Search NASA⌕ Search

SEARCH · Search NASA

Results for “architectures Mars surface exploration”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Evaluating science return in space exploration initiative architectures

Science is an important aspect of the Space Exploration Initiative, a program to explore the Moon and Mars with people and machines. Different SEI mission architectures are evaluated on the basis of three variables: access (to the planet's surface), capability (including number of crew, equipment, and supporting infrastructure), and time (being the total number of man-hours available for scientific activities). This technique allows us to estimate the scientific return to be expected from different architectures and from different implementations of the same architecture. Our methodology allows us to maximize the scientific return from the initiative by illuminating the different emphases and returns that result from the alternative architectural decisions.

Budden, Nancy Ann↗

A Parametric Assessment of Lunar and Mars Ascent Vehicle Synergy

The National Aeronautics and Space Administration has long had a focus on the human exploration of space, starting with Earth orbit, progressing to the Moon, and looking forward to Mars and other deep space destinations. With current priorities aiming toward a return to the Lunar surface in 2024 as part of an extended exploration campaign that will prepare the way for the first crewed mission to Mars, it is timely to examine possible commonalities between the Lunar and Martian mission architectures, particularly in the vehicle systems. One area of potential similarity lies within the ascent phase of the missions; at a first look, the initial Artemis missions to return to the Moon and a short-duration surface stay option for a Mars mission appear similar in several regards, especially in regards to the selection of the crew size, duration of crewed flight, and general subsystem functionality. This paper will take a closer look at these similarities as they apply to the respective ascent vehicles for each planetary body and how those similarities could enable synergies between the Lunar and Mars ascent vehicles of both missions.

Human Exploration↗

International Human Mission to Mars: Analyzing A Conceptual Launch and Assembly Campaign

In July of 2013, U.S. Congressman Kennedy (D-Mass.) successfully offered an amendment to H.R. 2687, the National Aeronautics and Space Administration Authorization Act of 2013. "International Participation—The President should invite the United States partners in the International Space Station program and other nations, as appropriate, to participate in an international initiative under the leadership of the United States to achieve the goal of successfully conducting a crewed mission to the surface of Mars." This paper presents a concept for an international campaign to launch and assemble a crewed Mars Transfer Vehicle. NASA’s “Human Exploration of Mars: Design Reference Architecture 5.0” (DRA 5.0) was used as the point of departure for this concept. DRA 5.0 assumed that the launch and assembly campaign would be conducted using NASA launch vehicles. The concept presented utilizes a mixed fleet of NASA Space Launch System (SLS), U.S. commercial and international launch vehicles to accomplish the launch and assembly campaign. This concept has the benefit of potentially reducing the campaign duration. However, the additional complexity of the campaign must also be considered. The reliability of the launch and assembly campaign utilizing SLS launches augmented with commercial and international launch vehicles is analyzed and compared using discrete event simulation.

Cates, Grant↗

Lunar Communications and Navigation: Lunar Communications, Position, Navigation, and Time (CPNT) Architecture

The NASA Moon-to-Mars (M2M) Architecture will enable the return of humans to the Moon, establish a long-term presence there, and open more of the lunar surface to exploration than ever before. This growth of lunar activity requires robust and resilient communications, position, navigation, and time capabilities for crew safety, the command and control of spacecraft, the return of science data, and the precise telerobotic maneuvering of assets both in space and on the lunar surface. Within the M2M Architecture, the sub-architecture for Communications, Position, Navigation, and Time (CPNT) details the specific CPNT systems and infrastructure required to meet the M2M objectives. Two objectives most fundamental to the CPNT sub-architecture are: (1) develop a lunar surface, orbital, and Moon-to-Earth communications architecture that scales to support long term science, exploration, and industrial needs and (2) develop a lunar position, navigation, and timing (PNT) architecture that also scales to support long term needs. The subject presentation provides an overview of the M2M Architecture, planned mission activities, and infrastructure development underway by NASA. The presentation provides overview of the surface wireless network and the challenges associated with operating on the lunar surface.

