Search NASA⌕ Search

SEARCH · Search NASA

Results for “contingency control”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

A Solar-assisted Voltage Optimization Method for Transmission Solar Network Power System

This paper proposes a new formulation and solution algorithm that uses transmission level solar inverters to address the security-constrained optimal power flow (SCOPF) problem. The goal is to stabilize voltage fluctuations in transmission networks in base case and contingency scenarios, by using bulk solar power plant with a minimal number of post-contingency corrections. To achieve this goal, a two-stage volt/var optimization method is proposed to first correct all voltage violations with the volt-var alternating current optimal power flow (ACOPF) algorithm for a base case. Then a linearized SCOPF volt-var control algorithm is proposed to identify the corrective actions for all potential voltage violations in all contingency scenarios. The proposed method was tested and validated on a modified IEEE 118-bus system with solar photovoltaic (PV) data.

Photovoltaic, Volt/Var Control↗

Computerized atmospheric trace contaminant control simulation for manned spacecraft

Buildup of atmospheric trace contaminants in enclosed volumes such as a spacecraft may lead to potentially serious health problems for the crew members. For this reason, active control methods must be implemented to minimize the concentration of atmospheric contaminants to levels that are considered safe for prolonged, continuous exposure. Designing hardware to accomplish this has traditionally required extensive testing to characterize and select appropriate control technologies. Data collected since the Apollo project can now be used in a computerized performance simulation to predict the performance and life of contamination control hardware to allow for initial technology screening, performance prediction, and operations and contingency studies to determine the most suitable hardware approach before specific design and testing activities begin. The program, written in FORTRAN 77, provides contaminant removal rate, total mass removed, and per pass efficiency for each control device for discrete time intervals. In addition, projected cabin concentration is provided. Input and output data are manipulated using commercial spreadsheet and data graphing software. These results can then be used in analyzing hardware design parameters such as sizing and flow rate, overall process performance and program economics. Test performance may also be predicted to aid test design.

Perry, J. L.↗

A Concept of Operations (ConOps) of an In-time Aviation Safety Management System (IASMS) for Advanced Air Mobility (AAM)

The growth of new emerging operations involving Advanced Air Mobility (AAM) necessitates developing a perspective for an In-time Aviation Safety Management System (IASMS). This perspective advances from the National Academies report on IASMS and its recommendation for developing a Concept of Operations (ConOps) for IASMS. A ConOps has been developed for In-time System-Wide Safety Assurance (ISSA) from which the IASMS ConOps pivots to provide a robust scope commensurate with the broad vision defined by the National Academies. The IASMS ConOps focuses on emerging operations and spans innovations in Unmanned Aircraft System (UAS) and an increasingly complex ecosystem comprised of a widening mix of vehicles and technologies, Urban Air Mobility (UAM) with industry-federated services, traditional operations, as well as new supersonic aircraft and space launch systems.The challenge for the IASMS ConOps is to be broad to encompass innovations in the coming years and decades while agile to ensure levels of safety compatible with operational and certification requirements of the National Airspace System (NAS). The IASMS ConOps interweaves increasing complexity of operational safety capabilities and unlocking UAS Maturity Levels (UMLs). The relationships between increased complexity of automation and automated systems, fewer operators who are not as traditionally higher skilled, more complex operational environments, and aviation operations management with mixed aircraft and equipage pose a multi-dimensional space for IASMS capabilities essential for safety assurance and risk management. Instantiating IASMS capabilities and how they would be integral to AAM operations and increasing maturity of UAM could be accomplished through a series of Safety Demonstrators. These Safety Demonstrators could provide increased understanding and insight into use of controls for risk mitigation, means of compliance for certification, and operational experience with safety services such as in relation to contingency management. The IASMS capabilities can be viewed as initially residing with the vehicle, airspace, and Supplemental Data Service Provider (SDSP). For example, vehicle capabilities include communications including the command and control link, Remote Identification (ID), conflict advisory/alerting, and UAS system monitoring. These capabilities monitor and assess data such as battery health, aircraft state, and human performance. Complexity of ISAMS capabilities depends on a number of factors. These factors are intendedonly as a notional categorization with the purpose being to reflect the complexity of the AAM ecosystem that would drive up the complexity of ISSA capabilities including systems, sensors, models, standards, and controls. Factors could include the Vehicle Flight Management, Environment, Airspace, and Contingency Management. Each of these factors can be comprised of multiple sub-factors that contribute to increasing complexity. For example, Airspace at a lower level of complexity could be dedicated to UTM operations that are unmonitored, and at a higher level of complexity could involve mixed UTM and ATM operations. The IASMS concept includes safety services that provide data and information to different participants in AAM. The roles and responsibilities of participants can be defined using the Responsible-Accountable-Consulted-Informed (RACI) analysis. For example, for the safety service involving the Remote ID, the Operator would be accountable for providing the data, the Vehicle would be responsible for transmitting it, and the USS, SDSP, Vertiports, FIMS (FAA), and Public Entities such as safety services would be informed by receiving the data. The IASMS ConOps identifies the capabilities needed for risk mitigation and safety assurance in the increasingly complex national airspace. The ConOps serves as a pathway for engaging with industry to gain operational experience including through the Safety Demonstrator series, the RACI analysis, and operational complexity factors. The ConOps serves to integrate these different perspectives to build a cohesive and cogent approach to an AAM safety management system.

