Search NASA⌕ Search

SEARCH · Search NASA

Results for “circuit breaker”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Adaptive Threshold-Based Zonal Isolation of Faults in a Multiterminal DC Using Local Measurements

Fast and accurate methods of fault detection and isolation are a pre-emptive measure in multiterminal dc (MTdc) systems. Zonal isolation of faults is necessary to prevent any misopertation of the dc breakers that can lead to a shutdown of the network. Existing techniques require fast-communication or data synchronization methods have their own disadvantages. This article proposes a method for efficient fault zone isolation without the need of a communication link that prevents any misoperation of the dc breakers in a radial MTdc. This method provides individual local measurement-based control to the hybrid dc circuit breakers (dcCB). Faults created outside the zone of protection for a breaker create a change in the rate of change of current or voltage leading to misoperation. To avoid detection using a fixed threshold, an adaptive threshold based approach is suggested that updates the threshold based on the present operating status. Sensitivity analysis by varying the current limiting inductance and fault location is performed. In conclusion, a three terminal radial model of an MTdc is used for zonal isolation using power system computer aided design/electromagnetic transients including dc.

24 POWER TRANSMISSION AND DISTRIBUTION↗

PV Inverter Failures Cause AC Breaker Damage - Power Quality

This poster discusses how PV inverter failures cause AC breaker damage and is intended to help system owners identify power quality issues and origins, help inverter and/or circuit breaker manufacturers develop safer failure modes, and develop addendums to standards for failure testing of breakers and inverters.

arc↗

It's a Go

The Electrical Power Distribution Control Team takes on the task of determining power failures throughout the Orbiter. The Displays and Controls Team takes on the task of determining distribution, circuit breakers, and switch failures that might occur on the Orbiter or displays that stop working. This paper will identify the circuit packages I have put together for the D&C group, the redesigning of a Hybrid Driver Controller box, and the web designing the Displays and Controls website for easier access to information which can range from indicators to switches.

Welker, Joshua T.↗

Characterizing electrical panel capacity, breaker space, and loads in U.S. single-family homes

Electrical panels distribute electricity to appliances, equipment, and other building loads and maintain safety by preventing overloads of branch circuits, feeders, and utility service wires connecting homes to the grid. Load calculations in the National Electrical Code (NEC) determine the capacity of installed electrical panels in the United States, which are rated in amps (A). Circuit breakers within electrical panels affect the magnitude and number of loads that panels can serve. In home retrofits and renovations, existing electrical panels may not accommodate new electrical loads, either due to insufficient electrical capacity or a lack of available breaker spaces. Homes with these panel constraints may need to replace existing panels with new panels that have greater capacity and breaker space.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Current-limiting voltage regulator

Voltage regulator, which operates within preset current limits, acts as a circuit breaker to prevent overload failure, and automatically resets when the overload is removed. The power dissipated in the series transistor of the circuit is constant from normal load to short circuit condition.

Cleveland, E. F.↗

Fast Overcurrent Tripping Circuit

Fast overcurrent tripping circuit designed for incorporation into power metal oxide/semiconductor field-effect transistor (MOSFET) switching circuit. Serves as fast electronic circuit breaker by sensing voltage across MOSFET's during conduction and switching MOSFET's off within 1 microsecond after voltage exceeds reference value corresponding to tripping current. Acts more quickly than Hall-effect current sensor and, in comparison with shunt current-measuring circuits, smaller and consumes less power. Also ignores initial transient overcurrents during first 5 microseconds of switching cycle.

Sullender, Craig C.↗

Practical aspects of instrumentation system installation, volume 13

A review of factors influencing installation of aircraft flight test instrumentation is presented. Requirements, including such factors as environment, reliability, maintainability, and system safety are discussed. The assessment of the mission profile is followed by an overview of electrical and mechanical installation factors with emphasis on shock/vibration isolation systems and standardization of the electric wiring installation, two factors often overlooked by instrumentation engineers. A discussion of installation hardware reviews the performance capabilities of wiring, connectors, fuses and circuit breakers, and a guide to proper selections is provided. The discussion of the installation is primarily concerned with the electrical wire routing, shield terminations and grounding. Also inclued are some examples of installation mistakes that could affect system accuracy. System verification procedures and special considerations such as sneak circuits, pyrotechnics, aircraft antenna patterns, and lightning strikes are discussed.