architecture↗

Desert Research and Technology Studies (D-RATS) 2022 Quicklook Report

This report summarizes the Desert Research and Technology Studies (D-RATS) 2022 analog tests. BACKGROUND - Artemis Challenges – NASA’s concept of operations (ConOps) for the Artemis mission architecture brings new challenges for human exploration of the lunar surface, including: (1) Low-angle, natural lighting at lunar poles; and (2) Exploration sites that challenge communication with Earth. - International Partner Involvement – NASA is working with the Japan Aerospace Exploration Agency (JAXA) to scope mission & functional requirements for an Artemis Pressurized Rover (PR), which JAXA may provide. - Charter – HQ Exploration Systems Development Mission Directorate (ESDMD) Moon to Mars Architecture Development Office (M2MADO) Strategy and Architectures (SA) chartered the Human-in-the-Loop (HITL) test team to investigate Artemis architectural questions related to pressurized rover ConOps. - Rationale – to inform the NASA/JAXA pressurized rover study-agreement. PLAN - Objectives – Analog tests conducted in October 2022 by the D-RATS team addressed three high-level objectives: 1. Investigate pressurized rover (PR) ConOps and capabilities for Artemis exploration 2. Integrate with JAXA engineers & astronauts and incorporate JAXA PR design elements into testing. 3. Re-establish analog field-testing skills & capabilities with rovers to investigate Artemis architecture ConOps. - Secondary Objectives – Work with other groups to leverage D-RATS field test for additional objectives. 4. Work with the Public Affairs Office (PAO) to perform D-RATS public outreach activities. 5. Coordinate with the Human Physiology Performance Protection & Operations (H-3PO) team to facilitate in-field evaluation of human health and performance (HHP) objectives. 6. Share D-RATS field-site and assets with Lunar LTE Studies (Lunar LiTES) team, to aid their study of the use of 4G/LTE communication protocols and devices for astronauts and robotic nodes on the lunar surface. - Team – Fully integrated test team comprised of members from 5 NASA centers, JAXA, and the United States Geological Survey (USGS) - Location – Black Point Lava Flow, ~40 miles north of Flagstaff, AZ HIGH-LEVEL OBJECTIVES ACCOMPLISHED - Investigated Pressurized Rover ConOps & Capabilities for Artemis Exploration (Objective 1) - Completed testing with 4 crew pairs, each spending 3 days and 2 nights in the rover conducting Artemis PR dayin-the-life activities (2 JAXA astronauts, 2 JAXA engineers, 1 NASA astronaut, 3 NASA engineers). - Collected detailed objective & subjective data supporting 10 strategic questions related to Artemis PR operations. - Field geologists present in field observed rover operations & EVAs. - Science team in Houston MCC communicated directly with crew. - Demonstrated crew-led and MCC-led PR teleoperation use cases during EVAs. - Integrated with JAXA Engineers & Astronauts and Incorporated JAXA PR Design Elements into Testing (Objective 2) - NASA & JAXA engineers, flight controllers, scientists, roboticists, and astronauts directly participated in and/or observed testing both in field and in MCC-Houston. - Incorporated JAXA PR design elements into both integrated and standalone testing at JSC and in the field. - Re-established Analog Field-Testing Skills & Capabilities with Rovers to Investigate Artemis Architecture ConOps (Objective 3) - Multiple teams successfully worked to establish and manage field-test base camp, monitor and maintain the rover, and plan and execute 2 weeks of consecutive field-testing with little to no breaks between crews. TEST OUTCOMES - Results will inform Artemis architecture ConOps & capabilities related to pressurized rover operations (see sections 2 for more details) - Summary and team detailed reports will be posted on the D-RATS 2022 wiki

Analog↗

Architecture Robustness in NASA’s Moon to Mars Capability Development – FY23 Data Results

