Search NASA⌕ Search

SEARCH · Search NASA

Results for “capacity planning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

AztechSat-1, a First Collaborative CubeSat Between NASA and Mexico

An international collaboration program for capacity building in space technology is being established between NASA and the Mexican Space Agency (AEM). Its objective is to develop a series of CubeSats collaboratively in a way that benefits both agencies. For AEM, this experience will support the development of human capital required for its space program. This project provides an opportunity for NASA future missions to benefit from commercially available technologies demonstrated in space. AEM was recently created by the Mexican Government to use and develop space technology in Mexico. Current AEM plans call for having the capability of developing its own communication satellites by 2030, so the need for having a Mexican cadre of space experts is mandatory. The program will start with the development and launching of AztechSat-1, the first AEM CubeSat project to be deployed from the International Space Station (ISS). Several public Mexican universities will participate in this project to demonstrate GlobalStar, a satellite communications provider using a constellation of LEO satellites, as an option for small satellite missions. AztechSat-1 mission objectives are:(1) Develop a flight ready CubeSat for deployment from the ISS; (2) Demonstrate GlobalStar´s Network as a method to advance communications in CubeSat missions. AztechSat-1 is envisioned as a 1U CubeSat and will be designed and constructed by Mexican graduate students from two major universities in Mexico: UNAM and IPN. The students will be mentored and supervised by researchers from NASA Ames Research Center (NARC). Flight acceptance tests are going to be done both at Mexican university labs as well as at NARC. Funding for the project will be provided concurrently by AEM, the Mexican participating universities, and other Mexican entities. The development of AztechSat-1 will emphasize the transfer of knowledge in space mission analysis and design, flight acceptance testing and other areas of space technology which are not well developed in Mexico yet. Mexican students will benefit from their mentoring from NASA researchers and will provide a multiplier effect in the development of the next generation of Mexican aerospace engineers. AztechSat-1 will be developed in a period of twelve months and will be launched by late 2015. AztechSat´s success will define the future of collaboration between NASA and AEM in capacity building. A plan for developing a series of AztechSat’s in a one per year basis, with increasing capabilities and complexity is currently being negotiated between NASA an AEM.

Martinez, Andres↗

Multi-Objective Multi-User Scheduling for Space Science Missions

We have developed an architecture called MUSE (Multi-User Scheduling Environment) to enable the integration of multi-objective evolutionary algorithms with existing domain planning and scheduling tools. Our approach is intended to make it possible to re-use existing software, while obtaining the advantages of multi-objective optimization algorithms. This approach enables multiple participants to actively engage in the optimization process, each representing one or more objectives in the optimization problem. As initial applications, we apply our approach to scheduling the James Webb Space Telescope, where three objectives are modeled: minimizing wasted time, minimizing the number of observations that miss their last planning opportunity in a year, and minimizing the (vector) build up of angular momentum that would necessitate the use of mission critical propellant to dump the momentum. As a second application area, we model aspects of the Cassini science planning process, including the trade-off between collecting data (subject to onboard recorder capacity) and transmitting saved data to Earth. A third mission application is that of scheduling the Cluster 4-spacecraft constellation plasma experiment. In this paper we describe our overall architecture and our adaptations for these different application domains. We also describe our plans for applying this approach to other science mission planning and scheduling problems in the future.

science planning↗

Total Probability of Collision as a Metric for Finite Conjunction Assessment and Collision Risk Management

On-orbit collision risk is becoming an increasing mission risk to all operational satellites in Earth orbit. Managing this risk can be disruptive to mission and operations, present challenges for decision-makers, and is time-consuming for all parties involved. With the planned capability improvements to detecting and tracking smaller orbital debris and capacity improvements to routinely predict on-orbit conjunctions, this mission risk will continue to grow in terms of likelihood and effort. It is very real possibility that the future space environment will not allow collision risk management and mission operations to be conducted in the same manner as it is today. This paper presents the concept of a finite conjunction assessment-one where each discrete conjunction is not treated separately but, rather, as a continuous event that must be managed concurrently. The paper also introduces the Total Probability of Collision as an analogous metric for finite conjunction assessment operations and provides several options for its usage in a Concept of Operations.

