Search NASA⌕ Search

SEARCH · Search NASA

Results for “design certification”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Aerodynamic Classification of Swept-Wing Ice Accretion

The continued design, certification and safe operation of swept-wing airplanes in icing conditions rely on the advancement of computational and experimental simulation methods for higher fidelity results over an increasing range of aircraft configurations and performance, and icing conditions. The current state-of-the-art in icing aerodynamics is mainly built upon a comprehensive understanding of two-dimensional geometries that does not currently exist for fundamentally three-dimensional geometries such as swept wings. The purpose of this report is to describe what is known of iced-swept-wing aerodynamics and to identify the type of research that is required to improve the current understanding. Following the method used in a previous review of iced-airfoil aerodynamics, this report proposes a classification of swept-wing ice accretion into four groups based upon unique flowfield attributes. These four groups are: ice roughness, horn ice, streamwise ice and spanwise-ridge ice. In the case of horn ice it is shown that a further subclassification of nominally 3D or highly 3D horn ice may be necessary. For all of the proposed ice-shape classifications, relatively little is known about the three-dimensional flowfield and even less about the effect of Reynolds number and Mach number on these flowfields. The classifications and supporting data presented in this report can serve as a starting point as new research explores swept-wing aerodynamics with ice shapes. As further results are available, it is expected that these classifications will need to be updated and revised.

Diebold, Jeff M.↗

NASA,FAA,ONERA Swept-Wing Icing and Aerodynamics: Summary of Research and Current Status

NASA, FAA, ONERA, and other partner organizations have embarked on a significant, collaborative research effort to address the technical challenges associated with icing on large scale, three-dimensional swept wings. These are extremely complex phenomena important to the design, certification and safe operation of small and large transport aircraft. There is increasing demand to balance trade-offs in aircraft efficiency, cost and noise that tend to compete directly with allowable performance degradations over an increasing range of icing conditions. Computational fluid dynamics codes have reached a level of maturity that they are being proposed by manufacturers for use in certification of aircraft for flight in icing. However, sufficient high-quality data to evaluate their performance on iced swept wings are not currently available in the public domain and significant knowledge gaps remain.

Aircraft Icing↗

Initial Low-Reynolds Number Iced Aerodynamic Performance for CRM Wing

NASA, FAA, ONERA, and other partner organizations have embarked on a significant, collaborative research effort to address the technical challenges associated with icing on large scale, three-dimensional swept wings. These are extremely complex phenomena important to the design, certification and safe operation of small and large transport aircraft. There is increasing demand to balance trade-offs in aircraft efficiency, cost and noise that tend to compete directly with allowable performance degradations over an increasing range of icing conditions. Computational fluid dynamics codes have reached a level of maturity that they are being proposed by manufacturers for use in certification of aircraft for flight in icing. However, sufficient high-quality data to evaluate their performance on iced swept wings are not currently available in the public domain and significant knowledge gaps remain.

Ice Formation↗

Status of NASA's Space Launch System

NASA's Space Launch System (SLS) continued to make significant progress in 2015 and 2016, completing hardware and testing that brings NASA closer to a new era of deep space exploration. Programmatically, SLS completed Critical Design Review (CDR) in 2015. A team of independent reviewers concluded that the vehicle design is technically and programmatically ready to move to Design Certification Review (DCR) and launch readiness in 2018. Just five years after program start, every major element has amassed development and flight hardware and completed key tests that will lead to an accelerated pace of manufacturing and testing in 2016 and 2017. Key to SLS' rapid progress has been the use of existing technologies adapted to the new launch vehicle. The existing fleet of RS-25 engines is undergoing adaptation tests to prove it can meet SLS requirements and environments with minimal change. The four-segment shuttle-era booster has been modified and updated with a fifth propellant segment, new insulation, and new avionics. The Interim Cryogenic Upper Stage is a modified version of an existing upper stage. The first Block I SLS configuration will launch a minimum of 70 metric tons (t) of payload to low Earth orbit (LEO). The vehicle architecture has a clear evolutionary path to more than 100t and, ultimately, to 130t. Among the program's major 2015-2016 accomplishments were two booster qualification hotfire tests, a series of RS-25 adaptation hotfire tests, manufacturing of most of the major components for both core stage test articles and first flight tank, delivery of the Pegasus core stage barge, and the upper stage simulator. Renovations to the B-2 test stand for stage green run testing was completed at NASA Stennis Space Center. This year will see the completion of welding for all qualification and flight EM-1 core stage components and testing of flight avionics, completion of core stage structural test stands, casting of the EM-1 solid rocket motors, additional testing of RS-25 engines and flight engine controllers This paper will discuss these and other technical and programmatic successes and challenges over the past year and provide a preview of work ahead before the first flight of this new capability.