In preparation for humanity’s return to the Moon, it is important to advance technologies and capabilities that will allow for sustainability on the lunar surface and prepare for human missions to Mars. As charged in Space Policy Directive-1, NASA’s Artemis program will advance and develop technologies on the lunar surface that can be leveraged towards a safe and successful human round-trip mission to Mars. NASA’s Exploration Systems Development Mission Directorate Capabilities Integration Team (ESDMD CIT) is advancing a continuous effort to identify and map gaps between capabilities and anticipated human spaceflight architecture elements. As upcoming exploration missions approach, the architectural design tradespace increasingly narrows. This paper provides an updated exploration of certain architectural and element design choices for upcoming missions to the Moon and Mars, comparing and contrasting capability gaps and classes of capability gaps that are architecture robust with those that are not. In doing so, we identify certain capabilities as relevant, and therefore robust, across varying architectural possibilities while identifying other capabilities as only applicable to specific architectural pathways. Capabilities that are applicable to multiple elements across the architecture have more architectural breadth because of their increased likelihood of remaining relevant even if changes are made to some elements they are mapped to. Correspondingly, capabilities that are applicable to specific elements across the architecture but are necessary under almost any eventuality have more architectural depth because of their increased likelihood of remaining relevant even if architecture changes are made. One of the key analyses in this paper is an exploration of architecture robustness as a function of capability area, as defined by the NASA Technology Taxonomy. These results are then evaluated and analyzed across human spaceflight architecture elements to gain a greater understanding of the relationships between exploration capabilities and the systems that will eventually be implemented. Additional insights regarding investment strategies are also considered. General conclusions about these relationships are drawn.

Gaps↗

Regenerative Fuel Cell Power Systems for Lunar and Martian Surface Exploration

This paper presents the preliminary results of a recent National Aeronautics and Space Administration (NASA) study funded under the Advanced Exploration Systems (AES) Modular Power Systems (AMPS) project. This study evaluated multiple surface locations on both the Moon and Mars, with the goal of establishing a common approach towards technology development and system design for surface power systems that use Regenerative Fuel Cell (RFC) energy storage methods. One RFC design may not be applicable to all surface locations; however, AMPS seeks to find a unified architecture, or series of architectures, that leverages a single development approach to answer the technology need for RFC systems. Early system trades were performed to select the most effective fuel cell and electrolyzer architectures based on current state-of-the-art technology, whereas later trades will establish a detailed system design to enable a near-term ground (non-flight) demonstration. This paper focuses on the initial trade studies, presents the selected fuel cell and electrolyzer architectures for follow-on system design studies, and suggests areas for further technology investment.

lunar and Mars exploration↗

The challenges and benefits of lunar exploration

Three decades into the Space Age, the United States is experiencing a fundamental shift in space policy with the adoption of a broad national goal to expand human presence and activity beyond Earth orbit and out into the Solar System. These plans mark a turning point in American space exploration, for they entail a shift away from singular forays to a long-term, evolutionary program of exploration and utilization of space. No longer limited to the technical and operational specifics of any one vehicle or any one mission plan, this new approach will involve a fleet of spacecraft and a stable of off-planet research laboratories, industrial facilities, and exploration programs. The challenges inherent in this program are immense, but so too are the benefits. Central to this new space architecture is the concept of using a lunar base for in-situ resource utilization, and for the development of planetary surface exploration systems, applicable to the Moon, Mars, and other planetary bodies in the Solar System. This paper discusses the technical, economic, and political challenges involved in this new approach, and details the latest thinking on the benefits that could come from bold new endeavors on the final frontier.

