Search NASA⌕ Search

SEARCH · Search NASA

Results for “Team X”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Support to X-33/Resusable Launch Vehicle Technology Program

The X-33 Guidance, Navigation, and Control (GN&C) Peer Review Team (PRT) was formed to assess the integrated X-33 vehicle GN&C system in order to identify any areas of disproportionate risk for initial flight. The eventual scope of the PRT assessment encompasses the GN&C algorithms, software, avionics, control effectors, applicable models, and testing. The initial (phase 1) focus of the PRT was on the GN&C algorithms and the Flight Control Actuation Subsystem (FCAS). The PRT held meetings during its phase 1 assessment at X-33 assembly facilities in Palmdale, California on May 17-18, 2000 and at Honeywell facilities in Tempe, Arizona on June 7, 2000. The purpose of these meetings was for the PRT members to get background briefings on the X-33 vehicle and for the PRT team to be briefed on the design basis and current status of the X-33 GN&C algorithms as well as the FCAS. The following material is covered in this PRT phase 1 final report. Some significant GN&C-related accomplishments by the X-33 development team are noted. Some topics are identified that were found during phase 1 to require fuller consideration when the PRT reconvenes in the future. Some new recommendations by the PRT to the X-33 program will likely result from a thorough assessment of these subjects. An initial list of recommendations from the PRT to the X-33 program is provided. These recommendations stem from topics that received adequate review by the PRT in phase 1. Significant technical observations by the PRT members as a result of the phase 1 meetings are detailed. (These are covered in an appendix.) There were many X-33 development team members who contributed to the technical information used by the PRT during the phase 1 assessment, who supported presentations to the PRT, and who helped to address the many questions posed by the PRT members at and after the phase 1 meetings. In all instances the interaction between the PRT and the X-33 development team members was cordial and very professional. The members of the PRT are grateful for the time and effort applied by all of these individuals and hope that the contents of this report will help to make the X-33 program a success.

Source record↗

New Lubricants Protect Machines and the Environment

In 1994, NASA and Lockheed Martin Space Operations commissioned Sun Coast Chemicals of Daytona Inc to develop a new type of lubricant that would be safe for the environment and help "grease the wheels" of the shuttle-bearing launcher platform. Founded in 1989, Sun Coast Chemicals is known amongst the racing circuit for effective lubricants that help overcome engine and transmission problems related to heat and wear damage. In a matter of weeks, Sun Coast Chemical produced the biodegradable, high-performance X-1R Crawler Track Lube. In 1996, Sun Coast Chemical determined there was a market for this new development, and introduced three derivative products, Train Track Lubricant, Penetrating Spray Lubricant, and Biodegradable Hydraulic Fluid, and then quickly followed with a gun lubricant/cleaner and a fishing rod and reel lubricant. Just recently, Sun Coast introduced the X-1R Corporation, which folds the high-performance, environmentally safe benefits into a full line of standard automotive and specially formulated racing products. The entire X-1R automotive product line has stood up to rigorous testing by groups such as the American Society of Mechanical Engineers, the Swedish National Testing and Research Institute, the Department of Mechanical Engineering at Oakland University (Rochester, Michigan), and Morgan-McClure Motorsports (Abingdon, Virginia). The X-1R Corporation also markets "handy packs" for simple jobs around the house, consisting of a multi-purpose, multi-use lubricant and grease. In 2003, The X-1R Corporation teamed up with Philadelphia-based Penn Tackle Manufacturing Co., a leading manufacturer of fishing tackle since 1932, to jointly develop and market a line of advanced lubrication products for saltwater and freshwater anglers

Source record↗

Analysis of the NGXO Telescope X-Ray Hartmann Data

Next Generation X-Ray Optics (NGXO) team at the Goddard Space Flight Center (GSFC) has been developing a new silicon-based grazing incidence mirror technology for future high resolution x-ray astronomical missions. Recently, the GSFC team completed the construction of first few mirror modules that contain one pair of mirrors. One of the mirror pairs was tested in GSFC 600-m long beamline facility and Panter (Neuried, Germay) 120-m long x-ray beamline facility. Both full aperture x-ray tests, Hartmann tests, and focal plane sweeps were completed. In this paper we present the data analysis process and compare the results from our models to measured x-ray centroid data, x-ray performance data, and out of focus images of the mirror pair.