In-Time Aviation Safety Management System↗

Overview of Umbilical Extravehicular Activity (EVA) Interfaces in Life Support Systems on Spacecraft Vehicles and Applications for the Crew Exploration Vehicle (CEV)

Extravehicular Activities (EVAs) for manned spacecraft vehicles have been performed for contingencies and nominal operations numerous times throughout history. This paper will investigate how previous U.S. manned spacecraft vehicles provided life support to crewmembers performing the EVA. Specifically defined are umbilical interfaces with respect to crewmember cooling, drinking water, air (or oxygen), humidity control, and carbon dioxide removal. As historical data is available, the need for planned versus contingency EVAs in previous vehicles as well as details for a nominal EVA day versus a contingency EVA day will be discussed. The hardware used to provide the cooling, drinking water, air (or oxygen), humidity control, and carbon dioxide removal, and the general functions of that hardware, will also be detailed, as information is available. The Crew Exploration Vehicle (CEV or Orion) EVA interfaces will be generically discussed to provide a glimpse of how similar they are to the EVA interfaces in previous vehicles. Conclusions on strategies that should be used for CEV based on previous spacecraft EVA interfaces will be made in the form of questions and recommendations.

Peterson, Laurie J.↗

Short Circuiting the Controller – Missteps in Maintenance and Inspection of Process and Wiring in STS-93

The primary objective of the Space Transportation System mission 93 (STS-93) was to deploy the Chandra X-Ray Observatory. Chandra, the world's most powerful X-Ray telescope, allowed scientists from around the world to study some of the most distant and dynamic objects in the universe. Stripped of nearly 7,000 pounds of its own gear to make room for the payload, the orbiter assigned to this mission was Space Shuttle Columbia. Prior to STS-93, Columbia had flown 25 flights and was NASA's oldest and heaviest orbiter. On July 23, 1999, after two prior launch scrubs, Eileen Collins and her crew of four launched from Kennedy Space Center. About five seconds after launch, Mission Control at Johnson Space Center detected a voltage drop on one of Columbia's electrical buses. As a result of this power fluctuation, a primary and back-up Main Engine controller dropped offline. Given design redundancy, the two remaining controllers supported all three engines. If there had been any other AC bus issues, one engine of the three on the Orbiter would have shut down. The redundant set of digital computer units in each engine controller saved Columbia and her crew from a very risky contingency abort. Post-flight inspection revealed soot on a screw head and a hole in an adjacent Kapton insulated wire. The single strand of polyimide wire was located nearly half-way down the payload bay. The Shuttle Independent Assessment Team (SIAT) reported that the wire had rubbed and chaffed against a burred screw head. The burr was later determined to be the result of overtightening of the screw by a technician during a maintenance refurbishment. Alone, the burr may not have been problematic, but later, during another ground processing event, possibly years after, someone inadvertently stepped on the wiring harness. With the pressure and motion of unintended contact, some of the Kapton insulation rubbed off against the burred screw head. The SIAT suspected the wire damage was pre-existing and was caused 4 or 5 years prior to the flight. Finally, the intense vibrations during the launch sequence allowed contact between the exposed conductor and exposed metal area on the burred screw head, resulting in the arcing and shorting of the wire. Due to the quick turnaround times of Space Shuttle Orbiters, wiring issues caused from multiple maintenance events were often overlooked. Additionally, failing to incorporate thorough and early inclusion of human systems integration (HSI) applications as a crucial part of the decision process can result in these types of misshaps. In order to reduce human error associated with integrated manufacturing, maintenance, refurbishment and flight preparations, wire inspection criteria should be refined and standardized, visual inspection processes should be quantified, and technicians should be certified by specially trained instructors. This case, among many others, unveils why human error management and development of safety metrics is a vital piece in the development of complex systems, and why it should be supported aggressively and implemented program wide.

