Search NASA⌕ Search

SEARCH · Search NASA

Results for “WASTE STORAGE”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

An Approach to Understanding Cohesive Slurry Settling, Mobilization, and Hydrogen Gas Retention in Pulsed Jet Mixed Vessels

The Hanford Waste Treatment and Immobilization Plant (WTP) is being designed and built to pretreat and vitrify a large portion of the waste in Hanford’s 177 underground waste storage tanks. Numerous process vessels will hold waste at various stages in the WTP. Some of these vessels have mixing-system requirements to maintain conditions where the accumulation of hydrogen gas stays below acceptable limits, and the mixing within the vessels is sufficient to release hydrogen gas under normal conditions and during off-normal events. Some of the WTP process streams are slurries of solid particles suspended in Newtonian fluids that behave as non-Newtonian slurries, such as Bingham yield-stress fluids. When these slurries are contained in the process vessels, the particles can settle and become progressively more concentrated toward the bottom of the vessels, depending on the effectiveness of the mixing system. One limiting behavior is a settled layer beneath a particle-free liquid layer. The settled layer, or any region with sufficiently high solids concentration, will exhibit non-Newtonian rheology where it is possible for the settled slurry to behave as a soft solid with a yield stress. In this report, these slurries are described as settling cohesive slurries.

08 HYDROGEN↗

Transuranic Waste Facility: Evaluation of Material-at-Risk Limits

The purpose of this analysis was to provide an evaluation and justification of the differences in the safety-basis parameters of Area G and the proposed TRU Waste Facility (TWF) in response to a request from the Los Alamos Field Office. Many of the differences in safety parameters stem from physical attributes such as facility location, size, and updated safety-basis requirements, etc. However, the primary safety-basis parameter that LANL and the Los Alamos Field Office can control for the proposed TWF is the required MAR limit. Based on the following analysis, LANL has proposed to reduce the overall facility MAR from 30,000 PE Ci to 21,400 PE Ci, and the waste storage buildings from 4,550 PE Ci to 3,200 PE Ci. The recommendation balances program requirements, operational considerations, facility construction cost, and container costs. To implement the reduced MAR strategy above, the Los Alamos Field Office and LANL will need to work with WIPP to ensure two characterization/shipment campaigns are scheduled each year. The analysis in this document included a review of historical trends and potential future scenarios in activity for enduring waste containers to define the expected normal operating range. The first part of the MAR analysis resulted in a newly defined range of activity of 10.5-18.0 PE Ci per DE2= expected for the design life of the new TWF. However, for accident scenario analysis, containers will use the WIPP WAC limits because there are no other individual container controls. Specifically, accident scenarios involving less than the building MAR will use the 80-PE Ci WIPP-WAC limit for drums. The accident analyses are intended to bound the potential impacts, and are not intended to be based on normal operational ranges. The Field Office also requested that LANL evaluate a potential reduction of the waste storage building MAR Limit by a factor of two to three. LANL used the newly defined MAR range of 10.5-18.0 PE Ci/DE to define upper and lower MAR boundary requirements using three containerization scenarios. The result of the analysis showed that the most probable scenario of future operations that balances costs, drum packaging efficiency, and shipment efficiency will routinely require the use of one-third to two-thirds of the MAR limit for each building. This result, paired with scenarios that could potentially provide short-term MAR increases, demonstrates that the MAR cannot be reduced by a factor as large as two to three, but can be reduced from 4,550 PE Ci to 3,200 PE Ci for waste storage buildings (a reduction of 30%). The TWF PDSA submittal contained combustibility values for enduring waste that appeared relatively large compared to Area G. The analysis provided the basis for the initial combustibility values established in the PDSA. Although the recent data provided combustibility values that were much lower than the PDSA assumptions (27% versus 80% in PDSA), the analysis shows that there is variability in combustible loading over time. For safety-basis accident scenarios, the material composition distribution for waste containers will be included in the MAR requirement by assuming all waste is combustible instead of applying a control for combustible loading. For operations and programs, it is better to assume 100% combustibles and maintain flexibility for waste generator containerization rather than to maintain a requirement for administrative controls of combustible loading. Controlling MAR through administrative controls is difficult for both the generator and waste management operations.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

