Search NASA⌕ Search

SEARCH · Search NASA

Results for “Validation Readiness”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Revalidation of the NASA Ames 11-by 11-Foot Transonic Wind Tunnel with a Commercial Airplane Model

The 11-By 11-Foot Transonic leg of the Unitary Plan Wind Tunnel (UPWT) was modernized to improve tunnel performance, capability, productivity, and reliability. Wind tunnel tests to demonstrate the readiness of the tunnel for a return to production operations included an Integrated Systems Test (IST), calibration tests, and airplane validation tests. One of the two validation tests was a 0.037-scale Boeing 777 model that was previously tested in the 11-By 11-Foot tunnel in 1991. The objective of the validation tests was to compare pre-modernization and post-modernization results from the same airplane model in order to substantiate the operational readiness of the facility. Evaluation of within-test, test-to-test, and tunnel-to-tunnel data repeatability were made to study the effects of the tunnel modifications. Tunnel productivity was also evaluated to determine the readiness of the facility for production operations. The operation of the facility, including model installation, tunnel operations, and the performance of tunnel systems, was observed and facility deficiency findings generated. The data repeatability studies and tunnel-to-tunnel comparisons demonstrated outstanding data repeatability and a high overall level of data quality. Despite some operational and facility problems, the validation test was successful in demonstrating the readiness of the facility to perform production airplane wind tunnel%, tests.

Kmak, Frank J.↗

Module-OT: A Turnkey Solution for Securing Energy Systems

The Modular Security Apparatus for Managing Distributed Cryptography for Command-and-Control Messages on Operational Technology Networks (Module-OT) is a flexible and lightweight solution for grid-edge devices focusing on end-to-end security. It is a bump- in- the-wire solution acting as a secure conduit for data between devices or systems across a network. It improves the cybersecurity posture of DER systems by providing authentication, authorization, and data integrity to secure DER communications. Additionally, it performs key management, provides data security through whitelisting Internet Protocol addresses and ports, blocks unauthorized connections, controls user access, and allows serial or Ethernet connections for added flexibility. The core software is portable to various Linux-based operating systems and is developed to be customized by the developer and researcher communities. Module-OT has been validated in the lab, has been demonstrated at a 500-KW PV-plus-storage site, and has been proven ready to secure operational technology devices. Its core functionality meets current standards, including validation procedures of the NIST Cryptographic Algorithm Validation Program (CAVP) and the Federal Information Processing Standard (FIPS 140-2). Because of its capability to provide an accessible and affordable option for stepping up security across modern energy systems, Module-OT can serve as an effective technological option to standardize cybersecurity moving forward.

cryptography↗

Auto-generating databases of Yield Strength and Grain Size using ChemDataExtractor

Abstract The emerging field of material-based data science requires information-rich databases to generate useful results which are currently sparse in the stress engineering domain. To this end, this study uses the’materials-aware’ text-mining toolkit, ChemDataExtractor, to auto-generate databases of yield-strength and grain-size values by extracting such information from the literature. The precision of the extracted data is 83.0% for yield strength and 78.8% for grain size. The automatically-extracted data were organised into four databases: a Yield Strength, Grain Size, Engineering-Ready Yield Strength and Combined database. For further validation of the databases, the Combined database was used to plot the Hall-Petch relationship for, the alloy, AZ31, and similar results to the literature were found, demonstrating how one can make use of these automatically-extracted datasets.

36 MATERIALS SCIENCE↗

The ARM Precipitation Best Estimate (PrecipBE) Value-Added Product Report

The U.S. Department of Energy Atmospheric Radiation Measurement (ARM) User Facility’s Precipitation Best-Estimate (PrecipBE) Value-Added Product integrates multiple precipitation datastreams, accounting for data quality and instrument limitations, to deliver comprehensive per-precipitation event properties alongside ancillary ARM data set data. PrecipBE bundles all valid surface rainfall samples into artificial intelligence (AI)-ready tabular and time-series formats, reporting bundle means and uncertainty ranges. This per-event structure provides an insightful and easy-to-use resource for researchers analyzing precipitation characteristics.

