Search NASA⌕ Search

SEARCH · Search NASA

Results for “Titan launch vehicle”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Viking Mars launch set for August 11

The 1975-1976 Viking Mars Mission is described in detail, from launch phase through landing and communications relay phase. The mission's scientific goals are outlined and the various Martian investigations are discussed. These investigations include: geological photomapping and seismology; high-resolution, stereoscopic horizon scanning; water vapor and thermal mapping; entry science; meteorology; atmospheric composition and atmospheric density; and, search for biological products. The configurations of the Titan 3/Centaur combined launch vehicles, the Viking orbiters, and the Viking landers are described; their subsystems and performance characteristics are discussed. Preflight operations, launch window, mission control, and the deep space tracking network are also presented.

Panagakos, N.↗

The Viking Mars Orbiter 1975 solar energy controller

The Jet Propulsion Laboratory is responsible for the Viking Orbiter System, which is part of the overall Viking Project managed by the Viking Project Office at Langley Research Center for NASA. The spacecraft will be launched on a Titan IIIE/-Centaur Launch Vehicle in August 1975. Solar energy for temperature control purposes is introduced into the propulsion module of the Orbiter. The energy enters by way of four individually commandable solar energy controllers (SECs). This paper summarizes the SEC thermal development, design and test results. Test results are presented for the prototype unit and for the flight units.

Stultz, J. W.↗

Planetary missions in the Shuttle era

A conservative fifteen-year plan for planetary exploration is presented in which the Space Shuttle is considered as just a basic transportation system that should be quite economical and have excellent reliability. It is noted that these planned missions are limited by the out-of-orbit escape capability of the Shuttle's Interim Upper Stage (IUS), rather than by the orbital payload capability of the Shuttle itself. A mission model is provided in which a rather even balance is maintained among missions to the inner planets, the outer planets, the comets and asteroids, and interplanetary missions out of the ecliptic plane; the cost estimate for this model is plotted. Launch requirements for the various missions are compared with the performance available from various IUS candidates under evaluation, and it is shown that even the lower-performance candidates can be brought up to the capability of the current Titan IIIE/Centaur/TE-364 expendable launch vehicle, which is adequate for most of the missions in the program. Missions which require higher-performance IUS options are noted, including the Mariner Jupiter and Saturn Orbiters.

Kraemer, R. S.↗

Space Station Freedom avionics technology

The Space Station Freedom Program (SSFP) encompasses the design, development, test, evaluation, verification, launch, assembly, and operation and utilization of a set of spacecraft in low earth orbit (LEO) and their supporting facilities. The spacecraft set includes: the Space Station Manned Base (SSMB), a European Space Agency (ESA) provided Man-Tended Free Flyer (MTFF) at an inclination of 28.5 degrees and nominal attitude of 410 km, a USA provided Polar Orbiting Platform (POP), and an ESA provided POP in sun-synchronous, near polar orbits at a nominal altitude of 822 km. The SSMB will be assembled using the National Space Transportation System (NSTS). The POPs and the MTFF will be launched by Expendable Launch Vehicles (ELVs): a Titan 4 for the US POP and an Ariane for the ESA POP and MTFF. The US POP will for the most part use derivatives of systems flown on unmanned LEO spacecraft. The SSMB portion of the overall program is presented.

Edwards, A.↗

Titan Explorer mission trades from the perspective of aerocapture

A detailed Titan aerocapture systems analysis and spacecraft design study was performed as part of NASA's In-Space Propulsion Program. The primary objective was to engineer a point design based on blunt body aeroshell technology and quantitatively assess feasibility and performance. This paper reviews the launch vehicle, propulsion, and trajectory options to reach Titan in the 2010-2015 time frame using aerocapture and all-propulsive vehicles. It establishes the range of entry conditions that would be consistent with delivering a 360 kg entry vehicle plus a 580 kg orbiter to Titan. Results show that inertial entry velocities in the range of 5.3 to 6.6 kmls are to be expected for chemical and solar electric propulsion options with Venus and/or Earth gravity assists. Trip times range from approximately 6 years for aerocapture orbiters to 8-11 years for all-propulsive vehicles. In addition to trip time reduction, the use of aerocapture enables the mission with a Delta 4450 class launch vehicle as opposed to an all-propulsive orbit insertion approach, which requires a Delta IV heavy or Titan IV class launch vehicle.