Cohen, Aaron↗

Design Variants of a Common Habitat for Moon and Mars Exploration

The Common Habitat is a long-duration habitat concept based on the Skylab II architecture that leverages a single, multi-destination design applicable to microgravity Mars transit, 1/6 g lunar surface, 3/8 g Mars surface, and 1 g Earth. A trade study for the Common Habitat will address vertical versus horizontal internal orientation and a crew size of four or eight crew. This has resulted in the creation of four variants of the Common Habitat: Four Crew Horizontal Configuration, Four Crew Vertical Configuration, Eight Crew Horizontal Configuration, and Eight Crew Vertical Configuration. Design guidelines that shaped the four configurations are discussed, including: mission duration, destinations/missions, pressure vessel, hatches and docking, subsystems and utilities, lander integration and offloading, and eight-crew extensibility. Functional capabilities for crew-related systems are also discussed, including: private habitation, meal preparation, meal consumption, medical operations, exercise, group socialization and recreation, human waste collection, hygiene, logistics, spacecraft monitoring and commanding, mission planning, robotics and teleoperation, scientific research, maintenance and fabrication, and EVA. Each of the four Common Habitat designs will be presented, with a deck-by-deck description of each workstation, crew station, or subsystem along with an assessment of its degree of compliance with the guidelines and functional capabilities. Finally, forward work will be identified that will down-select a single Common Habitat. This includes multiple analyses that will be performed on the four variants, a down-selection process, and design refinement goals for the selected variant.

Habitability↗

Is Mars Sample Return Required Prior to Sending Humans to Mars?

Prior to potentially sending humans to the surface of Mars, it is fundamentally important to return samples from Mars. Analysis in Earth's extensive scientific laboratories would significantly reduce the risk of human Mars exploration and would also support the science and engineering decisions relating to the Mars human flight architecture. The importance of measurements of any returned Mars samples range from critical to desirable, and in all cases these samples will would enhance our understanding of the Martian environment before potentially sending humans to that alien locale. For example, Mars sample return (MSR) could yield information that would enable human exploration related to 1) enabling forward and back planetary protection, 2) characterizing properties of Martian materials relevant for in situ resource utilization (ISRU), 3) assessing any toxicity of Martian materials with respect to human health and performance, and 4) identifying information related to engineering surface hazards such as the corrosive effect of the Martian environment. In addition, MSR would be engineering 'proof of concept' for a potential round trip human mission to the planet, and a potential model for international Mars exploration.

biohazards↗

Mars Science Laboratory Entry, Descent, and Landing System Overview

In 2012, the Mars Science Laboratory (MSL) mission will pioneer the next generation of robotic Entry, Descent, and Landing (EDL) systems by delivering the largest and most capable rover to date to the surface of Mars. In addition to landing more mass than prior missions to Mars, MSL will offer access to regions of Mars that have been previously unreachable. The MSL EDL sequence is a result of a more stringent requirement set than any of its predecessors. Notable among these requirements is landing a 900 kg rover in a landing ellipse much smaller than that of any previous Mars lander. In meeting these requirements, MSL is extending the limits of the EDL technologies qualified by the Mars Viking, Mars Pathfinder, and Mars Exploration Rover missions. Thus, there are many design challenges that must be solved for the mission to be successful. Several pieces of the EDL design are technological firsts, such as guided entry and precision landing on another planet, as well as the entire Sky Crane maneuver. This paper discusses the MSL EDL architecture and discusses some of the challenges faced in delivering an unprecedented rover payload to the surface of Mars.

Mars Science Laboratory (MSL)↗

Mars Planetary Network for Human Exploration Era – Potential Challenges and Solutions