Conjunction Assessment↗

The development of a high-capacity instrument module heat transport system, appendixes

Data sheets provide temperature requirements for 82 individual instruments that are under development or planned for grouping on a space platform or pallet. The scientific objectives of these instrument packages are related to solar physics, space plasma physics, astronomy, high energy astrophysics, resources observations, environmental observations, materials processing, and life sciences. System specifications are given for a high capacity instrument module heat transport system to be used with future payloads.

Source record↗

Collaborative Arrival Planning: Data Sharing and User Preference Tools

Air traffic growth and air carrier economic pressures have motivated efforts to increase the flexibility of the air traffic management process and change the relationship between the air traffic control service provider and the system user. One of the most visible of these efforts is the U.S. government/industry "free flight" initiative, in which the service provider concentrates on safety and cross-airline fairness, and the user on their business objectives and operating preferences, including selecting their own path and speed in real-time. In the terminal arrival phase of flight, severe restrictions and rigid control are currently placed on system users, typically without regard for individual user operational preferences. Airborne delays applied to arriving aircraft into capacity constrained airports are imposed on a first-come, first-serve basis, and thus do not allow the system user to plan for or prioritize late arrivals, or to economically optimize their arrival sequence. A central tenant of the free-flight operating paradigm is collaboration between service providers and users in reaching air traffic management decisions. Such collaboration would be particularly beneficial to an airline's "hub" operation, where off-schedule arrival aircraft are a consistent problem, as they cause serious air-port ramp difficulties, rippling airline scheduling effects, and result in large economic inefficiencies. Greater collaboration can also lead to increased airport capacity and decrease the severity of over-capacity rush periods. In the NASA Collaborative Arrival Planning (CAP) project, both independent exchange of real-time data between the service provider and system user and collaborative decision support tools are addressed. Data exchange of real-time arrival scheduling, airspace management, and air carrier fleet data between the FAA service provider and an air carrier is being conducted and evaluated. Collaborative arrival decision support tools to allow intra-airline arrival preferences are being developed and simulated. The CAP project is part of and leveraged from the NASA/FAA Center TRACON Automation System (CTAS), a fielded set of decision support tools that provide computer generated advisories for both enroute and terminal area controllers to manage and control arrival traffic more efficiently. In this paper, the NASA Collaborative Arrival Planning project is outlined and recent results detailed, including the real-time use of CTAS arrival scheduling data by a major air carrier and simulations of tactical and strategic user preference decision support tools.

Zelenka, Richard E.↗

Planning to Explore: Using a Coordinated Multisource Infrastructure to Overcome Present and Future Space Flight Planning Challenges

Few human endeavors present as much of a planning and scheduling challenge as space flight, particularly manned space flight. Just on the operational side of it, efforts of thousands of people across hundreds of organizations need to be coordinated. Numerous tasks of varying complexity and nature, from scientific to construction, need to be accomplished within limited mission time frames. Resources need to be carefully managed and contingencies worked out, often on a very short notice. From the beginning of the NASA space program, planning has been done by large teams of domain experts working months, sometimes years, to put together a single mission. This approach, while proven very reliable up to now, is becoming increasingly harder to sustain. Elevated levels of NASA space activities, from deployment of the new Crew Exploration Vehicle (CEV) and completion of the International Space Station (ISS), to the planned lunar missions and permanent lunar bases, will put an even greater strain on this largely manual process. While several attempts to automate it have been made in the past, none have fully succeeded. In this paper we describe the current NASA planning methods, outline their advantages and disadvantages, discuss the planning challenges of upcoming missions and propose a distributed planning/scheduling framework (CMMD) aimed at unifying and optimizing the planning effort. CMMD will not attempt to make the process completely automated, but rather serve in a decision support capacity for human managers and planners. It will help manage information gathering, creation of partial and consolidated schedules, inter-team negotiations, contingencies investigation, and rapid re-planning when the situation demands it. The fist area of CMMD application will be planning for Extravehicular Activities (EVA) and associated logistics. Other potential applications, not only in the space flight domain, and future research efforts will be discussed as well.

