Search NASA⌕ Search

SEARCH · Search NASA

Results for “cost data”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Study of Alternate Space Shuttle Concepts. Volume 2, Part 2: Concept Analysis and Definition

This is the final report of a Phase A Study of Alternate Space Shuttle Concepts by the Lockheed Missiles & Space Company (LMSC) for the National Aeronautics and Space Administration George C. Marshall Space Flight Center (MSFC). The eleven-month study, which began on 30 June 1970, is to examine the stage-and-one-half and other Space Shuttle configurations and to establish feasibility, performance, cost, and schedules for the selected concepts. This final report consists of four volumes as follows: Volume I - Executive Summary, Volume II - Concept Analysis and Definition, Volume III - Program Planning, and Volume IV - Data Cost Data. This document is Volume II, Concept Analysis and Definition.

Source record↗

Full-scale testing, production and cost analysis data for the advanced composite stabilizer for Boeing 737 aircraft. Volume 1: Technical summary

The full scale ground test, ground vibration test, and flight tests conducted to demonstrate a composite structure stabilizer for the Boeing 737 aircraft and obtain FAA certification are described. Detail tools, assembly tools, and overall production are discussed. Cost analyses aspects covered include production costs, composite material usage factors, and cost comparisons.

Aniversario, R. B.↗

Advanced Fuel Cycle Cost Basis Report: Module D1-1: Uranium-based Ceramic LWR Fuel Fabrication (Rev.2)

Cost module on LWR fuel fabrication to accompany the Advanced Fuel Cycle Cost Basis Report. In this update, we are adding detailed life cycle cost data and a calculated, levelized fabrication cost derived from a non-proprietary bottom-up estimate prepared in 1978 by Oak Ridge National Laboratory (ORNL) (Judkins and Olsen 1978a). In 2018, the 1978 ORNL estimate was escalated by SA&I authors to 2017 USD using factors that represent inflation, escalation above inflation typical of nuclear projects, and the effects of more stringent safety and environmental regulations. In this FY-21 document, the $/kgU results in 2017 USD from the unpublished 2018 interim study (Williams and Ganda 2018) can be escalated to 2020 USD using a factor of 1.052. The literature-based unit cost (or price) data from previous (2004–2017) AFC-CBRs are escalated to 2020 USD using factors from Chapter 8 of the main FY-21 AFC-CBR document. This data, in addition to the results of the updated bottom-up estimate, are used to define the “what-it-takes” (WIT) range for the unit fabrication costs for conventional ceramic UOX light-water reactor (LWR) fuel. This FY-23 document also includes calculated unit costs for accident-tolerant LWR fuels (ATFs) of three different types. Some of these fuels constitute a ceramic pelletized form with fuel meat uranium compounds other than UO2 (a.k.a.,. UOX), thus the change in the title of this module in which the word “UO2” is changed to “Uranium-based Ceramic.”

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

The 30 GHz solid state amplifier for low cost low data rate ground terminals

This report details the development of a 20-W solid state amplifier operating near 30 GHz. The IMPATT amplifier not only met or exceeded all the program objectives, but also possesses the ability to operate in the pulse mode, which was not called for in the original contract requirements. The ability to operate in the pulse mode is essential for TDMA (Time Domain Multiple Access) operation. An output power of 20 W was achieved with a 1-dB instantaneous bandwidth of 260 MHz. The amplifier has also been tested in pulse mode with 50% duty for pulse lengths ranging from 200 ns to 2 micro s with 10 ns rise and fall times and no degradation in output power. This pulse mode operation was made possible by the development of a stable 12-diode power combiner/amplifier and a single-diode pulsed driver whose RF output power was switched on and off by having its bias current modulated via a fast-switching current pulse modulator. Essential to the overall amplifier development was the successful development of state-of-the-art silicon double-drift IMPATT diodes capable of reproducible 2.5 W CW output power with 12% dc-to-RF conversion efficiency. Output powers of as high as 2.75 W has been observed. Both the device and circuit design are amenable to low cost production.

Ngan, Y. C.↗

Optics Enabled Networks and Architectures for Data Center Cost and Power Efficiency

Bandwidth demand for datacenter networks continues as performance increases and is further fueled by the exploding demand for AI and new HPC workloads. Managing power and costs will require a range of solutions including new networking and workload specialized architectures, composable systems and optical circuit switching. In this study we focus primarily on two topics, examining the benefits of flatter networks (enabled mainly by means of co-packaged-optics-enabled switches) and the utilization improvement potential for composable (disaggregated) systems, while discussing specialized hardware and networks, and optical circuit switching more briefly.