Human Systems Integration↗

Time Course of Effects of Carbon Dioxide Exposure on Physical and Cognitive Performance in a Simulated Surface Extravehicular Activity Contingency Scenario

INTRODUCTION Carbon dioxide (CO 2 ) is a metabolic byproduct produced by humans that must be scrubbed from the atmosphere by environmental control and life support systems in space vehicles and spacesuits to prevent buildup. Current nominal CO 2 limits are set by NASA Standard 3001, however, limits during contingency situations are not specified. The purpose of this study was to characterize and quantify the physiological, cognitive, and self-assessed symptom and performance metrics as a function of inspired CO 2 (P I CO 2 ) during a simulated 1-hour contingency lunar EVA scenario in virtual reality (VR). METHODS Fifteen healthy subjects completed 7 simulated EVA scenarios walking on a passive treadmill for one hour breathing dry, ambient air mixed with added CO 2 in a blind, counterbalanced manner (P I CO 2 : 0, 5, 10, 15, 20, 25, 30 mmHg) simulating a 2.0 km contingency EVA walkback to a habitat on the lunar surface in the event of a CO 2 scrubber malfunction. Subjects were immersed in a Lunar VR environment and asked to maintain their walking speed between 2.1 km/h and an upper limit individually calibrated to a fixed metabolic workload of 1.3 L/min of O 2 consumption, and performed periodic cognitive tasks and continuous cardiopulmonary measurements. Self-assessments of symptoms and task performance were measured via verbal Likert-scale survey at the onset of the walkback and at 10-minute intervals thereafter. RESULTS The time course of cardiopulmonary, cognitive, and self-reported responses at each level of P I CO 2 will be presented. All 15 subjects were able to complete the 1-hr walk back task at all CO 2 levels. Physiological responses were rapid, typically within 1 to 5 minutes. No effects of time were detected for cognitive measures. Symptomatic ratings of headache, shortness of breath, and fatigue demonstrated a time-course development, reaching asymptote after 40 minutes of CO 2 exposure. DISCUSSION These findings will inform the posture of risk associated with CO 2 exposure on human health and performance during microgravity and planetary surface operations, This will help inform decisions related to space suit and environmental life support hardware requirements and EVA operational limits for contingency extravehicular activity (EVA) scenarios.

carbon dioxide↗

Agent-Based Coordination Scheme for PV Integration (ABC4PV)

Renewables and especially photovoltaics (PV) have benefitted significantly from a host of incentives and policies targeted toward enhanced integration and adoption of specific energy technologies. However, with the push to move forward into a subsidy-free market framework, behind-the-meter residential PV applications have generally struggled to retain their value (unlike utility scale and commercial projects) [1]. This project focused on developing control-theoretic solutions aimed at improving the integration and interaction of behind-the-meter residential PV with other distribution system assets (controllable and non-controllable) to enhance the integrated value of residential PV. To this end, a suite of decentralized control methodologies have been developed to enable effective coordination and control of behind-the-meter residential load customers’ PV, battery storage systems (BSS), controllable loads and other similar assets within a distribution feeder. This interaction aims at procuring energy savings and, thus, energy bill savings. The main source of savings is drawn from reducing the effect of demand charge pricing and is realized at the feeder level, assuming community level interaction and management among the aforementioned assets. Optimal control of the assets is implemented with a distributed optimization methodology, leveraging consensus-based algorithms. The results gathered from the optimal control simulations demonstrates that the savings can be duly achieved and the algorithm decision times (to dynamically control asset set points, for example) are fast. As for the overall efficiency of PV+BSS systems, to procure energy savings from curtailment of the demand charge pricing effects, the optimal control is set up so as to minimize the variance of the load for all customers, throughout a feeder and throughout time in a rolling horizon scheduling with model predictive control. The control takes into account inter-temporal electrochemical storage (battery) degradation costs: specifically, we have developed a long-term lifetime model for the BSS that weighs in the effect of the degradation factor in the dispatch formulations, thus, a considerable operating cost that affects energy decision making. The levelized cost of energy (LCOE – redefined for the purpose of quantifying asset integration effectiveness through the customers’ energy cost) is shown to be below the threshold set for the combined PV+BSS topology of $ 0.14/kWh for multiple cases of PV penetration all the way up to 50%, provided that a policy of shared ownership of and savings is in place. Further, the LCOE calculated for the case before the deployment PV+BSS systems is also achievable, i.e. the deployment of PV+BSS, if planned and scheduled optimally. will have no effect on customers’ energy costs. From the control methodology viewpoint, the developed consensus-based algorithms are shown to converge for a wide range of problem cases (spanning normal operating scenarios and contingencies), guaranteeing dispatch solutions under forecasting errors, communication break-downs and cyber-security attacks. The proposed control solutions are scalable and real-time implementable, with dispatch computations and device set-point updates converging in less than 2s in most practical instances of the above events.