Bailey, Robert W.↗

Diffusion algorithms and data reduction routine for onsite launch predictions for the transport of Titan 3 C exhaust effluents

The NASA/MSFC multilayer diffusion algorithms have been specialized for the prediction of the surface impact for the dispersive transport of the exhaust effluents from the launch of a Titan 3 vehicle. This specialization permits these transport predictions to be made at the launch range in real time so that the effluent monitoring teams can optimize their monitoring grids. Basically, the data reduction routine requires just the meteorology profiles for the thermodynamics and kinematics of the atmosphere as an input. These profiles are graphed along with the resulting exhaust cloud rise history, the center line concentrations and dosages, and the hydrogen chloride isopleths.

Stephens, J. B.↗

Gemini launch vehicle development

This paper presents a brief description of the basic modifications made to the Titan II to adapt it to a Gemini launch vehicle (GLV), the ground rules under which they were made, how the principal systems were initially baselined, how they evolved, and how they have performed to date.

TITAN II ICBM↗

Geostationary earth science platform concepts

The new concepts are presented for the Geostationary Earth Science Platform. Bus and payload arrangements, with instrument locations on the payload module and basic payload dimensions, are depicted and compared for each concept. The Titan 4 SRMU (with solid rocket motor upgrage) launch vehicle is described and compared to the standard Titan 4. The upgraded Titan 4 is capable of launching a 13,500 lb payload to GEO. The launch configuration showing each concept packaged within the 16 ft diameter payload envelope is presented. This presentation is represented by viewgraph only.

Herardian, M. M.↗

Solar Electric and Chemical Propulsion for a Titan Mission

Systems analyses were performed for a Titan Explorer Mission characterized by Earth-Saturn transfer stages using solar electric power generation and propulsion systems for primary interplanetary propulsion, and chemical propulsion for capture at Titan. An examination of a range of system factors was performed to determine their effect on the payload delivery capability to Titan. The effect of varying launch vehicle type, solar array power level, ion thruster number, specific impulse, trip time, and Titan capture stage chemical propellant choice was investigated. The major purpose of the study was to demonstrate the efficacy of applying advanced ion propulsion system technologies like NASA's Evolutionary Xenon Thruster (NEXT), coupled with state-of-the-art (SOA) and advanced chemical technologies to a Flagship class mission. This study demonstrated that a NASA Design Reference Mission (DRM) payload of 406 kg could be successfully delivered to Titan using the baseline advanced ion propulsion system in conjunction with SOA chemical propulsion for Titan capture. In addition, the SEPS/Chemical system of this study is compared to an all- chemical NASA DRM mission. Results showed that the NEXT- based SEPS/Chemical system was able to deliver the required payload to Titan in 5 years less transfer time and on a smaller launch vehicle than the SOA chemical option.

Cupples, Michael↗

Advanced transportation system study: Manned launch vehicle concepts for two way transportation system payloads to LEO

The purpose of the Advanced Transportation System Study (ATSS) task area 1 study effort is to examine manned launch vehicle booster concepts and two-way cargo transfer and return vehicle concepts to determine which of the many proposed concepts best meets NASA's needs for two-way transportation to low earth orbit. The study identified specific configurations of the normally unmanned, expendable launch vehicles (such as the National Launch System family) necessary to fly manned payloads. These launch vehicle configurations were then analyzed to determine the integrated booster/spacecraft performance, operations, reliability, and cost characteristics for the payload delivery and return mission. Design impacts to the expendable launch vehicles which would be required to perform the manned payload delivery mission were also identified. These impacts included the implications of applying NASA's man-rating requirements, as well as any mission or payload unique impacts. The booster concepts evaluated included the National Launch System (NLS) family of expendable vehicles and several variations of the NLS reference configurations to deliver larger manned payload concepts (such as the crew logistics vehicle (CLV) proposed by NASA JSC). Advanced, clean sheet concepts such as an F-1A engine derived liquid rocket booster (LRB), the single stage to orbit rocket, and a NASP-derived aerospace plane were also included in the study effort. Existing expendable launch vehicles such as the Titan 4, Ariane 5, Energia, and Proton were also examined. Although several manned payload concepts were considered in the analyses, the reference manned payload was the NASA Langley Research Center's HL-20 version of the personnel launch system (PLS). A scaled up version of the PLS for combined crew/cargo delivery capability, the HL-42 configuration, was also included in the analyses of cargo transfer and return vehicle (CTRV) booster concepts. In addition to strictly manned payloads, two-way cargo transportation systems (CTRV's) were also examined. The study provided detailed design and analysis of the performance, reliability, and operations of these concepts. The study analyzed these concepts as unique systems and also analyzed several combined CTRV/booster configurations as integrated launch systems (such as for launch abort analyses). Included in the set of CTRV concepts analyzed were the medium CTRV, the integral CTRV (in both a pressurized and unpressurized configuration), the winged CTRV, and an attached cargo carrier for the PLS system known as the PLS caboose.