Spaceborne telescopes↗

Management of the Reflection Grating Spectrometer on the Constellation-X Mission

As RGS Integrated Product Team Lead, normal coordination and management efforts in the past year have involved setting and overseeing budgets and schedules, regular status reporting to the Program Manager at Goddard Space Flight Center (GSFC), interacting with Constellation-X groups at GSFC, Smithsonian Astrophysical Observatory (SAO), and RGS team institutions, and supporting the program needs of Constellation-X. In addition to the management aspects described above, there are four significant areas of direct contribution that were accomplished.

Source record↗

Thermal Radiator for CO2 Deposition in Deep Space Transit (FY21 XHab Final Report - University of North Texas)

This UNT Senior design team was tasked by NASA to develop a variable conductance thermal radiator prototype for CO2 deposition for deep space transit. NASA selects university teams every year to partake in the X-HAB Academic Innovation Challenge, with this year’s number of teams being six. Air Revitalization is a crucial system for any space travel, be it for Low Earth Orbit, such as the International Space Station, or for deep space transit. Current systems, such as the Carbon Dioxide Removal Apparatus aboard the ISS, require upkeep and maintenance, which cannot be done on long distance space missions. For the past several years, NASA has done research on Cryogenic systems for Carbon Dioxide removal. These systems operate on the fact that Carbon Dioxide freezes at a higher temperature than Oxygen and Nitrogen, so Carbon Dioxide can be frozen out of the cabin atmosphere without the use of filters, which degrade over time. To cool the cabin air down to a temperature where Carbon Dioxide freezes, Stirling cryocoolers have been used, which have shown promise in the hope of Carbon Dioxide deposition for Cabin Air Revitalization. Cryogenic systems are much more reliable but require significant energy input to operate. Physical systems, such as radiators, have generally not been used for this task, as there is a need to be able to “turn off” the rejection of heat to allow the frozen carbon dioxide to be collected. However, with working fluids pumped through a physical radiator, that aspect of operation can be achieved. The goal of this challenge is to determine the effectiveness of a variable conductance thermal radiator that can reject heat to deep space, without the use of a dedicated cryocooler to remove energy from the cabin air. The proposed design uses piping, hot and cold working fluids, and non-condensable gas to absorbl heat from the cabin air on one side of the radiator and reject the heat to deep space by means of thermal radiation. As well, the system will allow for the recovery of deposited Carbon Dioxide. The UNT X-HAB 2021 team will create a model radiator and test its performance with simulated heat sources and sinks and extrapolate those data points to analyze for real world conditions.

Travis Seaver↗

Constellation X-Ray Mission and Support

This report is a supplement to the Third Annual Report summarizing work performed by the Smithsonian Astrophysical Observatory (SAO) for NASA Goddard Space Flight Center (GSFC) under Cooperative Agreement NCC5-3681. The Agreement is entitled 'Constellation X-ray Mission Study and Support.' This supplementary report covers the period from October 1, 2001 through January 10, 2002. The report has been prepared and submitted to ensure that the Constellation-X Project Office at GSFC has current performance information needed to evaluate a proposed modified budget for FY02. That proposed budget is being submitted separately. SAO continues to perform work under the overall direction of Dr. Harvey Tananbaum, the SAO Principal Investigator for the program. Mr. Robert Rasche is the SAO Program Manager and is responsible for day-to-day program management at SAO and coordination with GSFC. The report summarizes the main areas of SAO activity. Most of the work has been done jointly with personnel from GSFC and Marshall Space Flight Center (MSFC). We describe SAO participation in these efforts. Under the Agreement, SAO performed work in seven major areas of activity. These areas related to: (1) Constellation X-ray Mission Facility Definition Team and Study Management; (2) Science Support; (3) Spectroscopy X-ray Telescope (SXT); (4) Systems Engineering; (5) Travel in Support of the Work Effort; and (6) In-house Management and Coordination.

