Search NASA⌕ Search

SEARCH · Search NASA

Results for “construction overview”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Nonmicrowave health and ecological effects: Overview

The potential environmental impacts due to the operation and construction of the Satellite Power System are discussed. The nonmicrowave health and ecological effects encompass impacts on the public, the terrestrial worker, the space worker, the ecology, and agriculture.

White, M. R.↗

Hubble Space Telescope: Wide field and planetary camera instrument handbook. Version 2.1

An overview is presented of the development and construction of the Wide Field and Planetary Camera (WF/PC). The WF/PC is a duel two dimensional spectrophotometer with rudimentary polarimetric and transmission grating capabilities. The instrument operates from 1150 to 11000 A with a resolution of 0.1 arcsec per pixel or 0.043 arcsec per pixel. Data products and standard calibration methods are briefly summarized.

Griffiths, Richard↗

GLAST: Launched And Being Commissioned - Status And Prospects for Microquasars

GLAST: Launched And Being Commissioned - Status And Prospects for Microquasars The Fermi Gamma-ray Space Telescope (Fermi) is a next generation high energy gamma-ray observatory launched in June 2008. The primary instrument is the Large Area Telescope (LAT), which will measure gamma-ray flux and spectra from 20 MeV to > 300 GeV and is a successor to the highly successful EGRET experiment on CGRO. The LAT has better angular resolution, greater effective area, wider field of view and broader energy coverage than any previous experiment in this energy range. An overview of the LAT instrument design and construction is presented which includes performance estimates with particular emphasis on how these apply to studies of microquasars. Early results on LS I +61 303 detection are presented.

79 ASTRONOMY AND ASTROPHYSICS↗

High Temperature Materials

Overview of high temperature metals, including component construction rules for advanced reactor designs, assessment of filler metal for Alloy 800H weldments, high-temperature crack growth rate testing, work packages and contributors for FY24, creep-fatigue damage summation evaluation, GCR metal needs, and high temperature metals from other programs.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

NASA Lunar Mining and Construction Activities and Plans

The Space Exploration Policy enacted by the US Congress in 2005 calls for the US National Aeronautics and Space Administration (NASA) to implement a sustained and affordable human and robotic program to explore the solar system and beyond; Extend human presence across the solar system, starting with a human return to the Moon by the year 2020, in preparation for human exploration of Mars and other destinations; Develop the innovative technologies, knowledge, and infrastructures both to explore and to support decisions about the destinations for human exploration; and Promote international and commercial participation in exploration to further U.S. scientific, security, and economic interests. In 2006, NASA released the Lunar Architecture Study, which proposed establishing a lunar Outpost on the Moon with international participation to extend human presence beyond Earth's orbit, pursue scientific activities, use the Moon to prepare for future human missions to Mars, and expand Earth s economic sphere. The establishment of sustained human presence on the Moon for science and exploration combines the design, integration, and operation challenges experienced from both the short Apollo lunar missions and the build-up and sustained crew operations of the International Space Station (ISS). Apollo experience reminds developers and mission planners that hardware must operate under extremely harsh environmental and abrasive conditions and every kilogram of mass and payload must be critical to achieve the mission s objectives due to the difficulty and cost of reaching the lunar surface. Experience from the ISS reminds developers and mission planners that integration of all hardware must be designed and planned from the start of the program, operations and evolution of capabilities on a continuous basis are important, and long-term life-cycle costs and logistical needs are equally or more important than minimizing early development and test costs. Overarching all of this is the need to implement efforts that are sustainable and affordable. One area NASA is developing that can significantly change how systems required for sustained human presence are designed and integrated, as well as potentially break our reliance on Earth supplied logistics, is In-Situ Resource Utilization (ISRU). ISRU, also known living off the land, involves the extraction and processing of local resources into useful products. In particular, the ability to make propellants, life support consumables, fuel cell reagents, and radiation shielding can significantly reduce the cost, mass, and risk of sustained human activities beyond Earth. Also, the ability to modify the lunar landscape for safer landing, transfer of payloads from the lander an outpost, dust generation mitigation, and infrastructure placement and buildup are also extremely important for long-term lunar operations. While extra-terrestrial excavation, material handling and processing, and site preparation and construction may be new to NASA and other space agencies, there is extensive terrestrial hardware and commercial experience that can be leveraged. This paper will provide an overview of current NASA activities in lunar ISRU mining and construction and how terrestrial experience in these areas are important to achieving the goal of affordable and sustainable human exploration.

