Search NASA⌕ Search

SEARCH · Search NASA

Results for “U.S. Agency for International Development”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

101 records · Page 6

The FRIB Decay Station: New Horizons with Rare Isotopes

In May 2022, the Facility for Rare Isotope Beams (FRIB), located on the campus of Michigan State University (MSU), began delivering exotic isotopes to an international community of scientists. New discoveries are now being reported from radioactive decay of neutron-rich nuclei near N = 20 and N = 28.FRIB is expected to produce roughly 80% of the unstable or radioactive isotopes predicted to exist up to uranium (Z = 92). The new user facility is supported by the U.S. Department of Energy, and it is operated by MSU. A high-power superconducting linear accelerator, shaped like a paper-clip, drives the production of these rare isotopes by colliding stable nuclei moving at half the speed of light with a rotating, water-cooled graphite tar-get. These collisions cause the primary stable beam to fragment into a wide variety of unstable nuclei, which can be subsequently filtered through a multistage magnetic separator, the Advanced Rare Isotope Separator, and transported to one of several experimental stations. The FRIB Decay Station initiator (FDSi) (see Figure 1) was developed to enable comprehensive radio-active decay studies of the exotic nuclei produced by FRIB and it was used in the first two experiments in 2022. Further, the FDSi is a highly reconfigurable multidetector system with two focal planes (FP1 for discrete spectroscopy and FP2 for total absorption spectroscopy) that can be optimized for the specific science goals of each experiment. It is designed, built, and operated by a community of users with the sup-port of U.S. funding agencies, including the Department of Energy and National Science Foundation.

07 ISOTOPE AND RADIATION SOURCES↗

Summary of US DOE R&D Activities on Graphite Oxidation (2006–2021)

The objective of the international collaboration between United States Department of Energy (U.S.-DOE) and Generation IV International Forum (GIF) is the development of the next generation of nuclear energy systems. The current GIF Project Arrangement (PA) on Materials (2018-2022) was revised in 2019 and extended for another 10 years (2020-2030). The Work Package 1 (“Graphite”) of the extended Project Plan (PP) on Materials specifies technical tasks and High Level Deliverables for research and development (R&D) activities related to using graphite in fuel elements, reflectors, and support structures of Very High Temperature Reactors (VHTR). The graphite tasks include specification and acquisition, qualification and development of new grades, characterization of properties, and development of behavior models. Specifically, Task 1.4 (“Graphite Oxidation Behavior”) outlines planned activities related to acute oxidation by air and chronic oxidation by impurities in the helium coolant. A final report on experimental data regarding graphite oxidation behavior is scheduled for 2022 (deliverable 3.1.1.4.a). In preparation of this deliverable, this document summarizes the R&D activities funded by U.S.-DOE from 2006 (the inception of the VHTR system arrangement) through present (2021). This report is being submitted to the GIF Graphite Working Group (GWG) to serve as input for the GWG high-level deliverable to the Project Management Board (PMB) of PA on Materials. Besides U.S.-DOE, other organizations participating to Task 1.4 of the current PA on Materials are: European Commission’s Joint Research Center (JRC), Korea Atomic Energy Research Institute (KAERI), and Japan Atomic Energy Agency (JAEA). U.S.-DOE is the main contributor on graphite oxidation R&D, with 85 % commitment of total funding during 2018-2022.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Instrumentation for the In-Core Real-Time Mechanical Testing of Structural Materials (INCREASE) Project

