Search NASA⌕ Search

SEARCH · Search NASA

Results for “advanced metering infrastructure”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

An Efficient and Versatile Means for Assembling and Manufacturing Systems in Space

Within NASA Space Science, Exploration and the Office of Chief Technologist, there are Grand Challenges and advanced future exploration, science and commercial mission applications that could benefit significantly from large-span and large-area structural systems. Of particular and persistent interest to the Space Science community is the desire for large (in the 10- 50 meter range for main aperture diameter) space telescopes that would revolutionize space astronomy. Achieving these systems will likely require on-orbit assembly, but previous approaches for assembling large-scale telescope truss structures and systems in space have been perceived as very costly because they require high precision and custom components. These components rely on a large number of mechanical connections and supporting infrastructure that are unique to each application. In this paper, a new assembly paradigm that mitigates these concerns is proposed and described. A new assembly approach, developed to implement the paradigm, is developed incorporating: Intelligent Precision Jigging Robots, Electron-Beam welding, robotic handling/manipulation, operations assembly sequence and path planning, and low precision weldable structural elements. Key advantages of the new assembly paradigm, as well as concept descriptions and ongoing research and technology development efforts for each of the major elements are summarized.

Dorsey, John T.↗

Estimation of solar photovoltaic energy curtailment due to volt–watt control

The widespread deployment of autonomous inverter‐based solutions for mitigating voltage and frequency excursions caused by high‐penetration photovoltaic (PV) systems has drawn increased attention due to their potential impact on PV production. It is now important to quantify the amount of solar energy curtailed as a result of the activation of inverter‐based grid support functions (GSFs). This study proposes a methodology for estimating the impact of volt–watt on customer PV energy curtailment using smart meter voltage data. This method estimates maximum possible curtailment for a given volt–watt curve based on the customer smart meter voltage during the time period of interest. This study compares the proposed methodology with field measurements using irradiance and customer inverter data from Hawaii as well as with results from a previous simulation‐driven study on the impact of advanced inverter GSF activation on PV energy curtailment. Results show that the proposed method for estimating lost PV production caused by volt–watt control aligns reasonably well with field measurements and computer simulations for hundreds of customers. The proposed method could be used to estimate customer energy curtailment, which could inform future compensation mechanisms for utilities leveraging customer‐sited resources to mitigate high voltage and defer infrastructure upgrades.

Emmanuel, Michael↗

A Review of Edge Computing Technology and Its Applications in Power Systems

Recent advancements in network-connected devices have led to a rapid increase in the deployment of smart devices and enhanced grid connectivity, resulting in a surge in data generation and expanded deployment to the edge of systems. Classic cloud computing infrastructures are increasingly challenged by the demands for large bandwidth, low latency, fast response speed, and strong security. Therefore, edge computing has emerged as a critical technology to address these challenges, gaining widespread adoption across various sectors. This paper introduces the advent and capabilities of edge computing, reviews its state-of-the-art architectural advancements, and explores its communication techniques. A comprehensive analysis of edge computing technologies is also presented. Furthermore, this paper highlights the transformative role of edge computing in various areas, particularly emphasizing its role in power systems. It summarizes edge computing applications in power systems that are oriented from the architectures, such as power system monitoring, smart meter management, data collection and analysis, resource management, etc. Additionally, the paper discusses the future opportunities of edge computing in enhancing power system applications.

24 POWER TRANSMISSION AND DISTRIBUTION↗

AGGREGATE: dAta-driven modelinG preservinG contRollable dEr for outaGe mAnagemenT and rEsiliency (Final Report)

