Search NASA⌕ Search

SEARCH · Search NASA

Results for “deployable payload mission”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

STS-75 Flight Day 4

On this fourth day of the STS-75 mission, the flight crew, Cmdr. Andrew Allen, Pilot Scott Horowitz, Payload Cmdr. Franklin Chang-Diaz, Payload Specialist Umberto Guidoni (Italy), and Mission Specialists Jeffrey Hoffman, Maurizio Cheli (ESA) and Claude Nicollier (ESA), are shown unlatching and deploying the Tethered Satellite System Reflight (TSS-1R) and activating several of the middeck experiments from the United States Microgravity Payload-3 (USMP-3). There is more imaging of the Space Shuttle's exhaust system using vented water vapor and Earth views, which include horizon shots.

Source record↗

Propulsive Small Expendable Deployer System (ProSEDS) Experiment

ProSEDS is a secondary (i.e. piggyback) payload on a Delta-11 GPS 8 mission scheduled for launch in August 2000. It will test the feasibility of generating generate electrodynamic thrust without propellant using a 5 kilometer conducting wire (tether). The ProSEDS obtains thrust as the tether cuts across the magnetic field, a voltage is induced across the wire. Electrons are attracted to the positively based far end of the wire. Electrons flow downward through the conductive tether. Earth's magnetic field exerts a drag force on the current in the tether segments, that is mechanically transferred via the wire to the stage. The primary objective for the ProSEDs mission is to demonstrate that a significant, measurable electrodynamic thrust through a tether in space. The primary mission will last one day, as the primary battery assures at least three orbits of data will be collected, the remaining power will be provided by the secondary battery, which uses tether generated power to recharge. The extended mission begins using the power provided through the tether, and wil terminate when a system ceases to function; (i.e., either degradation of the tether,through Atomic Oxygen contact, a micrometeoroid or other debris impact, or another malfunction.) The technology has many potential applications. Amongst the applications, which are reviewed in detail, are: (1) satellite deorbit, (2) reboost of the International Space Station, (3) propellantless reusable Orbit Transfer Vehicles, (4) Propulsion and power generation for future Jovian missions.

Johnson, Les↗

Global L-band Observatory for Water Cycle Studies (GLOWS)

L-band observations have proven useful for estimating soil moisture and ocean salinity variables to study the land surface and ocean. The European Space Agency (ESA) Soil Moisture and Ocean Salinity (SMOS) mission was the first (2009-present) spaceborne L-band radiometer. This was followed by two L-band missions flown by the National Aeronautics and Space Administration (NASA) to measure sea surface salinity (Aquarius 2011-2015) and soil moisture (SMAP 2015-present). It is critical to continue the time series of L-band observations that these missions have begun. To address this need we propose a new low-cost instrument concept known as the Global L-band active/passive Observatory for Water cycle Studies (GLOWS) that will include an L-band radiometer and radar to provide data continuity. The new mission concept includes a deployable reflectarray lens antenna with a compact feed that can be flown on an Earth Venture class satellite in a EELV Secondary Payload Adapter (ESPA) Grande-class mission. GLOWS will continue the science observations of SMAP and SMOS at the same resolution and accuracy at substantially lower cost, size, and weight.

David Long↗

A general architecture for intelligent training systems

A preliminary design of a general architecture for autonomous intelligent training systems was developed. The architecture integrates expert system technology with teaching/training methodologies to permit the production of systems suitable for use by NASA, other government agencies, industry, and academia in the training of personnel for the performance of complex, mission-critical tasks. The proposed architecture consists of five elements: a user interface, a domain expert, a training session manager, a trainee model, and a training scenario generator. The design of this architecture was guided and its efficacy tested through the development of a system for use by Mission Control Center Flight Dynamics Officers in training to perform Payload-Assist Module Deploys from the orbiter.

