Audit Report The Procurement of Safety Class/Safety-Significant Items at the Savannah River Site

The Department of Energy operates several nuclear facilities at its Savannah River Site, and several additional facilities are under construction. This includes the National Nuclear Security Administration's Tritium Extraction Facility (TEF) which is designated to help maintain the reliability of the U.S. nuclear stockpile. The Mixed Oxide Fuel Fabrication Facility (MOX Facility) is being constructed to manufacture commercial nuclear reactor fuel assemblies from weapon-grade plutonium oxide and depleted uranium. The Interim Salt Processing (ISP) project, managed by the Office of Environmental Management, will treat radioactive waste. The Department has committed to procuring products and services for nuclear-related activities that meet or exceed recognized quality assurance standards. Such standards help to ensure the safety and performance of these facilities. To that end, it issued Departmental Order 414.1C, Quality Assurance (QA Order). The QA Order requires the application of Quality Assurance Requirements for Nuclear Facility Applications (NQA-1) for nuclear-related activities. The NQA-1 standard provides requirements and guidelines for the establishment and execution of quality assurance programs during the siting, design, construction, operation, and decommissioning of nuclear facilities. These requirements, promulgated by the American Society of Mechanical Engineers, must be applied to 'safety-class' and 'safety-significant' structures, systems and components (SSCs). Safety-class SSCs are defined as those necessary to prevent exposure off site and to protect the public. Safety-significant SSCs are those whose failure could irreversibly impact worker safety such as a fatality, serious injury, or significant radiological or chemical exposure. Due to the importance of protecting the public, workers, and environment, we initiated an audit to determine whether the Department of Energy procured safety-class and safety-significant SSCs that met NQA-1 standards at the Savannah River Site. Our review disclosed that the Department had procured and installed safety-class and safety-significant SSCs that did not meet NQA-1 quality standards. Specifically, we identified multiple instances in which critical components did not meet required quality and safety standards. For example: (1) Three structural components were procured and installed by the prime contractor at Savannah River during construction of the MOX Facility that did not meet the technical specifications for items relied on for safety. These substandard items necessitated costly and time consuming remedial action to, among other things, ensure that nonconforming materials and equipment would function within safety margins; (2) In six instances, items used in the construction of TEF failed to satisfy quality standards. In one of these situations, operating procedures had to be modified to ensure that the problem item did not compromise safety; and (3) Finally, at the ISP, one component that did not meet quality standards was procured. The failure of the item could have resulted in a spill of up to 15,000 gallons of high-level radioactive waste. Based on an extensive examination of relevant internal controls and procurement practices, we concluded that these failures were attributable to inadequate attention to quality assurance at Savannah River. Simply put, Departmental controls were not adequate to prevent and/or detect quality assurance problems. For example, Federal and prime contractor officials did not expressly require that subcontractors or lower-tiered vendors comply with quality assurance requirements. Additionally, management did not effectively communicate quality assurance concerns between the several Departmental program elements operating at Savannah River. The procurement and installation of these nonconforming components resulted in cost increases. For example, as of October 2008, the MOX Facility had incurred costs of more than $680,000 due to problems associated with the procurement of $11 million of nonconforming safety-class reinforcing steel. In general, the internal control weaknesses we discovered could have permitted, without detection, the procurement and installation of safety critical components that did not meet quality assurance standards. In a worst case scenario, undetected, nonconforming components could fail and injure workers or the public. In certain instances, the Department took steps to ensure that the prime contractors at Savannah River began action to remediate nonconforming components and to strengthen policies and procedures. Additionally, the Department took actions to ensure that critical components necessary for projects worked as designed by requiring that the prime contractor place personnel at manufacturers' locations. Further, the Department had suspended work with certain other manufacturers due to quality assurance problems.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Audit Report on "Management Controls over the Department's Excess Weapons Inventories and Selected Sensitive Equipment used by Protective Forces"