Borek, R. W.↗

Grid Forming Inverter With Increased Short-Circuit Contribution to Address Inverter-Based Microgrid Protection Challenges

Substantial differences in fault levels between grid-tied and islanded modes is one of the primary challenges of microgrid protection. During grid-tied mode, the bulk grid provides significant short-circuit, while during islanded operation the short-circuit magnitude is small due to inverter-based resources limiting their current output close to nominal ratings. Consequently, conventional distribution protection strategies based on overcurrent cannot reliably protect microgrids when operating in islanded mode. Fuses and circuit breakers are particularly affected because of their inverse characteristics. Presently, the absence of affordable solutions for protecting microgrids in islanded mode leads to microgrids shutting down during electrical faults. The contribution of this article is two-fold. The first innovation proposes specific hardware modifications to grid-forming inverters to increase their short-circuit current during electrical faults. The second innovation introduces a novel control strategy designed to preserve control stability margins even when the grid-filter saturates, ensuring sinusoidal output currents under normal and fault conditions. Through experimental results, the inverter with the proposed modifications can provide more than three-times its nominal current during electrical faults. For the prototype testbed, this was sufficient to enable the use of traditional legacy overcurrent protection, achieving the fuse-to-relay and relay-to-relay minimum coordination time for the line-to-ground, line-to-line to ground, and three-phase electrical faults.

42 ENGINEERING↗

Fault Current Control and Protection in a Standalone DC Microgrid Using Adaptive Droop and Current Derivative

This report presents a novel fault detection, characterization, and fault current control algorithm for a standalone solar-photovoltaic (PV) based dc microgrids. The protection scheme is based on the current derivative algorithm. The overcurrent and current directional/differential comparison based protection schemes are incorporated for the dc microgrid fault characterization. For a low impedance fault, the fault current is controlled based on the current/voltage thresholds and current direction. Generally, the droop method is used to control the power-sharing between the converters by controlling the reference voltage. In this article, an adaptive droop scheme is also proposed to control the fault current by calculating a virtual resistance R droop , and to control the converter output reference voltage. For a high impedance fault, differential comparison method is used to characterize the fault. These algorithms effectively control the converter pulsewidth and reduce the flow of source current from a particular converter, which helps to increase the fault clearing time. Additionally, a trip signal is sent to the corresponding dc circuit breaker (DCCB), to isolate the faulted converter, feeder or a dc bus. The dc microgrid protection design procedure is detailed, and the performance of the proposed method is verified by simulation analysis.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Understanding Power Systems Protection in the Clean Energy Future

Wind and solar power and battery energy storage are often referred to as inverter-based resources (IBRs), which means they rely on power electronics (inverters) to generate grid-compatible electricity. This is unlike the fossil, nuclear, and hydroelectric plants that use spinning synchronous generators that have provided nearly all U.S. electricity until recently. Synchronous generators can inherently provide several services used to maintain a safe and stable grid and as they are replaced with IBRs it becomes important to understand how these services can be provided. One of these services is fault current, or the ability to inject large amounts of current during a short circuit. This current can easily be detected with low-cost equipment such as circuit breakers. IBRs do not inherently produce large amounts of fault current, and this may eventually require finding alternative sources of fault current or new system protection schemes. This document describes several alternative approaches to maintaining fault current protection and provide a safe, reliable power grid.

14 SOLAR ENERGY↗

High-voltage, high-power, solid-state remote power controllers for aerospace applications

Two general types of remote power controller (RPC) that combine the functions of a circuit breaker and a switch were developed for use in direct-current (dc) aerospace systems. Power-switching devices used in these designs are the relatively new gate-turnoff thyristor (GTO) and poweer metal-oxide-semiconductor field-effect transistors (MOSFET). The various RPC's can switch dc voltages to 1200 V and currents to 100 A. Seven different units were constructed and subjected to comprehensive laboratory and thermal vacuum testing. Two of these were dual units that switch both positive and negative voltages simultaneously. The RPC's using MOSFET's have slow turnon and turnoff times to limit voltage spiking from high di/dt. The GTO's have much faster transition times. All RPC's have programmable overload tripout and microsecond tripout for large overloads. The basic circuits developed can be used to build switchgear limited only by the ratings of the switching device used.

Sturman, J. C.↗

Preconceptual Designs of Coupled Power Delivery between a 4-Loop PWR and 100-500 MWe HTSE Plants