14 SOLAR ENERGY↗

Transient Stability Preventive Control via Tuning the Parameters of Virtual Synchronous Generators

This paper presents an optimal preventive control (OPC) method to improve the power system transient stability via tuning the transient parameter of virtual synchronous generators. The novelty of this work is that we formulate the preventive control as an optimization problem so that inverter parameters can be adjusted at the pre-contingency stage. A reinforcement learning (RL)-driven method is proposed to solve the OPC problem with the fault energy-based reward function. An ANDES-based RL environment is also developed. Versatile functions included in the proposed environment have been presented in this paper. The proposed OPC formulation, the RLdriven method, and the fault energy-based reward function are verified on several standard test systems.

Inverter-based resources, virtual synchronous gene↗

VSC-HVDC Interties for Urban Power Grid Enhancement

Urban power grids are facing many operational and expansion challenges to meet further demand growth and increased reliability requirements. Advanced transmission technologies have been considered by the electric utilities to effectively increase the utilization of existing infrastructure and operational flexibility. The focus of this paper is on VSC-HVDC technologies for urban power grid enhancement and modernization. First, a potential technical scheme is proposed for converting an existing AC circuit to DC operation, which could boost the power transfer capability of the critical transmission corridor and increase network operational flexibility. Second, this paper proposes three operation modes for the VSC-HVDC interties in urban power grids corresponding to normal, emergency and island operating conditions, respectively. An integrated, adaptive emergency control strategy (AEC) is proposed that can enable adaptive power flow responses of the VSC-HVDC intertie under varying system operating conditions and critical contingencies. The flexibility and effectiveness of the proposed operational principles of urban VSC-HVDC intertie and the corresponding control strategies are verified in PSCAD/EMTDC using a realistic urban power grid in China.

24 POWER TRANSMISSION AND DISTRIBUTION↗

The Bikinians

On March 29, 1944, a small contingent of Marines invaded Bikini Atoll. Their mission was to wrest control of the atoll from Japan and, at the same time, prevent the Bikinians from interfering with the ongoing war effort. The Marines found only five Japanese, all dead by suicide, and about 150 starving islanders who also were suffering from such diseases as the Yaws. The Marines fed the Bikinians and secured medical treatment for them. The Bikinians, like all Marshallese, were extremely grateful to be rescued by Americans. Two years later, the Navy landed on Bikini to send the islanders into exile so that their ancestral homeland could be used for Operation Crossroads. On March 7 th , the Bikinians were relocated to uninhabited Rongerik Atoll, where the Navy had built a village complete with twenty-six homes, canvas water tanks, screened toilets, and nine concrete cisterns. Although the accommodations were adequate, the Navy did not understand that uninhabited Marshallese atolls cannot sustain native life. Within two years, the Bikinians would have to be rescued from starvation again.

