Foil Bearing Supported Compressor-Expander

R&D Dynamics Corporation (RDD) is developing a fuel cell system compressor-expander designed for heavy-duty vehicle applications. The system emphasizes high reliability, versatility, long service life, and cost-effective mass production. Its design integrates a high-speed centrifugal compressor/expander, oil-free foil air/gas bearings, a direct current permanent magnet (DCPM) motor, and an inverter utilizing silicon carbide (SiC) switches. Key advantages include high efficiency, compact size and reduced weight, enhanced reliability, and elimination of oil contamination risks. The technology targets multiple sectors such as long-haul semi-trucks, mining and construction equipment, power generation, data centers, marine systems, and other heavy machinery. Evaluation units are ready for shipment, and manufacturing capabilities are currently being developed. Contract Number: DE-EE0009617 (2021).

30 DIRECT ENERGY CONVERSION↗

Power Plant Replacement Study

This report represents the final report for the Eastern Illinois University power plant replacement study. It contains all related documentation from consideration of possible solutions to the final recommended option. Included are the economic justifications associated with the chosen solution along with application for environmental permitting for the selected project for construction. This final report will summarize the results of execution of an EPC (energy performance contract) investment grade audit (IGA) which lead to an energy services agreement (ESA). The project includes scope of work to design and install energy conservation measures which are guaranteed by the contractor to be self-funding over its twenty year contract duration. The cost recovery is derived from systems performance improvements leading to energy savings. The prime focus of this EPC effort is to provide a replacement solution for Eastern Illinois University's aging and failing circa 1925 central steam production plant. Twenty-three ECMs were considered viable whose net impact will provide sufficient savings to successfully support the overall project objectives.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

ICE Calculator 2.0: Final Report for Phase 1 of the National Initiative to Update the Interruption Cost Estimate (ICE) Calculator

In 2021, Berkeley Lab and Resource Innovations, Inc. launched the “ICE 2.0 Initiative” – a national study to refresh the underlying data and enhance the functionality of the ICE Calculator. The Initiative involves Berkeley Lab contracting with sponsoring utilities to administer identical, updated and comprehensive interruption cost surveys to statistically representative samples of each utility’s customers. Berkeley Lab and Resource Innovations then pool the survey results across the utilities and use them to update the analytical engines that drive the ICE Calculator. The ICE 2.0 Initiative is being conducted in phases. Each phase involves the administration of interruption cost surveys to the customers of sponsoring utilities, followed by an update to the ICE Calculator based on analysis of the pooled survey results. This report describes the activities and findings from Phase 1 of the ICE 2.0 Initiative. Phase 1 was sponsored by eight utilities: American Electric Power, Commonwealth Edison, Dominion Energy, Duke Energy, DTE Electric, Exelon, National Grid, and Puget Sound Energy. Phase 1 involved 11 customer interruption cost survey activities representing a total of 24 electricity distribution service territories, 23 of them located in the Eastern and Midwestern regions of the U.S. and one located in the Pacific Northwest. ICE 2.0 vs. 1.0 Comparison This memorandum compares customer power interruption costs estimated using the recently updated Interruption Cost Estimate (ICE) Calculator (“ICE 2.0”) to the original ICE Calculator (“ICE 1.0”). ICE 1.0 was developed in 2009 based on 15 independent power interruption cost surveys conducted by 10 electric utilities between 1989 and 2012. ICE 2.0 was developed in 2025 through a national initiative based on a consistent set of power interruption cost surveys and 11 surveying efforts conducted across 24 electric utility service territories between 2022 and 2024.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Envision Charlotte Project Final Report