Honeycutt, John↗

Status of NASA's Space Launch System

NASA's Space Launch System (SLS) continued to make significant progress in 2015, completing hardware and testing that brings NASA closer to a new era of deep space exploration. The most significant program milestone of the year was completion of Critical Design Review (CDR). A team of independent reviewers concluded that the vehicle design is technically and programmatically ready to move to Design Certification Review (DCR) and launch readiness in 2018. Just four years after program start, every major element has amassed development and flight hardware and completed key tests that will set the stage for a growing schedule of manufacturing and testing in 2016. Key to SLS' rapid progress has been the use of existing technologies adapted to the new launch vehicle. The space shuttle-heritage RS-25 engine is undergoing adaptation tests to prove it can meet SLS requirements and environments with minimal change. The four-segment shuttle-era booster has been modified and updated with an additional propellant segment, new insulation, and new avionics. The Interim Cryogenic Upper Stage is a modified version of an existing upper stage. The first Block I SLS configuration will launch a minimum of 70 metric tons of payload to low Earth orbit (LEO). The vehicle architecture has a clear evolutionary path to more than 100 metric tons and, ultimately, to 130 metric tons. Among the program's major accomplishments in 2015 were the first booster qualification hotfire test, a series of seven RS-25 adaptation hotfire tests, manufacturing of most of the major components for both core stage test articles and first flight tank, delivery of the Pegasus core stage barge, and the upper stage simulator. Renovations to the B-2 test stand for stage green run testing was completed at NASA Stennis Space Center. This year will see the second booster qualification motor hotfire, flight and additional development RS-25 engine tests, and completion of core stage test articles and test stands and several flight article sections. This paper will discuss these and other technical and programmatic successes and challenges over the past year and provide a preview of work ahead before the first flight of this new capability.

Honeycutt, John↗

Status of NASA's Space Launch System

NASA's Space Launch System (SLS) continued to make significant progress in 2015, completing hardware and testing that brings NASA closer to a new era of deep space exploration. The most significant program milestone of the year was completion of Critical Design Review (CDR). A team of independent reviewers concluded that the vehicle design is technically and programmatically ready to move to Design Certification Review (DCR) and launch readiness in 2018. Just four years after program start, every major element has amassed development and flight hardware and completed key tests that will set the stage for a growing schedule of manufacturing and testing in 2016. Key to SLS' rapid progress has been the use of existing technologies adapted to the new launch vehicle. The space shuttle-heritage RS-25 engine is undergoing adaptation tests to prove it can meet SLS requirements and environments with minimal change. The four-segment shuttle-era booster has been modified and updated with an additional propellant segment, new insulation, and new avionics. The Interim Cryogenic Upper Stage is a modified version of an existing upper stage. The first Block I SLS configuration will launch a minimum of 70 metric tons (t) of payload to low Earth orbit (LEO). The vehicle architecture has a clear evolutionary path to more than 100t and, ultimately, to 130t. Among the program's major accomplishments in 2015 were the first booster qualification hotfire test, a series of seven RS-25 adaptation hotfire tests, manufacturing of most of the major components for both core stage test articles and first flight tank, delivery of the Pegasus core stage barge, and the upper stage simulator. Renovations to the B-2 test stand for stage green run testing was completed at NASA Stennis Space Center. This year will see the second booster qualification motor hotfire, flight and additional development RS-25 engine tests, and completion of core stage test articles and test stands and several flight article sections. This paper will discuss these and other technical and programmatic successes and challenges over the past year and provide a preview of work ahead before the first flight of this new capability.

Lyles, Garry↗

Effect of Ice Shape Fidelity on Swept-Wing Aerodynamic Performance

Low-Reynolds number testing was conducted at the 7 ft. x 10 ft. Walter H. Beech Memorial Wind Tunnel at Wichita State University to study the aerodynamic effects of ice shapes on a swept wing. A total of 17 ice shape configurations of varying geometric detail were tested. Simplified versions of an ice shape may help improve current ice accretion simulation methods and therefore aircraft design, certification, and testing. For each configuration, surface pressure, force balance, and fluorescent mini-tuft data were collected and for a selected subset of configurations oil-flow visualization and wake survey data were collected. A comparison of two ice shape geometries and two configurations with simplified geometric detail for each ice shape geometry is presented in this paper.