Loftin, R. Bowen↗

An Overview of the Mars Reconnaissance Orbiter (MRO) Science Mission

The Mars Reconnaissance Orbiter (MRO) is the latest addition to the suite of missions on or orbiting Mars as part of the NASA Mars Exploration Program. Launched on 12 August 2005, the orbiter successfully entered Mars orbit on 10 March 2006 and finished aerobraking on 30 August 2006. Now in its near-polar, near-circular, low-altitude (approximately 300 km), 3 p.m. orbit, the spacecraft is operating its payload of six scientific instruments throughout a one-Mars-year Primary Science Phase (PSP) of global mapping, regional survey, and targeted observations. Eight scientific investigations were chosen for MRO, two of which use either the spacecraft accelerometers or tracking of the spacecraft telecom signal to acquire data needed for analysis. Six instruments, including three imaging systems, a visible-near infrared spectrometer, a shallow-probing subsurface radar, and a thermal-infrared profiler, were selected to complement and extend the capabilities of current working spacecraft at Mars. Whether observing the atmosphere, surface, or subsurface, the MRO instruments are designed to achieve significantly higher resolution while maintaining coverage comparable to the current best observations. The requirements to return higher-resolution data, to target routinely from a low-altitude orbit, and to operate a complex suite of instruments were major challenges successfully met in the design and build of the spacecraft, as well as by the mission design. Calibration activities during the seven-month cruise to Mars and limited payload operations during a three-day checkout prior to the start of aerobraking demonstrated, where possible, that the spacecraft and payload still had the functions critical to the science mission. Two critical events, the deployment of the SHARAD radar antenna and the opening of the CRISM telescope cover, were successfully accomplished in September 2006. Normal data collection began 7 November 2006 after solar conjunction. As part of its science mission, MRO will also aid identification and characterization of the most promising sites for future landed missions, both in terms of safety and in terms of the scientific potential for future discovery. Ultimately, MRO data will advance our understanding of how Mars has evolved and by which processes that change occurs, all within a framework of identifying the presence, extent, and role of water in shaping the planet s climate over time.

astronomical instruments↗

Measurement of Atomic Oxygen in Diffuse Aurora and Ion Density in the E-Region

An ion mass spectrometer (IMS) was refurbished, calibrated and supplied to the University of Colorado payload (Dr. Charles Barth, P.I.) which was launched from White Sands in September of 1993 as NASA 33.062. The nose cone failed to deploy and their were problems with the ACS so the mission was declared a failure. However, the door covering the IMS deployed and the instrument obtained data. The launch occurred shortly after a payload carrying solar x-ray detectors was launched. Thus a small portion of the Colorado payload science was salvaged; namely, the NO(+)/O2(+) ratio to compare with the measured x-ray flux. Figure I shows the NO(+) to O2(+) ratio vs. altitude. The behavior is typical of the E-region.

Sharp, William E.↗

Integration and Testing Challenges of Small, Multiple Satellite Missions: Experiences from the Space Technology 5 Project

The ST5 payload, part of NASA s New Millennium Program headquartered at JPL, consisted of three micro satellites (approx. 30 kg each) deployed into orbit from the Pegasus XL launch. ST5 was a technology demonstration mission, intended to test new technologies for potential use for future missions. In order to meet the launch date schedule of ST 5, a different approach was required rather than the standard I&T approach used for single, room-sized satellites. The I&T phase was planned for spacecraft #1 to undergo integration and test first, followed by spacecraft #2 and #3 in tandem. A team of engineers and technicians planned and executed the integration of all three spacecraft emphasizing versatility and commonality. They increased their knowledge and efficiency through spacecraft #1 integration and testing and utilized their experience and knowledge to safely execute I&T for spacecraft #2 and #3. Each integration team member could perform many different roles and functions and thus better support activities on any of the three spacecraft. The I&T campaign was completed with STS s successful launch on March 22,2006

Sauerwein, Timothy A.↗

The Near Earth Object Scout Spacecraft: A Low Cost Approach to in-situ Characterization of the NEO Population