Since September 11, 2001, the Department of Energy has, on several occasions, revised its security posture based on identified threats and adversaries. These revisions in security posture have driven Departmental sites to upgrade their defensive and tactical equipment. Subsequent changes in the perceived threats have, in some cases, led to a reduction in the need for certain types of weapons, thus creating a pool of surplus equipment. These surplus weapons could potentially be used by other Department sites and Federal law enforcement agencies. Recent Office of Inspector General reports have raised concerns with the adequacy of controls related to defensive and tactical equipment. For example, our report on Management Controls Over Defense Related High Risk Property (OAS-M-08-06, April 2008) found that administrative controls over certain defense related high risk property were not sufficient for providing accountability over these items. Because of prior reported weaknesses in controls over defensive and tactical equipment, we initiated this audit to determine whether the Department and its contractors were properly managing excess weapons inventories and selected sensitive equipment used by protective forces. Our review disclosed that the Department was not always properly managing its inventories of excess weapons and selected sensitive equipment. We identified issues with the retention of unneeded weapons at many locations and with the identification and tracking of sensitive items. More specifically: Sites maintained large inventories of weapons that were no longer needed but had not been made available for use by either other Departmental sites or other Federal law enforcement agencies. For instance, at six of the locations included in our review we identified a total of 2,635 unneeded weapons with a total acquisition value of over $2.8 million that had not been officially declared as excess - an action that would have made them available for others to use. In addition; Sites were not always identifying, tracking and properly disposing of potentially high risk and sensitive equipment. In particular, we identified control weaknesses in this area related to weapons sights and scopes. These issues occurred because the Department did not have processes in place to properly manage excess inventories of weapons. In particular, the Department does not have requirements for ensuring timely declaration of excess weapons. Additionally, certain sites indicated that they were unwilling to give up excess weapons because of the possibility that they may be needed in the future. However, other sites had a need for some of these weapons and could have avoided purchasing them had they been made available through the excess screening process. Also, we found that the Department lacks clear guidance on the identification of high risk/sensitive equipment. Except for immaterial differences, we were able to locate and verify accountability over the items of defensive and tactical equipment we selected for review. Specifically, we took statistical samples of weapons, ammunition, and other related equipment and were able to verify their existence. While these accountability measures were noteworthy, additional action is necessary to strengthen controls over weapon and sensitive equipment management. Untimely declaration of excess weapons may result in an inefficient use of scarce Government resources. Similarly, if selected high risk/sensitive equipment is not properly categorized and tracked, accountability issues may occur. To address these issues, we made recommendations aimed at improving the management of these categories of defensive and tactical equipment.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Audit Report on "Work for Others Performed by the Department of Energy for the Department of Defense"

Pursuant to the Atomic Energy Act of 1954, as amended, and the Economy Act of 1932, the Department of Energy and its semi-autonomous National Nuclear Security Administration (NNSA) provide research and technical assistance to other Federal agencies on a reimbursable, full cost recovery basis through the Work for Others (WFO) program. For the vast majority of WFO technical projects, Department Federal officials furnish administrative project oversight while the actual detailed scientific or technical work is completed by the Department's 'management and operating' contractors. These contractors are awarded a special contract type specifically created under the Federal Acquisition Regulation to manage and operate Department sites and facilities, including sophisticated laboratories and technical centers, on a government-owned, contractor-operated basis. With annual expenditures exceeding $1 billion, the Department of Defense (DoD) is one of the Department's largest WFO customers. Work performed for DoD at the Department's national laboratories and other facilities includes highly technical research in areas such as nuclear weapons systems, counter-terrorism, and in-theater troop support. The National Defense Authorization Act for Fiscal Year (FY) 2009, required the Inspectors General of the DoD and the Department to review procurement methods to determine whether the Department complied with DoD procurement requirements and/or whether alternative procurement policies were in place. In response, we focused our review on projects performed by NNSA because it completes the vast majority (approximately $900 million in FY 2008) of the Department's work for DoD. As part of this effort, and, at the specific request of the DoD Office of Inspector General (DoD OIG), we identified the universe of WFO technical projects that received new funding in the fourth quarter of FY 2008 at NNSA sites. We independently reviewed a judgmental sample of 11 projects selected by the DoD OIG to meet the objectives of this audit. Our review revealed that NNSA managed DoD WFO technical projects in a manner consistent with requirements of the Atomic Energy Act of 1954, the Federal Acquisition Regulation, and the Department's implementing guidance, the Department of Energy Acquisition Regulation. Because of the very nature of the Department's management and operating contracting model, WFO projects may not be technically compliant with DoD procurement regulations in certain instances. We found that NNSA did not let new contracts or task orders for the DoD WFO technical projects we reviewed and instead managed them under its existing internal control process as part of its management and operating contract structure. In one instance, we noted that the Department had, at DoD's request, supplemented its control structure to incorporate specific DoD procurement requirements. Senior Department of Energy procurement officials acknowledged that neither the Department nor NNSA modified their existing prime contracts to incorporate specific defense procurement requirements because such modifications would be inappropriate, costly, and inefficient. In short, they informed us that the Department had developed and implemented a series of controls designed to monitor overall contractor performance, including WFO technical projects. Department and NNSA officials noted, however, that they were willing to incorporate DoD specific requirements into work orders should DoD request and fund such efforts. Additional details regarding management of WFO technical projects are discussed in the body of this report.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