Sanders, Gerald B.↗

Cyber-Resilient Design Methodology for Microgrids

Recent advancement in tools has helped with microgrid design, development, planning and operation. Microgrids offer a unique application based on users with different requirements for tools. The process of designing, constructing, commissioning, and assessing a microgrid is not always straightforward due to these distinct requirements. Additionally, metrics are needed for performance evaluation. This panel will offer an overview and description of tools that helps with microgrid design, construction, planning, operation, cyber security, and metrics-driven performance assessment driven by multiple diverse applications and use cases.

CCE↗

Development Overview of the Revised NASA Ultra Long Duration Balloon

The development of the National Aeronautics and Space Administration s (NASA) Ultra Long Duration Balloon (ULDB) has made significant strides in addressing the deployment issues experienced in the scaling up of the balloon structure. This paper concentrates on the super-pressure balloon developments that have been, and are currently being planned by the NASA Balloon Program Office at Goddard Space Flight Center s Wallops Flight Facility. The goal of the NASA ULDB development project is to attempt to extend the potential flight durations for large scientific balloon payloads. A summary of the February 2005 test flight from Ft. Sumner, New Mexico will be presented. This test flight spurred a number of investigations and advancements for this project. The development path has pursued some new approaches in the design, analysis, and testing of the balloons. New issues have been ideEti6ed throu& both analysis md testing. These have been addressed in the design stage before the next balloon construction was begun. This paper will give an overview of the recent history for this effort and the development approach pursued for ULDB. A description of the balloon design, including the modifications made as a result of the lessons learned, will be presented. Areas to be presented include the design approach, deployment issues that have been encountered and the proposed solutions, ground testing, photogrammetry, and an analysis overview. Test flight planning and considerations will be presented including test flight safety. An extended duration test flight of the National Aeronautics and Space Administration s Ultra Long Duration Balloon is planned for the May/June 2006 time frame. This flight is expected to fly from Sweden to either Canada or Alaska. Preliminary results of this flight will be presented as available. Future plans for both ground testing and additional test flights will also be presented. Goals of the future test flights, which are staged in increments of increasing suspended load and altitude, will be presented. This will include the projected balloon volumes, payload capabilities, test flight locations, and proposed flight schedule.

Cathey, H. M.↗

DOE Commercial Building Benchmark Models

The excitement surrounding the drive to build and renovate commercial buildings to achieve exemplary and even 'net zero performance,' coupled with the realization that complex systems engineering is usually required to achieve such levels, has led to a broader use of computer energy simulations. To provide a consistent baseline of comparison and save time conducting such simulations, the U.S. Department of Energy (DOE) - through three of its national laboratories - has developed a set of standard benchmark building models for new and existing buildings. These models represent a complete revision of the DOE benchmark buildings originally developed in 2006. The shapes, thermal zoning, and operation of the models are more indicative of real buildings than in the previous versions. DOE has developed 15 benchmark buildings that represent most of the commercial building stock, across 16 locations (representing all U.S. climate zones) and with three vintages (new, pre-1980, and post-1980 construction). This paper will provide an executive summary overview of these benchmark buildings, and how they can save building analysts valuable time. Fully documented and implemented to use with the EnergyPlus energy simulation program, the benchmark models are publicly available and new versions will be created to maintain compatibility with new releases of EnergyPlus. The benchmark buildings will form the basis for research on specific building technologies, energy code development, appliance standards, and measurement of progress toward DOE energy goals. Having a common starting point allows us to better share and compare research results and move forward to make more energy efficient buildings.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Lead tungstate calorimeter of the Jefferson Lab Eta Factory experiment

A new electromagnetic calorimeter (ECAL) consisting of 1596 lead tungstate PbWO 4 scintillating crystals has been fabricated and installed in the experimental Hall D at Jefferson Lab (JLab). The highgranularity, high-resolution calorimeter is required by the JLab Eta Factory experiment, whose main physics goal is to study rare decays of eta mesons. The ECAL replaced the inner part of the forward lead glass calorimeter of the GlueX detector. Signals from the detector will be digitized using twelve-bit flash analog-to-digital converters operated at a sampling rate of 250 MHz. The ECAL is integrated into the trigger system of the GlueX detector using electronics modules designed at JLab. The ECAL is currently at the commissioning stage and should be ready for the physics run in January 2025. We will give an overview of the JEF experiment, the design and construction of the ECAL, and the integration of the detector and its infrastructure into the Hall D experimental setup.