SUBSLAB SOIL GAS SAMPLING PLAN FOR COMMUNICATION, MAINTENANCE, AND STORAGE, SOLID WASTE MANAGEMENT UNIT (SWMU) 082

HydroGeoLogic, Inc. (HGL) prepared this Subslab Soil Gas (SSSG) Sampling Plan for Communications, Maintenance, and Storage (CM&S), Solid Waste Management Unit (SWMU) 082 for the National Aeronautics and Space Administration (NASA), Kennedy Space Center (KSC), Florida, under Contract Number 80KSC019D0012, Task Order 80KSC021F0097 technical directive #1, awarded on September 26, 2022. As described herein, all SSSG sampling and evaluations will be completed in accordance with U.S. Environmental Protection Agency’s (EPA), OSWER Technical Guide for Assessing and Mitigating the Vapor Intrusion Pathway from Subsurface Vapor Sources to Indoor Air (EPA, 2015).

Jason J Bublitz↗

Rayleigh-Taylor Instability within Sediment Layers Due to Gas Retention: Preliminary Theory and Experiments

In Hanford underground waste storage tanks, a typical waste configuration is settled beds of waste particles beneath liquid layers. The settled beds are typically composed of layers, and these layers can have different physical and chemical properties. One postulated configuration within the settled bed is a less-dense layer beneath a more-dense layer. The different densities can be a result of different gas retention in the layers or different degrees of settling and compaction in the layers. This configuration can experience a Rayleigh-Taylor (RT) instability where the less dense lower layer rises into the upper layer. Previous studies of gas retention and release have not considered potential buoyant motion within a settle bed of solids. The purpose of this report is to provide a review of RT instabilities, discuss predictions of RT behavior for sediment layers, and summarize preliminary experimental observations of RT instabilities in simulant experiments.

Hanford↗

Hanford Double Shell Tank Integrity Inspection - Integration of Customized Robotics - 18400

28 steel, double-shell, million gallon waste storage tanks located at the Hanford site in Washington State store both radioactive and hazardous waste. To monitor their condition and ensure continued viability, these tanks are inspected periodically through a comprehensive integrity program. In 2012, the first leak in a double-shell tank at Hanford was discovered in the 241-AY tank farm (Tank AY-102) and the failure was observed to be from the primary tank bottom. However, the exact failure location and damage mechanism have not been determined. A decision was made to pursue the capability to inspect the primary tank bottom region in order to provide additional tank integrity information. This work is particularly challenging due to the confined space in the double-shell tank annulus region (i.e. the 30 inch space between the primary and secondary tank shells), the limited dimensions of the tank risers that provide access to the annulus space (risers as small as 10 inches in diameter), and also the very small dimensions of the air channels in the concrete refractory pad that the primary waste storage tank rests on (channels are approximately two inches in diameter). Veolia Nuclear Solutions, along with Key Subcontractor Inuktun, were contracted to provide the capability to conduct these tank inspections in support of Hanford's double-shell tank integrity program. The Veolia Nuclear Solutions /Inuktun team designed, built, tested and delivered a tethered miniature robotic crawler system that utilizes the marsupial approach - a larger deployment crawler positions a smaller inspection crawler. The deployment crawler is installed via the tank riser, is magnetically coupled to the side of the tank shell, and drives to the selected deployment location at the end of one of the refractory channels where the small inspection robot is subsequently deployed. Operation of the equipment is controlled from a trailer outside the tank farm (a distance of several hundred feet). The system design includes a custom mechanism that provides for positioning and cable handling as well as the controls interface (laptop connected via control cables). The solution leveraged the Veolia Nuclear Solutions/Inuktun team's experience with delivering similar modular systems for other US and international sites. This simple but innovative solution delivered on an accelerated project schedule underlines the ability to provide effective robotic solutions to the nuclear industry. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Cell G 7606A Mockup Measurement Analysis Methods and Results