The AGGREGATE project team successfully developed and validated various modules for outage management. Brief summaries of each module are provided to showcase their strength for outage management and restoration for a distribution system with a high penetration of connected distribution energy resources (DERs). In recent years, inverter-based DERs have been widely deployed in distribution system. A most of behind-the-meter (BTM) solar power generation is not visible to the utility. The data-driven DER and load estimation modules are using machine learning (ML) and artificial intelligence (AI) to manage this issue, which provides an opportunity for distribution system operators (DSOs) to operate systems and make decisions in real-time for a distribution system with a high penetration of DERs deployed. Also, the estimated DER and true load can be further leveraged in network aggregation and cold-load pick up estimation for reducing the computing complexity and providing for fast restoration. After load demand and DER power generations have been estimated, the information will support topology and state estimation (SE). The topology estimation module demonstrated the viability of mixed integer linear programming (MILP) formulation to estimate the most likely operational radial topology and outage sections using power flow measurements, historical/estimated load and DERs data and smart meter ping measurements. Formulation includes continuous (power flow, load and DERs data) and binary measurements (smart meter ping measurements) in a single formulation. Errors in continuous data and binary data are modeled as normal distribution and Bernoulli distribution, respectively. In the future distribution grid, the power injection from controllable DERs will be essential for efficient and resilient grid operation. However, determining the optimal DER injections and restoration actions is dependent on knowledge of the system states. State estimation (SE), already the cornerstone of transmission energy management systems, will become commonplace in distribution management systems as more measurements become available from deployment of automated metering infrastructure (AMI). Observability analysis is the first step in SE, as it determines the sufficiency of the available measurements for accurately estimating the current system states. A new type of pseudo-measurement called a Correlational Measurement (CM) is introduced in this module, to enhance the observability of the system to enable more accurate SE. CMs encapsulate knowledge of correlation between demand patterns for similar classes of loads as well as injection patterns for same-technology renewable DERs. During grid contingency scenarios, DERs have been traditionally disconnected, without any fault ride-through capabilities. However, with new regulations and better technology, it is feasible for these resources to contribute to the grid’s restoration after an adverse event and hence enhance resilience. The controllability module proposes a two-step restoration scheme for the power system restoration process by leveraging additional degrees of freedom in power electronics interfaced DERs for mitigating voltage problems. In a resilience mode without the utility system, the distribution grid relies on DERs to serve critical load. In such a severe event with multiple faults on the distribution feeders, actuation of various protective devices (PDs) divides the distribution system into electrical islands. The undetected actuated PDs due to fault current contributions from DERs can delay the restoration process, thereby reducing the system resilience. The Advanced Outage Management (AOM) and the Advanced Feeder Restoration (AFR) modules developed in this project provide improved system resilience with multiple DERs. AOM identifies the faulted sections and actuated PDs in a distribution system with DERs by incorporating smart meter data. The most credible outage scenario including fault locations, PD actuations, and fault indicator (FI) failures is identified by a set of binary integer linear programming incorporating hypotheses. The AFR module serves to restore a distribution system with available energy resources taking into consideration the availability of utility sources and DERs. By partitioning the system into islands, critical load will be served with the available generation resources within islands based on the solution of a MILP. When the utility systems become available, the optimal path will be determined by a spanning tree search algorithm that reconnects these islands back to substations and restores the remaining load. The transmission and distribution (T&D) co-simulation module was used to validate the effect of a control action performed on the distribution side assets as it propagates to the transmission side. This ensures that the control action performed results in a feasible operating point on both the transmission and the distribution system. In addition to validation, the team used the T&D co-simulation module to demonstrate how distribution system assets can be used to mitigate issues on the transmission system. Specifically, the team demonstrated that appropriate switching operations on the distribution side can alleviate the line overload condition on the transmission side without causing new operational constraint violations.

24 POWER TRANSMISSION AND DISTRIBUTION↗

RF Technologies for Advancing Space Communication Infrastructure

This paper will address key technologies under development at the NASA Glenn Research Center designed to provide architecture-level impacts. Specifically, we will describe deployable antennas, a new type of phased array antenna and novel power amplifiers. The evaluation of architectural influence can be conducted from two perspectives where said architecture can be analyzed from either the top-down to determine the areas where technology improvements will be most beneficial or from the bottom-up where each technology s performance advancement can affect the overall architecture s performance. This paper will take the latter approach with focus on some technology improvement challenges and address architecture impacts. For example, using data rate as a performance metric, future exploration scenarios are expected to demand data rates possibly exceeding 1 Gbps. To support these advancements in a Mars scenario, as an example, Ka-band and antenna aperture sizes on the order of 10 meters will be required from Mars areostationary platforms. Key technical challenges for a large deployable antenna include maximizing the ratio of deployed-to-packaged volume, minimizing aerial density, maintaining RMS surface accuracy to within 1/20 of a wavelength or better, and developing reflector rigidization techniques. Moreover, the high frequencies and large apertures manifest a new problem for microwave engineers that are familiar to optical communications specialists: pointing. The fine beam widths and long ranges dictate the need for electronic or mechanical feed articulation to compensate for spacecraft attitude control limitations.

