Search NASASearch

SEARCH · Search NASA

Results for “Timeline”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

SolarAPP+ Performance Review (2024 Data)

The Solar Automated Permit Processing Plus (SolarAPP+) platform is an online portal to facilitate and expedite rooftop solar photovoltaic (PV) and battery storage permitting processes. SolarAPP+ allows PV contractors to upload system specifications, have that information automatically reviewed for code compliance, and receive instant approval for code-compliant systems, reducing authority having jurisdiction (AHJ) staff time needed for review. SolarAPP+ also provides inspection checklists to verify installation practices and adherence to approved designs. This report is part of an ongoing series of reviews of SolarAPP+ performance. Consistent with previous performance reviews, we summarize SolarAPP+ adoption trends to date and compare various metrics for PV systems permitted through SolarAPP+ versus systems permitted through traditional AHJ permitting processes. As of the end of 2024, 799 AHJs had expressed interest in the platform, with 264 fully adopting (215) or piloting (49) the platform. In 2024, 861 installers submitted 37,393 permits through the SolarAPP+ platform, including 27,375 permits for PV+storage systems. SolarAPP+ permits accounted for around 43% of all permits issued in all participating AHJs, and more than 60% of all permits in several participating AHJs. We compare permitting timelines through SolarAPP+ to traditional AHJ permitting processes to assess the platform's performance. Consistent with previous SolarAPP+ performance reviews, we find that permitting timelines are significantly shorter for SolarAPP+ projects. Based on median timelines, a typical SolarAPP+ project is permitted and inspected 12 business days sooner than traditional projects. We estimate that automatic SolarAPP+ permitting saved around 18,400 hours of AHJ staff time in 2024. Finally, we estimate that SolarAPP+ eliminated over 100,000 business days in permitting-related delays in 2024.

14 SOLAR ENERGY

Asset - An application in mission automation for science planning

Recent advances in computer technology were used to great advantage in planning science observation sequences for the Voyager 2 encounter with Uranus in 1986. Despite a loss of experienced personnel, a challenging schedule, workforce limitations, and the complex nature of the Uranus encounter itself, the resultant science observation timelines were the most highly optimized of the five Voyager encounters with the outer planets. In part, this was due to the development of a microcomputer-based system, called ASSET (Automated Science Sequence Encounter Timelines generator), which was used to design those science observation timelines. This paper details the development of that system. ASSET demonstrates several features essential to the design of the first expert systems for science planning which will be applied for future missions.

Finnerty, D. F.

A general software reliability process simulation technique

The structure and rationale of the generalized software reliability process, together with the design and implementation of a computer program that simulates this process are described. Given assumed parameters of a particular project, the users of this program are able to generate simulated status timelines of work products, numbers of injected anomalies, and the progress of testing, fault isolation, repair, validation, and retest. Such timelines are useful in comparison with actual timeline data, for validating the project input parameters, and for providing data for researchers in reliability prediction modeling.

Tausworthe, Robert C.

NASA/Mir Phase 1: A Lesson Learned in Long Duration Mission Planning and Operations

The NASA/Mir Phase I Program is a precursor to the assembly and operations of the International Space Station (ISS). The Phase I Program covers a four-year period and encompasses over ten shuttle flights to the Mir, culminating with the flight of STS-91 in June 1998. The Mir-Orbiting Station (Mir-OS) provides an excellent environment, both onboard and on the ground, for learning and studying the characteristics associated with crew-tended operations on long duration missions. By the end of the Phase I program, NASA astronauts will have accumulated over two years of continuous operations experience working and living onboard the Mir-OS. Ground controllers, working in Russia and at remote sites in the United States, will have gained valuable experience in the generation, maintenance, and coordination of the information and products required to support the long duration crew members onboard the Mir-OS. The experience gained by the crew and ground support personnel in the area of long duration mission operations has resulted in a number of factors that need to be considered in the definition and implementation of the processes and products for the ISS. While there are many areas in which experience has been gained, this paper focuses on the lessons learned regarding the level of detail and flexibility of crew timelines. Provided in this paper is an overview of the characteristics associated with long duration mission timeline development and execution, a summary of applicable lessons learned identified and documented through participation in the NASA/Mir Phase I Program, a detailed discussion of "Gross Timelines" as implementation which addresses the lessons learned. Also discussed are the challenges that must be overcome in getting the ISS program to recognize, evaluate, and learn from the crew and ground controller experience gained through participation in the NASA/Mir Phase I Program.