Balaban, Edward↗

A sampling-based optimization approach to handling environmental uncertainty for a planetary lander

Planning for unknown environments presents a number of technical challenges. The planner must ensure robustness to unknown phenomena and manage unpredictable variation in execution, all while operating in a capacity that maximizes its objective. Productivity in the face of these challenges re-quires an integrated approach to planning and execution that is capable of accomplishing goals, reacting to variation, and maximizing overall utility. We examine this problem in the context of a Europa Lander concept mission. We model the problem as a hierarchical task network, framing it as a utility maximization problem constrained on a depletable energy resource. We propose an uncertainty–sensitive deterministic planning framework that utilizes periodic replanning to better handle model uncertainty and variable execution. We demonstrate the efficacy of our framework through simulations of a Europa Lander concept mission in which our algorithm out-performs several baseline approaches in both utility maximization and robustness

Zilberstein, Shlomo↗

A Sampling-Based Optimization Approach to Handling Environmental Uncertainty for a Planetary Lander

Planning for unknown environments presents a number of technical challenges. The planner must ensure robustness to unknown phenomena and manage unpredictable variation in execution, all while operating in a capacity that maximizes its objective. Productivity in the face of these challenges re-quires an integrated approach to planning and execution that is capable of accomplishing goals, reacting to variation, and maximizing overall utility. We examine this problem in the context of a Europa Lander concept mission. We model the problem as a hierarchical task network, framing it as a utility maximization problem constrained on a depletable energy resource. We propose an uncertainty–sensitive deterministic planning framework that utilizes periodic replanning to better handle model uncertainty and variable execution. We demonstrate the efficacy of our framework through simulations of a Europa Lander concept mission in which our algorithm out-performs several baseline approaches in both utility maximization and robustness

Chien, Steve↗

Chandra Space Flight Software: Using Software to Autonomously Operation the Largest and Most Sensitive X-Ray Telescope in the World

Chandra is the world's largest and most sensitive X-ray telescope. The Chandra X-ray Observatory is the third in NASA's family of "Great Observatories." The Chandra X-ray Observatory, launched by Space Shuttle Columbia on July 23, 1999, is NASA's newest Great Observatory. The Chandra space flight software is the operational software, which controls and directs the Chandra X-ray Observatory. The Chandra flight software has executed faultlessly for over 13,000 hours on-orbit. The Chandra flight software directly controls the Pointing, Aspect Determination, Electrical Power Subsystem, Propulsion system, and the Command, Communications, and Data Management subsystems. The software controls the spacecraft operations during all phases of the mission. The software also performs thermal control of the telescope to maintain pointing accuracy and monitors radiation levels throughout the orbit so that the Science Instruments can be safed if radiation thresholds are exceeded. The efficient operation of Chandra flight software has enabled the gathering of crucial science data. The Chandra flight software fault protection is the key to early detection and prevention of science instrument or spacecraft damage in an operating platform/environment, which is completely unforgiving. Permanently open Sun Shade Door and ACIS focal plane radiator sensitivity exposes science instruments and mirrors to damage for pointing anomalies causing an attitude excursion. The Chandra flight software must prevent these attitude excursions from occurring for ANY failure. Another example is that the power system has an unregulated bus, which imposes severe operating requirements on Chandra flight software to control array pointing and battery connection/disconnect using a unique algorithmic and logic approach. The Chandra flight software has enabled a truly autonomous vehicle with greater than 99% of all mission data collected as planned. Less than 15% of spacecraft operations are conducted in view (1 hour out of 8) leading to very extended periods without ground contact. The Chandra flight software implements the flexible mission plan during this out of view period, manages the solid state recorder capacity, controls all pointing and maneuvers, provides fault detection for all satellite subsystems, and initiates communications with the ground at the appropriate time. This paper will describe the software architecture features, key design elements and software testing techniques that have facilitated Chandra's success.

Crumbley, Tim↗

Super NiCd Open-Circuit Storage and Low Earth Orbit (LEO) Life Test Evaluation

This presentation discusses Air Force tests performed on super NiCd cells to measure their performance under conditions simulating Low Earth Orbit (LEO) conditions. Super NiCd cells offer potential advantages over existing NiCd cell designs including advanced cell design with improved separator material and electrode making processes, but handling and storage requires active charging. These tests conclude that the super NiCd cells support generic Air Force qualifications for conventional LEO missions (up to five years duration) and that handling and storage may not actually require active charging as previously assumed. Topics covered include: Test Plan, Initial Characterization Tests, Open-Circuit Storage Tests, and post storage capacities.