99 GENERAL AND MISCELLANEOUS↗

EverGREEN 2045: An Energy Mix to Decarbonize Washington State

Washington State’s future resource mix is likely to be comprised of intermittent renewables and carbon-free generation including hydropower by 2045. Generation will likely be comprised of wind, solar photovoltaic (PV), batteries, pumped storage hydropower (PSH), existing nuclear power plants, and potentially enhanced geothermal systems and advanced nuclear reactor technologies. To assess the cost and stability of the future resource mix, we partner with X-energy (advanced reactor design) and AltaRock Energy (enhanced geothermal system) for proprietary cost data. After estimating the costs of these two new technologies, we design plausible future resource mix scenarios to meet Washington State’s Clean Energy Transformation Act which transitions the state to carbon-free generation by 2045. We assess the cost and stability of the future resource mix with power system analysis tools, finding revenues are sufficient to cover variable operating and maintenance costs for most technologies providing power in 2030 and 2045, but capacity payments or power purchase agreements will likely be necessary for flexible resources, including enhanced geothermal systems and advanced nuclear reactors, to participate in the future resource mix.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Briefing Materials for Technical Presentations, Volume B: The LACIE Symposium

Tables, charts, and LACIE segments are used to demonstrate the accuracy of estimated crop conditions and yield from 1974 to 1976, and to demonstrate the benefits of meteorological and LANDSAT data. Developments in data acquisition, sampling, and reduction are reviewed. The USDA application test system is highlighted with emphasis on user requirements, technology transfer, data base design, and cost data models for data base operation and management.

Source record↗

Government conceptual estimating for contracting and management

The use of the Aerospace Price Book, a cost index, and conceptual cost estimating for cost-effective design and construction of space facilities is discussed. The price book consists of over 200 commonly used conceptual elements and 100 systems summaries of projects such as launch pads, processing facilities, and air locks. The cost index is composed of three divisions: (1) bid summaries of major Shuttle projects, (2) budget cost data sheets, and (3) cost management summaries; each of these divisions is described. Conceptual estimates of facilities and ground support equipment are required to provide the most probable project cost for budget, funding, and project approval purposes. Similar buildings, systems, and elements already designed are located in the cost index in order to make the best rough order of magnitude conceptual estimates for development of Space Shuttle facilities. An example displaying the applicability of the conceptual cost estimating procedure for the development of the KSC facilities is presented.

Brown, J. A.↗

Assessing 21st century contaminants of concern using integrative passive sampling devices to obtain more meaningful and cost-effective data on impacts from stormwater runoff

In many cases stormwater compliance monitoring is labor intensive, expensive, and largely unsuccessful in providing the data needed to support stormwater management goals. In addition, data from manual grab sampling and automated composite sampling are rarely collected in a manner that provides the information required to identify sources of contamination, evaluate the effectiveness of Best Management Practices, or inform effective decision making. Furthermore, monitoring is often driven by the need to meet low concentration benchmarks for metals and other constituents that do not take into account loading into the receiving waters, resulting in arbitrary monitoring requirements (monthly or seasonally) that are not tied to the driving forces within the watershed such as hydrology (flow regime), weather (storm events and antecedent dry periods), and upland land use and cover (Rosen and Johnston 2015, US Navy 2016).

stormwater, passive samplers, trace metals↗

Cost Methodology for Biomass Feedstocks: Herbaceous Crops and Agricultural Residues

This report describes a set of procedures and assumptions used to estimate production and logistics costs of bioenergy feedstocks from herbaceous crops and agricultural residues. The engineering-economic analysis discussed here is based on methodologies developed by the American Society of Agricultural and Biological Engineers (ASABE) and the American Agricultural Economics Association (AAEA). An engineering-economic analysis approach was chosen due to lack of historical cost data for bioenergy feedstocks. Instead, costs are calculated using assumptions for equipment performance, input prices, and yield data derived from equipment manufacturers, research literature, and/or standards. Cost estimates account for fixed and variable costs. Several examples of this costing methodology used to estimate feedstock logistics costs are included at the end of this report.

09 BIOMASS FUELS↗

An Innovative Infrastructure with a Universal Geo-Spatiotemporal Data Representation Supporting Cost-Effective Integration of Diverse Earth Science Data

The SpatioTemporal Adaptive Resolution Encoding (STARE) is a unifying scheme encoding geospatial and temporal information for organizing data on scalable computing/storage resources, minimizing expensive data transfers. STARE provides a compact representation that turns set-logic functions into integer operations, e.g. conditional sub-setting, taking into account representative spatiotemporal resolutions of the data in the datasets. STARE geo-spatiotemporally aligns data placements of diverse data on massive parallel resources to maximize performance. Automating important scientific functions (e.g. regridding) and computational functions (e.g. data placement) allows scientists to focus on domain-specific questions instead of expending their efforts and expertise on data processing. With STARE-enabled automation, SciDB (Scientific Database) plus STARE provides a database interface, reducing costly data preparation, increasing the volume and variety of interoperable data, and easing result sharing. Using SciDB plus STARE as part of an integrated analysis infrastructure dramatically eases combining diametrically different datasets.