Hagopian, Jeff

Putting ROSE to Work: A Proposed Application of a Request-Oriented Scheduling Engine for Space Station Operations

Scheduling engines are found at the core of software systems that plan and schedule activities and resources. A Request-Oriented Scheduling Engine (ROSE) is one that processes a single request (adding a task to a timeline) and then waits for another request. For the International Space Station, a robust ROSE-based system would support multiple, simultaneous users, each formulating requests (defining scheduling requirements), submitting these requests via the internet to a single scheduling engine operating on a single timeline, and immediately viewing the resulting timeline. ROSE is significantly different from the engine currently used to schedule Space Station operations. The current engine supports essentially one person at a time, with a pre-defined set of requirements from many payloads, working in either a "batch" scheduling mode or an interactive/manual scheduling mode. A planning and scheduling process that takes advantage of the features of ROSE could produce greater customer satisfaction at reduced cost and reduced flow time. This paper describes a possible ROSE-based scheduling process and identifies the additional software component required to support it. Resulting changes to the management and control of the process are also discussed.

Jaap, John

An Enabling Technology for New Planning and Scheduling Paradigms

The Night Projects Directorate at NASA's Marshall Space Flight Center is developing a new planning and scheduling environment and a new scheduling algorithm to enable a paradigm shift in planning and scheduling concepts. Over the past 33 years Marshall has developed and evolved a paradigm for generating payload timelines for Skylab, Spacelab, various other Shuttle payloads, and the International Space Station. The current paradigm starts by collecting the requirements, called ?ask models," from the scientists and technologists for the tasks that are to be scheduled. Because of shortcomings in the current modeling schema, some requirements are entered as notes. Next, a cadre with knowledge of vehicle and hardware modifies these models to encompass and be compatible with the hardware model; again, notes are added when the modeling schema does not provide a better way to represent the requirements. Finally, the models are modified to be compatible with the scheduling engine. Then the models are submitted to the scheduling engine for automatic scheduling or, when requirements are expressed in notes, the timeline is built manually. A future paradigm would provide a scheduling engine that accepts separate science models and hardware models. The modeling schema would have the capability to represent all the requirements without resorting to notes. Furthermore, the scheduling engine would not require that the models be modified to account for the capabilities (limitations) of the scheduling engine. The enabling technology under development at Marshall has three major components: (1) A new modeling schema allows expressing all the requirements of the tasks without resorting to notes or awkward contrivances. The chosen modeling schema is both maximally expressive and easy to use. It utilizes graphical methods to show hierarchies of task constraints and networks of temporal relationships. (2) A new scheduling algorithm automatically schedules the models without the intervention of a scheduling expert. The algorithm is tuned for the constraint hierarchies and the complex temporal relationships provided by the modeling schema. It has an extensive search algorithm that can exploit timing flexibilities and constraint and relationship options. (3) An innovative architecture allows multiple remote users to simultaneously model science and technology requirements and other users to model vehicle and hardware characteristics. The architecture allows the remote users to submit scheduling requests directly to the scheduling engine and immediately see the results. These three components are integrated so that science and technology experts with no knowledge of the vehicle or hardware subsystems and no knowledge of the internal workings of the scheduling engine have the ability to build and submit scheduling requests and see the results. The immediate feedback will hone the users' modeling skills and ultimately enable them to produce the desired timeline. This paper summarizes the three components of the enabling technology and describes how this technology would make a new paradigm possible.