Romanofsky, Robert R.↗

Automatic Calibration and Health Monitoring of Infrastructure Sensors

Smart transportation infrastructure relies on networks of heterogeneous sensors - cameras, radars, and lidars - continuously monitoring traffic conditions. However, executing the initial spatial calibration of multiple sensors and the subsequent health monitoring presents significant operational challenges. Environmental factors, mechanical vibrations, and gradual drift cause spatial misalignment, degrading fusion performance and tracking accuracy. Traditional calibration approaches require manual intervention with specialized targets or survey equipment, resulting in service interruptions and high maintenance costs. This work presents an automated framework for initial calibration and continuous health monitoring without human intervention or service disruption. Our approach addresses two critical problems: (1) detecting when sensors become miscalibrated during operation, and (2) automatically re-establishing spatial alignment using only operational traffic data. The health monitoring component analyzes measurement innovations - differences between sensor observations and predicted object states - to detect systematic biases indicative of calibration drift. By computing bias magnitude, directional consistency, and rejection rates, the system identifies miscalibrations as small as 0.5 meters. Unlike traditional methods requiring known calibration targets, our diagnostic operates continuously on live traffic observations, enabling early detection before fusion quality degrades. The automatic recalibration algorithm leverages overlapping sensor fields-of-view and temporal correlation of vehicle observations. Using graph-based optimization, the system automatically discovers which sensor pairs observe common regions, estimates pairwise spatial transformations using RANSAC-based robust estimation, and jointly optimizes all sensor poses through bundle adjustment. The framework handles practical deployment challenges, including different sensor sampling rates (1-10 Hz), varying installation positions, unknown orientations, and limited overlap regions (>10%). When approximate sensor positions are available from installation surveys (+/-1m accuracy), the algorithm additionally estimates sensor orientations, refining both position and rotation to sub-meter and sub-degree accuracy. We validate the framework on multi-hour traffic datasets from six heterogeneous sensors with sampling rates ranging from 1 Hz to 10 Hz. Results demonstrate successful calibration even with sparse overlap (<20%) and automatic detection of miscalibrations exceeding 0.8 meters. This work enables a "deploy-and-forget" sensor infrastructure that maintains calibration autonomously, reducing maintenance costs while improving tracking accuracy. The techniques generalize beyond transportation to any multi-sensor monitoring application requiring robust spatial alignment, including smart cities, industrial monitoring, and surveillance systems.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Powernet in Farms Project

Coordinating behind-the-meter (BTM) distributed energy resources (DERs) is critical to ensuring efficiency and reliability for consumers facing an increasingly variable grid supply. Outside of very controlled environments, however, such coordination of heterogeneous resources at scale has remained a challenge due to harsh field conditions, the lack of adequate communication infrastructure, and the difficulty of modeling the system. The intent of this research was to refine the Powernet system deployed in a California dairy farm to achieve the following objectives: a) validate the results of the previous deployment and b) validate new hypothesis about system performance based on the simulation of the new system. The new system design would reduce the overall system cost, and achieve a payback period of less than 3 years, demonstrating the feasibility of such system and its relevance for a segment not well known for technology advancements in power systems. The new proposed system was significantly cheaper than the original design, which would enable the solution to be cost effective and likely economically viable. However, due to significant delays in project start date which affected funding availability, overlap with prior scheduled mandatory military leave from key members of the project team, and customer drop-out, due to the significant delays, which could not be replaced in time, caused the project to be ended prior to completion.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Hydrogen Production, Grid Integration, and Scaling for the Future