During 2016-2017, a study was conducted under the sponsorship of the NASA’s Space Communications and Navigation (SCaN) Program to investigate the deep space communications capacity taking into account the needs of all the present and envisioned future missions toward 2030s. It was soon recognized that planning for human exploration to Mars would impose certain unprecedent challenges, both fiscal and technical, to the current space communications paradigm. Targeting the assumed missions concepts, i.e., Crewed Mission to Phobos (CMTP) and Mars Short Stay Mission (MSSM), a Mars Planetary Network for the human exploration era has been formulated. The activity modeling and network traffic simulation/modeling we performed gave some insight into the technical challenges in space communications for the envisioned human Mars exploration era. Chief among the potential challenges are: (1) the high demand on the deep space network (DSN) assets for achieving the high-rate links, both return and forward, from Mars farthest/farther distance (up to 2.67 AU); (2) the need for resilient, persistent communication coverage for crewed vehicles, on surface and in orbits; (3) the significant period of outage for the Mars-Earth link due to superior solar conjunction; (4) the need for on-demand, simultaneous access to the proximity link by multiple vehicles and astronauts in the exploration zone; (5) the capability of determining precise, real-time, positions of surface vehicles and astronauts by the deep space habitat and/or other tele-operations entities. Solution space to each of the above challenges has been explored and analyzed in the context of the individual problem domain and, more importantly, in conjunction with that for the other challenges. This has led to an end-to-end definition of a Mars Planetary Network that would feature: (1) the fusion of deep space Ka-band and optical communications for achieving Mars-Earth high-rate links taking advantage of the optical/RF hybrid 8m/34m antennas in DSN; (2) the integrated application of the Multiple Spacecraft Per Antenna (MSPA) technique, for return link data acquisition, and the Multiple Uplink Per Antenna (MUPA) technique, for forward link data trasnmission, to reduce the number of 34m beam-wave guide (BWG) antennas needed for the era; (3) the integration of three, arrayed, 34m beam-wave guide (BWG) antennas, to provide a high G/T aperture, with the MSPA/MUPA techniques, and a dual “trunk link”approach to cut down the needed G/T -- hence, reducing the number of 34m antennas, relative to that in the single trunk approach by 50%; (4) the deployment of two areostationary/areosynchronous Mars relay orbiters; one of them could also function as (or be served by) a notional Deep Space Habitat (DSH); (5) the opportunistic deployment of a science orbiter in a Pioneer-6 type orbit, equidistant Mars/Earth, that could also serve as an intermediary relay during the Mars superior solar conjunction perod; (6) the existence of the multi-function Mars proximity link that provides the demand-assigned, multiple access (DAMA) capability; and (7) the provision of tracking observables, by leveraging on the planned Mars orbiting and surface infrastructure, to enable the in-situ navigation for surface and orbiting vehicles. This paper provides the description of the proposed Mars Planetary Network in the human exploration era, the trade-off analysis for the various alternative architectures, and the optimal solutions to the key challenges in defining this end-to-end network.

Cheung, Kar-Ming↗

Exploration Systems Development Mission Directorate: Moon to Mars Architecture Definition Document