In this paper we describe a micro/nano satellite spacecraft and a supporting mission profile and architecture designed to enable preliminary in-situ characterization of a significant number of Near Earth Objects (NEOs) at reasonable cost. The spacecraft will be referred to as the NEO Scout. NEO Scout spacecraft are to be placed in GTO, GEO, or cis-lunar space as secondary payloads on launch vehicles headed for GTO or beyond and will begin their mission after deployment from the launcher. A distinguishing key feature of the NEO scout system is to design the mission timeline and spacecraft to rendezvous with and land on the target NEOs during close approach to the Earth-Moon system using low-thrust/high- impulse propulsion systems. Mission feasibility and preliminary design analysis are presented along with detailed trajectory calculations. The use of micro/nano satellites in low-cost interplanetary exploration is attracting increasing attention and is the subject of several annual workshops and published design studies (1-4). The NEO population consists of those asteroids and short period comets orbiting the Sun with a perihelion of 1.3 astronomical units or less (5-8). As of July 30, 2013 10065 Near-Earth objects have been discovered. The spin rate, mass, density, surface physical (especially mechanical) properties, composition, and mineralogy of the vast majority of these objects are highly uncertain and the limited available telescopic remote sensing data imply a very diverse population (5-8). In-situ measurements by robotic spacecraft are urgently needed to provide the characterization data needed to support hardware and mission design for more ambitious human and robotic NEO operations. Large numbers of NEOs move into close proximity with the Earth-Moon system every year (9). The JPL Near-Earth Object Human Space Flight Accessible Targets Study (NHATS) (10) has produced detailed mission profile and delta V requirements for various NEO missions ranging from 30 to 420 days in duration and assuming chemical propulsion. Similar studies have been reported assuming high power electric propulsion for manned NEO rendezvous missions (11). The delta V requirement breakdown and mission profile data from references 10 and 11 are used as a basis for sizing the NEO Scout spacecraft and for conducting preliminary feasibility assessments using the Tsiokolvsky rocket equation, a (worst-case) delta V requirement of 10 km/sec, and a maximum spacecraft dry mass of 20 kg. Using chemical propellant for a 10 km/sec delta V drives spacecraft wet mass well above 300 kg so that chemical propulsion is a non-starter for the proposed mission profile and spacecraft wet mass limits. In contrast, a solar electric propulsion system needs only 8 kg of Xe propellant to accelerate the spacecraft to 10 km/sec in 163 days with 0.02 N of thrust and 500 W of power from1.6 sq m of 29% efficient solar panels. In a second example, accelerating a 4 kg payload to 7 km/sec over 180 days requires about 6.7 kg of propellant and 1.2 kg of solar panels (12 kg total spacecraft wet mass).

Koontz, Steven L.↗

The Adaptable, Deployable, Entry and Placement Technology (ADEPT) Enabling Advanced Entry, Descent, and Landing Capabilities for SmallSat Missions

The Adaptable, Deployable Entry and Placement Technology (ADEPT) is a mechanically deployable low-ballistic coefficient aeroshell entry system which performs entry, descent, and landing (EDL) functions for a broad range of planetary destinations including Mars, Venus, Titan and Earth. The deployable system allows mission planners to develop an aeroshell design that is stowed like a folded umbrella, and yet prior to the EDL mission segment, transforms into a deployed, near-rigid low ballistic coefficient configuration. The ADEPT architecture is scalable from a sub-1m class to 6m diameter entry vehicles for Venus and and it has been studied at up to 15m – 20m scale for human exploration class missions. There has been growing interest in performing interplanetary missions with small spacecraft as secondary payloads and ADEPT offers small satellite mission designers the ability to consider Aeroassist technologies to expand mission applications. The ADEPT architecture introduces a new approach for entry vehicle design. It deploys a flexible 3D woven carbon fabric as the primary drag surface. It is capable of surviving high aerothermal heating during entry, while maintaining a robust impermeable membrane that provides high drag for vehicle deceleration. The ADEPT project team has advanced this decelerator technology via systems-level testing at the one meter diameter (nano-ADEPT) scale. A subsonic aeroloads test (May 2015) and a pathfinder arc-jet aeroheating test (Sept 2015) and a successful sounding rocket flight (SR-1) launch of a 0.7 meter deployed diameter ADEPT (September 2018). The SR-1 flight experiment demonstrated most of the primary end-to-end mission stages including: launch in a stowed configuration, separation and deployment in zero-g, exo-atmospheric conditions, and passive ballistic re-entry of a 70 degree half-angle cone geometry. The ADEPT SR-1 sounding rocket flight experiment had to address challenges such as stowing within the constrained payload envelope, fabric folding, and packaging concerns.