Baer, Jean Marie↗

Developing Coastal Adaptation to Climate Change in the New York City Infrastructure-Shed: Process, Approach, Tools, and Strategies

While current rates of sea level rise and associated coastal flooding in the New York City region appear to be manageable by stakeholders responsible for communications, energy, transportation, and water infrastructure, projections for sea level rise and associated flooding in the future, especially those associated with rapid icemelt of the Greenland and West Antarctic Icesheets, may be beyond the range of current capacity because an extreme event might cause flooding and inundation beyond the planning and preparedness regimes. This paper describes the comprehensive process, approach, and tools developed by the New York City Panel on Climate Change (NPCC) in conjunction with the region s stakeholders who manage its critical infrastructure, much of which lies near the coast. It presents the adaptation approach and the sea-level rise and storm projections related to coastal risks developed through the stakeholder process. Climate change adaptation planning in New York City is characterized by a multi-jurisdictional stakeholder-scientist process, state-of-the-art scientific projections and mapping, and development of adaptation strategies based on a risk-management approach.

Rosenzweig, Cynthia↗

Exploration Missions to Host Small Payloads

The next-generation heavy launch vehicle, the Space Launch System (SLS), will provide the capability to deploy small satellites during the trans-lunar phase of the exploration mission trajectory. We will describe the payload mission concept of operations, the payload capacity for the SLS, and the payload requirements. Exploration Mission 1, currently planned for launch in December 2017, will be the first mission to carry such payloads on the SLS.