The production of research isotopes at the Radiochemical Engineering Development Center (REDC) invariably leads to the accumulation of radioactive waste. Storage of this waste onsite at ORNL serves as an interim solution prior to shipment to long term storage facilities, however onsite capacity is limited. Proper characterization of the activity of waste products is essential for determining the appropriate waste stream and, ultimately, mitigating the cost of disposal. This is typically done via gamma spectrometry and use of the In-Situ Object Counting System (ISOCS), a software package from Mirion that serves as an accepted community standard. However, variability in the contents, density, and activity distribution in waste containers can introduce large errors in ISOCS quantification. A measurement campaign using a mockup of the proposed setup in Cell G seeks to quantify the magnitude and source of these systematic errors. Analysis of this data will guide the creation of ISOCS geometry templates and measurement methods designed to minimize overall uncertainty in reported activities.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Experience of Consolidation Of Disused Sources In Developing Countries, An African Perspective

Application of sealed sources in agriculture, medicine and industry was used in many African countries without having any arrangements in place for managing the sources when their useful life was over. In Tanzania a substantial use of such sources was utilized. In the early days source management was not an area that was given the required attention hence a legacy associated with sealed sources became evident in many African countries and Tanzania was one of them. In the 90's Tanzania Atomic Energy Commission (TAEC), realized the scope of the waste problem and began to participate in an International Atomic Energy Agency Regional (IAEA) project on waste management. Tanzania in cooperation with IAEA initiated activities under the IAEA Technical Cooperation and the Regional projects 'Strengthening Waste Management Infrastructure, RAF/4/015'; and 'Sustaining the Waste Management Infrastructure RAF/3/005' which played a significant role. The first outcome of the project was realized in 1999, as the first 'Temporary Radioactive Waste Storage Facility' began to operate. This particular Storage facility gave the first impact as well as the need to develop this particular infrastructure further. As the project carried on, more and more orphan sources were recovered, collected and safely stored at the facility. As the use of nuclear technology was expanding and the identification of the extent of sealed sources in the countries became more defined, the need to develop a 'Central Radioactive Waste Management Facility' (CRWMF) was becoming more desired. The central radioactive waste storage facility was constructed and commissioned in 2005. The facility was more advanced and could be used for much longer periods of time, as one of the most advanced storage facility in the Region. At present a large number of disused sources from various industries as well as from different activities are being stored at the facility. Tanzanian authorities are also planning to initiate a nationwide mission to recover and properly store as well as dispose of abandoned sources. Cooperation among the AFRA Member states has been very rewarding in terms of experience and its importance. Skills that have been gained during the past years of existence of the AFRA project will be a vital contribution for years to come. This paper discusses the experiences of United Republic of Tanzania on management of orphan radioactive sources. The need to develop its own radioactive waste management infrastructure was required due to the fact, that many disused radioactive sources have been found abandoned and needed to be properly disposed of. The paper will also discuss some of these experiences. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Deliquescence of Eutectic LiCl-KCl Diluted with NaCl for Interim Waste Salt Storage

Molten eutectic LiCl-KCl salt is a widely used electrolyte for electrorefining uranium from spent nuclear fuel. Due to the hygroscopic nature of this salt, such operations must be performed under controlled atmospheric conditions, and waste salts require careful storage to avoid deliquescence and corrosion of container materials. This study investigated a potential processing path for reducing the degree of deliquescence through dilution to varying extents with NaCl. Here, the hydration behavior of LiCl-KCl salts diluted with NaCl was evaluated in terms of mass gain due to water absorption, degree of deliquescence (including first appearances of standing water), and evidence of corrosion to stainless steel containers in a humid air environment (40°C, 20% relative humidity). In this humid air environment, pure eutectic LiCl-KCl exhibited a 50 mass % increase due to water absorption and showed evidence of standing water after 24 h. Waste salt diluted with NaCl required loadings of 89 mass % NaCl in order to prevent deliquescence and exhibited a 3 mass % increase due to water absorption. After periodic observation for 48 h, standing water was observed near all ingots with the exception of the 89 mass % NaCl samples. Dilution with 89% NaCl was also found to reduce evidence of corrosion when stored in stainless steel crucibles. While dilution with NaCl greatly decreases steady-state hydration, the storage volume is increased ~10× through this procedure.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Ambient Dose Equivalent measured at the Instituto Nacional de Cancerologia Department of Nuclear Medicine