99 GENERAL AND MISCELLANEOUS↗

Thermodynamic performance testing of the orbiter flash evaporator system

System level testing of the space shuttle orbiter's development flash evaporator system (FES) was performed in a thermal vacuum chamber capable of simulating ambient ascent, orbital, and entry temperature and pressure profiles. The test article included the evaporator assembly, high load and topping exhaust duct and nozzle assemblies, and feedwater supply assembly. Steady state and transient heat load, water pressure/temperature and ambient pressure/temperature profiles were imposed by especially designed supporting test hardware. Testing in 1978 verified evaporator and duct heater thermal design, determined FES performance boundaries, and assessed topping evaporator plume characteristics. Testing in 1979 combined the FES with the other systems in the orbiter active thermal control subsystem (ATCS). The FES met or exceeded all nominal and contingency performance requirements during operation with the integrated ATCS. During both tests stability problems were encountered during steady state operations which resulted in subsequent design changes to the water spray nozzle and valve plate assemblies.

Jaax, J. R.↗

Opportunities for Launch Site Integrated System Health Engineering and Management

The launch site processing flow involves operations such as functional verification, preflight servicing and launch. These operations often include hazards that must be controlled to protect human life and critical space hardware assets. Existing command and control capabilities are limited to simple limit checking durig automated monitoring. Contingency actions are highly dependent on human recognition, decision making, and execution. Many opportunities for Integrated System Health Engineering and Management (ISHEM) exist throughout the processing flow. This paper will present the current human-centered approach to health management as performed today for the shuttle and space station programs. In addition, it will address some of the more critical ISHEM needs, and provide recommendations for future implementation of ISHEM at the launch site.

Waterman, Robert D.↗

Notional Airspace Operations Demonstration Plan

The airspace operations demonstration (AOD) is intended to show that the Access 5 Step 1 functional requirements can be met. The demonstration will occur in two phases. The initial on-range phase will be carried out in restricted airspace to demonstrate the cooperative collision avoidance (CCA) functional requirements and to provide risk-reduction for the AOD by allowing the test team to rehearse some elements of the demonstration mission. The CCA system to be used in these flights is based on Automatic Dependent Surveillance-Broadcast (ADS-B) which is a commercially-available system by which airplanes constantly broadcast their current position and altitude to other aircraft and ground resources over a dedicated radio datalink. The final phase will occur in the national airspace (NAS) and will be the formal demonstration of the remainder of the proposed functional requirements. The general objectives of the AOD are as follows: (1) Demonstrate that the UAS can aviate in the NAS (2) Demonstrate that the UAS can navigate in the NAS (3) Demonstrate that the UAS can communicate with the NAS (4) Demonstrate that the UAS can perform selected collision avoidance functions in the NAS (5) Demonstrate that the UAS can evaluate and avoid weather conflicts in the NAS (6) Demonstrate that the UAS can provide adequate command and control in the NAS In addition to the stated objectives, there are a number of goals for the flight demonstration. The demo can be accomplished successfully without achieving these goals, but these goals are to be used as a guideline for preparing for the mission. The goals are: (1) Mission duration of at least 24 hours (2) Loiter over heavy traffic to evaluate the data block issue identified during the Access 5 Airspace Operations Simulations (3) Document the contingency management process and lessons learned (4) Document the coordination process for Ground Control Stations (GCS) handoff (5) Document lessons learned regarding the process of flying in the NAS Preliminary planning for a notional mission to achieve the objectives and goals has been prepared. The planning is intended to serve as a guide for detailed planning of the AOD.

Trongale, Nicholas A.↗

Virtualization - A Key Cost Saver in NASA Multi-Mission Ground System Architecture