The Hydrogen Production, Grid Integration, and Scaling for the Future project will inform clean hydrogen production deployment across the planning, procurement, and operation stages of hydrogen production on the grid. Hydrogen production from renewables is a clean source of fuel which is near zero for greenhouse gas emissions and criteria pollutants. The results from this project will inform entities looking to build clean energy projects that produce good paying jobs in manufacturing, installation, maintenance and operation of these facilities. This project provides system characterization examples, multiple configurations, optimizations, and suggested metering and custody transfer points through multiple scenarios and hardware testing of NREL's state-of-the-art 1.25 MW polymer electrolyte membrane (PEM) electrolyzer system to characterize system performance in relevant scenarios. This work also creates a digital twin for emulation in the Advanced Research on Integrated Systems (ARIES) virtual environment and performs hardware-in-the-loop (HIL) testing of pilot-scale, decentralized, and centralized hydrogen systems.

centralized hydrogen production↗

Machine-Learning-Based Mapping and Modeling of Solar Energy with Ultra-High Spatiotemporal Granularity

Despite the rapid growth of solar energy, we still lack a dynamic, high-fidelity database that tracks the spatiotemporal variations of solar PVs and their associated infrastructures across different places at a spatially resolved scale. The absence of such data presents a barrier to various applications such as solar PV growth projection, solar energy integration, solar incentive design, and climate risk assessment. In this project, we aim to bridge this gap by developing AI-based algorithms to extract granular information about solar PV installations and their associated infrastructures (i.e., distribution grids) from widely available unstructured data like remote sensing images and street views. As a result, we have built the Solar Energy Atlas, a fine-grained, large-scale geospatial overlay of distributed solar PVs and distribution grids. On top of it, we have advanced the understanding of solar adoption and distribution grid vulnerability to climate-induced extremes. Our major contributions can be summarized as follow: (1) By developing new AI algorithms, we have built the most comprehensive solar PV spatiotemporal database covering the entire US. This is the first time we obtained the exact GPS locations, size, subtype, and installation year information for rooftop solar PVs across the US. This database can be used for solar PV growth projection, solar energy integration, solar energy policy analysis and design, and spatially-resolved climate risk assessment. (2) Leveraging this database, we have uncovered the socioeconomic driving factors that are correlated with earlier onset of solar adoption and higher saturated adoption levels. We have identified the heterogeneity in the effects of different types of financial incentives on solar adoption and provided implications for tailoring incentive design based on local income levels to promote equitable solar adoption. (3) We have developed a distribution grid GIS mapping algorithm which can obtain granular geospatial and topology information about distribution grids using multi-modal open data, reducing the dependency on hard-to-obtain smart meter data of conventional approaches. It shows effectiveness in both the U.S. and Sub-Saharan Africa. Using this algorithm, we have uncovered the non-uniform vulnerability of distribution grids to wildfires in California in the aspects of undergrounding protection and Distributed Energy Resources (DER) preparedness. This has provided important implications for improving the affordability and equity of grid adaptation approaches. (3) We have made our produced database publicly available and provided user-friendly interface to enable various stakeholders and the general public to interact with the data. We have also integrated the produced data into the Data Commons platform to enable the public to access the data and correlate it with other location-specific characteristics simply using natural language as queries. The impact of our project is three-fold: (1) New algorithms for mapping solar PVs and distribution grids across space and time, which are open source to facilitate researchers and industry; (2) New databases of solar PVs and distribution grids that have been made publicly available for engineering, social, and policy applications; (3) New understandings and actionable insights on the potential approaches to promoting solar adoption and reducing energy infrastructure vulnerabilities. In this report, we start by discussing the project background and motivation (section 5), followed by the overview of project objectives (section 6). Results and discussion for each task are presented in section 7. Significant accomplishments are summarized in section 8. This report will be concluded by discussing the paths forwards (section 9), products (section 10), and team roles (section 11).