Idaho National Laboratory (INL), in collaboration with the Electric Power Research Institute (EPRI), the Nuclear Regulatory Commission (NRC), the French Atomic and Alternative Energies Commission (CEA), the Joint Research Center (JRC), the Nuclear Research and Consultancy Group (NRG), and the Research Center Rez (CVR), started a Joint Experimental Program (JEEP) project that operates within the Nuclear Energy Agency’s Framework for Irradiation Experiments (FIDES II) program in order to develop capabilities for the in-core real-time mechanical testing of structural materials. This effort will focus on designing a shared capsule capable of housing a variety of in-core mechanical testing instrumentation allowing enhanced experiments for the material science community. The outcome of the project would be high-priority, stress relaxation data for stainless-steel-based materials provided by EPRI and CEA. Stress relaxation is a major phenomenon that contributes to material degradation in nuclear reactor components. Currently, nuclear material stress relaxation is assessed both before and after irradiation, using complex and costly post-irradiation examination (PIE) activities. In-situ data would support the development of precision modeling and simulation of this degradation phenomena and would provide validation and benchmarking for existing models using the PIE data. As part of the U.S. Department of Energy Advanced Sensor and Instrumentation (ASI) program, INL has fabricated and tested out-of-core mechanical test instrumentation. This instrumentation was designed for easy adaptation to the irradiation capsule proposed under this JEEP, and can be deployed to measure real-time stress relaxation under pressurized-water reactor (PWR) conditions. This initial effort will partially serve to replace the testing capabilities lost because of shutting down the Halden Boiling Water Reactor (HBWR). The project would provide these capabilities to the international community via a shared capsule design that is easily adaptable to additional material test reactors. The design features will incorporate expansion to PWR and non-light-water reactor (LWR) environments that will be developed in future work. The capsule and instrumentation will be demonstrated in the Massachusetts Institute of Technology Reactor (MITR) for phase I and the Petten High Flux Reactor (HFR) for phase II irradiations to deliver real-time stress relaxation data on high priority stainless steel structural materials.

36 MATERIALS SCIENCE↗

Alabama Carbon Storage: Data Sharing and Engagement (Final Report)

This report is the final technical report on Alabama Carbon Storage: Data Sharing Engagement (ACS:DSE) project activities. The goals of the ACS:DSE project are to compile geologic, geophysical, infrastructure, and other relevant CCUS datasets for the study area and develop a geologic model of the study area; develop an online platform to serve data to stakeholders; engage with the public, students, and industry to educate them about CCUS and the data platform; and ensure energy and environmental justice is central to all aspects of the project. Datasets compiled and expanded include formation depths and elevations, digital geophysical well logs, reservoir properties, geologic structures, and geologic models. The geologic data were used to create a three-dimensional geologic model, structure grids, structure contour maps, and fault trace maps. In addition to downloadable datasets, links to CCUS relevant regulatory agencies (e.g., OGB, U.S. Environmental Protection Agency) and sources for infrastructure and educational information were included on the website Educational materials on CCUS for use by K-12 teachers were produced as part of the ACS:DSE project.

01 COAL, LIGNITE, AND PEAT↗

Editorial: Advanced water splitting technologies development: Best practices and protocols

As the level of deployment and utilization of renewable energy sources, including wind and solar, continues to rise, large-scale, long-term energy storage technologies that could accommodate weekly and seasonal energy fluctuations will play a significant role in the overall deployment of renewable energies in the future. Harnessing and storing renewable energy resources via electrochemical, photoelectrochemical, or thermochemical processes by converting renewable energy into sustainable (energy storage) fuels have the potential to meet the long-term, terawatt scale energy storage challenge. Renewable hydrogen production is the cornerstone for sustainable fuel production and deep decarbonization of multiple sectors in our society. Cost-competitive clean hydrogen provides value to applications, such as 1) in the transportation sector for fuel cell vehicles, 2) in the electric grid sector for system stability and load balancing, and 3) in the industrial sector with metal refineries, cement production, and biomass upgrading (carbon-free fertilizer production). In addition, coupling clean renewable hydrogen with the carbon and nitrogen cycles enables known and well-established thermal-chemical processes to generate renewable hydrocarbon fuels and ammonia. The Advanced Water Splitting Technologies (AWST): low temperature electrolysis (LTE), high temperature electrolysis (HTE), photoelectrochemical (PEC) and solar thermo-chemical hydrogen (STCH) provide four unique and parallel approaches to produce low cost, low greenhouse gas (GHG) emission hydrogen at scale (Figure 1). Cost competitive clean hydrogen production using these four technologies is a current high priority focus for governments and industry. In June of 2022, the U.S. Department of Energy (DOE) launched the first in a series of Earthshot Initiatives. The Hydrogen Shot, “1 1 1” aims to reduce the cost of clean hydrogen by more than 80% to one dollar per one kilogram in 1 decade ($\$$1/kg H 2 ). The European Green Deal and the International Energy Agency (IEA) have implemented a strong focus on green hydrogen production for a clean and secure energy future.