Paul Wercinski↗

Shuttle performance enhancements using an OMS payload bay kit

The study focuses on the use of an orbital maneuvering system (OMS) payload bay kit (PBK) designed to utilize OMS tanks identical to those currently employed in the Orbiter OMS pods. Emphasis is placed on payload deployment capability and payload servicing/reboost capability augmentation from the point of view of payload mass, maximum deployment altitudes, and initial retrieval and final deployment altitudes. The deployment, servicing, and reboost requirements of the Hubble Space Telescope and Advanced X-ray and Astrophysics Facility are analyzed in order to show the benefits an OMS PBK can provide for these missions. It is shown that OMS PBKs can provide the required capability enhancement necessary to support deployment, reboost, and servicing of payloads requiring altitudes greater than 325 nautical miles.

Templin, Kevin C.↗

STS-99 Crew Interviews: Janet L. Kavandi

This NASA JSC video release is one in a series of space shuttle astronaut interviews and was recorded Aug. 9, 1999. Mission Specialist, Janet L. Kavandi, Ph.D. provides answers to questions regarding her role in the Shuttle Radar Topography Mission (SRTM), mission objectives, which center on the three-dimensional mapping of the entire Earth's surface, shuttle imaging radar, payload mast deploy and retraction, data recording vs. downlinking, the fly cast maneuver, applications of recorded data, international participation (DLR), the National Imaging and Mapping Agency (NIMA), and EarthCam (educational middle school project). The interview is summed up by Dr. Kavandi explaining that the mission's objective, if successful, will result in the the most complete high-resolution digital topographic database of the Earth.

Source record↗

iSat Surface Charging and Thruster Plume Interactions Analysis

NASA is designing the Iodine Satellite (iSAT) cubesat mission to demonstrate operations of an iodine electric thruster system. The spacecraft will be deployed as a secondary payload from a launch vehicle which has not yet been identified so the program must plan for the worst case environments over a range of orbital inclinations. We present results from a NASA and Air Force Charging Analyzer Program (NASCAP-2K) surface charging calculation used to evaluate the effects of charging on the spacecraft and to provide the charging levels at other locations in orbit for a thruster plume interaction analysis for the iSAT mission. We will then discuss results from the thruster interactions analysis using the Electric Propulsion Interactions Code (EPIC). The results of these analyses are being used by the iSAT program for a range of environments that could be encountered when the final mission orbit is selected.

Parker, L. Neergaard↗

Lunar Laser Ranging in the Artemis Era

The retroreflector arrays placed on the lunar surface by the Apollo astronauts and the Soviet Luna missions continue to contribute to our understanding of gravitational physics, Earth and Moon geophysics, geodesy, and dynamics. The key science questions addressed by Lunar Laser Ranging remain very relevant today: What is the interior structure of the Moon? Is the Equivalence Principle exact? Does the strength of gravity vary with space and time? What is the nature of spacetime? Do extra dimensions or other new physics alter the inverse square law of gravity? The lunar retroreflectors are also an essential component of the realizations of the lunar reference frames. The half-century old lunar retroreflectors continue to provide excellent ranging targets but are showing signs of degradation and the measurement error associated with their physical size and varying tilt is becoming a limitation in the quest for more precise range measurements. In addition, the clustering of the arrays in the mid-latitudes of the Moon limits their geometrical strength and coverage. The south polar region planned for Artemis presents an ideal opportunity for improving the geometric distribution. Retroreflectors utilizing a large optical cross-section single cube corner do not have tilt error associated with the existing arrays making them good options for lunar deployment. Several new retroreflectors of this type are being prepared for upcoming Commercial Lunar Payload Services missions as well as Artemis. This presentation will discuss NASA’s plans for expanding the lunar laser ranging capabilities with a focus on the Artemis Lunar Laser Retroreflector.

Stephen Merkowitz↗

Representative Space Shuttle missions and their impact on shuttle design.