Tananbaum, H.↗

Constellation X-Ray Mission and Support

This is the Third Annual Report of work performed by the Smithsonian Astrophysical Observatory (SAO) for NASA Goddard Space Flight Center (GSFC) under Cooperative Agreement NCC5-3681. The Agreement is entitled 'Constellation X-ray Mission Study and Support.' Work performed through January 31, 2001 was reported in a supplement to the Second Annual Report. That supplemental report was submitted in order to obtain funding subsequent to March 2001 which has, as the result of prior funding actions, become the de facto beginning of the funding year under the Agreement. This report covers the balance of the third year of the Agreement from February 1, 2001 through September 30, 2001. The Agreement as currently configured runs for two more years. When funding is significantly different from the originally approved amounts, SAO submits a revised budget. One such revision was submitted last year and was the basis for funding a portion of the work reported here. This report summarizes the main areas of SAO activity. Most of the work has been performed jointly with personnel from GSFC and Marshall Space Flight Center (MSFC). Consequently, we do not claim that such activities were carried out exclusively by SAO. Rather, we describe SAO participation in these efforts. Under the Agreement, SAO performed work in seven major areas of activity. These areas related to: (1) Constellation X-ray Mission Facility Definition Team and Study Management; (2) Science Support; (3) Spectroscopy X-ray Telescope (SXT); (4) Systems Engineering; (5) Travel; and (6) In-house Management and Coordination.

Tananbaum, H.↗

Constellation X-Ray Mission and Support

This Fifth Annual Report summarizes work performed by the Smithsonian Astrophysical Observatory (SAO) for NASA Goddard Space Flight Center (GSFC) under Cooperative Agreement NCC5-368. The Agreement is entitled 'Constellation X-ray Mission Study and Support.' This report covers the period from October 1, 2002 through September 30,2003. The report summarizes the main areas of SAO activity. Most of the work has been done jointly with personnel from GSFC and Marshall Space Flight Center (MSFC). We describe SAO participation in these efforts. In spite of the work being mainly a level of effort, a significant amount of work was accomplished. Under the Agreement, SAO performed work in eight major areas of activity. These areas related to: 1) Constellation X-ray Mission Facility Definition Team and Study Management; 2) Science Support; 3) Spectroscopy X-ray Telescope (SXT); 4) Systems Engineering; 5) Travel in Support of the Work Effort; 6) In-house Management and Coordination; 7) Technical Readiness and Implementation Plan (TRIP) Report and Follow-up; 8) Industry Liaison and Study Preparation.

Grady, Jean↗

Design, Construction, and Testing of Lightweight X-ray Mirror Modules

Lightweight and high resolution optics are needed for future space-based X-ray telescopes to achieve advances in high-energy astrophysics. The Next Generation X-ray Optics (NGXO) team at NASA GSFC is nearing mission readiness for a 10 arc-second Half Power Diameter (HPD) slumped glass mirror technology while laying the groundwork for a future 1-2 arc-second technology based on polished silicon mirrors. Technology Development Modules (TDMs) have been designed, fabricated, integrated with mirrors segments, and extensively tested to demonstrate technology readiness. Tests include X-ray performance, thermal vacuum, acoustic load, and random vibration. The thermal vacuum and acoustic load environments have proven relatively benign, while the random vibration environment has proven challenging due to large input amplification at frequencies above 500 Hz. Epoxy selection, surface preparation, and larger bond area have increased bond strength while vibration isolation has decreased vibration amplification allowing for space launch requirements to be met in the near term. The next generation of TDMs, which demonstrates a lightweight structure supporting more mirror segments, is currently being fabricated. Analysis predicts superior performance characteristics due to the use of E-60 Beryllium-Oxide Metal Matrix Composite material, with only a modest cost increase. These TDMs will be larger, lighter, stiffer, and stronger than the current generation. Preliminary steps are being taken to enable mounting and testing of 1-2 arc-second mirror segments expected to be available in the future. A Vertical X-ray Test Facility (VXTF) will minimize module gravity distortion and allow for less constrained mirror mounts, such as fully kinematic mounts. Permanent kinematic mounting into a modified TDM has been demonstrated to achieve 2 arc-second level distortion free alignment.