The Envision Charlotte Project (EC Project), supported by partners at the Center for Climate and Energy Solutions, the University of North Carolina at Charlotte’s Center for Sustainably Integrated Buildings and Sites and the City of Charlotte, has successfully demonstrated that existing buildings can benefit from operations improvements and low-cost efficiency upgrades, and that behavioral change campaigns can be effectively designed for measurability, longevity and impact. Support from this grant gave Envision Charlotte and its partners the resources and flexibility to demonstrate a variety of approaches to improve coordination with stakeholders in the implementation of programs to reduce the consumption of energy, water and waste. The project team also gained insights into the motivations and abilities that influence stakeholder engagement in sustainability initiatives at multiple levels. Importantly, as this report describes, strong partnerships between nonprofits, industry partners and research institutions can produce tangible impacts and replicable results in building efficiency. Further, building operators working alongside student researchers can form productive relationships that can advance building energy management goals. Key Findings of the EC Project This project focused on advancing solutions to energy efficiency in U.S. commercial buildings. The Building Re-Tuning™ Training (BRT) developed by the U.S. DOE’s Pacific Northwest National Lab (PNNL), designed to detect energy savings opportunities and implement improvements with resources and online tools, provided the starting point for the curriculum developed by stakeholders in the EC Project. Although the project partners encountered some issues with data consistency, the overall project outcomes fell short of the energy savings stated in the original proposal, and the total participating building targets were lower than anticipated, important findings, outcomes and lessons learned were achieved. EC Project grantees observed that the PNNL BRT, as currently written, was not compatible with the skills of average frontline mechanical personnel in the Charlotte region where the grant program was performed. Frontline staff are not, typically, energy managers, engineers or building commissioning agents, but they can play a key role in building performance. As detailed in this report, the grantees therefore focused on changes to the BRT that improved the level of training and competency of the frontline workers in this region. Among the technical observations related to improving the BRT that were observed in the EC Project: centralized facilities management often has an impact on building performance; operators can be overly reliant on service contracts; individual behaviors matter, and technology cannot be viewed as a crutch; current Building Automation Systems (BAS) are often too complex to support building efficiency optimization, but BAS coupled with appropriate training can support better outcomes; the “perfectly optimized” building is not a near-term possibility, but better education, especially of executives and managers, on the role of behavioral intervention is a promising direction the building science community can and should pursue; a lack of standards and protocols, and competition between proprietary software from service contracts, remain challenges for this industry. These technical observations, in turn, informed the EC Project’s overall findings, which were: Accomplishing building efficiency is a process of education for all involved in the building design, construction and operation supply chain. Building operators, as a professional class, have an opportunity for further training and education that will lead to better on-the-job performance. An updated Building Re-Tuning™ Training curriculum, based on the findings of this report, could be an avenue for these operators’ professional development.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Reported Energy and Cost Savings from the DOE ESPC Program

The objective of this work was to determine the realization rate of energy and cost savings from the Department of Energy's Savings Performance Contract (ESPC) program based on information reported by the energy services companies (ESCOs) that are carrying out ESPC projects at federal sites. Information was extracted from 134 Measurement and Verification (M&V) reports to determine reported, estimated, and guaranteed cost savings and reported and estimated energy savings for the previous contract year. Because the quality of the reports varied, it was not possible to determine all of these parameters for each project. For 133 of the 134 projects, there was sufficient information to compare estimated, reported, and guaranteed cost savings. For this group, the total estimated cost savings for the reporting periods addressed were $\$$95.7 million, total reported cost savings were $\$$96.8 million, and total guaranteed cost savings were $\$$92.1 million. This means that on average: ESPC contractors guaranteed 96% of the estimated cost savings, projects reported achieving 101% of the estimated cost savings, and projects reported achieving 105% of the guaranteed cost savings. For 129 of the projects examined, there was sufficient information to compare estimated and reported energy savings. On the basis of site energy, estimated savings for those projects for the previous year totaled 5.371 million MMBtu, and reported savings were 5.374 million MMBtu, just over 100% of the estimated energy savings. On the basis of source energy, total estimated energy savings for the 129 projects were 10.400 million MMBtu, and reported saving were 10.405 million MMBtu, again, just over 100.0% of the estimated energy savings.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Reported Energy and Cost Savings from the DOE ESPC IDIQ Program: FY 2022

The objective of this work was to determine the realization rate of energy and cost savings from the U.S. Department of Energy’s (DOE’s) Energy Savings Performance Contract (ESPC) program based on information reported by the energy services companies (ESCOs) that are carrying out ESPC projects at federal sites. Information was extracted from 190 measurement and verification (M&V) reports covering 182 projects to determine reported, estimated, and guaranteed cost savings and the associated reported and estimated energy savings for the previous contract performance year. This report covers projects that had a performance year ending in fiscal year 2021, between October 1, 2021 and September 30, 2022, and had an M&V report issued. Additionally, the annual cost to perform M&V was extracted from the individual project Task Order (TO) Schedules.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Direct Feed Low Activity Waste (DFLAW) Program: Development, Progression and Risk Management - 16476