The National Aeronautics and Space Administration (NASA) explores the unknown in air and space, innovates for the benefit of humanity, and inspires the world through discovery. Extending the reach of humanity through the human exploration of the Moon, Mars, and beyond is key to that mission. NASA’s Moon to Mars Strategy and Objectives document establishes long-term goals and objectives for crewed deep space exploration; however, satisfying NASA’s Moon to Mars Objectives requires an innovative approach to the definition, management, and execution of NASA’s Moon to Mars Architecture. An architecture offers a high-level unifying structure and defines a system. It provides rules, guidelines, and constraints that define a cohesive and coherent framework that identifies constituent parts, relationships, and connections and establishes how those parts fit and work together. This Architecture Definition Document (ADD) establishes the process for the decomposition of objectives empowers the agency’s success in achieving human exploration of the cosmos. NASA updates this document annually to reflect the maturation of the architecture and the progress NASA and partners make toward achieving exploration objectives. The ADD is not a manifest or requirements document. Instead, it serves as a tool for the programs, projects, and engineers who will implement and execute NASA’s bold ambitions for crewed exploration of deep space. As established in the Moon to Mars Strategy and Objectives, “Why” we explore encompasses three pillars: Science, Inspiration, and National Posture. Ensuring success in all three areas requires an architectural approach that incorporates innovation, collaboration, and partnerships that can be sustained across a multi-decadal effort. This second revision (Rev-B) of the ADD, developed to support NASA’s 2024 Architecture Concept Review (ACR), incorporates several key updates to support the continued evolution of the architecture. Since the last revision of the ADD, NASA has significantly improved the clarity of the objective decomposition, which distills exploration objectives into the characteristics and needs and use cases and functions needed to achieve them. The updated decomposition incorporates findings from internal studies and diverse stakeholder feedback. A model-based systems engineering approach ensures coherence and consistency, removing inconsistency and repetition. Revision B also incorporates advancements to NASA’s Mars architecture, including insight into initial capabilities, systems, and operations necessary to support the Humans to Mars segment. Updates to objective decomposition for Mars add significant detail to the ADD and hint at areas of forward work and future study. An appendix adds greater depth in the future decisions needed for Mars that will drive lunar needs. They are not the only decisions to be made, but they will have huge effects on subsequent decisions. NASA continues to introduce new exploration systems into the architecture. Two new elements — initial surface habitat and lunar surface cargo lander—successfully passed mission concept review in 2024 as a result of extensive analysis, concept refinement, and studies. These elements and their respective reference missions appear in this revision. NASA also continues to apply architecture processes to cross-agency efforts and coordination with external stakeholders by including definitions of architecture technology gaps — essential areas for engagement across and beyond the agency. The technology gaps appendix identifies areas that need attention and innovation to enable future exploration. In publishing this information, NASA communicates the technologies and capabilities that may benefit from partnership with industry, academia, other U.S. government agencies, and international space agencies. Ultimately, NASA established the Moon to Mars Architecture approach to communicate and facilitate humanity’s journey into the universe according to the principles and recurring tenets of NASA’s Moon to Mars Strategy and Objectives. The NASA architecture team thanks their many stakeholders, participants, and partners for their efforts to review and provide feedback. Their support has been critical to the success of this approach.

Elements↗

Low-Latency Teleoperations: Operational Implications for Human Space Exploration

Low-latency teleoperations (LLT) is envisioned to be an element of human exploration missions in a number of different applications. LLT can be broadly considered to encompass any remote operation of an asset with a communication delay that is less than the human response time to allow for what is effectively "real-time" or "near real-time" operations. This paper will explore motivations and operational implications for why and how LLT might be used for human exploration space missions. LLT analyses have been performed under the auspices of the NASA Human Spaceflight Architecture Team (HAT) and Evolvable Mars Campaign (EMC). The EMC created a flexible, evolvable, capability-driven architectural strategy to enable a sustainable long-term human presence at Mars. LLT is envisioned to be part of that strategy for both in-space and on-surface applications, and this paper will expand on operational considerations within that broader strategic context, as well additional contexts. Some operational implications explored in this paper, derived largely from previous work, are: (1) crew mission support, for which we will address roles for Mission Control on earth, balanced with the capability for crew and robotic assets to operate independently, (2) science operations, with a focus on "backroom" support, highly dynamic science, and enhanced science return and efficiency, and (3) operational efficiency at a deep-space destination such as Mars, including implications for communications infrastructures and how to leverage and balance system autonomy with crew operations, both of which can inform the overall operational "choreography" between crew members, multiple shifts, and exploration assets.

human spaceflight↗

Nuclear Thermal Propulsion (NTP): A Proven, Growth Technology for Fast Transit Human Missions to Mars