contruction↗

Risk Reduction on X-33/RLV Engines

Risk management has received considerable attention in the X-33 and Reusable Launch Vehicle (RLV) program due to aggressive schedules, limited funding. and planned private investment to develop the commercial VentureStar vehicle. As an X-33 and RLV team member and main propulsion supplier, Boeing Rocketdyn Propulsion and Power has addressed risk through a methodical application of systems engineering in identifying, assessing, and mitigating risks. The methods employed involve rigorous risk mitigation planning early in development, continuous risk monitoring and assessment during the course of development, and the systematic verification of compliance with technical requirements prior to delivery. In addition, an engine system reliability analysis was conducted to reduce risk. In July 1996, NASA selected Lockheed Martin's "Skunk Works" (LMSW) as the lead contractor for the X-33 and RLV program. The X-33 vehicle is a half-scale pathfinder for the full-scale RLV. The LMSW RLV design is a lifting body shaped vehicle employing linear aerospike engine provided propulsion. The initial X-33 flight is planned for the summer of 2000, and the initial VentureStar flight is planned for between 2005 and 2007.

Crowley, Tim↗

The Solar-B Mission

The Solar-B mission is a joint enterprise between Japan, the United States of America and the United Kingdom. The collaboration is led by ISAS, the Japanese Institute for Space and Astronautical Science (ISAS), NASA and PPARC (Particle Physics and Astrophysics Research Council) play supporting roles in the development of the scientific objectives and provision of the scientific instruments. The mission's primary objective is to conduct a systems study of the solar atmosphere through the acquisition of coordinated measurements of the photosphere, the transition region/low corona and the upper corona using three instruments: an optical telescope, an extreme ultraviolet imaging spectrometer and a soft x-ray telescope. Drs. Saku Tsuneta (NAOJ) and Alan Title (LMSAL) lead the optical imaging team. The optical telescope is a 50-cm aperture, diffraction limited, Gregorian. The focal plane package will record high resolution images, Dopplergrams, and vector magnetic fields on spatial scales dominated by elemental photospheric flux tubes, and over a field of view large enough to contain small active regions. Drs. Tetsuya Watanabe, Len Culhane (MSSL) and George Doschek (NRL) led the EUV imaging and spectroscopy team. The EUV telescope has a 15-cm primary mirror feeding a toroidal grating. The optics have multiplayer coatings which select two wavebands between 180-204 A and 250-290 A. Drs. Kiyoto Shibasaki (NAOJ) and Leon Golub (SAO) lead the X-ray imaging team. The x-ray telescope will provide full disk, soft x-ray images with twice the spatial resolution of the Yohkoh SXT and enhanced sensitivity to longer (>40 A) wavelengths. The launch of Solar-B, into a sun-synchronous orbit, is scheduled for August 2004. Solar-B is the second mission in the Sun-Earth Connection, Solar-Terrestrial Probe Program which is managed by the Goddard Space Flight Center. The Science Directorate of the Marshall Space Flight Center manages the Solar-B Project for the ST Probe Project Office. This paper discusses the objectives, specifications, and design of the scientific instruments as presented at the Preliminary Design Review held at MSFC in May 2000.

Davis, John M.↗

Catholic University Co-Operative Agreement

R. Starr is the leader of the science team for the X-Ray Spectrometer (XRS) which will fly on-board the SSTI Clark satellite. This XRS will fly small room-temperature, solid-state detectors that have never been flown in space before. In addition to testing this new technology, this instrument is designed to detect X-rays from solar flares and gamma-ray bursts in the energy region from about 1 keV to 100 keV. The XRS has been through environmental testing and has been integrated to the spacecraft. The Clark spacecraft is scheduled to be launched in August 1998 and the XRS will collect data in orbit continuously for the next three years.