INFORMATION: Audit Report on "Accounting and Reporting for the American Recovery and Reinvestment Act by the Department of Energy's Funding Recipients"

The American Recovery and Reinvestment Act of 2009 (Recovery Act) was established to jumpstart the U.S. economy, create or save millions of jobs, and invest in the Nation's energy future. The Department of Energy received approximately $37 billion through the Recovery Act to support a variety of science, energy and environmental initiatives. The Office of Management and Budget (OMB) issued guidance for carrying out stimulus-related activities which requires, among other things, that recipients ensure funds provided by the Recovery Act are clearly distinguishable from non-Recovery Act funds in all reporting systems and that recipients' actions are transparent to the public. To meet these requirements, the Department's recipients must clearly and accurately track and report on 18 separate data elements. In addition, the Department was to develop and implement a process to ensure that recipient information reported to the public was free from material omissions and significant reporting errors. Our recent report (OAS-RA-10-01, October 2009) noted that the Department had developed a quality assurance process to facilitate the quarterly reviews of recipient data and planned to test it during the first quarterly reporting cycle. To determine whether the Department's quality assurance process was effective, we examined information reported by recipients of Departmental funding as of September 30, 2009. We also sought to determine whether the Department's prime contractors were prepared to track and report on Recovery Act activities. The Department had taken a number of actions designed to ensure the accuracy and transparency of reported Recovery Act results. This process identified potential anomalies with information reported by 1,113 of 2,038, or 55 percent of recipients. We view the Department's data quality assurance efforts as both timely and significant. As noted by our audit testing, however, opportunities exist to strengthen the process. In particular: (1) Site officials did not always ensure that anomalies, once identified during the quality assurance process, were actually resolved. For example, the Department's process identified that about 740 of the approximately 10,000 jobs reported in the first quarter of Fiscal Year 2010 as created/retained were for projects reported as having no funds spent. Although these problems were referred to site officials for follow-up and/or correction, the information was never actually changed; (2) The Department did not always utilize the correct basis when evaluating the accuracy of 'funds provided' data submitted by grant recipients. For example, in its analysis process, the Department used data reflecting 'funds obligated' rather than the correct amount of 'total grant awards'. This generated a number of potential false positives; and, (3) Duplicate reports by certain recipients, resulting in overstatements of as much as $137 million of the more than $18 billion obligated, were not corrected. We observed that the Department had taken prompt action to ensure that its prime facility management contractors could properly report Recovery Act information. Notably, the seven contractors in this category included in our review had modified their accounting systems, as necessary, to ensure that they could accurately track and report on Recovery Act activities. The systems at each of these entities had been restructured so that they: (i) could separate Recovery Act and non-Recovery Act funds; and, (ii) had adequate processing capacity to handle the projected increase in transactions. We found the Department's decision to limit its reviews to the four elements that it considered to be critical (award amount, invoiced amount, jobs created/retained, and project status) to be reasonable. We concluded, however, other elements or dependent relationships should not be completely excluded from review. Beyond its initial development and implementation of its quality assurance process, the Department had taken steps to improve its ability to ensure that Recovery Act information was both accurate and transparent to the public. Specifically, officials changed the quality assurance plan based on initial data reviews. Department officials also informed us that they are in the process of updating their quality assurance process to meet new OMB requirements. For example, recent guidance directed agencies to focus on certain data elements, such as award number and recipient name, during their quality assurance reviews. In addition, subsequent to our review, the Department added two more data elements and comparisons to its quarterly assurance process, including an analysis of costs/expenditures and a comparison of the recipient reported project status to the Department's data contained in its financial system.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Audit Report on "Management Controls over the Department of Energy's American Recovery and Reinvestment Act - Louisiana State Energy Program"