This Direct Feed Low-Activity Waste (DFLAW) Program paper describes the key programmatic elements to enable the startup of treatment and disposal of Hanford tank waste through a phased startup of the Hanford Tank Waste Treatment and Immobilization Plant (WTP). Specifically the DFLAW Program consists of the Low- Activity Waste (LAW) vitrification facility, and the direct feed to LAW of treated tank farm supernatant from the Low-Activity Waste Pretreatment System (LAWPS). This document identifies the overall strategy, objectives, and processes of the U.S. Department of Energy (DOE), Office of River Protection (ORP) and all supporting DOE subcontractors, and describes the scope of the program elements. In addition gaps, risks, and opportunities to successful integration for commissioning of all needed systems and facilities to produce immobilized LAW product (ILAW) are described. The scope of the DFLAW Program extends up to the point that LAW Facility hot commissioning is complete and all DFLAW systems are fully operational. The DFLAW Program coordinates, integrates, and monitors all the activities necessary to successfully commission and start up the WTP LAW facility. This involves integrating the readiness of all the plant, personnel and program/procedures that support startup of hot commissioning of tank farms systems, WTP systems, waste treatment and disposal systems, and site utility, infrastructure and services. Multiple Hanford contractors have responsibilities to execute and perform scope under the umbrella of the DFLAW Program. The primary focus of the One System organization, comprised of WTP Project and Tank Operations Contract (TOC) personnel, is to manage the coordination and integration across the interfaces of the work scope described above. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Reported Energy and Cost Savings from the DOE ESPC IDIQ Program: FY2021

The objective of this work was to determine the realization rate of energy and cost savings from the U.S. Department of Energy’s (DOE’s) Energy Savings Performance Contract (ESPC) program based on information reported by the energy services companies (ESCOs) that are carrying out ESPC projects at federal sites. Information was extracted from 201 measurement and verification (M&V) reports covering 193 projects to determine reported, estimated, and guaranteed cost savings and the associated reported and estimated energy savings for the previous contract performance year. This report covers projects that had a performance year ending in fiscal year 2021, between October 1, 2020 and September 30, 2021, and had an M&V report issued. Additionally, the annual cost to perform M&V was extracted from the individual project Task Order (TO) Schedules.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

ICE Calculator 2: Final Report for Phase 1 and 2 of the National Initiative to Update the Interruption Cost Estimate (ICE) Calculator

ICE 2.0 Phase 2 Final Report In 2021, Berkeley Lab and Resource Innovations, Inc. launched the “ICE Calculator 2 Initiative” – a national study to refresh the underlying data and enhance the functionality of the ICE Calculator. The Initiative involves Berkeley Lab contracting with sponsoring utilities to administer identical, updated and comprehensive interruption cost surveys to statistically representative samples of each utility’s customers. Berkeley Lab and Resource Innovations then pool the survey results across the utilities and use them to update the analytical engines that drive the ICE Calculator. The ICE Calculator 2 Initiative is being conducted in phases. Each phase involves the administration of interruption cost surveys to the customers of sponsoring utilities, followed by an update to the ICE Calculator based on analysis of the pooled survey results. This report describes the activities and findings from Phase 1 and 2 of the ICE Calculator 2 Initiative. Phase 1 was sponsored by eight utilities: American Electric Power, Commonwealth Edison, Dominion Energy, Duke Energy, DTE Electric, Exelon, National Grid, and Puget Sound Energy. Phase 2 was sponsored by six utilities: Empire District Electric Company, Evergy Missouri, Pacific Gas & Electric, San Diego Gas & Electric, Southern California Edison, and Union Electric. Phase 1 and 2 involved 15 customer interruption cost survey activities representing a total of 30 electricity distribution service territories. ICE Calculator Version 2.0 and 2.2 Comparison This memorandum describes–at a high-level–the improvements in interruption cost estimates for the version 2.2 of the ICE Calculator (released February 2026) compared to version 2.0 (released in April 2025). Version 2.2 of the ICE Calculator corresponds to Phase 2 of the initiative, while version 2.0 corresponds to Phase 1. The improvements in version 2.2 result from both a significant increase in the number of customer responses that have been collected and the identification of seven additional factors that help estimate customer interruption costs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Light Water Reactor Sustainability Program — A Summary of Collaborative Research and Development Activities