14 SOLAR ENERGY↗

Power-to-Gas Systems for Active Load Management at EV Charging Sites with High DER Penetration

Intermittent renewable systems and increasing electric vehicle (EV) penetrations increase load intermittency—and will require expensive distribution system infrastructure upgrades. Power-to-gas (P2G) systems are highly controllable loads that can be modulated to regulate the net load behind the meter. In this work, we present an active load management approach using P2G systems to regulate the net load for an EV charging station with high penetrations of renewable generation. The system also validates the feasibility of the proposed approach using a 750-kW electrolyzer operated with the distribution system in a real-time power-hardware-in-the-loop test. Finally, we evaluate the impact of the size of the P2G system on its ability to regulate the net load.

ADVANCED PROPULSION SYSTEMS,POWER TRANSMISSION AND↗

Introducing the 9500 Node Distribution Test System to Support Advanced Power Applications: An Operations-Focused Approach

The 9500 Node Test System is a representative section of distribution power system model developed as a part of the GridAPPS-D™ project, an effort funded by DOE as a part of the Grid Modernization Lab Consortium (GMLC) program. The test system was developed to fulfill a growing need to represent the rapidly evolving state of electric distribution systems by combining elements of legacy infrastructure systems, modern feeder topologies, and an anticipated future with smart grid technologies. It also provides a network model capable of supporting the simulation of operational scenarios such as the ones in a utility distribution control center. This test system allows the evaluation of the performance of advanced power applications in real-time, such as one that simulates the operations of an Advanced Distribution Management Systems (ADMS), Distributed Energy Resource Management Systems (DERMS), etc. in a Distribution control center. This model is an extension of the widely used IEEE 8500 Node Test Feeder and is currently being validated to become an IEEE test case to help increase adoption and widespread usage among both academia and industry. It is a full-size model representative of a section of a utility’s distribution system with multiple feeders fed from different substations. The model includes multiple distribution circuits, a sub-transmission system, multiple substations, behind the meter customer rooftop photovoltaics (PV), and multiple utility-scale distributed energy resources. To enable accurate simulations of operational scenarios, the 9500 Node Test System is designed to support procedure-based operations, with the ability to realistically demonstrate switching operations, feeder reconfiguration, adjustment of volt-var control equipment, dispatch of distributed generation, and response to planned and unplanned outages. The 9500 Node Test System includes three radial distribution feeders with 12.3 MVA of average load, consisting of both medium voltage and low voltage equipment each supplied by a different distribution substation. The three distribution feeders are connected to each other through Normally-Open switches which can be closed when needed to simulate restoration scenarios due to a fault. One feeder represents today’s grid with low penetration of customer-side renewables. The second represents a potential future grid with microgrids and 100% renewable penetration. The third has no customer generation resources, a district steam plant, and a utility-scale solar farm. The three diverse circuits were created to allow the simulation of both today’s situation as well as potential future scenarios. All three feeders have customers connected by low-voltage secondary triplex lines. This test system meets all requirements outlined in the report for creating a simulation environment that would enable discussion between key technical stakeholders as well as having the potential to accelerate operational application development and their subsequent testing and integration. The new model is a possible representation of what we believe the distribution grid may look like in the future: a high penetration of renewables, reconfigurable radial and mesh topology, numerous DERs, islanded microgrids, and significantly increased data and measurement density. The system supports both the solution of existing and newer algorithms but also enables the evaluation of applications in a realistic operational environment defined by task oriented procedural steps that represent the interaction between the control center operator and field personnel.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Automated Model for Improved Mapping of Country-Scale High-Resolution Coastal Bathymetry

Accurate and up-to-date maps of coastal bathymetry are critical for a variety of sectors from vessel navigation to port construction and are increasingly vital to inform coastal infrastructure management amid accelerating sea-level rise and more frequent and severe storm-surge events. The primary challenges to accurate and efficient bathymetric mapping from optical remote sensing are: accurately modeling light attenuation in both the atmosphere and water column; and inefficient data processing pipelines for highresolution satellite imagery. To address the effects of light attenuation within the water-column we have developed a novel physics-based bathymetry model that accounts for variations in water-column inherent optical properties on a pixel-by-pixel basis in optically-shallow aquatic environments, which represents a major advancement. For applications to satellite imagery, we have developed a software package that automatically applies the robust 6S atmospheric correction algorithm, estimates the bottom depth from the physics-based bathymetry model, which corrects for attenuation by suspended particulate matter and colored dissolved organic matter in the water column on a pixel-by-pixel basis, and leverages highperformance computing for rapid application to region-scale (e.g., CONUS) 2-meter resolution imagery datasets. Our approach is tailored to sensors that collect data at two-meter resolution with high return times for frequent updates. We mapped 591 WorldView satellite images for Florida, North Carolina, and Alaska and validated the maps against LiDAR-derived bathymetry data. Results show median RMSE of 1.75, 1.59, and 2.67 meters, respectively. By combining the strengths of Oak Ridge National Laboratory in high-performance computing and remote-sensing science with the water-column modeling expertise of Scripps Institution of Oceanography we advance the state of bathymetric mapping capability.