The Department of Energy's (Department) Office of Energy Efficiency and Renewable Energy (EERE) provides grants to states, territories and the District of Columbia (states) to support their energy priorities through the State Energy Program (SEP). Federal funding is based on a grant formula that considers the population and energy consumption in each state, and amounted to $25 million for Fiscal Year (FY) 2009. The American Recovery and Reinvestment Act of 2009 (Recovery Act) expanded the SEP by authorizing an additional $3.1 billion to states using the existing grant formula. EERE made grant awards to states after reviewing plans that summarize the activities states will undertake to achieve SEP Recovery Act objectives, including preserving and creating jobs; saving energy; increasing renewable energy sources; and, reducing greenhouse gas emissions. EERE program guidance emphasizes that states are responsible for administering SEP within each state, and requires each state to implement internal controls over the use of Recovery Act funds. The State of Louisiana received $71.6 million in SEP Recovery Act funds; a 164-fold increase over its FY 2009 SEP grant of $437,000. As part of the Office of Inspector General's strategy for reviewing the Department's implementation of the Recovery Act, we initiated this review to determine whether the Louisiana State Energy Office had internal controls in place to efficiently and effectively administer Recovery Act funds provided for its SEP program. Louisiana developed a strategy for SEP Recovery Act funding that focused on improving energy efficiency in state buildings, housing and small businesses; increasing Energy Star appliance rebates; and, expanding the use of alternative fuels and renewable energy. Due to a statewide hiring freeze, Louisiana outsourced management of the majority of its projects ($63.3 million) to one general contractor. Louisiana plans to internally manage one project, Education and Outreach ($2.6 million). The remaining funds are allocated to program specific management expenses, including the contractor's fee, a monitoring contract, and Louisiana's payroll expenses ($5.7 million). Louisiana formally approved the general contractor in February 2010. State officials plan to initiate a separate consulting contract for monitoring, verifying and auditing expenditures, energy savings and other metrics as required by EERE for Recovery Act funding.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Preliminary Audit Report on "Management Controls over the Commonwealth of Virginia's Efforts to Implement the American Recovery and Reinvestment Act Weatherization Assistance Program"

The Department of Energy's (Department) Weatherization Assistance Program received $5 billion under the American Recovery and Reinvestment Act of 2009 (Recovery Act) to improve the energy efficiency of homes, multi-family rental units and mobile homes owned or occupied by low-income persons. Subsequently, the Department awarded a three-year Weatherization Assistance Program grant for $94 million to the Commonwealth of Virginia (Virginia). This grant provided more than a ten-fold increase in funds available to Virginia for weatherization over that authorized in Fiscal Year (FY) 2009. Corresponding to the increase in funding, the Recovery Act increased the limit on the average amount spent to weatherize a home (unit) from $2,500 to $6,500. Virginia's Department of Housing and Community Development (DHCD) administers the Recovery Act grant through 22 local community action agencies. These agencies (sub-grantees) are responsible for determining applicant eligibility, weatherizing homes, and conducting home assessments and inspections. Typical weatherization services include installing insulation; sealing ducts; tuning and repairing furnaces; and, mitigating heat loss through windows, doors and other infiltration points. Virginia plans to use its Recovery Act Weatherization funding to weatherize about 9,193 units over the life of the grant - a significant increase over the 1,475 housing units that were planned to be completed in FY 2009. Given the significant increase in funding and the demands associated with weatherizing thousands of homes, we initiated this audit to determine if Virginia had adequate safeguards in place to ensure that the Weatherization Program was managed efficiently and effectively. The State of Virginia's DHCD had not implemented financial and reporting controls needed to ensure Weatherization Program funds are spent effectively and efficiently. Specifically, DHCD had not: (1) Performed on-site financial monitoring of any of its sub-grantees under the Recovery Act; (2) Reviewed documentation supporting sub-grantee requests for reimbursements to verify the accuracy of amounts charged; (3) Periodically reconciled amounts paid to sub-grantees to the actual cost to weatherize units; (4) Maintained vehicle and equipment inventories as required by Federal regulations and state and Federal program directives; and (5) Accurately reported Weatherization Program results to the Department. Exacerbating weaknesses in DHCD's financial controls, the Department's most recent program monitoring visit to Virginia, made in 2008 before passage of the Recovery Act, did not include a required financial review. Hence, the financial control weaknesses discussed above were not detected and had not been addressed. As described in this report, these control and reporting weaknesses increase the risk that Recovery Act objectives may not be achieved and that fraud, waste or abuse can occur and not be detected in this critically important program.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Audit Report on "Waste Processing and Recovery Act Acceleration Efforts for Contact-Handled Transuranic Waste at the Hanford Site"

