to be combined into each complement and there are a limited number of hours available for data collection. Through data/sample sharing, we can reduce the burden on the test subject, while usually avoiding significant science impacts. Restrictions on food, exercise, medications and sleep cycle are important to consider for your research.

Platts, S. H.↗

Exploring the Science Trade Space with the JPL Innovation Foundry A-Team

The Jet Propulsion Laboratory Innovation Foundry has established a new approach for exploring, developing, and evaluating early concepts with a group called the Architecture Team. The Architecture Team combines innovative collaborative methods and facilitated sessions with subject matter experts and analysis tools to help mature mission concepts. Science, implementation, and programmatic elements are all considered during an A-Team study. In these studies, Concept Maturity Levels are used to group methods. These levels include idea generation and capture (Concept Maturity Level 1), initial feasibility assessment (Concept Maturity Level 2), and trade space exploration (Concept Maturity Level 3). Methods used for exploring the science objectives, feasibility, and scope will be described including the use of a new technique for understanding the most compelling science, called a Science Return Diagram. In the process of developing the Science Return Diagram, gradients in the science trade space are uncovered along with their implications for implementation and mission architecture. Special attention is paid toward developing complete investigations, establishing a series of logical claims that lead to the natural selection of a measurement approach. Over 20 science-focused A-Team studies have used these techniques to help science teams refine their mission objectives, make implementation decisions, and reveal the mission concept's most compelling science. This article will describe the A-Team process for exploring the mission concept's science trade space and the Science Return Diagram technique.

science↗