54 ENVIRONMENTAL SCIENCES↗

Advanced Distributed Wind Turbine Controls Series: Part 1-Flatirons Campus Model Overview – Microgrids, Infrastructure Resilience, and Advanced Controls Launchpad (MIRACL)

Wind turbines are typically deployed to provide energy, reduce diesel-fuel consumption, reduce carbon emissions, and reduce costs for energy and fuel transportation. However, in addition to solely providing energy to the power system, wind turbines contain rotating masses and inverter-based controls that can enable various reliability and resilience services through advance controls. As part of the Microgrids, Infrastructure Resilience, and Advanced Controls Launchpad (MIRACL), it is demonstrated that advanced wind turbine controls can be employed to support higher contributions of wind, and to demonstrate ways that wind can play a role in supporting grid stability in islanded or grid-connected configurations. This paper documents models of various subsystem comprising a portion of NREL's Flatirons campus that will be used in three subsequent reports to demonstrate capabilities of advanced wind turbine controls. The series of reports will detail advanced capabilities of distributed wind turbines to provide support to isolated grids, distribution grids, and microgrids. We developed models to simulate a wind turbine (600 kW), solar PV (430 kW), battery energy storage system (1 MW/1MWh), a diesel generator (2 MW) and various types of loads (critical, dynamic). The model of the subsystems in MATLAB/Simulink are validated with available data from real-world components on NREL's Flatirons Campus. These validated models can be configured for various studies including four MIRACL use cases: 1) isolated grids, 2) microgrids, and 3) behind-the-meter, and 4) front-of-the-meter wind turbine deployments.

17 WIND ENERGY↗

Developing Separate Effects Transient Test Experiments Using an Out-of-Pile Flowing Water Loop

In 2017 the Transient Reactor Test Facility was restarted after being placed in a standby state since 1994. This Test Reactor’s restart has since enabled the progressive development of new nuclear technologies within the U.S. that were previously required to outsource to other countries. While the reactor’s restart was a large feat worthy of recognition, the experimental use of its characteristics has required the further development of in-pile experimental infrastructure sufficient to support programmatic needs. This hardware have taken the form of capsule designs (compact and elongated) as well as loop concepts representing the phenomena of interest for a subset of separate effects tests desire for each respective testing campaign. The Transient Testing Program has a large-integrated effort that aligns with the U.S. Department of Energy’s current needs. This study compliments those programmatic elements by developing, fabricating and demonstrating a full-scale flowing water loop in an out-of-pile environment. The goal of this effort is to develop a pragmatic understanding of the engineering capabilities and limitations associated with geometric form-factors, metering technology, and controls logic under representative thermal hydraulic conditions that would be experienced within the TREAT reactor during an in-pile reactivity initiated accident test. The outcomes of this study result in an evaluation of the conceptual design of a comprehensive flowing water loop including objective figures of merit (FoMs) for comparing unique instrumentation and the basis for their selection during operations. These efforts directly contribute to and are required for the further advancement of transient testing capabilities within the U.S.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Autonomous Tools for Attack Surface Reduction (Final Report)