Jaap, John

Enabling a New Planning and Scheduling Paradigm

The Flight Projects Directorate at NASA's Marshall Space Flight Center is developing a new planning and scheduling environment and a new scheduling algorithm to enable a paradigm shift in planning and scheduling concepts. Over the past 33 years Marshall has developed and evolved a paradigm for generating payload timelines for Skylab, Spacelab, various other Shuttle payloads, and the International Space Station. The current paradigm starts by collecting the requirements, called "tasks models," from the scientists and technologists for the tasks that they want to be done. Because of shortcomings in the current modeling schema, some requirements are entered as notes. Next a cadre with knowledge of vehicle and hardware modifies these models to encompass and be compatible with the hardware model; again, notes are added when the modeling schema does not provide a better way to represent the requirements. Finally, another cadre further modifies the models to be compatible with the scheduling engine. This last cadre also submits the models to the scheduling engine or builds the timeline manually to accommodate requirements that are expressed in notes. A future paradigm would provide a scheduling engine that accepts separate science models and hardware models. The modeling schema would have the capability to represent all the requirements without resorting to notes. Furthermore, the scheduling engine would not require that the models be modified to account for the capabilities (limitations) of the scheduling engine. The enabling technology under development at Marshall has three major components. (1) A new modeling schema allows expressing all the requirements of the tasks without resorting to notes or awkward contrivances. The chosen modeling schema is both maximally expressive and easy to use. It utilizes graphics methods to show hierarchies of task constraints and networks of temporal relationships. (2) A new scheduling algorithm automatically schedules the models without the intervention of a scheduling expert. The algorithm is tuned for the constraint hierarchies and the complex temporal relationships provided by the modeling schema. It has an extensive search algorithm which can exploit timing flexibilities and constraint and relationship options. (3) A web-based architecture allows multiple remote users to simultaneously model science and technology requirements and other users to model vehicle and hardware characteristics. The architecture allows the users to submit scheduling requests directly to the scheduling engine and immediately see the results. These three components are integrated so that science and technology experts with no knowledge of the vehicle or hardware subsystems and no knowledge of the internal workings of the scheduling engine have the ability to build and submit scheduling requests and see the results. The immediate feedback will hone the users' modeling skills and ultimately enable them to produce the desired timeline. This paper summarizes the three components of the enabling technology and describes how this technology would make a new paradigm possible.

Jaap, John

Integrated Vehicle Ground Vibration Testing of Manned Spacecraft: Historical Precedent

For the first time in nearly 30 years, NASA is developing a new manned space flight launch system. The Ares I will carry crew and cargo to not only the International Space Station, but onward for the future exploration of the Moon and Mars. The Ares I control system and structural designs use complex computer models for their development. An Integrated Vehicle Ground Vibration Test (IVGVT) will validate the efficacy of these computer models. The IVGVT will reduce the technical risk of unexpected conditions that could place the vehicle or crew in jeopardy. The Ares Project Office's Flight and Integrated Test Office commissioned a study to determine how historical programs, such as Saturn and Space Shuttle, validated the structural dynamics of an integrated flight vehicle. The study methodology was to examine the historical record and seek out members of the engineering community who recall the development of historic manned launch vehicles. These records and interviews provided insight into the best practices and lessons learned from these historic development programs. The information that was gathered allowed the creation of timelines of the historic development programs. The timelines trace the programs from the development of test articles through test preparation, test operations, and test data reduction efforts. These timelines also demonstrate how the historical tests fit within their overall vehicle development programs. Finally, the study was able to quantify approximate staffing levels during historic development programs. Using this study, the Flight and Integrated Test Office was able to evaluate the Ares I Integrated Vehicle Ground Vibration Test schedule and workforce budgets in light of the historical precedents to determine if the test had schedule or cost risks associated with it.

Lemke, Paul R.