benchmarking, low temperature electrolysis↗

Final Technical Report for U.S.-Japan Hadronic Physics Exchange Program for Studies of Hadron Structure and QCD

Nuclear physics explores the fundamental properties of matter -- how protons and neutrons emerge as quantum systems of elementary particles, how they form the atomic nuclei, and how they give rise to the wide variety of phenomena and applications at biological, technical, and astronomical scales. It is a global scientific effort centered around large-scale experimental user facilities (particle accelerators and detectors), advanced theoretical methods and concepts, and computational techniques and resources. Exchange of knowledge and ideas, scientific collaboration, and workforce development on a global scale are essential for the future of the field. The nuclear physics program envisaged in the 2023 DOE/NSF NSAC Long-Range Plan and pursued at the U.S. National Labs has strong synergies with programs at other facilities worldwide and will realize significant benefits from international collaboration. Nuclear physics is also recognized for promoting international cooperation in the broadest sense through joint construction and operation of experimental equipment, personal contacts between scientists, and education and training. The U.S.-Japan Hadronic Physics Exchange Program (USJPHE) supported collaborative scientific research in hadronic physics and quantum chromodynamics. USJHPE focused on subject areas related to the programs at current and future experimental facilities in the U.S.\ and Japan and supported both experimental and theoretical studies. USJHPE particularly aimed to realize synergies between the hadronic physics programs at Jefferson Lab 12 GeV and J-PARC resulting from the complementarity of electromagnetic and hadronic probes in the multi-GeV energy range. Subject areas of common interest included the quark-gluon structure of hadrons and nuclei, meson and baryon spectroscopy, strangeness and hypernuclear physics, and other related topics. USJHPE also supported research in hadronic physics and nuclear-physics-enabled tests of fundamental symmetries related to the programs at Brookhaven National Lab, Fermilab, KEK, Spring-8, and university-based facilities in the U.S. and Japan. USJHPE especially promoted collaboration between the U.S. and Japanese nuclear physics communities in developing the physics program and instrumentation for the future Electron-Ion Collider. USJHPE was intended to provide travel grants to U.S.-based scientists (primary institutional affiliation with a U.S.\ university, national laboratory, or other research center) to visit Japanese institutions and conduct collaborative research there. The program supported senior researchers, postdoctoral fellows, and students. Continuing the setup of the preceding grant period, J-PARC served as the Japanese “hub” for U.S. physicists for short- and long-term visits, and JLab served as the corresponding U.S. “hub”. The program was officially managed through the U. of Connecticut in Storrs, CT. Support for Japanese physicists visiting the U.S. was provided through funds from Japanese funding agencies. The USJHPE program promoted the scientific exchange and the collaborative spirit in hadronic physics between the two countries.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Alaska Liquid Natural Gas Pipeline Front-End Engineering & Design (Final Technical Report)