The Department of Energy's Office of Environmental Management's (EM), Richland Operations Office (Richland), is responsible for disposing of the Hanford Site's (Hanford) transuranic (TRU) waste, including nearly 12,000 cubic meters of radioactive contact-handled TRU wastes. Prior to disposing of this waste at the Department's Waste Isolation Pilot Plant (WIPP), Richland must certify that it meets WIPP's waste acceptance criteria. To be certified, the waste must be characterized, screened for prohibited items, treated (if necessary) and placed into a satisfactory disposal container. In a February 2008 amendment to an existing Record of Decision (Decision), the Department announced its plan to ship up to 8,764 cubic meters of contact-handled TRU waste from Hanford and other waste generator sites to the Advanced Mixed Waste Treatment Project (AMWTP) at Idaho's National Laboratory (INL) for processing and certification prior to disposal at WIPP. The Department decided to maximize the use of the AMWTP's automated waste processing capabilities to compact and, thereby, reduce the volume of contact-handled TRU waste. Compaction reduces the number of shipments and permits WIPP to more efficiently use its limited TRU waste disposal capacity. The Decision noted that the use of AMWTP would avoid the time and expense of establishing a processing capability at other sites. In May 2009, EM allocated $229 million of American Recovery and Reinvestment Act of 2009 (Recovery Act) funds to support Hanford's Solid Waste Program, including Hanford's contact-handled TRU waste. Besides providing jobs, these funds were intended to accelerate cleanup in the short term. We initiated this audit to determine whether the Department was effectively using Recovery Act funds to accelerate processing of Hanford's contact-handled TRU waste. Relying on the availability of Recovery Act funds, the Department changed course and approved an alternative plan that could increase costs by about $25 million by processing Hanford TRU-waste on-site rather than at AMWTP. Further, under the newly adopted alternative approach, the Department would fail to achieve the previously anticipated reductions in volume associated with the use of existing AMWTP waste compaction capabilities.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Audit Report on "The Department of Energy's Opportunity for Energy Savings Through Improved Management of Facility Lighting"

The American Recovery and Reinvestment Act of 2009 (Recovery Act) highlighted the importance of reducing the Nation's dependence on foreign oil and conserving scarce energy resources. The Department of Energy, as the designated lead agency for promoting new technologies, providing leadership for energy conservation and helping Federal agencies reduce energy costs, plays a pivotal role in achieving the Recovery Act's energy related goals. The Department spends nearly $300 million per year in energy costs for its 9,000 buildings at 24 sites. Electricity costs, totaling $190 million, account for close to two-thirds of the Department's total energy expenditures, with roughly 40 percent or $76 million of those costs attributable to the cost of lighting. New lighting technologies and advanced lighting systems offer the Department the opportunity to significantly reduce energy consumption; decrease operating costs at its sites throughout the country; and, demonstrate the benefits of using new lighting technologies that are currently being developed in its laboratories and by other sources. Because of its energy conservation leadership role, we initiated this audit to determine whether the Department's facilities had implemented lighting conservation measures.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