Duffy, James B.↗

The Personnel Launch System

NASA has begun to study candidate vehicles for manned access to space in support of the Space Station or other future missions requiring on-demand transportation of people to and from earth orbit. One such system, which would be used to complement the present Shuttle or an upgraded version, is the Personnel Launch System (PLS), which is envisioned as a reusable priority vehicle to place people and small payloads into orbit using an experimental launch vehicle. The design of the PLS is based on a Space Station crew changeout requirement whereby eight passengers and two crew members are flown to the station and a like number are returned within a 72 hour mission duration. Experimental and computational aerothermodynamic heating studies have been conducted using a new two-color thermographic technique that involved coating the model with a phosphor that radiates at varying color intensities as a function of temperature when illuminated with UV light. A full-scale model, the HL-20, has been produced and will be used for man-machine research. Three launch vehicle concepts are being considered, a Titan IV, the Advanced Launch System, and a Shuttle equipped with liquid rocket boosters.

Piland, William M.↗

A Titan Explorer Mission Utilizing Solar Electric Propulsion and Chemical Propulsion Systems

Mission and Systems analyses were performed for a Titan Explorer Mission scenario utilizing medium class launch vehicles, solar electric propulsion system (SEPS) for primary interplanetary propulsion, and chemical propulsion for capture at Titan. An examination of a range of system factors was performed to determine their affect on the payload delivery capability to Titan. The effect of varying the launch vehicle, solar array power, associated number of SEPS thrusters, chemical propellant combinations, tank liner thickness, and tank composite overwrap stress factor was investigated. This paper provides a parametric survey of the aforementioned set of system factors, delineating their affect on Titan payload delivery, as well as discussing aspects of planetary capture methodology.

Cupples, Michael↗

Calculated maximum Hl ground-level concentrations downwind from launch pad aborts of the space shuttle and Titan 3 C vehicles at Kennedy Space Center

A quantitative assessment is described of the potential environmental hazard posed by the atmospheric release of HCl resulting from the burning of solid propellant during two hypothetical on-pad aborts of the Titan 3 C and space shuttle vehicles at Kennedy Space Center. In one pad-abort situation, it is assumed that the cases of the two solid-propellant engines are ruptured and the burning propellant falls to the ground in the immediate vicinity of the launch pad where it continues to burn for 5 minutes. In the other pad-abort situation considered, one of the two solid engines on each vehicle is assumed to ignite and burn at the normal rate while the vehicle remains on the launch pad. Calculations of maximum HCl ground-level concentration for the above on-pad abort situations were made using the computerized NASA/MSFC multilayer diffusion models in conjunction with appropriate meteorological and source inputs. Three meteorological regimes are considered-fall, spring, and afternoon sea-breeze. Source inputs for the hazard calculations were developed. The principal result of the calculations is that maximum ground-level HCl concentrations at distances greater than 1 kilometer from the launch pad are less than 3 parts per million in all cases considered.