The Alaska Gasline Development Corporation (AGDC) is Alaska’s natural gas infrastructure development corporation established in 2013. AGDC’s mission is to maximize the benefit of Alaska’s vast North Slope natural gas resources for Alaskans through the development of infrastructure necessary to move the gas into local and international markets. AGDC was identified for a Congressionally Directed Spending (CDS) project for funding in the Energy and Water Development and Related Agencies Appropriations Act, 2023 under the heading: “Congressionally Directed Energy Efficiency and Renewable Energy Projects.” The CDS included $\$$4,000,000 of direct funding, with required match funds, to move the project forward. Alaska’s North Slope holds America’s largest proven and conventional natural gas supply. The integrated Alaska LNG Project will deliver 3.5 billion cubic feet of natural gas per day from Alaska’s North Slope gas fields to Alaskans as well as to a marine terminal located at tidewater in Cook Inlet. Alaska LNG is an integrated gas infrastructure project with three major components: a gas treatment plant (GTP) located at Prudhoe Bay, an 807-mile (1,287 km) gas pipeline (Mainline Pipeline) to Southcentral Alaska with interconnections for in-state gas use, and a natural gas liquefaction facility (LNG Facility) in Nikiski, Alaska. The integrated Alaska LNG Project has several strategic advantages including proven gas resources, existing upstream infrastructure, an advantageous arctic climate for LNG production, proximity to LNG markets, a track record of reliability from a state that first began exporting LNG to Japan in 1969, and broad support from Alaskans. North Slope natural gas is a conventional resource and can be produced with minimal drilling at a fraction of the carbon dioxide emissions of shale gas from the Lower 48 states. Through the development of the Alaska LNG Project, Alaska can provide energy security to Alaskans and a stable source of LNG to the Asia-Pacific region for generations. The Alaska LNG Project has been progressed through Pre-Front-End Engineering Design (Pre-FEED) and has obtained all major federal and State of Alaska permits and authorizations to construct the project, including the Federal Energy Regulatory Commission (FERC) Order Granting Authorization Under Section 3 of the Natural Gas Act. On September 5, 2024, the U.S. Department of Energy (DOE), National Energy Technology Laboratory (NETL) awarded Project No. DE-FE0032307 to AGDC with the objective to progress the project to Front-End Engineering Design (FEED) entry for the Alaska LNG Project Phase 1 Pipeline. The award Start Date was made effective July 1, 2023, with a Period of Performance through June 30, 2025. On March 27, 2025, AGDC announced the execution of definitive commercial agreements with Glenfarne Alaska LNG, LLC, an affiliate of Glenfarne Group, LLC, (together as “Glenfarne”), to lead the development of the Alaska LNG Project and enter FEED for the Phase 1 Pipeline. Project activities are now funded and directed by this private sector partner who holds a 75% interest in 8 Star Alaska, LLC (8 Star). 8 Star holds the assets of the Alaska LNG Project. As planned, AGDC continues to hold 25% minority interest in 8 Star and will play a governance role moving forward with Alaska LNG. This definitive commercial agreement milestone led to the successful completion of AGDC’s Statement of Project Objectives (SOPO) for FEED entry and led to the completion of DOE Project No. DE-FE0032307. At conclusion of the SOPO, AGDC also reached the award’s maximum federal cost share of $\$$4,000,000. AGDC is, therefore, providing Final Technical Report to close out DOE Project No. DE-FE0032307.

02 PETROLEUM↗

National Virtual Biotechnology Laboratory: Report on Rapid R&D Solutions to the COVID-19 Crisis

With funding from the CARES Act, the U.S Department of Energy (DOE) established the National Virtual Biotechnology Laboratory (NVBL) in March 2020 to address key challenges associated with the COVID-19 crisis. NVBL brought together the broad scientific and technical expertise and resources of DOE’s 17 national laboratories to help tackle medical supply short ages, discover potential drugs to fight the virus, develop and validate COVID-19 testing methods, model disease spread and impact across the nation, and understand virus transport in buildings and the environment. National laboratory resources leveraged for this effort include a suite of world-leading user facilities broadly available to the research community, such as light and neutron sources, nanoscale science research centers, sequencing and biocharacterization facilities, and high-performance computing facilities. Within months, NVBL teams produced innovations in materials and advanced manufacturing that mitigated shortages in test kits and personal protective equipment (PPE), creating nearly 1,000 new jobs. They used DOE’s high-performance computers and light and neutron sources to identify promising candidates for antibodies and antivirals that universities and drug companies are now evaluating. NVBL researchers also developed new diagnostic targets and sample collection approaches, and supported U.S. Food and Drug Administration (FDA), Centers for Disease Control and Prevention (CDC), and U.S. Department of Defense (DoD) efforts to establish national guidelines used in administering millions of tests. Researchers used artificial intelligence and high-performance computing to produce near-real-time data analysis to forecast disease transmission, stress on public health infrastructure, and economic impact, which supported decision-makers at the local, state, and national levels. NVBL teams also studied how to control indoor virus movement to minimize uptake and protect human health. NVBL’s accomplishments demonstrate not only the powerful resource represented by DOE’s national laboratories working together to meet national needs, but also the effectiveness of the integrated NVBL framework for rapidly responding to emergencies with research and development (R&D) solutions. As the fight against COVID continues, sustained efforts are needed to confront this pandemic as well as future threats. Examples include: 1) Establishing “supply chains on demand” to meet emergency production needs by leveraging the materials and manufacturing expertise of DOE national laboratories and developing advances in electronics, sensing, robotics, and automation capabilities; 2) Improving the speed and robustness of drug discovery by integrating experimental platforms with DOE’s computational and experimental user facilities, which provide unique resources to support the discovery of high-potential therapeutic agents; 3) Protecting public, environmental, and animal health by developing new testing protocols and instrumentation adaptable to diverse sample types (both physiological and environmental) to quickly detect a wide range of pathogens and monitor other biorisks; 4) Supporting near-real-time data needs of decision-makers at the local, regional, state, and national levels by advancing data curation, analysis, and modeling using artificial intelligence and new data science tools for managing and evaluating large diverse datasets; 5) Harnessing DOE’s expertise in environmental modeling to design rooms and air handling for offices, classrooms, restaurants, and other structures to minimize biorisk transmissions. Going forward, NVBL is poised to apply the unique capabilities and expertise of the national laboratory complex to future national and international emergencies, both natural and engineered. Through this framework, the Office of Science will continue to be an integral component of agency wide efforts to prepare for and respond to biorisks and other crises.