54 ENVIRONMENTAL SCIENCES↗

New Mexico Clean Energy and Resilience Growth (NM CERG) Cluster

The New Mexico Clean Energy Resilience and Growth (NM CERG) project was designed to foster a clean energy cluster in New Mexico by providing a robust pipeline of support for clean-energy technology startups. By leveraging the expertise and resources of national laboratories, universities, and regional partners, the project contributed to a deeper understanding of how public-private partnerships can enhance the commercialization of innovative clean energy technologies. The project explored the key challenges faced by startups, such as securing capital, rapid prototyping, technology validation, and transitioning from research to market-ready products.

02 PETROLEUM↗

Power subsystem automation study

Generic power-system elements and their potential faults are identified. Automation functions and their resulting benefits are defined and automation functions between power subsystem, central spacecraft computer, and ground flight-support personnel are partitioned. All automation activities were categorized as data handling, monitoring, routine control, fault handling, planning and operations, or anomaly handling. Incorporation of all these classes of tasks, except for anomaly handling, in power subsystem hardware and software was concluded to be mandatory to meet the design and operational requirements of the space station. The key drivers are long mission lifetime, modular growth, high-performance flexibility, a need to accommodate different electrical user-load equipment, onorbit assembly/maintenance/servicing, and potentially large number of power subsystem components. A significant effort in algorithm development and validation is essential in meeting the 1987 technology readiness date for the space station.

Imamura, M. S.↗

A Space Testbed for Photovoltaics

The Ohio Aerospace Institute and the NASA Lewis Research Center are designing and building a solar-cell calibration facility, the Photovoltaic Engineering Testbed (PET) to fly on the International Space Station to test advanced solar cell types in the space environment. A wide variety of advanced solar cell types have become available in the last decade. Some of these solar cells offer more than twice the power per unit area of the silicon cells used for the space station power system. They also offer the possibilities of lower cost, lighter weight, and longer lifetime. The purpose of the PET facility is to reduce the cost of validating new technologies and bringing them to spaceflight readiness. The facility will be used for three primary functions: calibration, measurement, and qualification. It is scheduled to be launched in June of 2002.

Landis, Geoffrey A.↗

Multi-Mission System Architecture Platform: Design and Verification of the Remote Engineering Unit

The Multi-Mission System Architecture Platform (MSAP) represents an effort to bolster efficiency in the spacecraft design process. By incorporating essential spacecraft functionality into a modular, expandable system, the MSAP provides a foundation on which future spacecraft missions can be developed. Once completed, the MSAP will provide support for missions with varying objectives, while maintaining a level of standardization that will minimize redesign of general system components. One subsystem of the MSAP, the Remote Engineering Unit (REU), functions by gathering engineering telemetry from strategic points on the spacecraft and providing these measurements to the spacecraft's Command and Data Handling (C&DH) subsystem. Before the MSAP Project reaches completion, all hardware, including the REU, must be verified. However, the speed and complexity of the REU circuitry rules out the possibility of physical prototyping. Instead, the MSAP hardware is designed and verified using the Verilog Hardware Definition Language (HDL). An increasingly popular means of digital design, HDL programming provides a level of abstraction, which allows the designer to focus on functionality while logic synthesis tools take care of gate-level design and optimization. As verification of the REU proceeds, errors are quickly remedied, preventing costly changes during hardware validation. After undergoing the careful, iterative processes of verification and validation, the REU and MSAP will prove their readiness for use in a multitude of spacecraft missions.