Dumbauld, R. K.↗

Dragonfly Rotor Optimization using Machine Learning Applied to an OVERFLOW Generated Airfoil Database

NASA’s 4th New Frontiers Mission is the Titan Dragonfly relocatable lander. This coaxial quadrotor vehicle will be launched on a rocket to Titan in 2028. Following a gravity assisted Earth flyby and an approximate 6-year transit, Dragonfly will enter the Titan atmosphere around 2034 with the goal of exploring Titan’s pre-biotic chemistry and habitability. The multirotor design for this unique application has continually evolved since 2016 with constraints such as Titan’s cryogenic atmosphere at 95 Kelvin (-288 F), gravity 14% that of Earth’s, atmospheric density 440% of standard sea-level air, and the inability to test the entire system together under all these conditions until the first flight on Titan. This paper focuses on rotor design aspects of the Dragonfly lander and introduces a novel framework for multirotor design optimization considering multiple flight conditions. The methodology leverages machine learning methods and is demonstrated in the context of Dragonfly. A new OVERFLOW Machine Learning Airfoil Performance (PALMO) database is first presented. PALMO is then wrapped inside a Bayesian optimization framework and applied to a 4-rotor system (one side of the Dragonfly lander). Training data is generated on each iteration of the optimization using the CAMRAD-II comprehensive analysis software to evaluate successive rotor designs in multiple relevant flight conditions. An optimal design for the 4-rotor system was found with approximately 900 rotor designs analyzed in CAMRAD-II, which required 9 million queries of the PALMO surrogate models. This demonstration case evaluated 10,000,000 potential candidate rotor designs in 5.5 hours on 114 CPU cores using uniform inflow, and in 27.8 hours using the prescribed wake model. This work thus enables mid-fidelity rotor design optimization without requiring access to high-performance computing.

Dragonfly↗

HEUS-RS applications study, volume 1

Studies are given for sizing and integrating a high energy upper stage restartable solid motor into a flight stage with various payloads for use with Titan 3 and Thor launch vehicles. Motor and stage configurations are given along with performance evaluation of the HEUS-RS with the space shuttle.

Source record↗

A feasibility study of unmanned rendezvous and docking in Mars orbit. Volume 1: Summary

The technical feasibility of achieving automatic rendezvous and docking in Mars orbit as a part of a surface sample return mission was investigated based on using as much existing Viking '75 Orbiter and Lander hardware as possible. Both 1981 and 1983/84 mission opportunities were considered. The principle result of the study was the definition of a three stage 289 kg Mars Ascent Vehicle (MAV) capable of accepting a 1 kg sample, injecting itself into a 2200 km circular orbit, and rendezvousing with an orbiting spacecraft carrying an earth return vehicle. Conclusions are that with state of the art systems plus limited application of new developments in areas where feasibility has already been demonstrated, e.g., solid rocket motor sterilization, it is possible to land a small ascent vehicle capable of automatically ascending and rendezvousing with a modified Viking '75 orbiter spacecraft. The mission can be flown in 1981 or 1983/84, but a dual launch or a larger launch vehicle than the Viking Titan 3 Centaur, or the use of space storable propellants for Mars orbit injection, would be required in the 1983/84 opportunity.

Source record↗

A Saturn atmospheric probe - A proposed augmentation to the Cassini mission

The Saturn probe augmentation of the Cassini mission is studied with particular attention given to the scientific rationale for such an augmentation and any associated issues of technical feasibility, system requirements, performance penalties, and costs. A minimal science complement probe, which concentrates only on atmospheric composition and structure with a total mass requirement of slightly less than 200 kg, is described as well as a full science complement probe with a total mass requirement of about 240 kg. It is noted that either of these Saturn probe configurations can be added to the currently planned mission within the launch performance limitations of the Titan 34D7/Centaur G(prime) launch vehicle.

Swenson, Byron L.↗

Cassini's Test Methodology for Flight Software Verification and Operations

The Cassini spacecraft was launched on 15 October 1997 on a Titan IV-B launch vehicle. The spacecraft is comprised of various subsystems, including the Attitude and Articulation Control Subsystem (AACS). The AACS Flight Software (FSW) and its development has been an ongoing effort, from the design, development and finally operations. As planned, major modifications to certain FSW functions were designed, tested, verified and uploaded during the cruise phase of the mission. Each flight software upload involved extensive verification testing. A standardized FSW testing methodology was used to verify the integrity of the flight software. This paper summarizes the flight software testing methodology used for verifying FSW from pre-launch through the prime mission, with an emphasis on flight experience testing during the first 2.5 years of the prime mission (July 2004 through January 2007).

Cassini Mission↗