Rilee, Michael Lee↗

Environmental Cost Analysis System (ECAS) Status and Compliance Requirements for EM Consolidated Business Center Contracts - 13204

The Department of Energy (DOE) Office of Environmental Management (EM) has developed a web-accessible database to collect actual cost data from completed EM projects to support cost estimating and analysis. This Environmental Cost Analysis System (ECAS) database was initially deployed in early 2009 containing the cost and parametric data from 77 decommissioning, restoration, and waste management projects completed under the Rocky Flats Closure Project. In subsequent years we have added many more projects to ECAS and now have a total of 280 projects from 8 major DOE sites. This data is now accessible to DOE users through a web-based reporting tool that allows users to tailor report outputs to meet their specific needs. We are using it as a principal resource supporting the EM Consolidated Business Center (EMCBC) and the EM Applied Cost Engineering (ACE) team cost estimating and analysis efforts across the country. The database has received Government Accountability Office review as supporting its recommended improvements in DOE's cost estimating process, as well as review from the DOE Office of Acquisition and Project Management (APM). Moving forward, the EMCBC has developed a Special Contract Requirement clause or 'H-Clause' to be included in all current and future EMCBC procurements identifying the process that contractors will follow to provide DOE their historical project data in a format compatible with ECAS. Changes to DOE O 413.3B implementation are also in progress to capture historical costs as part of the Critical Decision project closeout process. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Orbit transfer vehicle engine study. Volume 2: Technical report

The orbit transfer vehicle (OTV) engine study provided parametric performance, engine programmatic, and cost data on the complete propulsive spectrum that is available for a variety of high energy, space maneuvering missions. Candidate OTV engines from the near term RL 10 (and its derivatives) to advanced high performance expander and staged combustion cycle engines were examined. The RL 10/RL 10 derivative performance, cost and schedule data were updated and provisions defined which would be necessary to accommodate extended low thrust operation. Parametric performance, weight, envelope, and cost data were generated for advanced expander and staged combustion OTV engine concepts. A prepoint design study was conducted to optimize thrust chamber geometry and cooling, engine cycle variations, and controls for an advanced expander engine. Operation at low thrust was defined for the advanced expander engine and the feasibility and design impact of kitting was investigated. An analysis of crew safety and mission reliability was conducted for both the staged combustion and advanced expander OTV engine candidates.

Source record↗

Interconnection Cost Analysis in ISO-New England

Electric transmission system operators (ISOs, RTOs, or utilities) require new large generators seeking to connect to the grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. Berkeley Lab has collected interconnection cost data for 194 projects in New England from interconnection studies performed between 2010 and 2021. Project-level cost summary data are available for download on this page. We find: -Interconnection costs have grown over time, especially for projects that withdraw. -Interconnection costs are highest for onshore wind, followed by solar and storage. Natural gas and offshore wind projects tend to cost less to interconnect, in comparison. -Economies of scale exist for solar and possibly storage projects, but not for other resource types. -Wind and solar projects requesting capacity network resource interconnection service have higher interconnection costs, despite being evaluated using the same interconnection standard in the analyzed studies. -Low and high interconnection costs can be found throughout the ISO-NE footprint. -Costs are split fairly evenly between investments at the point of interconnection and within the broader network for active and withdrawn projects, while complete projects incur most costs at the point of interconnection.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Data Availability in Appliance Standards and Labeling Program Development and Evaluation

In this report, we describe the necessary data inputs for both standards development and program evaluation and perform an initial assessment of the availability and uncertainty of those data inputs in China. For standards development, we find that China and its standards and labeling program administrators currently has access to the basic market and technical data needed for conducting market and technology assessment and technological and economic analyses. Some data, such as shipments data, is readily available from the China Energy Label product registration database while the availability of other data, including average unit energy consumption, prices and design options, needs improvement. Unlike some other countries such as the United States, most of the necessary data for conducting standards development analyses are not publicly available or compiled in a consolidated data source. In addition, improved data on design and efficiency options as well as cost data (e.g., manufacturing costs, mark-ups, production and product use-phase costs) – key inputs to several technoeconomic analyses – are particularly in need given China’s unconsolidated manufacturing industry. For program evaluation, we find that while China can conduct simple savings evaluations on its incentive programs with the data it currently has available from the Ministry of Finance – the program administrator, the savings estimates produced by such an evaluation will carry high uncertainty. As such, China could benefit from an increase in surveying and metering in the next one to three years to decrease the uncertainty surrounding key data points such as unit energy savings and free ridership.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