Full Mission Astronaut Radiation Exposure Assessments for Long Duration Lunar Surface Missions

Risk to astronauts due to ionizing radiation exposure is a primary concern for missions beyond Low Earth Orbit (LEO) and will drive mission architecture requirements, mission timelines, and operational practices. Both galactic cosmic ray (GCR) and solar particle event (SPE) environments pose a risk to astronauts for missions beyond LEO. The GCR environment, which is made up of protons and heavier ions covering a broad energy spectrum, is ever present but varies in intensity with the solar cycle, while SPEs are sporadic events, consisting primarily of protons moving outward through the solar system from the sun. The GCR environment is more penetrating and is more difficult to shield than SPE environments, but lacks the intensity to induce acute effects. Large SPEs are rare, but they could result in a lethal dose, if adequate shielding is not provided. For short missions, radiation risk is dominated by the possibility of a large SPE. Longer missions also require planning for large SPEs; adequate shielding must be provided and operational constraints must allow astronauts to move quickly to shielded locations. The dominant risk for longer missions, however, is GCR exposure, which accumulates over time and can lead to late effects such as cancer. SPE exposure, even low level SPE exposure received in heavily shielded locations, will increase this risk. In addition to GCR and SPE environments, the lunar neutron albedo resulting mainly from the interaction of GCRs with regolith will also contribute to astronaut risk. Full mission exposure assessments were performed for proposed long duration lunar surface mission scenarios. In order to accomplish these assessments, radiation shielding models were developed for a proposed lunar habitat and rover. End-to-End mission exposure assessments were performed by first calculating exposure rates for locations in the habitat, rover, and during extra-vehicular activities (EVA). Subsequently, total mission exposures were evaluated for proposed timelines. A number of computational tools and mathematical models, which have been incorporated into NASA's On-Line Tool for the Assessment of Radiation In Space (OLTARIS), were used for this study. These tools include GCR and SPE environment models, human body models, and the HZETRN space radiation transport code, which is used to calculate the transport of the charged particles and neutrons through shielding materials and human tissue. Mission exposure results, assessed in terms of effective dose, are presented for proposed timelines and recommendations are made for improved astronaut shielding and safer operational practice.

Adamczyk, Anne M.

Full Mission Astronaut Radiation Exposure Assessments for Long Duration Lunar Surface Missions

Risk to astronauts due to ionizing radiation exposure is a primary concern for missions beyond Low Earth Orbit (LEO) and will drive mission architecture requirements, mission timelines, and operational practices. For short missions, radiation risk is dominated by the possibility of a large Solar Particle Event (SPE). Longer duration missions have both SPE and Galactic Cosmic Ray (GCR) risks. SPE exposure can contribute significantly toward cancer induction in combination with GCR. As mission duration increases, mitigation strategies must address the combined risks from SPE and GCR exposure. In this paper, full mission exposure assessments were performed for the proposed long duration lunar surface mission scenarios. In order to accomplish these assessments, previously developed radiation shielding models for a proposed lunar habitat and rover were utilized. End-to-End mission exposure assessments were performed by first calculating exposure rates for locations in the habitat, rover, and during Extra-Vehicular Activities (EVA). Subsequently, total mission exposures were evaluated for the proposed timelines. Mission exposure results, assessed in terms of effective dose, are presented for the proposed timelines and recommendations are made for improved astronaut shielding and safer operational practices.

Adamczyk, Anne

Gas Chromatograph Method Optimization Trade Study for RESOLVE: 20-meter Column v. 8-meter Column

RESOLVE is the payload on a Class D mission, Resource Prospector, which will prospect for water and other volatile resources at a lunar pole. The RESOLVE payload's primary scientific purpose includes determining the presence of water on the moon in the lunar regolith. In order to detect the water, a gas chromatograph (GC) will be used in conjunction with a mass spectrometer (MS). The goal of the experiment was to compare two GC column lengths and recommend which would be best for RESOLVE's purposes. Throughout the experiment, an Inficon Fusion GC and an Inficon Micro GC 3000 were used. The Fusion had a 20m long column with 0.25mm internal diameter (Id). The Micro GC 3000 had an 8m long column with a 0.32mm Id. By varying the column temperature and column pressure while holding all other parameters constant, the ideal conditions for testing with each column length in their individual instrument configurations were determined. The criteria used for determining the optimal method parameters included (in no particular order) (1) quickest run time, (2) peak sharpness, and (3) peak separation. After testing numerous combinations of temperature and pressure, the parameters for each column length that resulted in the most optimal data given my three criteria were selected. The ideal temperature and pressure for the 20m column were 95 C and 50psig. At this temperature and pressure, the peaks were separated and the retention times were shorter compared to other combinations. The Inficon Micro GC 3000 operated better at lower temperature mainly due to the shorter 8m column. The optimal column temperature and pressure were 70 C and 30psig. The Inficon Micro GC 3000 8m column had worse separation than the Inficon Fusion 20m column, but was able to separate water within a shorter run time. Therefore, the most significant tradeoff between the two column lengths was peak separation of the sample versus run time. After performing several tests, it was concluded that better detection via good peak separation with a longer run time is a better asset than moderate peak separation with a shorter run time. Even given that RESOLVE is highly interested in water and that mission timeline is of significant importance given the short seven-to-ten-day mission timeline, worse detection with an 8m column may lead to overlooking other substances existing on the moon that could advance planetary science. Thus, I recommend the 20m column. However, if mission timeline and water separation are deemed the highest priority, the 8m column should be selected due to its ability to separate water within a shorter run time than the 20m column.