This study develops a preconceptual design for the integration between a large-scale high-temperature electrolysis facility and a NPP. Two hydrogen facility sizes are considered: 100 MWnom and 500 MWnom. Both steam supply designs use cold reheat steam extraction as a heat source. A reboiler inside the protected area of the power plant transfers steam heat to the demineralized water supply for the hydrogen plant. After the heat transfer, the extracted steam condenses and returns to the condenser while the process steam routes out of the protected area to the electrolyzers. Electrical power is tapped off from the high voltage side of the GSU transformer, where it is then transported via a 345-kV transmission line to the hydrogen facility. Circuit breakers and disconnects are located at both ends of the transmission line. Step down transformers and miscellaneous switchgear/buses are located at the end of the transmission line inside the HTEF boundary. Control capabilities for the steam interfacing equipment and electrical dispatch are accessible from the Main Control Room, and protective relays for the transmission line are located inside the Relay Room. Computer modeling was performed for the thermal and electrical designs. PEPSE analysis provided the steady-state parameters for thermal extraction from the turbine cycle. These parameters were used to inform transients and size equipment in combination with Applied Flow Technology (AFT) Arrow and AFT Fathom modeling for steam and water piping, respectively. Electrical transients were analyzed using PSCAD. An ETAP model was used to evaluate power flow and short circuit, which enabled the sizing of transformers and protective equipment. A cost estimate was developed for both integration designs when considering plant separation distances of 250 m and 500 m. From these estimates, the modifications for thermal and electrical interfacing of a first-of-a-kind nuclear-integrated hydrogen facility are anticipated to cost between $60–250/kWnom., where the subscript “nom” refers to the nominal size of the hydrogen plant. On a thermal power basis, the thermal power has a cost of approximately $8/MWth for a 500 MWnom high temperature electrolysis plant located 500 m distant from the NPP. That value decreases to approximately $7.5/MWth for a 250 m separation distance between the hydrogen plant and the NPP. This value is lower than previous estimates of the cost of heat extracted from NPPs primarily because in this work the steam is extracted from cold reheat instead of the main steam line, which reduces the cost of the dispatched steam by approximately $3.5/MWth. Nuclear steam extraction can provide a profit avenue for many plants and is not restricted to hydrogen production. Ammonia production, oil refining, and paper production, among other industrial processes all require thermal energy, which can be provided by NPPs. Future work should look further at the details of thermal extraction for a variety of use cases. This can include increased levels of extraction and multiple simultaneous users. Additionally, site-specific studies should be performed to develop industry experience and improve cost accuracy.

08 HYDROGEN↗

Fault Location Using the Natural Frequency of Oscillation of Current Discharge in MTdc Networks

This paper discusses a novel offline-fault location approach using single ended measurements. The natural dissipation of the circuit parameters are considered for fault location. A relationship between the damped natural frequency of oscillation of the transmission line current and fault location is established. The hybrid dc circuit breaker (dcCB) interrupts the fault current, whereby the transmission line current attenuates under the absence of any driving voltage source. The line capacitance discharges into the fault at a specific frequency of oscillation and rate of attenuation. Utilizing this information, the fault location in a multi-terminal direct current (MTdc) network can be obtained. A three terminal radial model of a MTdc is used for performance evaluation of the proposed method using Power System Computer Aided Design (PSCAD)/Electromagnetic Transients including dc (EMTdc).

42 ENGINEERING↗

Power System Waveform Classification Using Time-Frequency and CNN

Many modern reclosers and circuit breakers have microprocessor relays that record waveforms of system events. In some cases, utilities may record a half-a-dozen event captures for every event. This is thousands of events per year. The industry needs faster, more automated, more conclusive, and easy-to-use systems that can process massive amounts of event recordings without extensive input/support from power system engineers. To address the need for a commercially viable solution that can classify waveform data, energies were directed to develop a universal neural network (NN) structure (deep learning algorithm) that works for a wide variety of system event types. The structure that showed the most promise was one that included the use of spectrograms. The technique has shown positive results in audio engineering, particularly with respect to speech recognition. A waveform signature could be treated as a spoken word like audio waveforms for specific things such as “YES” or “UP”. No two people produce the exact same waveform when speaking each of these words, but audio processing algorithms based on spectrograms and convolutional neural networks (CNN) can still distinguish the word regardless of the speaker. No two circuits produce the exact same waveform for a given event, but the NN can be trained to classify the event type regardless of the circuit or location on the circuit. A Power System Neural Network (PSNN) has been developed to use a CNN to classify events within waveform data for power systems. The waveform is converted to an array of values by way of spectrograms and interpreted as an image. This image is passed into the CNN. The test results on independent simulated test and validation datasets show greater than 99% accuracy. While the results thus far are based on simulated data, the performance of the PSNN is very promising and should work for a wide variety of power system conditions of interest. Ultimately, much of the custom code and tools used today and much of the manual effort expended today may be automated using this PSNN.

24 POWER TRANSMISSION AND DISTRIBUTION↗

End-to-end microgrid protection using distributed data-driven methods

This paper introduces an end-to-end microgrid protection framework that offers real-time system monitoring, fault-related decision making, and circuit breaker control. This is achieved through the design of distributed data-driven techniques based on the support vector machine method, where each relay is responsible for distributed data collection, fault detection, fault localization, and fault isolation. Local communication is established among neighboring relays, fostering cooperative fault localization and isolation. This decentralized design not only reduces the computational and communication requirements but also enables the adaptability of each relay under varying operational dynamics. The proposed end-to-end protection framework was validated using MATLAB/Simulink simulations on a 100% renewable microgrid, achieving an accuracy of 93.1% with response time of 0.0523 s, in protecting against a range of fault scenarios that are characterized by various types, locations, impedances, load conditions, photovoltaic power levels, and microgrid operating modes.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Adaptive Fault Current-Limiting Control of MMC for Protection of Multiterminal HVDC Systems