This report describes the collaborative research and development projects in which the U.S. Department of Energy’s Light Water Reactor Sustainability (LWRS) Program is engaged with industry, regulatory agencies, and other organizations to achieve outcomes that are directed at sustaining the U.S. nuclear power industryduring Fiscal Year 2018. One way that this Program accomplishes its objectives—to develop technologies and other solutions that can improve the reliability, sustain the safety, enhance the economic performance, and extend the life of current reactors—is by conducting research together with industry and key organizations through cooperative arrangements and plans, through coordinated planning and management of resources and activities, through periodic technical exchanges of data and information, or by other means of interaction (i.e., contracts, memoranda of understanding, non-disclosure agreements, etc.). Broadly, these interactions represent different types of collaborations—formal or informal agreements between two or more organizations to work on something together that may be for a short or extended duration and may involve a single purpose or broad set of goals. DOE’s research, development, and demonstration role focuses on enhancing the safe, efficient, and economical performance of the nation’s nuclear fleet while studying and mitigating aging phenomena and issues that are applicable to the service environments of operating reactors and require unique DOE laboratory expertise. Often, research and development (R&D) and demonstration activities are cost-shared, coordinated, or otherwise jointly conducted with industry, regulatory agencies, or other organizations through the aforementioned or other collaborative mechanisms. Operation of the existing fleet of plants to 60 years, extending the operating lifetimes of those plants beyond 60 years and, where practical, making further improvements in their productivity are essential to support the nation’s energy needs. Recently, several utilities have submitted or announced plans to submit applications to the U.S. NRC to begin the subsequent license-renewal process, extending the operating license period beyond 60 years from the date of their initial licensing. This marks an important planned milestone in the history of commercial nuclear power operations in the U.S.—one that underscores the long-term dependability of these plant designs and the commitment to their long-term performance by the organizations that operate them. The LWRS Program will continue to work with owner-operators to address the key issues needed to support the technical bases for continued safe long-term operation of our nation’s nuclear power assets.

42 ENGINEERING↗

The Economics of Energy Savings Performance Contracts

Energy Savings Performance Contracts (ESPCs) allow governments to tap private capital to finance energy efficiency improvements; the debt service on the financing is paid from the energy and energy-related cost savings generated by the efficiency projects themselves. Since 1998 about 43% of the funding for energy efficiency upgrades in US federal buildings has come from ESPC and other similar programs. This paper describes the balance sheet for an ESPC project as currently implemented by US federal agencies, and shows how parameters such as the cost of the project, the interest rate for financing, level of savings, energy escalation rates, and others combine to determine the project cash flow. The paper also examines the sensitivity of project economics to changes in each of these parameters.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Reported Energy and Cost Savings from the DOE ESPC IDIQ Program: FY 2023

The objective of this work was to determine the realization rate of energy and cost savings from the U.S. Department of Energy’s (DOE’s) Energy Savings Performance Contract (ESPC) program based on information reported by the energy services companies (ESCOs) that are carrying out ESPC projects at federal sites. Information was extracted from 201 measurement and verification (M&V) reports covering 191 projects to determine reported, estimated, and guaranteed cost savings and the associated reported and estimated energy savings for the previous contract performance year. This report covers projects that had a performance year ending in fiscal year 2023, between October 1, 2022 and September 30, 2023, and had an M&V report issued. Additionally, the annual cost to perform M&V was extracted from the individual project Task Order (TO) Schedules.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Dramatic Demand Reduction In The Desert Southwest