Column

Integrated Medical Model (IMM) 4.0 Enhanced Functionalities

The Integrated Medical Model is a probabilistic simulation model that uses input data on 100 medical conditions to simulate expected medical events, the resources required to treat, and the resulting impact to the mission for specific crew and mission characteristics. The newest development version of IMM, IMM v4.0, adds capabilities that remove some of the conservative assumptions that underlie the current operational version, IMM v3. While IMM v3 provides the framework to simulate whether a medical event occurred, IMMv4 also simulates when the event occurred during a mission timeline. This allows for more accurate estimation of mission time lost and resource utilization. In addition to the mission timeline, IMMv4.0 features two enhancements that address IMM v3 assumptions regarding medical event treatment. Medical events in IMMv3 are assigned the untreated outcome if any resource required to treat the event was unavailable. IMMv4 allows for partially treated outcomes that are proportional to the amount of required resources available, thus removing the dichotomous treatment assumption. An additional capability IMMv4 is to use an alternative medical resource when the primary resource assigned to the condition is depleted, more accurately reflecting the real-world system. The additional capabilities defining IMM v4.0the mission timeline, partial treatment, and alternate drug result in more realistic predicted mission outcomes. The primary model outcomes of IMM v4.0 for the ISS6 mission, including mission time lost, probability of evacuation, and probability of loss of crew life, are be compared to those produced by the current operational version of IMM to showcase enhanced prediction capabilities.

Spae Adaptation Syndrome

Intra-EVA Space-to-Ground Interactions when Conducting Scientific Fieldwork Under Simulated Mars Mission Constraints