From Energy Audits to Home Performance: 30 Years of Articles in Home Energy Magazine

Home Energy Magazine has been publishing articles about residential energy efficiency for 30 years. Its goal has been to disseminate technically reliable and neutral information to the practitioners, that is, professionals in the business of home energy efficiency. The articles, editorials, letters, and advertisements are a kind of window on the evolution of energy conservation technologies, policies, and organizations. Initially, the focus was on audits and simple retrofits, such as weatherstripping and insulation. Instrumentation was sparse sometimes limited to a ruler to measure depth of attic insulation and a blower door was exotic. CFLs were heavy, awkward bulbs which might, or might not, fit in a fixture. Saving air conditioning energy was not a priority. Solar energy was only for the most adventurous. Thirty years on, the technologies and business have moved beyond just insulating attics to the larger challenge of delivering home performance and achieving zero net energy. This shift reflects the success in reducing space heating energy and the need to create a profitable industry by providing more services. The leading edge of the residential energy services market is becoming much more sophisticated, offering both efficiency and solar systems. The challenge is to continue providing relevant and reliable information in a transformed industry and a revolutionized media landscape.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Audits and Energy Efficiency in Support of Resilience

Presentation provides an overview of how facility energy and water efficiency audits can provide resilience benefits, how NREL's REopt Lite web tool optimizes the economic and resilience benefits of distributed energy resources, and how FEMP's Technical Resilience Navigator assesses risk to a site's critical functions and prioritizes solutions.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Combining Traditional Cyber Security Audit Data with Psychosocial Data: Towards Predictive Modeling for Insider Threat Mitigation

The purpose of this chapter is to motivate the combination of traditional cyber security audit data with psychosocial data, so as to move from an insider threat detection stance to one that enables prediction of potential insider presence. Two distinctive aspects of the approach are the objective of predicting or anticipating potential risks and the use of organizational data in addition to cyber data to support the analysis. The chapter describes the challenges of this endeavor and progress in defining a usable set of predictive indicators, developing a framework for integrating the analysis of organizational and cyber security data to yield predictions about possible insider exploits, and developing the knowledge base and reasoning capability of the system. We also outline the types of errors that one expects in a predictive system versus a detection system and discuss how those errors can affect the usefulness of the results.

97 MATHEMATICS AND COMPUTING↗

Pilot Quality Control Program for Audit RT External Beams at Mexican Hospitals

A pilot quality control program for audit 18 radiotherapy RT external beams at 13 Mexican hospitals is described--for eleven {sup 60}Co beams and seven photon beams of 6, 10 and 15 MV from accelerators. This program contains five parts: a) Preparation of the TLD-100 powder: washing, drying and annealing (one hour 400 deg. C plus 24 hrs 80 deg. C). b) Sending two IAEA type capsules to the hospitals for irradiation at the hospital to a nominal D{sub W} = 2 Gy{center_dot}c) Preparation at the SSDL of ten calibration curves CC in the range of 0.5 Gy to 6 Gy in terms of absorbed dose to water D{sub W} for {sup 60}Co with traceability to primary laboratory NRC (Canada), according to a window irradiation: 26/10/2007-7/12/2007. d) Reading all capsules that match their hospital time irradiation and the SSDL window irradiation. f) Evaluation of the Dw imparted by the hospitals.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

SU-E-T-173: Evaluation of the MicroSTAR Reader for the OSLD System for Remote Dosimetry Audits at the IROC HQAC