A crucial requirement of the protection system for multi-terminal high-voltage DC (MTDC) transmission is that it is capable of selectively isolating the faulty area from the healthy part of the network using DC circuit breakers (DCCBs), while ensuring continuous operation of converter stations in the healthy part of the network. But in the half-bridge modular multilevel converters (HB-MMCs) based MTDC system, since HB-MMCs do not have fault current absorption capability, when a DC fault occurs, the rising fault currents can quickly reach the blocking threshold within a few milliseconds and disrupt the operation of the MMCs in the healthy part. To facilitate fault-ride-through capability of MTDC system, large DC reactors are often considered in series with DCCBs to reduce the rate of rise of the fault current and prevent blocking the MMCs in the healthy part of the DC networks; however, large DC reactors prohibitively increase the cost of the system, introduce stability issues and can create post-fault oscillations. This paper presents an adaptive fault current-limiting control method for MMCs to avoid their blocking and enable the continuous operation of the healthy part of MTDC systems. The method contains two parts: The first part is based on circulating current feedforward control, which emulates virtual reactors in each arm of an MMC, and is immediately activated when the fault current starts to increase to reduce the rate of rise of the fault current. The second part temporarily bypasses all the submodules when the fault current exceeds a preset threshold, complementing the fault current-limiting effect of the first part. Neither part requires fault detection signals, and they are automatically activated during faults. Simulation case studies of a four-terminal bipolar MMC-based high-voltage DC system are presented to demonstrate the effectiveness of the proposed control methods.

active fault current limiting↗

Investigation of flow regimes in arc plasma–gas interactions using a two-temperature arc in crossflow model

The perpendicular impingement of a gas stream on an electric arc, a configuration known as the arc in crossflow, is of primary relevance in the study of plasma-gas interactions, as well as in industrial applications such as circuit breakers and wire-arc spraying. The flow dynamics in the arc in crossflow are the result of coupled fluid-thermal-electromagnetic phenomena accompanied by large property gradients, which can produce significant deviations from Local Thermodynamic Equilibrium (LTE) among electrons and gas species. These characteristics can lead to the establishment of distinct flow regimes depending on the relative values of the controlling parameters of the system, such as inflow velocity, arc current, and inter-electrode spacing. A two-temperature non-LTE (NLTE) model is used to investigate the arc dynamics and the establishment of flow regimes in the arc in crossflow. The plasma flow model is implemented within a nonlinear Variational Multiscale (VMS) numerical discretization approach that is less dissipative, and hence better suited to capture unstable behavior, than traditional VMS methods commonly used in computational fluid dynamics simulations. The Reynolds and the Enthalpy dimensionless numbers, characterizing the relative flow strength and arc strength, respectively, are chosen as the controlling parameters of the system. Simulation results reveal the onset of dynamic behavior and the establishment of steady, periodic, quasi-periodic, and chaotic or potentially turbulent, regimes, as identified by distinct spatiotemporal fluctuations. The computational findings reveal the role of increasing the relative arc strength on enhancing flow stability by delaying the growth of fluctuating and unstable flow behavior.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Distributed Ledger Technology for Fault Tolerant Distribution Grid Operations

This paper explores the potential of distributed ledger technology (DLT) to improve fault-tolerant grid operations by leveraging its core features as an immutable, decentralized ledger, a distributed, consensus-based agreement process, and a distributed state-replication engine. Distribution power systems deliver electricity to millions of customers; however, they are susceptible to various threats that can result in customer interruptions. These include faults caused by adverse weather conditions, natural disasters, vegetation growth, equipment failure, and malicious attacks. To minimize the effects of these faults, fault-handling approaches rely on network knowledge to isolate affected areas and reconnect unaffected areas, reducing the number of affected customers while maintaining safety. Here, we present a trusted data-sharing architecture that enables independent, distributed actors to reconstruct the pre-fault system state by enabling distributed resources to make appropriate decisions with limited network/system information. Although the process requires some data sharing between switch-delimited areas, the approach limits the amount of private information shared, preserving customers' privacy and business-sensitive information. We include three use cases that form a foundation for third parties to develop functional solutions that can eventually be deployed in the field. The gross error detection method used within switch-delimited areas can identify sensor errors and accurately detect circuit breaker states. The evaluation of possible reconnection while preserving data ownership resulted in a voltage magnitude difference smaller than 0.001% from the OpenDSS power flow solution that has full system knowledge, which is below the expected power flow tolerance. The approach offers a promising opportunity for improving fault-tolerant distribution grid operations.

24 POWER TRANSMISSION AND DISTRIBUTION↗