Four representative Space Shuttle missions for the 1980's are described: mission 1, a third stage deployment and retrieval mission; mission 2, a combination orbiting element revisit and sortie mission; mission 3, a rapid payload retrieval and return mission; and mission 4, a 30-day earth observation sortie mission. The first three missions are proposed baseline reference missions, and, as such, their mission requirements must be met by the baseline shuttle configuration developed by NASA contractors. Typically, these missions impact the design in terms of such basics as shuttle launch payload capability, payload bay size, performance of the orbital maneuvering system (OMS) and the reaction control system (RCS), the basic 7-day orbital system lifetime, and the thermal protection system for high cross-range entry. To illustrate that vehicle design may be subject to requirements from other mission types as well, mission 4 is included. Each description stresses mission requirements having unique impact on vehicle design.

Young, K. A.↗

Space transportation system options for extended duration and power

A modification kit for the Space Transportation System (STS) Orbiter is proposed to provide more power and mission duration for payloads. The power extension package (PEP) - a flexible-substrate solar array deployed on the Space Shuttle Orbiter remote manipulator system - can provide as much as 29 kW total power for durations of 10 to 48 days. The kit is installed only for those flights which require enhanced power or duration. Modifications to the Orbiter thermal control and life support systems to improve heat balance and to reduce consumables are proposed. The changes consist of repositioning the Orbiter forward radiators and replacing the lithium hydroxide scrubber with a regenerable solid amine.

Loftus, J. P., Jr.↗

Space Shuttle power extension package

A modification kit for the Space Transportation System (STS) Orbiter is proposed to provide more power and mission duration for payloads. The power extension package (PEP), a flexible-substrate solar array deployed on the Space Shuttle Orbiter remote manipulator system, can provide as much as 29 kW total power for durations of 10 to 48 days. The kit is installed only for those flights which require enhanced power or duration. The PEP is made possible by development of the flexible-substrate array technology and, in itself, contributes to the technology base for the use of large area solar cells. Modifications to the Orbiter thermal control and life support systems to improve heat balance and to reduce consumables are proposed. The changes consist of repositioning the Orbiter forward radiators and replacing the lithium hydroxide scrubber with a regenerable solid amine.

Loftus, J. P., Jr.↗

Research of advanced techniques for X-ray detectors and telescopes with applications to rockets and the LAMAR facility

A program for the development of high throughput instrumentation for X-ray astronomy based upon focusing optics is being carried out by the Smithsonian Astrophysical Observatory. The instrumentation is applicable to investigations requiring large area focusing optics for direct imaging or dispersive spectroscopy. The long range goals of this program are the development of telescopes and gratings for future major X-ray astronomy facilities, including additions to the LAMAR OSS-2/SHEAL experiment after the initial flights. Tests of the devices and their more immediate utilization in scientific investigations can be carried out with SPARTAN payloads deployed and retrieved by the Space Shuttle. However, the present backlog of approved SPARTAN missions is longer than the three-year duration of the program described in this program. Laboratory studies and breadboarding of instrumentation are discussed.

Gorenstein, P.↗

The Near Earth Object (NEO) Scout Spacecraft: A Low-cost Approach to In-situ Characterization of the NEO Population

This paper describes a microsatellite spacecraft with supporting mission profile and architecture, designed to enable preliminary in-situ characterization of a significant number of Near Earth Objects (NEOs) at reasonably low cost. The spacecraft will be referred to as the NEO-Scout. NEO-Scout spacecraft are to be placed in Geosynchronous Equatorial Orbit (GEO), cis-lunar space, or on earth escape trajectories as secondary payloads on launch vehicles headed for GEO or beyond, and will begin their mission after deployment from the launcher. A distinguishing key feature of the NEO-Scout system is to design the spacecraft and mission timeline so as to enable rendezvous with and landing on the target NEO during NEO close approach (<0.3 AU) to the Earth-Moon system using low-thrust/high-impulse propulsion systems. Mission durations are on the order 100 to 400 days. Mission feasibility and preliminary design analysis are presented, along with detailed trajectory calculations.

Woeppel, Eric A.↗