Cirtain, Jonathan↗

A Machine Learning Approach to Improve Air Traffic Management Initiatives

Collaborating closely with commercial air carriers and related organizations, the Federal Aviation Administration(FAA) regulates air traffic and ensures the safety and efficiency of air operations. Air traffic controllers make strategic decisions, such as delaying, rerouting, or canceling flights, partly based on guidance provided by the FAA’s Air TrafficControl System Command Center (ATCSCC). The guidance includes, among other things, control measures known asTraffic Management Initiatives (TMIs) designed to enhance safety and improve operational efficiency. TMIs play a crucial role in managing the demand and capacity within the U.S. National Airspace System (NAS). Two major TMIs that are routinely used (primarily to mitigate the adverse effects of bad weather) are Ground Delay Programs (GDPs) andGround Stops (GSs). In a GDP, flights destined for airports facing thunderstorm activity experience delays at their origin airports. This proactive approach minimizes the risk of routing aircraft through hazardous weather conditions and also replaces (fuel burning) airborne delays with ground delays. In a GS, a temporary restriction is imposed on the departure or arrival of aircraft at a specific airport or within a designated airspace. Although other TMIs (e.g., miles-in-trail) are also implemented as part of (air) traffic flow management in the NAS, the focus of this work is on GDPs and GSs. Since TMIs, by design, lead to flight delays or cancellations, it is crucial to put in place the right set of parameters(e.g., scope and duration of the GDP). For example, when the end time of a GDP extends beyond what is necessary, it imposes unnecessary delays on departing flights. This situation could occur as a result of inaccurate prediction of the(required) duration of the GDP based on the weather forecast. On the other hand, if a GDP ends prematurely before the underlying capacity constraints are resolved at the destination airport, it may result in airborne holding. The delicate balance lies in matching the termination of the GDP precisely with the resolution of capacity constraints, avoiding both the imposition of unnecessary ground delays and the need for airborne holding due to premature program termination.Failing to specify the right parameters for TMIs also leads to flight delays, creating a significant obstacle in managing the increasing traffic volumes causing increased work load for the controllers. To address this issue, we propose the integration of Machine Learning (ML) models in the traffic flow management(TFM) pipeline. In current operations, decisions are made by human experts based on extensive training, historical patterns, available traffic and weather data. Since we have an abundance of data from past events that tell us the likely impact of various TMIs, by ingesting historical data, properly trained ML models can offer valuable insights and aid human decision-making. With the FAA increasingly exploring advanced analytics, ML emerges as a focal point for enhancing TFM within the National Airspace System (NAS). As a first step, this study aims to provide traffic controllers with decision-making support for the issuance and adjustment of TMIs. Data analytics and machine learning have been previously employed to address some of the challenges associated with TMIs. Numerous studies have concentrated on various facets of TMI issuance, exploring factors influencing TMI parameters, including arrival rate, airport capacity, and delay prediction. For example, using weather forecasts, several statistical methods were used to produce probabilistic capacity profiles which in conjunction with deterministic models provided insights into the GDP planning process [1–4]. The downside of using deterministic models is that they rely on fixed inputs and predetermined rules, which lack the ability to account for the inherent uncertainty and variability present in real-world scenarios. In a separate series of studies, researchers aimed to predict the occurrences of GDPs and GSs. The majority of these studies utilized various supervised learning methods, including Decision Trees, Naive Bayes, Support VectorMachines, and Random Forests to analyze the influence of weather conditions and arrival demand on TMI incidents[5–8]. However, these studies primarily focused on predicting the incidence of TMIs without explicitly addressing the scope of TMIs, including their duration and their geographical coverage. Furthermore, the emphasis of these studies was largely on GDPs, given their higher frequency and longer duration when compared to GSs. A limited number of studies focused on predicting the parameters of TMIs, specifically addressing their duration and extent. In one such study focusing on optimizing the TMI parameters at San Francisco International Airport (SFO),the authors utilized a probabilistic forecast of fog [9]. They simulated various capacity scenarios based on the (fog)burn-off forecasts, selecting GDP parameters that minimized airborne and overall ground delays. However, this approach exclusively emphasizes stratus (fog) burn-off as the primary determinant of GDP and GS, neglecting other influential factors like severe weather events, runway closures, lower capacity than traffic demand, and other important variables. Given the complexity of predicting the TMI and determining its scope, we seek a more holistic approach. We aim to consider all significant factors that could impact TMIs and their parameters. What sets this research apart is the fusion of all data sources relevant to the issuance and adjustment of TMIs and it represents the first comprehensive attempt to optimize TMIs in this manner. Since this comprehensive solution involves various aspects, we break down the problem into smaller components and input all parameters into a unified model called the “TMI Adjuster”. Figure 1 shows the overall framework and the list of datasets used in each model. The objective of the TMI Adjuster module is to deliver reliable, consistent and expedited recommendations for the progression, adjustment, and termination of TMIs. The ML solution entails developing a pipeline capable of predicting the necessity of a TMI (e.g., GS or GDP) along with its various parameters. For example, in the case of a GS, this includes the scope of the GS either in terms of distance from the destination airport or based on pre-defined airspace sectors. Here, scope refers to those regions and departing airports that are subject to the GS. In this paper, we concentrate on the issuance of GSs in the three major airports in the New York area — LaGuardia(LGA), John F. Kennedy International (JFK), and Newark Liberty International (EWR). We fuse traffic, weather and other relevant aviation data from years 2017 to 2019 to train and validate the ML models. In particular, we use the following datasets: •Terminal Aerodrome Forecast (TAF): meteorological forecasts specific to each airport, issued four times a day, covering predefined time periods. •TMI data: includes all GSs and GDPs along with their respective parameters. •Aviation System Performance Metrics (ASPM): includes traffic related data such as aircraft delays, arrival, and departure rates. •Notices to Airmen (NOTAMs): utilized to extract runway closure data and manage interdependencies between terminals in close proximity. •Flight cancellation data •Airspace Flow Programs (AFP): includes information on flight airborne holdings caused by TMIs. The data preprocessing entails transforming ASPM, TMI, AFP, NOTAMs, and weather data into an hourly format and consolidating all datasets by merging them based on date and time as the primary key. The TMI Adjuster framework comprises two parallel models: one dedicated to GS and a second model focused on GDP. As previously mentioned, our specific focus is on the GS model as a multi-classification problem. In this framework, each data point of the GS model input summarizes ten hours of data. Specifically, the data loader for the GS model generates the input and output of the model as follows: at a given time step, the input includes the actual traffic, weather, and TMI data from the two-hour window before the time step, alongside the weather forecast and scheduled traffic for the next 8 hours starting from the time step. Based on this information, the output of the GS model for each time interval consists of three dimensions. The first dimension represents a binary decision on whether there should be a GS in place for the next hour or not. The second dimension is related to the scope of the GS in the United States, and the third dimension is related to the scope of the GS in Canada (i.e., to determine if the GS impacts airports in Canada).One of the challenges with TMI modeling is the sparsity of TMI events, particularly regarding its scope. To address this challenge in the scope of the GS model output, we implement grouping. The GS scope for the US region is defined based on a list of centers that should be included when the GS is in place. With 20 centers in the US, we utilized historical data to group them into 4 categories. In particular, we summarized our historical data in a graph format where nodes represent centers, and link weights are defined based on the co-occurrence of centers in the scope parameter ofTMIs. By identified strongly connected components in this graph, we were able to partition the centers into four groups. We consider two model structures for the GS Model. Firstly, a hierarchical classification model [10], where the human decision-making for a GS is of hierarchical nature. The decision-maker first decides whether there is a need fora GS, and if the answer is yes, determines the scope. A hierarchical classification model organizes the problem into a class hierarchy, typically a tree or a Directed Acyclic Graph (DAG) structure, and considers the dependency of the decision in the previous step to the next component [10]. Here, we employ the local classifier per level approach, which involves training one multi-class classifier for each level of the class hierarchy. The second structure is the independent structure. In this setting, as the name suggests, we do not consider the dependency of the decisions in the different dimensions of the output of the model. Instead, for each dimension, we train a multi-class classifier independently. Table 1 summarizes GS model statistics for training, validation and testing. The table documents the effect of limiting data to the time steps when there was actually a TMI in place or when a TMI had just terminated. This resulted in a more balanced distribution of the GS class(GS positive class)versus “No GS”(GS negative class), which might help the training process. While JFK and LGA follow very similar distributions, with 40% and 42% GS positive class respectively, EWR has proportionally fewer GS incidents at 28%. Our subsequent phase involves evaluating the performance of both hierarchical structure and independent structure using different state-of-the-art multi-class classifier models such as Random Forest, Decision Trees, K-nearest Neighbors, and Logistic Regression and forecast the duration and scope of the GSs.