Ambient dose equivalent values were determined in several sites at the Instituto Nacional de Cancerologia, Departmento de Medicina Nuclear, using TLD-100 and TLD-900 thermoluminescent dosemeters. Additionally, ambient dose equivalent was measured at a corridor outside the hospitalization room for patients treated with {sup 137}Cs brachytherapy. Dosemeter calibration was performed at the Instituto Nacional de Investigaciones Nucleares, Laboratorio de Metrologia, to known {sup 137}Cs gamma radiation air kerma. Radionuclides considered for this study are {sup 131}I, {sup 18}F, {sup 67}Ga, {sup 99m}Tc, {sup 111}In, {sup 201}Tl and {sup 137}Cs, with main gamma energies between 93 and 662 keV. Dosemeters were placed during a five month period in the nuclear medicine rooms (containing gamma-cameras), injection corridor, patient waiting areas, PET/CT study room, hot lab, waste storage room and corridors next to the hospitalization rooms for patients treated with {sup 131}I and {sup 137}Cs. High dose values were found at the waste storage room, outside corridor of {sup 137}Cs brachytherapy patients and PET/CT area. Ambient dose equivalent rate obtained for the {sup 137}Cs brachytherapy corridor is equal to (18.51{+-}0.02)x10{sup -3} mSv/h. Sites with minimum doses are the gamma camera rooms, having ambient dose equivalent rates equal to (0.05{+-}0.03)x10{sup -3} mSv/h. Recommendations have been given to the Department authorities so that further actions are taken to reduce doses at high dose sites in order to comply with the ALARA principle (as low as reasonably achievable).

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Retrieval of Tank Waste from Storage

This book will provide an overview of the key elements in remediating complex waste sites using the Hanford Site as a case study. In this chapter, the existing infrastructure to store and transfer Hanford wastes, a short history of operations in Hanford Tank Farms, the SST retrieval needs and subsequent DST waste handling operations for retrieval, treatment, and closure are discussed. Waste retrieval operational examples are summarized.

Fountain, Matthew S.↗

Nuclear Energy Advanced Modeling and Simulation (NEAMS) Waste Integrated Performance and Safety Codes (IPSC) : FY10 development and integration.

This report describes the progress in fiscal year 2010 in developing the Waste Integrated Performance and Safety Codes (IPSC) in support of the U.S. Department of Energy (DOE) Office of Nuclear Energy Advanced Modeling and Simulation (NEAMS) Campaign. The goal of the Waste IPSC is to develop an integrated suite of computational modeling and simulation capabilities to quantitatively assess the long-term performance of waste forms in the engineered and geologic environments of a radioactive waste storage or disposal system. The Waste IPSC will provide this simulation capability (1) for a range of disposal concepts, waste form types, engineered repository designs, and geologic settings, (2) for a range of time scales and distances, (3) with appropriate consideration of the inherent uncertainties, and (4) in accordance with robust verification, validation, and software quality requirements. Waste IPSC activities in fiscal year 2010 focused on specifying a challenge problem to demonstrate proof of concept, developing a verification and validation plan, and performing an initial gap analyses to identify candidate codes and tools to support the development and integration of the Waste IPSC. The current Waste IPSC strategy is to acquire and integrate the necessary Waste IPSC capabilities wherever feasible, and develop only those capabilities that cannot be acquired or suitably integrated, verified, or validated. This year-end progress report documents the FY10 status of acquisition, development, and integration of thermal-hydrologic-chemical-mechanical (THCM) code capabilities, frameworks, and enabling tools and infrastructure.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

F-Tank Farm Performance Assessment Updates through the Special Analysis Process at Savannah River Site - 12169