The Biologic Analog Science Associated with Lava Terrains (BASALT) project is a four-year program dedicated to iteratively designing, implementing, and evaluating concepts of operations (ConOps) and supporting capabilities to enable and enhance scientific exploration for future human Mars missions. The BASALT project has incorporated three field deployments during which real (non-simulated) biological and geochemical field science have been conducted at two high-fidelity Mars analog locations under simulated Mars mission conditions, including communication delays and data transmission limitations. BASALT's primary Science objective has been to extract basaltic samples for the purpose of investigating how microbial communities and habitability correlate with the physical and geochemical characteristics of chemically altered basalt environments. Field sites include the active East Rift Zone on the Big Island of Hawai'i, reminiscent of early Mars when basaltic volcanism and interaction with water were widespread, and the dormant eastern Snake River Plain in Idaho, similar to present-day Mars where basaltic volcanism is rare and most evidence for volcano-driven hydrothermal activity is relict. BASALT's primary Science Operations objective has been to investigate exploration ConOps and capabilities that facilitate scientific return during human-robotic exploration under Mars mission constraints. Each field deployment has consisted of ten extravehicular activities (EVAs) on the volcanic flows in which crews of two extravehicular and two intravehicular crewmembers conducted the field science while communicating across time delay and under bandwidth constraints with an Earth-based Mission Support Center (MSC) comprised of expert scientists and operators. Communication latencies of 5 and 15 min one-way light time and low (0.512 Mb/s uplink, 1.54 Mb/s downlink) and high (5.0 Mb/s uplink, 10.0 Mb/s downlink) bandwidth conditions were evaluated. EVA crewmembers communicated with the MSC via voice and text messaging. They also provided scientific instrument data, still imagery, video streams from chest-mounted cameras, GPS location tracking information. The MSC monitored and reviewed incoming data from the field across delay and provided recommendations for pre-sampling and sampling tasks based on their collective expertise. The scientists used dynamic priority ranking lists, referred to as dynamic leaderboards, to track and rank candidate samples relative to one another and against the science objectives for the current EVA and the overall mission. Updates to the dynamic leaderboards throughout the EVA were relayed regularly to the IV crewmembers. The use of these leaderboards enabled the crew to track the dynamic nature of the MSC recommendations and helped minimize crew idle time (defined as time spent waiting for input from Earth during which no other productive tasks are being performed). EVA timelines were strategically designed to enable continuous (delayed) feedback from an Earth-based Science Team while simultaneously minimizing crew idle time. Such timelines are operationally advantageous, reducing transport costs by eliminating the need for crews to return to the same locations on multiple EVAs while still providing opportunities for recommendations from science experts on Earth, and scientifically advantageous by minimizing the potential for cross-contamination across sites. This paper will highlight the space-to-ground interaction results from the three BASALT field deployments, including planned versus actual EVA timeline data, ground assimilation times (defined as the amount of time available to the MSC to provide input to the crew), and idle time. Furthermore, we describe how these results vary under the different communication latency and bandwidth conditions. Together, these data will provide a basis for guiding and prioritizing capability development for future human exploration missions.

Beaton, Kara H.

LMI Automated Air Cargo Operations Market Research and Forecast

Air cargo companies and aircraft manufacturers are making significant investments to enable the movement of cargo via various levels of automated aircraft, such as aircraft with simplified operations requiring a pilot, remotely monitored or piloted aircraft, and fully autonomous aircraft. These investments will enable greater utilization of aircraft while unlocking new air markets traditionally served by ground transportation only. Many cargo companies and aerospace experts envision an operating environment where a single pilot can remotely pilot numerous aircraft for significant increases in aircraft utilization. The future operating environment is also expected to include air cargo companies flying smaller aircraft from airports and distribution centers outside of major U.S. cities directly to city centers, avoiding congested roads and increasing the velocity of cargo shipments, particularly those that are high-value, time-sensitive, and security sensitive (e.g., pharmaceuticals). These are just a few benefits and use cases cargo companies and aerospace experts see with the advancement of automated aircraft. To better understand industry’s direction, NASA asked the LMI team to research the forecasted market, timeline, risks, and opportunities for integrating unmanned air cargo vehicles into the National Airspace System (NAS) for the development and prioritization of the NASA Air Traffic Management Exploration’s research portfolio. To begin the market assessment, we gathered data via numerous interviews with key stakeholders and subject matter experts and literature reviews. We then incorporated the data into a custom-developed systems dynamics model and visualization dashboard. The systems dynamics model classifies the size of the market (e.g., overall fleet size of automated aircraft) for four distinct use cases over the next 20 years. The model projects the year in which various types of automated aircraft will enter the commercial cargo market based on our team’s collective research on when the aircraft will become viable due to manufacturing and certification timelines and the lifespan of current, traditional aircraft in service, to name a few factors. While this report defines our team’s estimated timeline of entry and growth, the model is dynamic—it enables NASA users to change variables based on future-year events. If the necessary technology does not mature in accordance with our assumptions, then NASA can change the entry of service point to a future year to evaluate the changes in market size in the out years. This flexibility will be key to deciding when and how NASA should invest in various areas.