Farzan Masrour Shalmani↗

Collaborative Seamless Manager for Airspace Resources and Traffic

In today's NAS, airlines conduct pre-departure flight planning with limited information about traffic congestion. Then, as events evolve (pre-departure, on the surface, or inflight) and are impacted by congestion, limited options for changing flight plans are offered to the airlines, and, in some cases, flight plans are changed by air traffic managers on behalf of the airlines. For the airlines, this produces flight plan uncertainty and possible disruption to their business plans. The Collaborative Seamless Manager of Airspace Resources and Traffic (CSMART) is a tool being developed for the 2045 Next Gen System that will enhance the airlines' ability to flight plan, both pre-departure and during flight. CSMART achieves this, using the UTM architecture approach, by connecting via the internet airlines with other airlines and airlines with FAA agents. Flight plans, including digital, discrete planned trajectories with tolerances, are passed through the connection. Planned trajectories are used to create probabilistic predictions of when and where congestion will occur. Pre-departure, airline agents will use the predictions to collaboratively and seamlessly create flight plans that avoid congestion or go through it, depending on business objectives. In cases, where demand exceeds capacity and priorities need to be set, airline agents will have the ability to negotiate with each other to set them. Moreover, if flights are impacted by congestion during flight, CSMART will allow airlines more real-time decision making options for changing flight plans. This seminar presents the general CSMART concept and tool and research needed to develop it.

Windhorst, Robert D.↗

Space images of the future - Landsat-C and Thematic Mapper

The article discusses the five-channel multispectral scanner and the panchromatic forty-meter-resolution return-beam vidicon cameras designed for Landsat C. The thematic mapper device, a second-generation multispectral scanner employing six channels and thirty-meter resolutions which is presently planned by NASA, is also described. Brief attention is given to the heat capacity mapper, coastal zone color scanner, and Seasat synthetic aperture radar.

Stoney, W. E.↗

Utility experience with two demonstration wind turbine generators

Edison has committed 360 MW of nameplate generating capacity to wind energy by year 1990 in its long-range generation plan. To reach this goal the Company's wind energy program focuses on three areas: the continuous evaluation of the wind resource, the hands-on demonstration of wind turbine generators (WTG) and an association with wind park developers. Two demonstration WTGs have been installed and operated at Edison's Wind Energy Center near Palm Springs, California: a 3 MW horizontal axis Bendix/Schachle WTG and a 500 kW vertical axis Alcoa WTG. They are part of a one to two year test program during which the performance of the WTGs will be evaluated, their system operation and environmental impact will be assessed and the design criteria of future WTGs will be identified. Edison's experience with these two WTGs is summarized and the problems encountered with the operation of the two machines are discussed.