42 ENGINEERING↗

NORTH DAKOTA CARBONSAFE PHASE III: SITE CHARACTERIZATION AND PERMITTING OF GEOLOGIC STORAGE OF CARBON DIOXIDE

The Energy & Environmental Research Center (EERC), in partnership with Minnkota Power Cooperative Inc. (Minnkota), SLB, and Computer Modelling Group Ltd. (CMG), supported wide-scale deployment of carbon capture and storage (CCS) as part of the U.S. Department of Energy (DOE) National Energy Technology Laboratory Carbon Storage Assurance Facility Enterprise (CarbonSAFE) Initiative Phase III. This phase included the acquisition, analysis, and development of information to fully characterize two storage complexes to demonstrate viable storage resources for commercial volumes of CO2 (defined by DOE as a minimum of 50 million tonnes [MMt] of CO2 within a 30-year period) (National Energy Technology Laboratory, 2024). Phase III also involved the preparation, submission, and approval of North Dakota underground injection control (UIC) Class VI storage facility permits (SFPs)—required precursors to applications for Class VI injection well permits. The presumed viability of commercial-scale CCS, situated adjacent to Minnkota’s Milton R. Young Station (MRYS), is validated by Minnkota’s continued pursuit of Project Tundra—an initiative to build the world’s largest lignite-based CCS project in central North Dakota (www.projecttundrand.com). Project Tundra comprises two scopes of work, Tundra Capture (installation of postcombustion CO2 capture at MRYS) and Tundra SGS (secure geologic storage). The efforts of North Dakota CarbonSAFE Phase III, Site Characterization and Permitting, supported Tundra SGS. Extensive site-specific characterization activities included a successful multimeasurement geophysical approach and drilling a stratigraphic test well (J-ROC 1, subsequently renamed Liberty-1) adjacent to MRYS. Core collection and analyses, downhole testing and fluid sampling, and geophysical logging were performed on J-ROC 1 and on a nearby stratigraphic test well (known as J-LOC 1), which was drilled, cored, and tested under a complementary project funded by the North Dakota Lignite Research Program. The injection tests performed on J-LOC 1 positively impacted the CarbonSAFE project, resulting in fewer proposed injection wells and significant construction, operations, and monitoring cost savings. The characterization data collected and analyses performed were integrated into geologic models, and successive numerical simulations were run to determine CO2 plume extent and subsurface pressure buildup associated with the planned CO2 injection rate of nearly 4 MMt per year. The latter doubles the CarbonSAFE Initiative goal with an estimated 100 MMt of CO2 stored in 20 years. Application of the U.S. Environmental Protection Agency’s (EPA’s) method for estimating the Class VI Rule area of review (AOR) to the overpressurized Broom Creek Formation inspired an alternative method of calculation, called risk-based AOR delineation. This peer-reviewed method was applied for the first time during the storage facility-permitting process. The two SFP applications submitted in 2021 successfully resulted in North Dakota Industrial Commission (NDIC) orders in 2022 authorizing the creation of the storage facility areas and amalgamation of pore space as well as establishing financial responsibility requirements. After approval of the SFPs, Minnkota filed in 2022 applications for permits to reenter the J-ROC 1 well and to drill two new wells—all with the intended purpose to become Class VI injection wells. To establish eligibility under the Internal Revenue Code for Section 45Q tax incentives, a monitoring, reporting, and verification (MRV) plan was prepared and submitted by Minnkota to EPA in 2022, resulting in the first such plan approved in North Dakota. Also in 2022, under the National Environmental Policy Act (NEPA), Minnkota prepared and submitted an environmental information volume (EIV) describing the proposed CCS project and associated potential environmental impacts. Based on the EIV, DOE determined that the proposed construction project required an environmental assessment, and Minnkota submitted the first draft in 2023 and a revised draft in 2024. Both submissions were followed by a public comment period. Subsequently, DOE issued a finding of no significant impact (FONSI) on September 13, 2024. A successful outreach program, strongly based in the production, presentation, and dissemination of informational material, fostered an environment to aid stakeholders in making informed decisions regarding the planned project. Opportunities for public input were provided at various steps along the way, including at county planning and zoning meetings, before and during the SFP administrative hearing, and during environmental assessment public comment periods. In addition, land/pore space owners and mineral owners had various points of contact, including granting access rights, securing pore space leasing, and mineral owner notifications. Based upon the successful storage facility permitting issued by NDIC, approval of the MRV plan by EPA, and receipt of a FONSI under the NEPA, Minnkota is continuing its pursuit of Project Tundra. In December 2023, the Office of Clean Energy Demonstrations under its Carbon Capture Demonstrations Projects Program announced funding for the capture system (Office of Clean Energy Demonstrations, 2023) and a proposal for CarbonSAFE Phase IV: Construction funding was submitted in March 2024 for the storage project. A go/no-go decision to proceed with construction and operations in the Broom Creek Formation is anticipated in 2024. References National Energy Technology Laboratory, CarbonSafe Initiative, https://netl.doe.gov/carbon-management/carbon-storage/carbonsafe (accessed August 2024). Office of Clean Energy Demonstrations, 2023, OCED selects three projects in CA, ND, and TX to reduce harmful carbon pollution, create new economic opportunities, and advance carbon reducing technologies, December, www.energy.gov/oced/articles/oced-selects-three-projects-ca-nd-and-tx-reduce-harmful-carbon-pollution-create-new (accessed August 2024).