The electric power grid is a complex critical infrastructure that forms the lifeline of modern society, and its secure and reliable operation is of paramount importance to national security and economic wellbeing. However, recent findings documented in authoritative sources indicate the threat of cyber-based attacks growing in numbers and sophistication. However, securing the grid against stealthy cyberattacks is a challenging task due to legacy nature of the infrastructure coupled with dynamic nature of threat landscape and ever-growing sophistication of the adversaries. Additionally, the grid’s attack surface continues to grow with the increased dependence on digital communications and control that now extends to each consumer through smart meters and distributed energy resources. Unfortunately, this expansive surface increases the grid’s vulnerability and further exposes critical control systems in both substations and control centers. To respond to this emerging need, we had successfully assembled an interdisciplinary team with academic- industry partnership to successfully conduct research, development, evaluation, demonstration, and commercialization of attack surface reduction tools, whose goal was to significantly reduce the cyber attack surface in the North American power grid. Our proposed project was a synergistic collaborative effort leveraging the synergistic expertise of the team members across power systems, cyber security and CPS security, testbeds, field deployments and demonstration, and successful commercialization. The following are the specific tasks that have been successfully completed two phases (2016-2020). Phase I: Task 1: Developed and implemented a robust Project Management and Data Management Plan, coupled with a well thought out Risk Mitigation Plan. Task 2.1: Developed a comprehensive framework that continually assesses and autonomously reduces the attack surface for the power grid control environment spanning across substations, control center and the SCADA network to significantly reduce the risks of cyber attacks. Task 2.2: Developed attack surface analysis techniques, metrics, and tools that assess the attack surface at multiple levels including the control center, substations, and the SCADA network. Task 2.3: Developed attack surface reduction techniques and tools that dynamically reduce attack surface and hence increase attacker’s cost without interfering in the critical functions of the system. Task 2.4: Prototyped, implemented, and quantitatively evaluated/validated the techniques and tools on a realistic industrial CPS security testbed environment by leveraging the unique resources of the team. Task 3: Developed Commercialization plan to transition the developed tools into power system industry stakeholders for a broader adoption by leveraging the expertise of our industrial members. Phase II: Task 4: Successfully completed field demonstration, verification, and evaluation of the effectiveness of the attack surface analysis and reduction techniques on a realistic utility testbed environment. This also involved the development of realistic scenarios, sound metrics, data sets, evaluation criteria, and documentation. Technology integration & Field demonstration: The project had significantly advanced the state-of-the-art research and practice in improving the cybersecurity of our nation’s power grid infrastructure against cyber threats. In particular, the proposed, designed, and deployed attack surface analysis and reduction algorithms and tools have contributed to significantly reducing the exposure and risk of the devices, substations, and the integrated SCADA/EMS/ DMS grid environment to cyber threat. Strong demonstration and evaluation techniques have verified the feasibility of the developed techniques on realistic cyber-physical testbeds and utility partner's real grid environment, and collaborative research and evaluation of attack surface reduction techniques (for wide-are monitoring and control) within a vendor (GE) EMS platform. The Attack Host Analyzer (AHA) tool that was developed through this project was made available through GitHub.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Validation of an Advanced High-Pressure PEM Electrolyzer and Composite Hydrogen Storage

One of the challenges associated with transitioning our nation’s transportation economy to any alternative fuel is bringing fuel production, storage, transportation, and end-customer delivery infrastructure online. There are challenges associated with planning and implementing hydrogen fueling stations at locations relevant to the parallel effort of bringing the related transportation vehicles into the market. There are additional challenges associated with the operation of hydrogen fueling stations and reducing operating costs through energy reduction. Through calculation and design efforts it was concluded that elevating the pressure of a PEM cell stack and further developing hydrogen processing equipment that support elevated pressures while maintaining similar characteristics to their current production counterparts will yield in energy savings and by extension cost reductions. In this report, the design of a 57-bar (827-psig) electrolysis system and electrolysis cell stack is described. Furthermore, the fabrication, component verification, and integrated testing are summarized. Prior to this development effort, Proton had demonstrated thousand of hours of durability on 30-bar (435-psig) differential pressure PEM electrolysis hardware. Proton has sold and installed many of these 30-bar devices at customer sites. Through this project, Proton has developed and tested 57-bar PEM electrolysis, thereby extending the proven capability of PEM electrolysis as a hydrogen generation and electrochemical compression device. A design and validation effort to arrange hydrogen processioning equipment for refueling OEM vehicles was also undertaken within this project. By arranging equipment within two 6-meter ISO shipping containers and further developing NFPA 2 Hydrogen Technologies Code to support containerized hydrogen equipment, efforts to site, install, and commission, and approve hydrogen fueling stations were reduced and now provide a groundwork for future installations.