This report summarizes a project that was funded to the University of Nevada Las Vegas (UNLV), with subcontractors Pulte Homes and NV Energy. The project was motivated by the fact that locations in the Desert Southwest portion of the US demonstrate very high peak electrical demands, typically in the late afternoons in the summer. These high demands often require high priced power to supply the needs, and the large loads can cause grid supply problems. An approach was proposed through this contact that would reduce the peak electrical demands to an anticipated 65% of what code-built houses of the similar size would have. It was proposed to achieve energy reduction through four approaches applied to a development of 185 homes in northwest part of Las Vegas named Villa Trieste. First, the homes would all be highly energy efficient. Secondly, each house would have a PV array installed on it. Third, an advanced demand response technique would be developed to allow the resident to have some control over the energy used. Finally, some type of battery storage would be used in the project. Pulte Homes designed the houses. The company considered initial cost vs. long-term savings and chose options that had relatively short paybacks. HERS (Home Energy Rating Service) ratings for the homes are approximately 43 on this scale. On this scale, code-built homes rate at 100, zero energy homes rate a 0, and Energy Star homes are 85. In addition a 1.764 Wp (peak Watt) rated PV array was used on each house. This was made up of solar shakes that were in visual harmony with the roofing material used. A demand response tool was developed to control the amount of electricity used during times of peak demand. While demand response techniques have been used in the utility industry for some time, this particular approach is designed to allow the customer to decide the degree of participation in the response activity. The temperature change in the residence can be decided by the residents by adjusting settings. In a sense the customer can choose between greater comfort and greater money savings during demand response circumstances. Finally a battery application was to be considered. Initially it was thought that a large battery (probably a sodium-sulfur type) would be installed. However, after the contract was awarded, it was determined that a single, centrally-located battery system would not be appropriate for many reasons, including that with the build out plan there would not be any location to put it. The price had risen substantially since the budget for the project was put together. Also, that type of battery has to be kept hot all the time, but its use was only sought for summer operation. Hence, individual house batteries would be used, and these are discussed at the end of this report. Many aspects of the energy use for climate control in selected houses were monitored before residents moved in. This was done both to understand the magnitude of the energy flows but also to have data that could be compared to the computer simulations. The latter would be used to evaluate various aspects of our plan. It was found that good agreement existed between actual energy use and computed energy use. Hence, various studies were performed via simulations. Performance simulations showed the impact on peak energy usage between a code built house of same size and shape compared to the Villa Trieste homes with and without the PV arrays on the latter. Computations were also used to understand the effect of varying orientations of the houses in this typical housing development, including the effect of PV electrical generation. Energy conservation features of the Villa Trieste homes decreased the energy use during peak times (as well as all others), but the resulting decreased peak occurred at about the same time as the code-built houses. Consideration of the PV generation decreases the grid energy use further during daylight hours, but did not extend long enough many days to decrease the peak. Hence, a demand response approach, as planned, was needed. With participation of the residents in the demand response program developed does enable the houses to reduce the peak demand between 66% and 72%, depending on the built years. This was addressed fully in the latter part the study and is described in the latter part of this report.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Development of a Hydrogasification Process for Co-Production of Substitute Natural Gas (SNG) and Electric Power from Western Coals

This report presents the results of the research and development conducted on an Advanced Hydrogasification Process (AHP) conceived and developed by Arizona Public Service Company (APS) under U.S. Department of Energy (DOE) contract: DE-FC26-06NT42759 for Substitute Natural Gas (SNG) production from western coal. A double-wall (i.e., a hydrogasification contained within a pressure shell) down-flow hydrogasification reactor was designed, engineered, constructed, commissioned and operated by APS, Phoenix, AZ. The reactor is ASME-certified under Section VIII with a rating of 1150 pounds per square inch gage (psig) maximum allowable working pressure at 1950 degrees Fahrenheit (°F). The reaction zone had a 1.75 inch inner diameter and 13 feet length. The initial testing of a sub-bituminous coal demonstrated ~ 50% carbon conversion and ~10% methane yield in the product gas under 1625°F, 1000 psig pressure, with a 11 seconds (s) residence time, and 0.4 hydrogen-to-coal mass ratio. Liquid by-products mainly contained Benzene, Toluene, Xylene (BTX) and tar. Char collected from the bottom of the reactor had 9000-British thermal units per pound (Btu/lb) heating value. A three-dimensional (3D) computational fluid dynamic model simulation of the hydrodynamics around the reactor head was utilized to design the nozzles for injecting the hydrogen into the gasifier to optimize gas-solid mixing to achieve improved carbon conversion. The report also presents the evaluation of using algae for carbon dioxide (CO 2 ) management and biofuel production. Nannochloropsis, Selenastrum and Scenedesmus were determined to be the best algae strains for the project purpose and were studied in an outdoor system which included a 6-meter (6M) radius cultivator with a total surface area of 113 square meters (m 2 ) and a total culture volume between 10,000 to 15,000 liters (L); a CO 2 on-demand feeding system; an on-line data collection system for temperature, pH, Photosynthetically Activate Radiation (PAR) and dissolved oxygen (DO); and a ~2 gallons per minute (gpm) algae culture dewatering system. Among the three algae strains, Scenedesmus showed the most tolerance to temperature and irradiance conditions in Phoenix and the best self-settling characteristics. Experimental findings and operational strategies determined through these tests guided the operation of the algae cultivation system for the scale-up study. Effect of power plant flue gas, especially heavy metals, on algae growth and biomass adsorption were evaluated as well.