The F-Area Tank Farm (FTF) is owned by the U.S. Department of Energy and operated by Savannah River Remediation, LLC (SRR), Liquid Waste Operations contractor at DOE's Savannah River Site (SRS). The FTF is in the north-central portion of the SRS and occupies approximately 22 acres within F-Area. The FTF is an active radioactive waste storage facility consisting of 22 carbon steel waste tanks and ancillary equipment such as transfer lines, evaporators and pump tanks. An FTF Performance Assessment (PA) was prepared to support the eventual closure of the FTF underground radioactive waste tanks and ancillary equipment. The PA provides the technical basis and results to be used in subsequent documents to demonstrate compliance with the pertinent requirements identified below for final closure of FTF. The FTank Farm is subject to a state industrial waste water permit and Federal Facility Agreement. Closure documentation will include an F-Tank Farm Closure Plan and tank-specific closure modules utilizing information from the performance assessment. For this reason, the State of South Carolina and the Environmental Protection Agency must be involved in the performance assessment review process. The residual material remaining after tank cleaning is also subject to reclassification prior to closure via a waste determination pursuant to Section 3116 of the Ronald W. Reagan National Defense Authorization Act of Fiscal Year 2005. The projected waste tank inventories in the FTF PA provide reasonably bounding FTF inventory projections while taking into account uncertainties in the effectiveness of future tank cleaning technologies. As waste is removed from the FTF waste tanks, the residual contaminants will be sampled and the remaining residual inventory is characterized. In this manner, tank specific data for the tank inventories at closure will be available to supplement the waste tank inventory projections currently used in the FTF PA. For FTF, the new tank specific data will be evaluated through the Special Analysis process. The FTF Special Analyses process will be utilized to evaluate information regarding the final residual waste that will be grouted in place in the FTF Tanks and assess the potential impact the new inventory information has on the FTF PA assumptions and results. The Special Analysis can then be used to inform decisions regarding FTF tank closure documents. The purpose of this paper is to discuss the Special Analysis process and share insights gained while implementing this process. An example of an area of interest in the revision process is balancing continuous improvement versus configuration control of agreed upon methodologies. Other subjects to be covered include: 1) defining the scope of the revisions included in the Special Analysis, 2) determining which PA results should be addressed in the Special Analysis, and 3) deciding whether the Special Analysis should utilize more qualitative or quantitative assessments. For the SRS FTF, an FTF PA has been prepared to provide the technical basis and results to be used in subsequent documents to demonstrate compliance with the pertinent requirements for final closure of FTF. The FTF Special Analyses process will be utilized to evaluate the impact new information has on the FTF PA assumptions and results. The Special Analysis can then be used to inform decisions regarding FTF tank closure documents. In preparing SAs, it is crucial that the scope of the SA be well defined within the SA, since the specific scope will vary from SA to SA. Since the SAs are essentially addendums to the PA, the SA scope should utilize the PA as the baseline from which the SA scope is defined. The SA needs to focus on evaluating the change associated with the scope, and not let other changes interfere with the ability to perform that evaluation by masking the impact of the change. In preparing the SA, it is also important to let the scope determine whether the Special Analysis should utilize more qualitative or quantitative assessments and also which results from the PA should be addressed in the Special Analysis. These decisions can vary from SA and should not be predetermined. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

NEAMS Nuclear Waste Management IPSC : evaluation and selection of tools for the quality environment.