Peck, Wesley↗

A U.S. scientific community review of carbon cycle science gaps and opportunities to better support earth system science and carbon management

Greenhouse gas (GHG) emissions continue to grow, while natural carbon reservoirs are becoming increasingly vulnerable to anthropogenic pressures, climate extremes, and disturbance. These changes are impacting humans, ecosystems, and natural resources worldwide. Tracking and mitigating GHG emissions require a pivot to operational monitoring of regional carbon flux and stock changes. The current GHG observing system is addressing needs at two distinct scales: 1) Local scale (< 1 km), related to anthropogenic point source emissions, and 2) global scales (> 1000 km), related to land and ocean carbon sinks. More focus on intermediate (10–1000 km) scales is needed to more effectively monitor progress in reducing carbon emissions, enhancing removals, and maintaining sinks. Representatives from carbon cycle biomass and flux communities across United States government agencies and academic institutions met in September 2024 to discuss the rationale and scientific context for more effectively implementing an operational system for GHG monitoring in support of urban and national carbon management needs. To guide development of this system, we propose a multi-tiered global spaceborne observing framework for carbon flux and stock, prioritizing: 1) frequent GHG partial columns for carbon emissions and removals; 2) continuous time series and data fusion of biomass from Lidar and Synthetic Aperture Radar (SAR) for carbon stocks, and 3) expanded coverage of tropical, high latitude, and oceanic regions to monitor carbon cycle tipping points and feedbacks. This system should be complemented by expanded surface and airborne networks for oceanic and terrestrial/aquatic ecosystems for calibration, ground truthing, and study of under-sampled regions.