Somov, Alexander [Thomas Jefferson National Accele↗

Negative Ion Based Heating and Diagnostic Neutral Beams for ITER

To meet the requirements of the four operating and one start-up scenarios foreseen in the International Tokamak Experimental Reactor (ITER) a flexible heating mix will be required, which has to include a reliable contribution from neutral beams. The current baseline of ITER foresees 2 Heating Neutral Beam (HNB) systems based on negative ion technology, each operating at 1 MeV 40 A D{sup -} ions, and each capable of delivering up to 16.7 MW of D deg. to the ITER plasma. A 3rd HNB injector is foreseen as an upgrade option. In addition a dedicated Diagnostic Neutral Beam (DNB) injecting 100 keV 60 A of negative hydrogen ions will be available for charge exchange resonant spectroscopy (CXRS). The significant R and D effort necessary to meet the design requirements will be provided in the Neutral Beam Test Facility (NBTF), which is to be constructed in Padua, Italy. This paper gives an overview of the current status of the neutral beam (NB) systems and the chosen configuration. The ongoing integration effort into the ITER plant is highlighted and open interface issues are identified. It is shown how installation and maintenance logistics has influenced the design. ITER operating scenarios are briefly discussed, including start-up and commissioning. For example it is now envisaged to have a low current hydrogen phase of ITER operations, essentially for commissioning of the many auxiliary systems used on ITER. The low current limits the achievable plasma density, and hence the NB energy due to shine through limitations. Therefore a possible reconfiguration of the auxiliary heating systems is now being discussed. Other NB related issues identified by the ongoing design review process are emphasized and possible impact on the implementations of the HNB and DNB systems is indicated.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Detectors and diagnostics for multiprobe radiography using high-energy short-pulse lasers

Multiprobe radiography requires the following diagnostic capabilities at minimum: radiographic source diagnostics, spectroscopy, imaging, and tomography diagnostics. Depending on the repetition rate of the radiation sources, the diagnostics may be a single-shot diagnostic, such as photographic (radiochromic and X-ray films for high energy photons) films, or a multiple-shot diagnostic for repetitive source operations, such as a high-speed framing camera. Due to the drastically different detector physics of electrons, photons at different energies (keV to 10s of MeV in the radiography context), heavy ions such as protons, alphas, and neutrons, see, for example, Ref. [1, 2] for an overview, different types or configurations of detectors and constructions may be required for multiprobe radiography applications. Some of the common detector metricsinclude, independent of the particle/photon species, sensitivities or efficiency, energy resolution, spatial or temporal resolutions and others. Some unique detection scenarios arise in a multiprobe radiography setting, for example, crosstalk mitigation and particle identification (ID) when X-ray and higher energy photons, relativistic electrons, neutrons, other hadrons, and heavy particles coexist at the detector location.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Light Dark Matter Searches at Fermilab

Accelerator-based dark sector searches present an excellent opportunity to discover the particles that constitute cosmological dark matter in a laboratory setting. At Fermilab, an exciting program of dark sector searches is now underway across a suite of experiments using high intensity, low- and high-energy proton beamlines. Some of these searches are being carried out at neutrino experiments, which bring high luminosity sources of meson decays near large, sensitive detectors and can therefore probe a variety of dark sector models. Additionally, there have been recent studies highlighting the sensitivity of future and proposed experiments to light dark matter and other dark sector models using protons from Fermilab s new PIP-II linac, currently under construction. In this talk, I will give an overview of Fermilab s accelerator-based dark sector search program, highlight recent results, and discuss future prospects.

43 PARTICLE ACCELERATORS↗

Cooperative answers in database systems

A major concern of researchers who seek to improve human-computer communication involves how to move beyond literal interpretations of queries to a level of responsiveness that takes the user's misconceptions, expectations, desires, and interests into consideration. At Maryland, we are investigating how to better meet a user's needs within the framework of the cooperative answering system of Gal and Minker. We have been exploring how to use semantic information about the database to formulate coherent and informative answers. The work has two main thrusts: (1) the construction of a logic formula which embodies the content of a cooperative answer; and (2) the presentation of the logic formula to the user in a natural language form. The information that is available in a deductive database system for building cooperative answers includes integrity constraints, user constraints, the search tree for answers to the query, and false presuppositions that are present in the query. The basic cooperative answering theory of Gal and Minker forms the foundation of a cooperative answering system that integrates the new construction and presentation methods. This paper provides an overview of the cooperative answering strategies used in the CARMIN cooperative answering system, an ongoing research effort at Maryland. Section 2 gives some useful background definitions. Section 3 describes techniques for collecting cooperative logical formulae. Section 4 discusses which natural language generation techniques are useful for presenting the logic formula in natural language text. Section 5 presents a diagram of the system.