Sartori, John↗

NASA Utilization of the International Space Station and the Vision for Space Exploration

In response to the U.S. President s Vision for Space Exploration (January 14, 2004), NASA has revised its utilization plans for ISS to focus on (1) research on astronaut health and the development of countermeasures that will protect our crews from the space environment during long duration voyages, (2) ISS as a test bed for research and technology developments that will insure vehicle systems and operational practices are ready for future exploration missions, (3) developing and validating operational practices and procedures for long-duration space missions. In addition, NASA will continue a small amount of fundamental research in life and microgravity sciences. There have been significant research accomplishments that are important for achieving the Exploration Vision. Some of these have been formal research payloads, while others have come from research based on the operation of International Space Station (ISS). We will review a selection of these experiments and results, as well as outline some of ongoing and upcoming research. The ISS represents the only microgravity opportunity to perform on-orbit long-duration studies of human health and performance and technologies relevant for future long-duration missions planned during the next 25 years. Even as NASA focuses on developing the Orion spacecraft and return to the moon (2015-2020), research on and operation of the ISS is fundamental to the success of NASA s Exploration Vision.

Robinson, Julie A.↗

NASA Utilization of the International Space Station and the Vision for Space Exploration

In response to the U.S. President's Vision for Space Exploration (January 14, 2004), NASA has revised its utilization plans for ISS to focus on (1) research on astronaut health and the development of countermeasures that will protect our crews from the space environment during long duration voyages, (2) ISS as a test bed for research and technology developments that will insure vehicle systems and operational practices are ready for future exploration missions, (3) developing and validating operational practices and procedures for long-duration space missions. In addition, NASA will continue a small amount of fundamental research in life and microgravity sciences. There have been significant research accomplishments that are important for achieving the Exploration Vision. Some of these have been formal research payloads, while others have come from research based on the operation of International Space Station (ISS). We will review a selection of these experiments and results, as well as outline some of ongoing and upcoming research. The ISS represents the only microgravity opportunity to perform on-orbit long-duration studies of human health and performance and technologies relevant for future long-duration missions planned during the next 25 years. Even as NASA focuses on developing the Orion spacecraft and return to the moon (2015-2020), research on and operation of the ISS is fundamental to the success of NASA s Exploration Vision.

Robinson, Julie A.↗

NASA Utilization of the International Space Station and the Vision for Space Exploration

In response to the U.S. President s Vision for Space Exploration (January 14, 2004), NASA has revised its utilization plans for ISS to focus on (1) research on astronaut health and the development of countermeasures that will protect our crews from the space environment during long duration voyages, (2) ISS as a test bed for research and technology developments that will insure vehicle systems and operational practices are ready for future exploration missions, (3) developing and validating operational practices and procedures for long-duration space missions. In addition, NASA will continue a small amount of fundamental research in life and microgravity sciences. There have been significant research accomplishments that are important for achieving the Exploration Vision. Some of these have been formal research payloads, while others have come from research based on the operation of International Space Station (ISS). We will review a selection of these experiments and results, as well as outline some of ongoing and upcoming research. The ISS represents the only microgravity opportunity to perform on-orbit long-duration studies of human health and performance and technologies relevant for future long-duration missions planned during the next 25 years. Even as NASA focuses on developing the Orion spacecraft and return to the moon (2015-2020), research on and operation of the ISS is fundamental to the success of NASA s Exploration Vision.