Werntz, Carl↗

The X-33 Flight Test Challenge

Low cost access to space has eluded present launch system technologies. Our objective is to reduce the cost of putting a payload into space from $10,000 per pound to $1000 per pound. In July 1996, a cooperative agreement was initiated between the Lockheed Martin Skunk Works and NASA to help accomplish this goal. The X-33 is the first step in the process to make low cost space access a reality. The X-33 is a suborbital, hypersonic lifting body, proof of concept of a reusable launch vehicle. The X-33 flight test program will validate technologies such as a metallic thermal protection system, Linear Aerospike Engines, use of tanks and struts as fundamental structural elements, as well as quick turnaround time. Flight testing will begin in July 2000, with launches originating from Edwards Air Force Base and initial landings at Michael Army Airfield in Utah. Data collected from these flight tests will aid in the decision to build an economically viable single stage to orbit reusable launch vehicle. This paper will explore the technical challenges facing the X-33 Flight Test Team.

Borden, David↗

New Energetic Radio Pulsars: An Archival X-Ray Survey

This ADP grant was to analyze archival X-ray data obtained in the direction of radio pulsars that were recently discovered as part of the Parkes Multibeam Pulsar Search, which was done using the 64-m Parkes radio telescope in Australia. The survey discovered nearly 700 pulsars, of which roughly three dozen were possible candidates for the detection of X-ray emission. Our team looked at 30 of the most interesting candidates. In most cases, there was insufficient data in the archive to conclude anything. However in several cases, there were interesting archival observations. In three cases, a detailed analysis proved scientifically interesting, and two publications have resulted.

Source record↗

The Generation-X X-ray Observatory Vision Mission and Technology Study

The new frontier in astrophysics is the study of the birth and evolution of the first stars, galaxies and black holes in the early Universe. X-ray astronomy opens a window into these objects by studying the emission from black holes, supernova explosions and the gamma-ray burst afterglows of massive stars. However, such objects are beyond the grasp of current or near-future observatories. X-ray imaging and spectroscopy of such distant objects will require an X-ray telescope with large collecting area and high angular resolution. Our team has conceived the Generation-X Vision Mission based on an X-ray observatory with 100 sq m collecting area at 1 keV (1000 times larger than Chandra) and 0.1 arcsecond angular resolution (several times better than Chandra and 50 times better than the Constellation-X resolution goal). Such an observatory would be capable of detecting the earliest black holes and galaxies in the Universe, and will also study extremes of density, gravity, magnetic fields, and kinetic energy which cannot be created in laboratories. NASA has selected the Generation-X mission for study under its Vision Mission Program. We describe the studies being performed to develop the mission concept and define candidate technologies and performance requirements for Generation-X. The baseline Generation-X mission involves four 8m diameter X-ray telescopes operating at Sun-Earth L2. We trade against an alternate concept of a single 26m diameter telescope with focal plane instruments on a separate spacecraft. A telescope of this size will require either robotic or human-assisted in-flight assembly. The required effective area implies that extremely lightweight grazing incidence X-ray optics must be developed. To achieve the required aerial density of at least 100 times lower than in Chandra, we will study 0.1mm thick mirrors which have active on-orbit figure control. We discuss the suite of required detectors, including a large FOV high angular resolution imager, a cryogenic imaging spectrometer and a grating spectrometer. We outline the development roadmap to confront the many technological challenges far implementing the Generation-X mission.