08 HYDROGEN↗

The impact of energy-efficiency upgrades and other distributed energy resources on a residential neighborhood-scale electrification retrofit

We report ambitious targets for carbon emissions reductions are highlighting new challenges for electrification strategies, leading to an increased focus on building load flexibility and energy management to complement the variability inherent in renewable energy generation. Over the next decade millions of existing homes could undergo electrification retrofits, and there is an urgent need to understand the potential impacts of electrifying major residential loads such as water and space heating on community load characteristics, resident energy bills, and the utility's distribution system. Behind-the-meter distributed energy resources (DERs), including efficiency measures, photovoltaics (PV), battery storage, managed electric vehicle (EV) charging, and controls such as home energy management systems (HEMS), can significantly alter a neighborhood's load profile and provide benefits to both the residents and the grid. We present a novel approach to characterizing the impact of a hypothetical neighborhood-scale residential retrofit program on individual homes' energy use profiles, associated utility bills, and the local distribution system. We modeled a mixed-fuel community of 30 single-family homes in Denver, Colorado, and compared the effects of retrofit scenarios ranging from conventional energy-efficiency upgrades to full electrification with and without more advanced DER technologies. We analyzed which packages of DERs most reliably enable demand flexibility in response to a time-of-use (TOU) rate for this and similar neighborhoods. Our buildings-to-grid co-simulation framework includes a generic secondary distribution feeder model to capture voltage profiles, transformer loading, and other grid impacts in each case. We also calculated the carbon emissions associated with energy use in the community. The methodology developed here can be broadly applied to community-scale beneficial electrification studies in other regions, climates, utility infrastructures, and building typologies to make specific, targeted recommendations based on quantified projections of energy demand in any given community. Our findings indicate that residential electrification can be achieved without negatively impacting the monthly utility bill, and that a combination of conventional energy-efficiency measures, PV, battery, controls, and managed EV charging to maximize a community's demand flexibility is a promising strategy. Adding DERs (especially PV) as part of efficient electrification produces much bigger savings than efficient electrification without DERs. A key barrier is that upgrades require upfront costs, and modest utility bill savings result in long payback periods.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Life-Cycle Assessments of Selected NASA Ground-Based Test Facilities

In the past two years, two separate facility-specific life cycle assessments (LCAs) have been performed as summer student projects. The first project focused on 13 facilities managed by NASA s Aeronautics Test Program (ATP), an organization responsible for large, high-energy ground test facilities that accomplish the nation s most advanced aerospace research. A facility inventory was created for each facility, and the operational-phase carbon footprint and environmental impact were calculated. The largest impacts stemmed from electricity and natural gas used directly at the facility and to generate support processes such as compressed air and steam. However, in specialized facilities that use unique inputs like R-134a, R-14, jet fuels, or nitrogen gas, these sometimes had a considerable effect on the facility s overall environmental impact. The second LCA project was conducted on the NASA Ames Arc Jet Complex and also involved creating a facility inventory and calculating the carbon footprint and environmental impact. In addition, operational alternatives were analyzed for their effectiveness at reducing impact. Overall, the Arc Jet Complex impact is dominated by the natural-gas fired boiler producing steam on-site, but alternatives were provided that could reduce the impact of the boiler operation, some of which are already being implemented. The data and results provided by these LCA projects are beneficial to both the individual facilities and NASA as a whole; the results have already been used in a proposal to reduce carbon footprint at Ames Research Center. To help future life cycle projects, several lessons learned have been recommended as simple and effective infrastructure improvements to NASA, including better utility metering and data recording and standardization of modeling choices and methods. These studies also increased sensitivity to and appreciation for quantifying the impact of NASA s activities.

Sydnor, George Honeycutt↗