54 ENVIRONMENTAL SCIENCES↗

HarDWR - Harmonized Water Rights Records

A dataset within the Harmonized Database of Western U.S. Water Rights (HarDWR). For a detailed description of the database, please see the meta-record v2.0. Changelog v2.0 - Recalculated based on data sourced from WestDAAT - Changed using a Site ID column to identify unique records to using aa combination of Site ID and Allocation ID - Removed the Water Management Area (WMA) column from the harmonized records. The replacement is a separate file which stores the relationship between allocations and WMAs. This allows for allocations to contribute to water right amounts to multiple WMAs during the subsequent cumulative process. - Added a column describing a water rights legal status - Added "Unspecified" was a water source category - Added an acre-foot (AF) column - Added a column for the classification of the right's owner v1.02 - Added a .RData file to the dataset as a convenience for anyone exploring our code. This is an internal file, and the one referenced in analysis scripts as the data objects are already in R data objects. v1.01 - Updated the names of each file with an ID number less than 3 digits to include leading 0s v1.0 - Initial public release Description Here we present an updated database of Western U.S. water right records. This database provides consistent unique identifiers for each water right record, and a consistent categorization scheme that puts each water right record into one of seven broad use categories. These data were instrumental in conducting a study of the multi-sector dynamics of inter-sectoral water allocation changes though water markets (Grogan et al., *in review*). Specifically, the data were formatted for use as input to a process-based hydrologic model, Water Balance Model (WBM), with a water rights module (Grogan et al., *in review*). While this specific study motivated the development of the database presented here, water management in the U.S. West is a rich area of study (e.g., Anderson and Woosly, 2005; Tidwell, 2014; Null and Prudencio, 2016; Carney et al., 2021) so releasing this database publicly with documentation and usage notes will enable other researchers to do further work on water management in the U.S. West. We produced the water rights database presented here in four main steps: (1) data collection, (2) data quality control, (3) data harmonization, and (4) generation of cumulative water rights curves. Each of steps (1)-(3) had to be completed in order to produce (4), the final product that was used in the modeling exercise in Grogan et al. (*in review*). All data in each step is associated with a spatial unit called a Water Management Area (WMA), which is the unit of water right administration utilized by the state in which the right came from. Steps (2) and (3) required use to make assumptions and interpretation, and to remove records from the raw data collection. We describe each of these assumptions and interpretations below so that other researchers can choose to implement alternative assumptions an interpretation as fits their research aims. Motivation for Changing Data Sources The most significant change has been a switch from collecting the raw water rights directly from each state to using the water rights records presented in WestDAAT, a product of the Water Data Exchange (WaDE) Program under the Western States Water Council (WSWC). One of the main reasons for this is that each state of interest is a member of the WSWC, meaning that WaDE is partially funded by these states, as well as many universities. As WestDAAT is also a database with consistent categorization, it has allowed us to spend less time on data collection and quality control and more time on answering research questions. This has included records from water right sources we had previously not known about when creating v1.0 of this database. The only major downside to utilizing the WestDAAT records as our raw data is that further updates are tied to when WestDAAT is updated, as some states update their public water right records daily. However, as our focus is on cumulative water amounts at the regional scale, it is unlikely most records updates would have a significant effect on our results. The structure of WestDAAT led to several important changes to how HarWR is formatted. The most significant change is that WaDE has calculated a field known as `SiteUUID`, which is a unique identifier for the Point of Diversion (POD), or where the water is drawn from. This separate from `AllocationNativeID`, which is the identifier for the allocation of water, or the amount of water associated with the water right. It should be noted that it is possible for a single site to have multiple allocations associated with it and for an allocation to be able to be extracted from multiple sites. The site-allocation structure has allowed us to adapt a more consistent, and hopefully more realistic, approach in organizing the water right records than we had with HarDWR v1.0. This was incredibly helpful as the raw data from many states had multiple water uses within a single field within a single row of their raw data, and it was not always clear if the first water use was the most important, or simply first alphabetically. WestDAAT has already addressed this data quality issue. Furthermore, with v1.0, when there were multiple records with the same water right ID, we selected the largest volume or flow amount and disregarded the rest. As WestDAAT was already a common structure for disparate data formats, we were better able to identify sites with multiple allocations and, perhaps more importantly, allocations with multiple sites. This is particularly helpful when an allocation has sites which cross WMA boundaries, instead of just assigning the full water amount to a single WMA we are now able to divide the amount of water between the number of relevant WMAs. As it is now possible to identify allocations with water used in multiple WMAs, it is no longer practical