Figueroa-Feliciano, Enectali↗

Thermographic Testing Using on the X-33 Space Launch Vehicle Program by BFGoodrich Aerospace

The X-33 program is a team effort sponsored by NASA, under Cooperative Agreement NCC8-115, and led by the Lockheed Martin Corporation. Team member BFGoodrich Aerospace Aerostructures Group (formerly Rohr) is responsible for design, manufacture, and integration of the Thermal Protection System (TPS) of the X-33 launch vehicle. The X-33 is a half-scale, experimental prototype of a vehicle called RLV (Reusable Launch Vehicle) or VentureStar(Trademark), an SSTO (single stage to orbit) vehicle, which is a proposed successor to the aging Space Shuttle. Thermographic testing has been employed by BFGoodrich Aerospace Aerostructures Group for a wide variety of uses in the testing of components of the X-33. Thermographic NDT (TNDT) has been used for inspecting large graphite-epoxy/aluminum honeycomb sandwich panels used on the Leeward Aeroshell structure of the X-33. And TNDT is being evaluated for use in inspecting carbon-carbon composite parts such as the nosecap and wing leading edge components. Pulsed Infrared Testing (PIRT), a special form of TNDT, is used for the routine inspection of sandwich panels made of brazed inconel honeycomb and facesheets. In the developmental and qualification testing of sub-elements of the X-33, thermography has been used to monitor 1) Arc Jet tests at NASA Ames Research Center in Mountainview, CA and NASA Johnson Space Center in Houston, TX, 2) High Temperature (wind) Tunnel Tests (HTT) at NASA Langley Research Center in Langley, VA, and 3) Hot Gas Tests at NASA Marshall Space Flight Center in Huntsville, AL.

Burleigh, Douglas↗

The first year of teaming - A progress report

The National AeroSpace Plane (NASP) national contractor team began formal operations on January 31, 1991, and made considerable progress toward demonstrating the feasibility of the X-30 and the technology readiness to enter a full-scale development program. Two cycles of conceptual design are complete, preliminary design is initiated, and many of the major configuration and structural arrangement decisions are complete. Results of work in supporting technology areas for a variety of the propulsion system technologies are mentioned, including the low-speed oxidizer system, the production of slush hydrogen, and the use of external burning. Results of tests currently being performed on structural demonstration articles are satisfactory. Each of these demonstration articles is representative of structures and materials to be incorporated into the team's X-30 design. An operating team is outlined that encompasses not only the five principal contractors and their subcontractors, but also government and university laboratories through an innovative arrangement that brings this work into the mainstream of the program.

Waldman, Barry J.↗

Lockheed Martin Skunk Works Single Stage to Orbit/Reusable Launch Vehicle

Lockheed Martin Skunk Works has compiled an Annual Performance Report of the X-33/RLV Program. This report consists of individual reports from all industry team members, as well as NASA team centers. This portion of the report is comprised of a status report of Lockheed Martin's contribution to the program. The following is a summary of the Lockheed Martin Centers involved and work reviewed under their portion of the agreement: (1) Lockheed Martin Skunk Works - Vehicle Development, Operations Development, X-33 and RLV Systems Engineering, Manufacturing, Ground Operations, Reliability, Maintainability/Testability, Supportability, & Special Analysis Team, and X-33 Flight Assurance; (2) Lockheed Martin Technical Operations - Launch Support Systems, Ground Support Equipment, Flight Test Operations, and RLV Operations Development Support; (3) Lockheed Martin Space Operations - TAEM and A/L Guidance and Flight Control Design, Evaluation of Vehicle Configuration, TAEM and A/L Dispersion Analysis, Modeling and Simulations, Frequency Domain Analysis, Verification and Validation Activities, and Ancillary Support; (4) Lockheed Martin Astronautics-Denver - Systems Engineering, X-33 Development; (5) Sanders - A Lockheed Martin Company - Vehicle Health Management Subsystem Progress, GSS Progress; and (6) Lockheed Martin Michoud Space Systems - X-33 Liquid Oxygen (LOX) Tank, Key Challenges, Lessons Learned, X-33/RLV Composite Technology, Reusable Cyrogenic Insulation (RCI) and Vehicle Health Monitoring, Main Propulsion Systems (MPS), Structural Testing, X-33 System Integration and Analysis, and Cyrogenic Systems Operations.

Source record↗