Robinson, Julie A.↗

Sao Paulo Lightning Mapping Array (SP-LMA): Deployment and Plans

An 8-10 station Lightning Mapping Array (LMA) network is being deployed in the vicinity of Sao Paulo to create the SP-LMA for total lightning measurements in association with the international CHUVA [Cloud processes of tHe main precipitation systems in Brazil: A contribUtion to cloud resolVing modeling and to the GPM (GlobAl Precipitation Measurement)] field campaign. Besides supporting CHUVA science/mission objectives and the Sao Luz Paraitinga intensive operation period (IOP) in December 2011-January 2012, the SP-LMA will support the generation of unique proxy data for the Geostationary Lightning Mapper (GLM) and Advanced Baseline Imager (ABI), both sensors on the NOAA Geostationary Operational Environmental Satellite-R (GOES-R), presently under development and scheduled for a 2015 launch. The proxy data will be used to develop and validate operational algorithms so that they will be ready for use on "day1" following the launch of GOES-R. A preliminary survey of potential sites in the vicinity of Sao Paulo was conducted in December 2009 and January 2010, followed up by a detailed survey in July 2010, with initial network deployment scheduled for October 2010. However, due to a delay in the Sa Luz Paraitinga IOP, the SP-LMA will now be installed in July 2011 and operated for one year. Spacing between stations is on the order of 15-30 km, with the network "diameter" being on the order of 30-40 km, which provides good 3-D lightning mapping 150 km from the network center. Optionally, 1-3 additional stations may be deployed in the vicinity of Sa Jos dos Campos.

Bailey, J. C.↗

Sao Paulo Lightning Mapping Array (SP-LMA): Deployment, Operation and Initial Data Analysis

An 8-10 station Lightning Mapping Array (LMA) network is being deployed in the vicinity of Sao Paulo to create the SP-LMA for total lightning measurements in association with the international CHUVA [Cloud processes of the main precipitation systems in Brazil: A contribution to cloud resolving modeling and to the GPM (Global Precipitation Measurement)] field campaign. Besides supporting CHUVA science/mission objectives and the Sao Luiz do Paraitinga intensive operation period (IOP) in November-December 2011, the SP-LMA will support the generation of unique proxy data for the Geostationary Lightning Mapper (GLM) and Advanced Baseline Imager (ABI), both sensors on the NOAA Geostationary Operational Environmental Satellite-R (GOES-R), presently under development and scheduled for a 2015 launch. The proxy data will be used to develop and validate operational algorithms so that they will be ready for use on "day1" following the launch of GOES-R. A preliminary survey of potential sites in the vicinity of Sao Paulo was conducted in December 2009 and January 2010, followed up by a detailed survey in July 2010, with initial network deployment scheduled for October 2010. However, due to a delay in the Sao Luiz do Paraitinga IOP, the SP-LMA will now be installed in July 2011 and operated for one year. Spacing between stations is on the order of 15-30 km, with the network "diameter" being on the order of 30-40 km, which provides good 3-D lightning mapping 150 km from the network center. Optionally, 1-3 additional stations may be deployed in the vicinity of Sao Jos dos Campos.

Blakeslee, R.↗

Prime Time for Model-Predictive Control? Assessing the Technical and Market Readiness of Advanced Controls in Buildings

Despite three decades of extensive research and field testing that have consistently validated the benefits of Model Predictive Control (MPC) in building applications, the technology has seen limited market adoption. This paper evaluates the readiness of MPC for widespread deployment, showcases recent demonstrations and field tests across diverse building types, including residential, small commercial, large commercial, and campus settings. Our results demonstrate that MPC can optimize system operations to achieve load shifting, minimize curtailment of on-site generation, and reduce energy costs by up to 80 %, while maintaining or improving occupant comfort. We also show that MPC can effectively control large assets, such as MW-sized thermal storage systems, and respond to dynamic pricing signals. However, achieving scale remains difficult due to labor-intensive workflows, reliance on a “PhD-in-the-loop” for MPC design and maintenance, susceptibility to fragile data infrastructure, and persistent workforce education and acceptance barriers. To bridge this gap, we outline a transition from bespoke, labor intensive prototypes toward streamlined, segment-targeted deployment strategies that leverage model templates, semantic tools, and generative AI. By automating control configuration and reducing engineering effort, these recommendations provide a pathway for transforming successful research demonstrations into scalable, market ready solutions for MPC-based controls.