The "fast conjunction" long surface stay mission option was selected for NASA's recent Mars Design Reference Architecture (DRA) 5.0 study because it provided adequate time at Mars (approx. 540 days) for the crew to explore the planet's geological diversity while also reducing the "1-way" transit times to and from Mars to approx. 6 months. Short transit times are desirable in order to reduce the debilitating physiological effects on the human body that can result from prolonged exposure to the zero-gravity (0-gE) and radiation environments of space. Recent measurements from the RAD detector attached to the Curiosity rover indicate that astronauts would receive a radiation dose of approx. 0.66 Sv (approx. 66 rem)-the limiting value established by NASA-during their 1-year journey in deep space. Proven nuclear thermal rocket (NTR) technology, with its high thrust and high specific impulse (Isp approx. 900 s), can cut 1-way transit times by as much as 50 percent by increasing the propellant capacity of the Mars transfer vehicle (MTV). No large technology scale-ups in engine size are required for these short transit missions either since the smallest engine tested during the Rover program-the 25 klbf "Pewee" engine is sufficient when used in a clustered arrangement of three to four engines. The "Copernicus" crewed MTV developed for DRA 5.0 is a 0-gE design consisting of three basic components: (1) the NTP stage (NTPS); (2) the crewed payload element; and (3) an integrated "saddle truss" and LH2 propellant drop tank assembly that connects the two elements. With a propellant capacity of approx. 190 t, Copernicus can support 1-way transit times ranging from approx. 150 to 220 days over the 15-year synodic cycle. The paper examines the impact on vehicle design of decreasing transit times for the 2033 mission opportunity. With a fourth "upgraded" SLS/HLV launch, an "in-line" LH2 tank element can be added to Copernicus allowing 1-way transit times of 130 days. To achieve 100 to 120 day transit times, Copernicus' saddle truss/drop tank assembly is replaced by a "star truss" assembly with paired modular drop tanks to further increase the vehicle's propellant capacity. The HLV launch count increases (from approx. 5 to 7) and a fourth engine is needed to reduce total mission burn time and gravity losses. Using a "split mission" approach, the NTPS, in-line tank and the saddle truss/LH2 drop tank elements can be configured as a pre-deployed Earth Return Vehicle/propellant tanker supporting 90-day crewed mission transits. The split mission approach also eliminates the need for on-orbit assembly. Mission scenario descriptions, key features and operational characteristics for five different vehicle configurations are presented.

Borowski, Stanley K.↗

Design Considerations for a Crewed Mars Ascent Vehicle

Exploration architecture studies identified the Mars Ascent Vehicle (MAV) as one of the largest "gear ratio" items in a crewed Mars mission. Because every kilogram of mass ascended from the Martian surface requires seven kilograms or more of ascent propellant, it is desirable for the MAV to be as small and lightweight as possible. Analysis identified four key factors that drive MAV sizing: 1) Number of crew: more crew members require more equipment-and a larger cabin diameter to hold that equipment-with direct implications to structural, thermal, propulsion, and power subsystem mass. 2) Which suit is worn during ascent: Extravehicular Activity (EVA) type suits are physically larger and heavier than Intravehicular Activity (IVA) type suits and because they are less flexible, EVA suits require more elbow-room to maneuver in and out of. An empty EVA suit takes up about as much cabin volume as a crew member. 3) How much time crew spends in the MAV: less than about 12 hours and the MAV can be considered a "taxi" with few provisions for crew comfort. However, if the crew spends more than 12 consecutive hours in the MAV, it begins to look like a Habitat requiring more crew comfort items. 4) How crew get into/out of the MAV: ingress/egress method drives structural mass (for example, EVA hatch vs. pressurized tunnel vs. suit port) as well as consumables mass for lost cabin atmosphere, and has profound impacts on surface element architecture. To minimize MAV cabin mass, the following is recommended: Limit MAV usage to 24 consecutive hours or less; discard EVA suits on the surface and ascend wearing IVA suits; Limit MAV functionality to ascent only, rather than dual-use ascent/habitat functions; and ingress/egress the MAV via a detachable tunnel to another pressurized surface asset.