Wehrey, M. C.↗

Propellant Densification Ground Testing Conducted for Launch Vehicles

The NASA Glenn Research Center at Lewis Field has taken the lead in the development of practical densified cryogenic propellants for launch vehicle applications. The technology of subcooling cryogenic propellants below their normal boiling point to produce a denser fluid is one of the key process technologies necessary to meet the challenge of single-stage-to-orbit and reusable launch vehicles. Densified propellants are critical to lowering launch costs because they enable more propellant to be packed into a given unit volume, thus improving the performance by reducing the overall size and weight of the launch vehicle. This two-pronged research and test program has evolved into (1) conducting tank loading tests using densified liquid hydrogen and (2) developing two large-scale propellant densification systems that will be performance tested next year at Glenn. The propellant-loading test program was undertaken at Glenn in coordination with Lockheed Martin Michoud Space Systems. In this testing, the liquid hydrogen recirculation and densification process was simulated, and the thermal stratification of the densified propellant was recorded throughout the tank. The test article was a flight-weight tank constructed from composite materials similar to those to be used on the X-33 launch vehicle. The tank geometry as designed by Lockheed Martin had two cylindrical lobes with a center septum. Liquid hydrogen flow rate, pressure data, and temperature data plotted over time were collected while the subscale tank was filled with 27 R (15 K) densified liquid hydrogen propellant. This testing has validated mathematical models and demonstrated the readiness of densified propellant technology for near-term use. It marks the first time that such a process has been carried out with a multiple-lobe, flight-similar tank. Glenn researchers have also been working on providing a process and critical test data for the continuous production of densified liquid hydrogen (LH2) and densified liquid oxygen (LO2). Each densification production process uses a high-efficiency, subatmospheric boiling bath heat exchanger to cool the working fluid. A near triple-point hydrogen boiling bath is used to condition and subcool hydrogen to 27 R (15 K), and a nitrogen boiling bath is used to cool the liquid oxygen to 120 R (66.7 K). Multistage centrifugal compressors operating at cryogenic inlet conditions maintain the heat exchanger bath vapor pressure below 1 atm. The LO2 propellant densification unit shown in the photograph has a 30 lb/sec capacity, whereas the LH2 unit was designed to process 8 lb/sec of propellant. Each densification unit will be transported to Glenn's South Forty area after all fabrication work is completed sometime late next year. There the LO2 and LH2 densifier performance tests will be conducted with another larger Lockheed Martin tank designated the Structural Test Article (STA). This liquid oxygen tank is a full-scale, flight-weight, prototype aluminum tank designed for the X-33. It has a capacity of 20,000 gallons of LO2. The tank loading and recirculation testing planned for next year with STA will provide the data necessary for full-scale development of propellant densification technology.

Tomsik, Thomas M.↗

Maximum Oxygen Uptake During and After Long-Duration Space Flight

Decreased maximum oxygen consumption (VO2max) during and after space flight may impair a crewmember s ability to perform mission-critical work that is high intensity and/or long duration in nature (Human Research Program Integrated Research Plan Risk 2.1.2: Risk of Reduced Physical Performance Capabilities Due to Reduced Aerobic Capacity). When VO2max was measured in Space Shuttle experiments, investigators reported that it did not change during short-duration space flight but decreased immediately after flight. Similar conclusions, based on the heart rate (HR) response of Skylab crewmembers, were made previously concerning long-duration space flight. Specifically, no change in the in-flight exercise HR response in 8 of 9 Skylab crewmembers indicated that VO2max was maintained during flight, but the elevated exercise HR after flight indicated that VO2max was decreased after landing. More recently, a different pattern of in-flight exercise HR response, and assumed changes in VO2max, emerged from routine testing of International Space Station (ISS) crewmembers. Most ISS crewmembers experience an elevated in-flight exercise HR response early in their mission, with a gradual return toward preflight levels as the mission progresses. Similar to previous reports, exercise HR is elevated after ISS missions and returns to preflight levels by 30 days after landing. VO2max has not been measured either during or after long-duration space flight. The purposes of the ISS VO2max experiment are (1) to measure VO2max during and after long-duration spaceflight, and (2) to determine if submaximal exercise test results can be used to accurately estimate VO 2max.

Moore, Alan D., Jr.↗