air traffic management

The Cooling Loop A Anomaly of 2013: A Case Study in Human-Systems Resilience

Throughout the history of human spaceflight, NASA has employed an operational paradigm of 24/7 dependence on experts in Mission Control Center (MCC). In addition to nominal flight control and mission operations, these 85+ experts per shift manage anomaly detection, diagnosis, and response, and support the crew in real-time in performing maintenance and repair, procedure execution, and other complex mission operations. Future long-duration exploration missions (LDEMs) beyond low-Earth orbit (LEO) will not operate successfully using this same Human-Systems Integration Architecture (HSIA) where crew rely on ground controllers, have ready access to resupply, and have a fallback plan of evacuation. As distance from Earth increases and the communication delay grows, crews will need to respond independently and adequately to time-critical vehicle malfunctions. It will not always be sufficient or even possible to ‘safe the system’ and then wait upon ground intervention. A new and radically different HSIA is needed to accommodate the paradigm shift of deep-space travel. Historical International Space Station (ISS) data show that for a 30-day mission, the likelihood of a high-consequence vehicle anomaly of uncertain origin that requires rapid response is greater than 10%. The likelihood of such an event is 50% by the fourth month of the mission, and it grows exponentially with time. Our team has conducted in-depth investigations into these events and their corresponding anomaly resolution activities. Using MCC and Mission Evaluation Room (MER) anomaly resolution artifacts (including meeting summaries, caution and warning data, and ISS daily summaries), we created timelines detailing ground actions and in-orbit events for two significant anomalies. We then mapped these timelines onto Mars transit conditions, introducing a ground-crew communications time delay and shifting immediate response, time-critical task execution, and vehicle commanding to the crew. In detailing successful anomaly resolution in transit to Mars, the timelines highlight where effective resolution requires drastically evolved onboard capabilities. Though this research has yielded a rich data set based on ground response in past missions, there is still insufficient knowledge to assess the potential impact of inflight anomalies on a small autonomous crew on future LDEMs beyond LEO. To begin building an evidence base that will inform future HSIA standards and requirements, we are developing an approach to systematically capture crew anomaly response and procedure execution during early Artemis missions. Being the first human spaceflight beyond LEO since Apollo, early Artemis missions provide a rare and unique opportunity to serve as a testbed for Mars missions. Our work aims to capitalize on planned data collection to derive crew operational responses to anomalous events in real-time. Our team is also researching the level of simulation fidelity required for empirically validating proposed HSIA standards and evaluating HSIA implementations for LDEMs beyond LEO. This work will produce a trade space study of HSIA simulation objectives and fidelity requirements. Ultimately, these research efforts will assist in developing the standards and technologies needed to build a next-generation HSIA for LDEMs beyond LEO.

human-systems integration architecture

Operational Implications from Field Test Results: Sensorimotor Guidelines for Exploration Missions

Two key sensorimotor objectives of the joint NASA-Russian Field Test (FT) study were (1) to quantify functional performance on long duration crewmembers as close to landing as possible, and (2) to develop a recovery timeline back to preflight baseline. The purpose of this presentation is to provide an overview of the FT results and discuss the operational implications for future exploration missions. The NASA and Russian teams conducted a total of 48 Field Tests, including 18 using a reduced Pilot FT (PFT) protocol. The combined PFT/FT cohort included 14 first-time fliers, 4F, and nine cosmonauts who repeated FT during a second mission. The mission durations were 185 ± 42 days, mean ± std. Nominally, the initial postflight session was performed in the medical test at the Soyuz landing site or at the nearby airport (R+2.2 ± 1.3 hrs, mean ± std), and then repeated multiple times throughout the postflight recovery. The common tasks performed across PFT and full FT protocols included sit-to-stand, recovery from fall (prone to stand) and tandem walk, performed in that order of increasing difficulty. The full FT protocol also included seated tasks (eccentric gaze, dysmetria finger to nose, eye-hand coordination on a tablet, grip force discrimination), a standing posture test with an upper body perturbation, a timed up and go mobility test with obstacles, and a dynamic visual acuity task during vertical oscillations. While there was considerable variability in the postflight outcome measures across crewmembers, the level of vestibular/cerebellar and sensorimotor impairment was greater than previously observed during shorter spaceflight missions. Most striking was the higher incidence of motion sickness even without constraining the standard medical interventions. Motion sensitivity prevented some crewmembers from attempting and/or completing the early testing. The recovery timeline varied with task complexity, generally taking longer when either the basis of support was limited (e.g., tandem walk) or visual cues were deprived (eyes closed). Based on this evidence, mission planners need to expect a range of response across individuals and tasks following G-transitions. Individual health assessments are recommended along with development of pre-worked, prioritized content and timelines, with the ability to change roles depending on crew readiness. Handholds and balance aids are recommended to help stabilize the crewmembers to perform specific tasks (e.g., touch screen selection) or to allow the crewmember the ability to rest with onset of symptoms. Based on anecdotal reports and performance on computerized dynamic posturography, multiple testing on landing day appeared to be beneficial for some participants, while others may have pushed beyond their motion tolerance limit in an effort to complete more FT objectives. Instead of delaying planetary surface operations to allow for recovery, our results suggest that early mobility may be important. Early active self-administered retraining, individualized based on the level of initial impairment and motion sensitivity, will enable a more efficient motor learning and enhance crew performance.