The objective of the U.S. Department of Energy Office of Nuclear Energy Advanced Modeling and Simulation Nuclear Waste Management Integrated Performance and Safety Codes (NEAMS Nuclear Waste Management IPSC) is to provide an integrated suite of computational modeling and simulation (M&S) capabilities to quantitatively assess the long-term performance of waste forms in the engineered and geologic environments of a radioactive-waste storage facility or disposal repository. These M&S capabilities are to be managed, verified, and validated within the NEAMS Nuclear Waste Management IPSC quality environment. M&S capabilities and the supporting analysis workflow and simulation data management tools will be distributed to end-users from this same quality environment. The same analysis workflow and simulation data management tools that are to be distributed to end-users will be used for verification and validation (V&V) activities within the quality environment. This strategic decision reduces the number of tools to be supported, and increases the quality of tools distributed to end users due to rigorous use by V&V activities. This report documents an evaluation of the needs, options, and tools selected for the NEAMS Nuclear Waste Management IPSC quality environment. The objective of the U.S. Department of Energy (DOE) Office of Nuclear Energy Advanced Modeling and Simulation Nuclear Waste Management Integrated Performance and Safety Codes (NEAMS Nuclear Waste Management IPSC) program element is to provide an integrated suite of computational modeling and simulation (M&S) capabilities to assess quantitatively the long-term performance of waste forms in the engineered and geologic environments of a radioactive-waste storage facility or disposal repository. This objective will be fulfilled by acquiring and developing M&S capabilities, and establishing a defensible level of confidence in these M&S capabilities. The foundation for assessing the level of confidence is based upon the rigor and results from verification, validation, and uncertainty quantification (V&V and UQ) activities. M&S capabilities are to be managed, verified, and validated within the NEAMS Nuclear Waste Management IPSC quality environment. M&S capabilities and the supporting analysis workflow and simulation data management tools will be distributed to end-users from this same quality environment. The same analysis workflow and simulation data management tools that are to be distributed to end-users will be used for verification and validation (V&V) activities within the quality environment. This strategic decision reduces the number of tools to be supported, and increases the quality of tools distributed to end users due to rigorous use by V&V activities. NEAMS Nuclear Waste Management IPSC V&V and UQ practices and evidence management goals are documented in the V&V Plan. This V&V plan includes a description of the quality environment into which M&S capabilities are imported and V&V and UQ activities are managed. The first phase of implementing the V&V plan is to deploy an initial quality environment through the acquisition and integration of a set of software tools. An evaluation of the needs, options, and tools selected for the quality environment is given in this report.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Challenge problem and milestones for : Nuclear Energy Advanced Modeling and Simulation (NEAMS) waste Integrated Performance and Safety Codes (IPSC).

This report describes the specification of a challenge problem and associated challenge milestones for the Waste Integrated Performance and Safety Codes (IPSC) supporting the U.S. Department of Energy (DOE) Office of Nuclear Energy Advanced Modeling and Simulation (NEAMS) Campaign. The NEAMS challenge problems are designed to demonstrate proof of concept and progress towards IPSC goals. The goal of the Waste IPSC is to develop an integrated suite of modeling and simulation capabilities to quantitatively assess the long-term performance of waste forms in the engineered and geologic environments of a radioactive waste storage or disposal system. The Waste IPSC will provide this simulation capability (1) for a range of disposal concepts, waste form types, engineered repository designs, and geologic settings, (2) for a range of time scales and distances, (3) with appropriate consideration of the inherent uncertainties, and (4) in accordance with robust verification, validation, and software quality requirements. To demonstrate proof of concept and progress towards these goals and requirements, a Waste IPSC challenge problem is specified that includes coupled thermal-hydrologic-chemical-mechanical (THCM) processes that describe (1) the degradation of a borosilicate glass waste form and the corresponding mobilization of radionuclides (i.e., the processes that produce the radionuclide source term), (2) the associated near-field physical and chemical environment for waste emplacement within a salt formation, and (3) radionuclide transport in the near field (i.e., through the engineered components - waste form, waste package, and backfill - and the immediately adjacent salt). The initial details of a set of challenge milestones that collectively comprise the full challenge problem are also specified.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Nuclear Energy Advanced Modeling and Simulation (NEAMS) waste Integrated Performance and Safety Codes (IPSC) : gap analysis for high fidelity and performance assessment code development.