Gaasterland, Terry↗

Performance of the QWIP Focal Plane Arrays for NASA's Landsat Data Continuity Mission

The focal plane assembly for the Thermal Infrared Sensor (TIRS) instrument on NASA's Landsat Data Continuity Mission (LDCM) consists of three 512 x 640 GaAs Quantum Well Infrared Photodetector (QWIP) arrays. The three arrays are precisely mounted and aligned on a silicon carrier substrate to provide a continuous viewing swath of 1850 pixels in two spectral bands defined by filters placed in close proximity to the detector surfaces. The QWIP arrays are hybridized to Indigo ISC9803 readout integrated circuits (ROICs). QWIP arrays were evaluated from four laboratories; QmagiQ, (Nashua, NH), Army Research Laboratory, (Adelphi, MD}, NASA/ Goddard Space Flight Center, (Greenbelt, MD) and Thales, (Palaiseau, France). All were found to be suitable. The final discriminating parameter was the spectral uniformity of individual pixels relative to each other. The performance of the QWIP arrays and the fully assembled, NASA flight-qualified, focal plane assembly will be reviewed. An overview of the focal plane assembly including the construction and test requirements of the focal plane will also be described.

Jhabvala, M.↗

Design and Scaling of the Natural Convection Shutdown Heat Removal Test Facility

The Natural convection Shutdown heat removal Test Facility (NSTF) at Argonne National Laboratory (ANL) reflects a 1/2 scale model of one conceptual design for passive safety in advanced reactors. The project was initiated in 2010 primarily to conduct ex-vessel, passive decay heat removal experiments in support of the Advanced Reactor Concepts (ARC), Small Modular Reactor (SMR), and Next Generation Nuclear Plant (NGNP) programs while also generating data for code validation purposes. The facility successfully demonstrated scoping objectives in late 2013, and is expected to begin testing by early 2014. The following paper summarizes some of the key design and scaling considerations used in construction of the experimental facility, along with an overview of the current instrumentation and data acquisition methods. Details of the distributed fiber optic temperature system will be presented, which introduces a level of data density suitable for CFD validation and is a first-of-its-kind for largescale thermal hydraulics facilities.

Lisowski, Darius D.↗

The Space Station as a Construction Base for Large Space Structures

The feasibility of using the Space Station as a construction site for large space structures is examined. An overview is presented of the results of a program entitled Definition of Technology Development Missions (TDM's) for Early Space Stations - Large Space Structures. The definition of LSS technology development missions must be responsive to the needs of future space missions which require large space structures. Long range plans for space were assembled by reviewing Space System Technology Models (SSTM) and other published sources. Those missions which will use large space structures were reviewed to determine the objectives which must be demonstrated by technology development missions. The three TDM's defined during this study are: (1) a construction storage/hangar facility; (2) a passive microwave radiometer; and (3) a precision optical system.

Gates, R. M.↗

Space station systems analysis study. Part 2, Volume 3: Appendixes, Book 1. Program requirements documentation

The objective elements representative of the kinds of space activities that will be supported by the space construction base (SCB) are discussed in (1) a brief mission overview including the primary purpose and general objectives; (2) descriptions of the processes involved (where applicable), the mission hardware, the principal activities to be undertaken, the test requirements, and the principal tests; and (3) the SCB requirements including such items as special devices (e.g., fabrication modules, assembly or construction fixtures, cranes, and airlocks), power, data management and communications, waste management, environmental control, safety, and logistics. Each program option is then described in terms of the objective elements it supports, its orbit, the general makeup of the SCB, the transportation approach, and the program schedule goals. The specific requirements that are imposed on the SCB in order to support program option L are given.

Source record↗

OVERVIEW AND STATUS OF THE 12 GeV CRYOGENIC SYSTEM UPGRADE AT JLAB

As part of the planned Jefferson Laboratory's electron accelerator (CEBAF) power upgrade, ten additional superconducting RF cryomodules will be added to its accelerator linacs. Although physically the same size as each of the original 40 linac cryomodules, each new cryomodule will have approximately 4 times the acceleration power. To support the additional cryomodule heat loads generated, the existing 2 K, 4600 W Central Helium Liquefier (CHL) plant capacity will be doubled to a total of 9200 W at 2 K plus 24,000 W at 35 K for shield loads. The specified base line process cycle has been modeled after the laboratory's 'Ganni Helium Cycle' process technology. In addition, a fourth physics experimental 'Hall D' will be constructed which will have an additional stand alone 200 W at 4 K helium cryogenic plant. In October of 2008, Jefferson Laboratory (JLab) received approval for project 'Critical Decision 3' construction phase status from the US Department of Energy. An overview of the planned cryogenic systems and current design baseline as it relates to operations will be presented.

42 ENGINEERING↗