Search NASA⌕ Search

SEARCH · Search NASA

Results for “cryomodule”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Operational Experience of the New Booster Cryomodule at the Upgraded Injector Test Facility

Since the early 1990s, the in­jec­tor of the CEBAF ac­cel­er­a­tor at Jef­fer­son Lab has re­lied on a nor­mal-con­duct­ing RF graded-beta cap­ture sec­tion to boost the ki­netic en­ergy of the elec­tron beam from 100 / 130 keV to 600 keV for sub­se­quent ac­cel­er­a­tion using a cry­omod­ule hous­ing two su­per­con­duct­ing 5-cell cav­i­ties sim­i­lar to those used through­out the ac­cel­er­a­tor. To sim­plify the in­jec­tor de­sign and im­prove the beam qual­ity, the nor­mal-con­duct­ing RF cap­ture sec­tion and the cry­omod­ule will be re­placed with a new sin­gle booster cry­omod­ule em­ploy­ing a su­per­con­duct­ing, β = 0.6, 2-cell-cav­ity cap­ture sec­tion and a sin­gle, β = 0.97, 7-cell cav­ity. The Up­graded In­jec­tor Test Fa­cil­ity at Jef­fer­son Lab is cur­rently host­ing the new cry­omod­ule to eval­u­ate its per­for­mance with beam be­fore in­stal­la­tion at CEBAF. While demon­strat­ing sat­is­fac­tory per­for­mance of the booster and good agree­ment with sim­u­la­tions, our beam test re­sults also speak to lim­i­ta­tions of ac­cel­er­a­tor op­er­a­tions in a noisy, ther­mally un­reg­u­lated en­vi­ron­ment.

Bruker, M. W.↗

Cryomodule Test

Explore the source record for details and available documents.

Posen, Samuel Elliott↗

Operational Experience of the New Booster Cryomodule at the Upgraded Injector Test Facility

Since the early 1990s, the in­jec­tor of the CEBAF ac­cel­er­a­tor at Jef­fer­son Lab has re­lied on a nor­mal-con­duct­ing RF graded-beta cap­ture sec­tion to boost the ki­netic en­ergy of the elec­tron beam from 100 / 130 keV to 600 keV for sub­se­quent ac­cel­er­a­tion using a cry­omod­ule hous­ing two su­per­con­duct­ing 5-cell cav­i­ties sim­i­lar to those used through­out the ac­cel­er­a­tor. To sim­plify the in­jec­tor de­sign and im­prove the beam qual­ity, the nor­mal-con­duct­ing RF cap­ture sec­tion and the cry­omod­ule will be re­placed with a new sin­gle booster cry­omod­ule em­ploy­ing a su­per­con­duct­ing, β = 0.6, 2-cell-cav­ity cap­ture sec­tion and a sin­gle, β = 0.97, 7-cell cav­ity. The Up­graded In­jec­tor Test Fa­cil­ity at Jef­fer­son Lab is cur­rently host­ing the new cry­omod­ule to eval­u­ate its per­for­mance with beam be­fore in­stal­la­tion at CEBAF. While demon­strat­ing sat­is­fac­tory per­for­mance of the booster and good agree­ment with sim­u­la­tions, our beam test re­sults also speak to lim­i­ta­tions of ac­cel­er­a­tor op­er­a­tions in a noisy, ther­mally un­reg­u­lated en­vi­ron­ment.

Bruker, M. W.↗

RF and Mechanical Design of a 915 MHz SRF Cavity for Conduction-Cooled Cryomodules

Conduction-cooled SRF niobium cavities are being developed for use in compact, continuous-wave electron linear accelerators for a variety of industrial applications. A 915 MHz two-cell cavity has been designed to achieve an energy gain of 3.5 MeV. The design of the cell shape aims at minimizing the peak surface magnetic field. Field flatness is achieved by adjusting the length of the outer end half-cells. The higher-order mode analysis shows that absorbers are not required for a moderate beam current of 5 mA. One of the beam tubes has two side-ports for insertion of coaxial fundamental power couplers. The mechanical design and analysis were done to maintain a stress near or less than 15.5 MPa for all anticipated loading conditions. This is half the measured yield strength and is to provide relief from creep when cavity is evacuated and stored with outside atmospheric pressure.

Ciovati, Gianluigi↗

Mitigating field emission in SSR2 cryomodules for PIP-II

The SSR2 cavities for PIP-II have consistently been affected by field emission since the first cold tests with the unity coupler. A comprehensive root cause analysis was conducted to investigate the origin of this issue and to identify the fabrication, processing, and handling factors that have the greatest impact on field emission onset. New techniques were developed and effectively implemented to achieve field emission-free SSR2 cavities. In addition, effort was dedicated both to relating the radiation level measured at the test stand with the expected levels in the LINAC tunnel and to understand the evolution of field emission through the assembly steps. The challenge of overcoming field emission also led to a reassessment of design choices, enhancing our understanding of their effects on cavity performance.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