Purpose: Analysis of the performance of the microSTARii reader for optically stimulated luminescence dosimeters (OSLD) used by the IROC Houston Quality Assurance Center (IROC HQAC) for external audits compare to the characteristics of the Microstar reader. Methods: The IROC HQAC uses the Microstar reader for the OSLD program for verification of output of photon, electron and proton beams. The calculation of dose from the OSLD system is based on a group of factors defined at time of the commissioning of a batch of detectors. Factors like system sensitivity (SS), depletion (KD), element correction factor (ECF), linearity (KL), energy correction (KE). The new microSTARii unit presents many hardware and software upgrades that were considered useful for this program. Based on these changes many factors, that were considered reader dependent, were revised in order to analyze the effect of the new reading process. The SS, KD, ECF and KL were evaluated and compared with data defined based on reading done on Microstar reader. Results: The SS is reader specific and specified at 100 cGy dose level. This value is define per reading session and monitored over time. The KD factor was found to be different because of reading procedure are different. The ECF values changed for a group of nano dots compare to values defined based on reading done on the Microstar reader. The KL was defined for the reader. Conclusion: The new microSTARii reader presents new features that improve the efficiency of the OSLD program at the IROC HQAC. New characterization is needed before final implementation is done to match the requirements of the existing OSLD system defined for the Microstar reader. Changes in uncertainty of the results has not been analized.

07 ISOTOPE AND RADIATION SOURCES↗

TU-C-201-03: The Use of Checklists and Audit Tools for Safety and QA

Recent use of HDR has increased while planning has become more complex often necessitating 3D image-based planning. While many guidelines for the use of HDR exist, they have not kept pace with the increased complexity of 3D image-based planning. Furthermore, no comprehensive document exists to describe the wide variety of current HDR clinical indications. This educational session aims to summarize existing national and international guidelines for the safe implementation of an HDR program. A summary of HDR afterloaders available on the market and their existing applicators will be provided, with guidance on how to select the best fit for each institution’s needs. Finally, the use of checklists will be discussed as a means to implement a safe and efficient HDR program and as a method by which to verify the quality of an existing HDR program. This session will provide the perspective of expert HDR physicists as well as the perspective of a new HDR user. Learning Objectives: Summarize national and international safety and staffing guidelines for HDR implementation Discuss the process of afterloader and applicator selection for gynecologic, prostate, breast, interstitial, surface treatments Learn about the use of an audit checklist tool to measure of quality control of a new or existing HDR program Describe the evolving use of checklists within an HDR program.

60 APPLIED LIFE SCIENCES↗

TU-FG-201-06: Remote Dosimetric Auditing for Clinical Trials Using EPID Dosimetry: A Pilot Study

Purpose: To perform a pilot study for remote dosimetric credentialing of intensity modulated radiation therapy (IMRT) based clinical trials. The study introduces a novel, time efficient and inexpensive dosimetry audit method for multi-center credentialing. The method employs electronic portal imaging device (EPID) to reconstruct delivered dose inside a virtual flat/cylindrical water phantom. Methods: Five centers, including different accelerator types and treatment planning systems (TPS), were asked to download two CT data sets of a Head and Neck (H&N) and Postprostatectomy (P-P) patients to produce benchmark plans. These were then transferred to virtual flat and cylindrical phantom data sets that were also provided. In-air EPID images of the plans were then acquired, and the data sent to the central site for analysis. At the central site, these were converted to DICOM format, all images were used to reconstruct 2D and 3D dose distributions inside respectively the flat and cylindrical phantoms using inhouse EPID to dose conversion software. 2D dose was calculated for individual fields and 3D dose for the combined fields. The results were compared to corresponding TPS doses. Three gamma criteria were used, 3%3mm-3%/2mm–2%/2mm with a 10% dose threshold, to compare the calculated and prescribed dose. Results: All centers had a high pass rate for the criteria of 3%/3 mm. For 2D dose, the average of centers mean pass rate was 99.6% (SD: 0.3%) and 99.8% (SD: 0.3%) for respectively H&N and PP patients. For 3D dose, 3D gamma was used to compare the model dose with TPS combined dose. The mean pass rate was 97.7% (SD: 2.8%) and 98.3% (SD: 1.6%). Conclusion: Successful performance of the method for the pilot centers establishes the method for dosimetric multi-center credentialing. The results are promising and show a high level of gamma agreement and, the procedure is efficient, consistent and inexpensive. Funding has been provided from Department of Radiation Oncology, TROG Cancer Research and the University of Newcastle. Narges Miri is a recipient of a University of Newcastle postgraduate scholarship.

60 APPLIED LIFE SCIENCES↗