to store this information within a single column. Instead the stAllocationToWMATab.csv file was created, which is an allocation by WMA matrix containing the percent Place of Use area overlap with each WMA. We then use this percentage to divide the allocation's flow amount between the given WMAs during the cumulation process to hopefully provide more realistic totals of water use in each area. However, not every state provides areas of water use, so like HarDWR v1.0, a hierarchical decision tree was used to assign each allocation to a WMA. First, if a WMA could be identified based on the allocation ID, then that WMA was used; typically, when available, this applied to the entire state and no further steps were needed. Second was the spatial analysis of Place of Use to WMAs. Third was a spatial analysis of the POD locations to WMAs, with the assumption that allocation's POD is within the WMA it should belong to; if an allocation still had multiple WMAs based on its POD locations, then the allocation's flow amount would be divided equally between all WMAs. The fourth, and final, process was to include water allocations which spatially fell outside of the state WMA boundaries. This could be due to several reasons, such as coordinate errors / imprecision in the POD location, imprecision in the WMA boundaries, or rights attached with features, such as a reservoir, which crosses state boundaries. To include these records, we decided for any POD which was within one kilometer of the state's edge would be assigned to the nearest WMA. Other Changes WestDAAT has Allowed In addition to a more nuanced and consistent method of assigning water right's data to WMAs, there are other benefits gained from using the WestDAAT dataset. Among those is a consistent categorization of a water right's legal status. In HarDWR v1.0, legal status was effectively ignored, which led to many valid concerns about the quality of the database related to the amounts of water the rights allowed to be claimed. The main issue was that rights with legal status' such as "application withdrawn", "non-active", or "cancelled" were included within HarDWR v1.0. These, and other water rights status' which were deemed to not be in use have been removed from this version of the database. Another major change has been the addition of the "unspecified water source category. This is water that can come from either surface water or groundwater, or the source of which is unknown. The addition of this source category brings the total number of categories to three. Due to reviewer feedback, we decided to add the acre-foot (AF) column so that the data may be more applicable to a wider audience. We added the ownerClassification column so that the data may be more applicable to a wider audience. File Descriptions The dataset is a series of various files organized by state sub-directories. In addition, each file begins with the state's name, in case the file is separate from its sub-directory for some reason. After the state name is the text which describes the contents of the file. Here is each file described in detail. Note that st is a placeholder for the state's name. stFullRecords_HarmonizedRights.csv: A file of the complete water records for each state. The column headers for each of this type of file are: state - The name of the state to which the allocations belong to. FIPS - The two digit numeric state ID code. siteID - The site location ID for POD locations. A site may have multiple allocations, which are the actual amount of water which can be drawn. In a simplified hypothetical, a farm stead may have an allocation for "irrigation" and an allocation for "domestic" water use, but the water is drawn from the same pumping equipment. It should be noted that many of the site ID appear to have been added by WaDE, and therefore may not be recognized by a given state's water rights database. allocationID - The allocation ID for the water right. For most states this is the water right ID, and what is recommended to use should a right be looked up on a given state's water rights database. The water amounts associated with these IDs tend to be finer scaled than those associated with siteID. It should be noted that some allocations may be extracted from multiple sites, particularly for larger Places of Use. ownerClassification - A classification of the types of owners for water rights. The most common is `Private` which incorporates a wide range of entities. Several classifications would be grouped into a government category, most of which are for the U.S. Federal Government. These allocations could be listed as "Federal", "United States of America", or as the names of any number of federal agencies. The last major grouping of entities is for "Native American"s. priorityDate - The date we use as the water right priority date for our modeling analysis. This is the legal priority date when it is available. However, for some rights, specifically from California and New Mexico, we used a pseudo priority date (e.g. well completion date or start of well drilling date) when a legal priority date was not available. The most questionable dates come from New Mexico, where the only date associated with certain water right records was the date the allocation was recorded in the database. As the allocation record creation tended to be within a few months of the filing of the application of the water right, from manually double checking the water rights, and our analysis focuses on aggregating water rights on the timescale of years, we determined it was acceptable to use such dates to include as many records as possible. primaryBeneficialUse - From the numerous state water use categories, WaDE categorized them into 21 categories WestDAAT. This column is the original WaDE category for the primary water use at the PoD site. allocationBeneficialUse - From the numerous state water use categories, WaDE categorized them into 21 categories for WestDAAT. This column is the original WaDE category

Economics↗