This report describes a gap analysis performed in the process of developing the Waste Integrated Performance and Safety Codes (IPSC) in support of the U.S. Department of Energy (DOE) Office of Nuclear Energy Advanced Modeling and Simulation (NEAMS) Campaign. The goal of the Waste IPSC is to develop an integrated suite of computational modeling and simulation capabilities to quantitatively assess the long-term performance of waste forms in the engineered and geologic environments of a radioactive waste storage or disposal system. The Waste IPSC will provide this simulation capability (1) for a range of disposal concepts, waste form types, engineered repository designs, and geologic settings, (2) for a range of time scales and distances, (3) with appropriate consideration of the inherent uncertainties, and (4) in accordance with rigorous verification, validation, and software quality requirements. The gap analyses documented in this report were are performed during an initial gap analysis to identify candidate codes and tools to support the development and integration of the Waste IPSC, and during follow-on activities that delved into more detailed assessments of the various codes that were acquired, studied, and tested. The current Waste IPSC strategy is to acquire and integrate the necessary Waste IPSC capabilities wherever feasible, and develop only those capabilities that cannot be acquired or suitably integrated, verified, or validated. The gap analysis indicates that significant capabilities may already exist in the existing THC codes although there is no single code able to fully account for all physical and chemical processes involved in a waste disposal system. Large gaps exist in modeling chemical processes and their couplings with other processes. The coupling of chemical processes with flow transport and mechanical deformation remains challenging. The data for extreme environments (e.g., for elevated temperature and high ionic strength media) that are needed for repository modeling are severely lacking. In addition, most of existing reactive transport codes were developed for non-radioactive contaminants, and they need to be adapted to account for radionuclide decay and in-growth. The accessibility to the source codes is generally limited. Because the problems of interest for the Waste IPSC are likely to result in relatively large computational models, a compact memory-usage footprint and a fast/robust solution procedure will be needed. A robust massively parallel processing (MPP) capability will also be required to provide reasonable turnaround times on the analyses that will be performed with the code. A performance assessment (PA) calculation for a waste disposal system generally requires a large number (hundreds to thousands) of model simulations to quantify the effect of model parameter uncertainties on the predicted repository performance. A set of codes for a PA calculation must be sufficiently robust and fast in terms of code execution. A PA system as a whole must be able to provide multiple alternative models for a specific set of physical/chemical processes, so that the users can choose various levels of modeling complexity based on their modeling needs. This requires PA codes, preferably, to be highly modularized. Most of the existing codes have difficulties meeting these requirements. Based on the gap analysis results, we have made the following recommendations for the code selection and code development for the NEAMS waste IPSC: (1) build fully coupled high-fidelity THCMBR codes using the existing SIERRA codes (e.g., ARIA and ADAGIO) and platform, (2) use DAKOTA to build an enhanced performance assessment system (EPAS), and build a modular code architecture and key code modules for performance assessments. The key chemical calculation modules will be built by expanding the existing CANTERA capabilities as well as by extracting useful components from other existing codes.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Double-Shell tank Integrity program - 15533

Waste at Hanford is stored in 149 single-shell tanks and 28 double-shell tanks (DSTs). Concerns related to aging radioactive waste storage facilities throughout the US DOE complex led to Brookhaven National Laboratory (BNL) developing guidelines for structural integrity programs for tank systems (BNL-52527, Guidelines for Development of Structural Integrity Programs for DOE High-Level Waste Storage Tanks). The committee of experts who developed these guidelines is commonly known as the Tank Structural Integrity Panel (TSIP). The US DOE has subsequently adopted these guidelines, and requires site operators to have a program consistent with them (DOE M 435.1, Radioactive Waste Management Manual). The Washington River Protection Solutions, LLC (WRPS) manages the tanks for the US DOE Office of River Protection (ORP) under the Tank Operations Contract (TOC). The US DOE-ORP contractual agreement with the TOC (11-NSD-010) includes a requirement to 'maintain the tank structural integrity program as described in RPP-7574, Double-Shell tank Integrity Project Plan'. The DST integrity is maintained with a variety of activities such as ultrasonic and visual inspections, chemistry controls, corrosion monitoring and structural analyses methods. The recent loss of tank 241-AY-102 has led to the formation of the High-Level Waste Integrity Assessment Panel to evaluate the DST integrity project (DSTIP) and to recommend improvements to the DSTIP. This panel continues the DOE practice of seeking expert advice to guide the formulation and continuous assessment of tank integrity activities. The panel has concluded its work and WRPS has developed a series of tasks to implement their recommendations. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Site Environmental Report for 2018