S J Wood

Mars 2020 Entry, Descent, and Landing System Software Implementation

On February 18th, 2021, the Mars 2020 project's Perseverance Rover successfully touched down on the Martian surface after nearly eight years of development. The Mars 2020 Entry, Descent, and Landing (EDL) System largely leveraged heritage from the Mars Science Laboratory (MSL) EDL System while employing targeted technological advancements. The landing process is autonomously directed by a software behavior implemented in the rover's primary flight computer called the EDL Timeline that assumes control of the vehicle six days before atmospheric entry. This paper first walks through the basics of the EDL Timeline mechanics and how the behavior is designed to account for internal system variations and environmental unknowns. It then summarizes the interactions between the EDL timeline and other high-level system behaviors like spacecraft mode transitions and system fault protection, focusing on the complications that arise when passing spacecraft control between executive functions. Although the MSL-inherited EDL System is reliable and capable, targeted updates and a thorough verification and validation program were required for Mars 2020. This paper discusses changes made to close vulnerabilities discovered during both MSL and Mars 2020 development cycles, landing system capability enhancements that were enabling for Mars 2020's mission, and how these updates were integrated with the heritage system. It then describes how both analysis and testing campaigns were utilized to verify and validate all aspects of EDL and system behaviors that run during the six days before landing, as well as the operational workarounds that were needed to address problems found during the development and commissioning process. Finally, this paper imparts lessons learned from Mars 2020 EDL development, implementation, and operations, emphasizing how systems designed to conduct time-critical mission events with low margin of error can be improved in the future.

Stehura, Aaron

A Decision Support System for Extravehicular Operations Under Significant Communication Latency

Humanity hopes to perform extravehicular activities (EVAs) on the surface of Mars; however, several technical and operational challenges must first be overcome. Foremost among these challenges is managing a significant communication latency between Earth and Mars. Current and historical paradigms of EVA operations have required near-real-time communication between the crewmember(s) and Earth-based mission control. Nextgeneration operational paradigms for supporting deep space exploration will necessitate a distributed decision authority system, including delayed Earth-based mission control, the onplanet extravehicular crewmember(s), and intermediate mission support from intravehicular (IV) crewmember(s) within real-time communication range. This latter group is of particular interest: they must provide operations support without the plentiful resources available to mission control on Earth. Thus, NASA is developing the Personalized EVA Informatics and Decision Support (PersEIDS) software platform. PersEIDS is designed to bolster operator situational awareness and offload operator workload by automatically tracking and projecting consumables usage over an EVA timeline, providing real-time probabilistic safety assessments and recommending alternative EVA timeline(s) when the active timeline is not expected to be completed under consumables limits. The PersEIDS concept of operations, use cases, and models will be presented. A limited version of PersEIDS was demonstrated during a three-day-long study where each day a roughly four-hour-long simulated Martian EVA was performed in virtual reality at the NASA Johnson Space Center. The first day was a control trial without PersEIDS support; the second and third days represented different levels of decision support provided by PersEIDS to the IV crewmember acting as mission control. With PersEIDS support, the IV crewmember was able to manage the mission to completion faster and with more remaining consumables; however, additional testing is required to understand confounding factors, e.g., training bias.

Mars