Pritoni, Marco↗

Technology Readiness of the NEXT Ion Propulsion System

The NASA's Evolutionary Xenon Thruster (NEXT) ion propulsion system has been in advanced technology development under the NASA In-Space Propulsion Technology project. The highest fidelity hardware planned has now been completed by the government/industry team, including: a flight prototype model (PM) thruster, an engineering model (EM) power processing unit, EM propellant management assemblies, a breadboard gimbal, and control unit simulators. Subsystem and system level technology validation testing is in progress. To achieve the objective Technology Readiness Level 6, environmental testing is being conducted to qualification levels in ground facilities simulating the space environment. Additional tests have been conducted to characterize the performance range and life capability of the NEXT thruster. This paper presents the status and results of technology validation testing accomplished to date, the validated subsystem and system capabilities, and the plans for completion of this phase of NEXT development. The next round of competed planetary science mission announcements of opportunity, and directed mission decisions, are anticipated to occur in 2008 and 2009. Progress to date, and the success of on-going technology validation, indicate that the NEXT ion propulsion system will be a primary candidate for mission consideration in these upcoming opportunities.

Benson, Scott W.↗

Progress in Technology Validation of the Next Ion Propulsion System

The NASA's Evolutionary Xenon Thruster (NEXT) ion propulsion system has been in advanced technology development under the NASA In-Space Propulsion Technology project. The highest fidelity hardware planned has now been completed by the government/industry team, including a flight prototype model (PM) thruster, an engineering model (EM) power processing unit, EM propellant management assemblies, a breadboard gimbal, and control unit simulators. Subsystem and system level technology validation testing is in progress. To achieve the objective Technology Readiness Level 6, environmental testing is being conducted to qualification levels in ground facilities simulating the space environment. Additional tests have been conducted to characterize the performance range and life capability of the NEXT thruster. This paper presents the status and results of technology validation testing accomplished to date, the validated subsystem and system capabilities, and the plans for completion of this phase of NEXT development.

Benson, Scott W.↗

Simulated Ice Shapes on the High Lift Common Research Model Using LEWICE3D

Computational icing tools consist of predicting two distinct problems, the dry air aerodynamics around the iced or uniced vehicle and the accretion of ice due to inclement weather. A desire exists to advance these tools such that they can be reliably used earlier in the design process to limit the need for more costly flight and wind tunnel testing. To achieve these goals the computational tools need to be benchmarked and validated against high quality experimental data sets to raise the software’s Technology Readiness Level. An ongoing collaborative effort between NASA and Boeing Commercial Airplanes is focused on obtaining this required experimental data and subsequently benchmarking and/or validating the tools that predict the aerodynamics around the iced and uniced vehicle. Currently the scope of this effort is focused on the usage of simulated ice shapes to be representative of the iced vehicle. This presentation discusses the generation of those simulated ice shapes.

Icing↗

An overview of results from the ion diagnostics sensors flown on DS1

The Deep Space 1 (DS1) mission has successfully validated the use of ion propulsion technology for interplanetary spacecraft. The NASA Solar Electric Propulsion (SEP) Technology Applications Readiness (NSTAR) Project developed the Ion Propulsion Subsystem (IPS) for DS1. As part of the NSTAR validation effort, the NSTAR Project included a diagnostics element to characterize the local environment produced during IPS operations and its effects on spacecraft subsystems and science instruments. An integrated, comprehensive set of diagnostics, the NSTAR Diagnostics Package (NPD) was developed and operated on DS1 to characterize the IPS environment. The DS1 Spacecraft Team officially assigned the name “IPS Diagnostics Subsystems (IDS)” to the NDP for the DS1 mission. During the technology validation phase of the DS1 mission, a large amount of data was collected from the IDS under a variety of IPS operating conditions. IDS was able to characterize the contamination environment, charge-exchange xenon ion and electron population and energies, plasma noise and electromagnetic noise, and magnetic fields associated with IPS. The results presented here describe the charge-exchange plasma, contamination, plasma wave/EMI, and DC magnetic environments critical to designers of future space missions using ion propulsion

Henty, M. D.↗