Rucker, Michelle A.↗

NASA’s Moon to Mars (M2M) Transit Habitat (TH) Refinement Point of Departure (PoD) Design

As NASA prepares for the next human footsteps on the lunar surface, the Agency is already looking ahead to systems that will enable a sustained human presence on the lunar surface and mission to Mars, including a lunar Surface Habitat and Mars Transit Habitat (TH). This paper describes the latest NASA government reference design for the TH and how it will support NASA's Moon to Mars human exploration architecture. First, it will serve as a test and demonstration platform in lunar orbit, demonstrating capabilities required for long-duration microgravity human spaceflight as part of the lunar-Mars analog missions. Then, the TH will also serve as a major Mars habitation exploration element to support the crew during their transit from the lunar orbit to Mars and returning them safely to lunar orbit. This paper will cover several considerations contributing to the latest habitat design refinement, including data on the TH's concept of operations, system functional definition, subsystem assumptions, notional interior layouts, a detailed mass and volume breakdown, and trade studies and analyses required to close identified technology/ development/architecture gaps. In addition to a technical description of the TH, this paper describes how the current TH government reference design will achieve many of the current lunar and Mars mission goals. Additionally, there are many assumed technological advances needed to support the prescribed mission phases leading up to the crewed mission to Mars in the late 2030s. The paper will describe many of the TH systems requiring further technology development and identify architectural solutions to achieve these mass, reliability, autonomy, and crew health targets. As a whole, the data in the paper shows that a TH meeting the 43 metric tons launch mass/trans-Mars injection burn limits specified by the Evolvable Mars Campaign is achievable near the desired timeframe with moderate strategic investments including maintainable life support systems, re-purposable structures and packaging, and lightweight exercise modalities. It also identifies operational and technological options to reduce this mass to less than 41 metric tons, including staging of launch structure/packaging and alternate structural materials. The resulting design detail and data contained in this paper are intended to help teams across NASA and potential commercial, academic, or international partners understand the current performance targets of the Transit Habitat and vehicle interface considerations imposed by the latest Moon to Mars mission scope.

Habitation Systems↗

NASA’s Strategic Analysis Cycle 2021 (SAC21) Human Mars Architecture

[Note: this is the presentation for a companion paper with the following abstract] The National Aeronautics and Space Administration’s (NASA) Mars Architecture Team (MAT) was challenged to develop a mission architecture capable of transporting humans to the surface of Mars and back as fast—and as soon—as practical. This challenge represented a significant departure from previous approaches that minimized Earth-launched mass and maximized in-space transportation efficiency, often resulting in roundtrip missions of three years or more in duration. In the interest of crew health, MAT’s cross-Agency team of subject matter experts was challenged to develop an architecture capable of shortening crew time away from Earth to about two years. MAT was given specific mission constraints, such as number of crew, as well as mandates to minimize surface infrastructure as much as possible and to incorporate nuclear transportation options. The resulting MAT-developed concept, referred to here as the Strategic Analysis Cycle 2021 (SAC21) architecture, leverages Artemis elements and emerging commercial capabilities for cargo and logistics launches, and features a hybrid Nuclear Electric Propulsion (NEP)/Chemical transportation system able to complete the 1.8 billion kilometer round-trip journey to Mars and back in 760 to 850 days transit time for the 2039 Earth departure opportunity. Three Mars Descent Systems (MDS), each capable of landing about 25 metric tons of useful cargo on the surface of Mars, would be pre-deployed in advance of crew departure from Earth; two of these MDS’s would deliver a partially fueled Mars Ascent Vehicle (MAV), a fission power system, surface mobility, and additional MAV propellant. To minimize surface infrastructure, only two of the four Mars crew would descend and live in an MDS-landed pressurized rover, exploring the martian surface for 30 martian days, or sols, before returning to Mars orbit aboard their MAV and rejoining the other two crew on the Deep Space Transport for the Earth return voyage. Specifics of many of these architecture elements are detailed in separate technical publications; this paper outlines the end-to-end integrated architecture performance and concept of operations, including synergies with Artemis lunar architecture elements. It is important to note that NASA does not have a formal human Mars program and no decisions have been made; the architecture described here is intended to fill in an often-overlooked corner of the trade space, helping to complete the menu of options available to decision-makers as they chart the course for humans to Mars. Note: Slide 9 contains a ~2 min video, best viewed when downloaded. Once downloaded to begin video you may be requested to hit options and Trust this document.

Long-duration spaceflight↗