Lawrence Berkeley National Laboratory (LBNL, Berkeley Lab) is a multi-program scientific facility operated by the University of California (UC) for the U.S. Department of Energy (DOE). Berkeley Lab’s research is focused on the physical, biological, environmental, and computational sciences, with the objective of delivering scientific knowledge and discoveries pertinent to DOE’s mission. This annual report describes environmental protection activities and potential impacts resulting from LBNL operations conducted in 2018. The format and content of this report satisfy the requirements of both DOE Order 231.1B, Administrative Change 1 (Environment, Safety, and Health Reporting) and the operating contract between UC and DOE (DOE Contract No. DE-AC02-05CH11231, also known as Contract 31). LBNL activities are planned and conducted with full regard to protecting employees, the public, and the environment, as well as complying with all applicable environmental, safety, and health laws and regulations. As presented in Chapter 2, Berkeley Lab implements an Environmental Management System (EMS) to oversee environmental compliance activities and continually improve overall environmental performance while maintaining operational capability and sustaining its overall mission. The effectiveness of the EMS and environmental programs is reviewed annually as part of the performance evaluation process of Contract 31. For fiscal year (FY) 2018, which began October 1, 2017, and ended September 30, 2018, the EMS was given a performance rating of B plus for its management of environmental activities (on a scale from A plus as the highest grade, to F as the lowest). The measurement and rating system was developed jointly by Berkeley Lab, UC, and DOE. The FY 2018 rating was based on how Berkeley Lab met the objective in DOE’s FY 2018 Performance Evaluation and Measurement Plan (Appendix B in Contract 31, Section J) of providing an efficient and effective EMS. Six significant accomplishments, which ranged from effective teaming on projects and with regulatory agencies to improved program assessment approaches, were factors in the rating. The EMS was also graded through the federal Office of Management and Budget’s annual EMS performance metrics, in which a reporting scorecard rates elements of the International Organization for Standardization (ISO) 14001 standard and the degree of integration between the EMS and Berkeley Lab’s sustainable practices. Overall scores fall into one of three categories: green (highest), yellow (middle), or red (lowest). For FY 2018, Berkeley Lab received a score of green. A week-long formal conformity audit of the EMS was conducted at the end of July by a qualified external party, as is required every three years. The audit team found that Berkeley Lab’s EMS continues to conform to the ISO standard with no major nonconformance. An overview of environmental protection and restoration programs is provided in Chapter 3, including information about compliance activities, operating permits, and regulatory agency inspections and audits that occurred during 2018. Twenty-one minor violations and two Class II violations were issued during agency inspections of programs governing aboveground and underground storage tanks, hazardous waste treatment units, hazardous waste storage areas, hazardous materials management, and wastewater, stormwater, and air emission sources. This report also includes information on environmental monitoring performed in 2018 (Chapter 4). The results of these monitoring activities confirmed that groundwater cleanup actions have been effective in reducing concentrations of volatile organic compounds (VOCs) in the groundwater, although concentrations appear to be reaching asymptotic levels in some areas. Site groundwater plumes are stable or are attenuating, and VOCs are not migrating off site. All emissions and discharges from LBNL operations were within environmental compliance release limits except oxides of nitrogen and carbon monoxide from boilers (under 5 million BTUs) from Buildings 2, 66, and 88. The radiological dose assessments (Chapter 5) performed in 2018 concluded that the maximum potential dose to a hypothetical resident from Berkeley Lab’s airborne radionuclide releases was approximately 0.04% of the DOE and U.S. Environmental Protection Agency annual limit of 10 millirem per year (mrem/yr); the potential dose from all radiation sources at Berkeley Lab was approximately 0.15% of the average natural background radiation dose of 310 mrem/yr in the United States, and about 0.5% of the DOE annual limit of 100 mrem/yr from all sources.

54 ENVIRONMENTAL SCIENCES↗

Waste Management Fundamentals for Environmental Professionals (UTrain 50448) [Slides]

At the pilot of this course, we discovered that we need to focus on how we do waste management at LANL. Environmental Professionals have a variety of jobs - most impact waste in some way. Finding a balance between comprehensive enough and too much is key. The goals of this training are for it to be good, consistent, and helpful, not just a requirement. The course modules are: Intro to Waste, Waste Regulations and Requirements, Waste Planning, Waste Generation and Tracking, Waste Characterization, Waste Packaging, Waste Accumulation and Storage, Waste Treatment, Waste Shipping, and Operation Experience and Lessons Learned.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