With science team budgets being slashed, and a lack of adequate facilities for science payload teams to operate their instruments, there is a strong need for innovative new ground systems that are able to provide necessary levels of capability processing power, system availability and redundancy while maintaining a small footprint in terms of physical space, power utilization and cooling.The ground system architecture being presented is based off of heritage from several other projects currently in development or operations at Goddard, but was designed and built specifically to meet the needs of the Science and Planetary Operations Control Center (SPOCC) as a low-cost payload command, control, planning and analysis operations center. However, this SPOCC architecture was designed to be generic enough to be re-used partially or in whole by other labs and missions (since its inception that has already happened in several cases!)The SPOCC architecture leverages a highly available VMware-based virtualization cluster with shared SAS Direct-Attached Storage (DAS) to provide an extremely high-performing, low-power-utilization and small-footprint compute environment that provides Virtual Machine resources shared among the various tenant missions in the SPOCC. The storage is also expandable, allowing future missions to chain up to 7 additional 2U chassis of storage at an extremely competitive cost if they require additional archive or virtual machine storage space.The software architecture provides a fully-redundant GMSEC-based message bus architecture based on the ActiveMQ middleware to track all health and safety status within the SPOCC ground system. All virtual machines utilize the GMSEC system agents to report system host health over the GMSEC bus, and spacecraft payload health is monitored using the Hammers Integrated Test and Operations System (ITOS) Galaxy Telemetry and Command (TC) system, which performs near-real-time limit checking and data processing on the downlinked data stream and injects messages into the GMSEC bus that are monitored to automatically page the on-call operator or Systems Administrator (SA) when an off-nominal condition is detected. This architecture, like the LTSP thin clients, are shared across all tenant missions.Other required IT security controls are implemented at the ground system level, including physical access controls, logical system-level authentication authorization management, auditing and reporting, network management and a NIST 800-53 FISMA-Moderate IT Security plan Risk Assessment Contingency Plan, helping multiple missions share the cost of compliance with agency-mandated directives.The SPOCC architecture provides science payload control centers and backup mission operations centers with a cost-effective, standardized approach to virtualizing and monitoring resources that were traditionally multiple racks full of physical machines. The increased agility in deploying new virtual systems and thin client workstations can provide significant savings in personnel costs for maintaining the ground system. The cost savings in procurement, power, rack footprint and cooling as well as the shared multi-mission design greatly reduces upfront cost for missions moving into the facility. Overall, the authors hope that this architecture will become a model for how future NASA operations centers are constructed!

Ground System Architecture↗

Proximity operations considerations affecting spacecraft design

Proximity operations can be defined as the maneuvering of two or more spacecraft within 1 nautical mile range, with relative velocity less than 10 feet per second. The passive vehicle is nontranslating and should provide for maintenance of the desired approach attitude. It must accommodate the active (translating) vehicle induced structural loads and performance characteristics (mating hardware tolerances), and support sensor compatibility (transponder, visual targets, etc.). The active vehicle must provide adequate sensor systems (relative state information, field-of-view, redundancy), flight control hardware (thruster sizing, minimal cross-coupling, performance margins, redundancy) and software (reconfigurable, attitude/rate modes, translation and rotation fine control authority) characteristic, and adequate non-propulsive consumables such as power. Operational concerns must be considered. These include the following: (1) the desired approach trajectory and relative orientation; (2) the active vehicle thruster plume effects (forces, torques, contamination) on the passive vehicle; and (3) procedures for contingencies such as loss of communications, sensor or propulsion failures, and target vehicle loss of control.

Staas, Steven K.↗

Real-time contingency handling in MAESTRO

A scheduling and resource management system named MAESTRO was interfaced with a Space Station Module Power Management and Distribution (SSM/PMAD) breadboard at MSFC. The combined system serves to illustrate the integration of planning, scheduling, and control in a realistic, complex domain. This paper briefly describes the functional elements of the combined system, including normal and contingency operational scenarios, then focusses on the method used by the scheduler to handle real-time contingencies.

Britt, Daniel L.↗

A Surrogate-Based Asynchronous Decomposition Technique for Realistic Security-Constrained Optimal Power Flow Problems

Here we present a decomposition approach for obtaining good feasible solutions for the security-constrained, alternating-current, optimal power flow (SC-AC-OPF) problem at an industrial scale and under real-world time and computational limits. The approach was designed while preparing and participating in ARPA-E’s Grid Optimization Competition (GOC) Challenge 1. The challenge focused on a near-real-time version of the SC-AC-OPF problem, where a base operating point is optimized, taking into account possible single-element contingencies, after which the system adapts its operating point following the response of automatic frequency droop controllers and voltage regulators. Our solution approach for this problem relies on state-of-the-art nonlinear programming algorithms, and it employs nonconvex relaxations for complementarity constraints, a specialized two-stage decomposition technique with sparse approximations of recourse terms and contingency ranking and prescreening. The paper describes and justifies our approach and outlines the features of its implementation, including functions and derivatives evaluation, warm-starting strategies, and asynchronous parallelism. We discuss the results of the independent benchmark of our approach by ARPA-E’s GOC team in Challenge 1, where it was found to consistently produce high-quality solutions across a wide range of network sizes and difficulty, and conclude by outlining future extensions of the approach.

97 MATHEMATICS AND COMPUTING↗