01 COAL, LIGNITE, AND PEAT↗

Projecting Future Colorado River Basin Water and Hydropower Operations

Drought, variable renewable energy (VRE) resources (primarily wind and photovoltaic technologies), and power markets can all impact hydropower plant operations. We analyze how these three factors collectively may potentially change the future operation and economics of federal dams and hydropower plants located in the Colorado River Basin (CRB). Federal CRB energy and capacity resources, including 4,200 MW of hydropower capacity, are marketed by Western Area Power Administration (WAPA) and sold through long-term Firm Electric Service (FES) contracts to entities located in 15 western and central States that serve millions of electricity consumers. The parameters of FES contracts allow a wide range of scheduling flexibility for FES customers. The FES customers will adjust the timing of energy delivery according to the changing water, power market, and VRE contribution level to the power grid. We simulate and project water and hydropower operations with two models: 1) reservoir operation and 2) power system operation (production cost) with various temporal granularity. We consider two sets of grid scenarios (one representing today's infrastructure, and one representing higher VRE contributions in 2036) and two sets of water scenarios (drought and normal hydrology). We modeled scenarios to understand the power market-energy price levels and patterns, FES customer scheduling, hydropower economics, WAPA finances and hydropower operation for various hydrologic conditions, and VRE contribution level to the power grid. The detailed modeling framework includes: (1) creating ensembles of CRB hydrologic and hydropower futures, (2) selecting representative futures, (3) simulation of FES customer contracts, (4) simulating western U.S. power grid economic scheduling and dispatch under two VRE contribution levels, utilizing information from modeling steps (1)-(4), (5) assessment of reservoir water and hydropower operation, and (6) comparing scenario operations and economics. Our study team comprising WAPA, and an interdisciplinary team of national labs will gain insight into how WAPA can prepare for and adapt its practices in response to an evolving U.S. power grid.

Colorado River↗

Understanding and Controlling Cesium Loading on Crystalline Silicotitanate - 19601

Savannah River Remediation (SRR) contracted with Westinghouse Electric Corporation (WEC), Columbia Energy and Environmental Services (CEES), to build and deliver a modular ion exchange process that will be used to remove radioactive cesium from dissolved salt solution contained in Tank 10 at the Savannah River Site (SRS). The resulting decontaminated salt solution will be sent to Tank 11 and then to Tank 50 for final disposition in grout at the Saltstone facility. At the end of processing, the loaded ion exchange (IX) columns are drained, rinsed, and dried. The IX columns are removed from the modular unit and stored at Interim Safe Storage (ISS). This ion exchange process is called the Tank Closure Cesium Removal (TCCR) system. The TCCR system consists of several unit operations and process monitoring capability housed within three modular units. The first modular unit contains the process control computer, the second modular unit contains the main process equipment (two prefilters, four IX columns, and resin trap (post filtration)), and the third modular unit is the ventilation system. The main unit operations of the TCCR system are filtration, ion exchange, and ventilation. The ion exchange media utilized is a form of inorganic Crystalline Silicotitanate (CST), IONSIV{sup TM} R9120-B supplied by UOP Honeywell. CST has a high selectivity for cesium (Cs) and has some affinity for other Group IA alkali metals on the periodic chart (hydrogen, lithium, sodium, potassium, rubidium, and francium). CST has also been shown to have affinity for strontium and actinides. Cesium loading on the CST is dependent on many factors including chemical composition (cations and anions), temperature, and pH of the salt solution. The actual amount of Cs loaded onto an IX column is dependent on the factors above along with the salt solution volume fed to the IX column. Because of CST's high selectivity for Cs, the Cs-137 equilibrium loading can contribute enough decay heat to result in an ion exchange column boiling event under no flow conditions in the IX column. The boiling event under no flow is a safety concern that must be prevented from occurring. To prevent boiling of the column under no flow conditions, the Cs-137 equilibrium loading must be determined and understood. Several methodologies were evaluated for performing the Cs-137 equilibrium loading determination for CST. After review of available research and development (R and D), batch equilibrium contact test data, and Zheng Anthony Miller (ZAM) model predictions for the salt solution chemistry in Tank 10, a methodology for determining the Cs-137 equilibrium loading on CST was selected. The methodology selected involves an in-tank batch equilibrium contact test performed in duplicate that considers additional corrections to account for anticipated operational evolutions. The in-tank batch equilibrium contact test utilizes ∼0.1 grams of CST secured in a slotted sample vial. The slotted sample vial design allows for salt solution to be in contact with the CST. The slotted sample vials containing the CST are submerged in Tank 10 and exposed to the salt solution for ten days. After ten days, the samples are retrieved and sent to the Savannah River National Laboratory (SRNL) for analysis of the Cs-137 equilibrium loading. Additional corrections are then made to the Cs-137 results to account for anticipated operational evolutions. Anticipated operational evolutions include external additions (water/caustic) to Tank 10 that result in a change to its chemical composition, tank temperature effects, departures from the laboratory testing (mixed vs. stagnant tank conditions), and IX column flushes. A description of the methodologies considered, feasibility of methodology deployment, and the down select process (benefits vs. risks) is discussed in this paper. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Data Quality Objectives for WTP Feed Acceptance Criteria - 12043

The Hanford Tank Waste Treatment and Immobilization Plant (WTP) is under construction for the U.S. Department of Energy by Bechtel National, Inc. and subcontractor URS Corporation (contract no. DE-AC27-01RV14136). The plant when completed will be the world's largest nuclear waste treatment facility. Bechtel and URS are tasked with designing, constructing, commissioning, and transitioning the plant to the long term operating contractor to process the legacy wastes that are stored in underground tanks (from nuclear weapons production between the 1940's and the 1980's). Approximately 56 million gallons of radioactive waste is currently stored in these tanks at the Hanford Site in southeastern Washington. There are three major WTP facilities being constructed for processing the tank waste feed. The Pretreatment (PT) facility receives feed where it is separated into a low activity waste (LAW) fraction and a high level waste (HLW) fraction. These fractions are transferred to the appropriate (HLW or LAW) facility, combined with glass former material, and sent to high temperature melters for formation of the glass product. In addition to PT, HLW and LAW, other facilities in WTP include the Laboratory (LAB) for analytical services and the Balance of Facilities (BOF) for plant maintenance, support and utility services. The transfer of staged feed from the waste storage tanks and acceptance in WTP receipt vessels require data for waste acceptance criteria (WAC) parameters from analysis of feed samples. The Data Quality Objectives (DQO) development was a joint team effort between WTP and Tank Operations Contractor (TOC) representatives. The focus of this DQO effort was to review WAC parameters and develop data quality requirements, the results of which will determine whether or not the staged feed can be transferred from the TOC to WTP receipt vessels. The approach involved systematic planning for data collection consistent with EPA guidance for the seven-step DQO process. Data quality requirements for sample collection and analysis of all WAC parameters were specified during the DQO process. There were eighteen key parameters identified with action limits to ensure the feed transfer and receipt would not exceed plant design, safety, permitting, and processing requirements. The remaining WAC parameters were grouped in the category for obtaining data according to WTP contract specifications, regulatory reporting requirements, and for developing the feed campaign processing sequence. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