Scale models↗

Analysis of the Tropospheric Doppler Radar Wind Profiler Measurement Accuracy

- The Tropospheric Doppler Radar Wind Profiler (TDRWP) is a wind measurement instrument at NASA’s Kennedy Space Center, co-located on the United States Space Force’s (USSF) Eastern Range (ER) at the Cape Canaveral Space Force Station (CCAFS), that generates atmospheric wind profiles which are utilized in the design, certification and operations of various launch vehicles - NASA’s Space Launch System (SLS) - Commercial launch vehicles - NASA Crew-4 in April 2022 was first NASA crewed mission to use TDRWP - Composed of twenty antenna sectors and transmitter unit pairs which operate at 48 MHz - TDRWP data is required for day-of-launch structural margin and performance assessments

Meghan E. Carrico↗

Understanding Workforce Agility at NASA Kennedy Space Center

NASA leads the world in space research and provides other government agencies, educational institutions, and companies opportunities to explore, launch, and conduct research in and around space. NASA has 11 formal locations based around the United States, and each has different goals and objectives to help NASA meet its overall mission. 2004, President George Bush announced a new vision for the Space Exploration program. During his grand announcement, he discussed that the Space Shuttles would retire due to the 2003 Space Shuttle Columbia accident, where the crew and the space vehicle were lost. The Kennedy Space Center (KSC) would no longer manage the day-to-day operations of maintaining the US Space Shuttle fleet. Our NASA teams would continue working to finish the Space Shuttle program's mission to build the International Space Station. Afterward, NASA would transition to develop and test a new spacecraft, the Crew Exploration Vehicle. The third goal was to return to the moon by 2020 as the launching point for missions beyond, to get humans from lower Earth orbit to the moon and Mars. (Secretary, 2004) The KSC engineering workforce had to prepare to transition from Operational support of the Space Shuttle program to the design and development of over 50 subsystems for the future SLS and Orion Launch Systems at the Kennedy Space Center. These subsystems developed at the Kennedy Space Center Engineering Directorate followed a comprehensive design process that required several different product deliverables during various phases for each subsystem. (Schafer et al., 2013) What allowed these systems to be successful? What enabled NASA KSC to complete over 130 Artemis 1 Design Certification and System Acceptance Reviews, closing over 21,656 Requirements to deem the Artemis 1 rocket ready for launch? Little is known about the NASA engineering workforce agility characteristics that enabled the organization to transition from the Space Shuttle program that ended in 2011 and launch the Artemis Program's SLS rocket on November 16, 2022.

Workforce Agility↗

Enhancing In-Flight Structural Health Monitoring of Vertical Lift Vehicles Operating in an Urban Environment

In-situ airframe sensors have long been considered a potential solution for structural health monitoring that could change the design, certification, operation and maintenance paradigms of flight vehicles. In this approach, large networks of sensors covering the entire, or most of, an airframe throughout its operational lifetime would support real-time decisions on airworthiness and obviate the need to overbuild components or perform multiple cycles of structural qualification testing and inspections. This concept would go beyond the current practice of placing select sensors in strategic locations or relying on such sensors only during airframe qualification flights and inspections. For vehicles in the emerging urban air mobility space, reducing weight associated with overbuilds and shortening down-time associated with inspections are critical for improving safety and affordability. In practice, the wide-scale use of in-situ sensors as primary assurance for structural health has not been demonstrated to be feasible or the best solution. A sensor integration testbed was developed as a platform to evaluate the potential of multiple sensor types to enable decision making on airworthiness. We report on the initial runs of this testbed with multiple sensors attached to a common test article. Metal foil strain gauges, eddy current, fiber optic, guided wave (acoustic emission and ultrasonic)and carbon nanotube roving sensors were affixed to the test article. Baseline as well as post damage initiation and fatiguing data are presented and discussed. Despite the relative simplicity of the test article, the interpretation of the as-captured test data was generally not conclusive or did not have wide enough coverage. This result emphasizes the challenges and current limitations both in testing and the practical broad application of embedded sensors as the determinative elements in critical decision making on wide-scale structural health.

Vertical Lift Vehicles↗

Enhancing In-Flight Structural Health Monitoring of Vertical Lift Vehicles Operating in an Urban Environment

In-situ airframe sensors have long been considered a potential solution for structural health monitoring that could change the design, certification, operation, and maintenance paradigms of flight vehicles. In this approach, large networks of sensors covering the entire, or most of, an airframe throughout its operational lifetime would support real-time decisions on airworthiness and obviate the need to overbuild components or perform multiple cycles of structural qualification testing and inspections. This concept would go beyond the current practice of placing select sensors in strategic locations or relying on such sensors only during airframe qualification flights and inspections. For vehicles in the emerging urban air mobility space, reducing weight associated with overbuilds and shortening down-time associated with inspections are critical for improving safety and affordability. In practice, the wide-scale use of in-situ sensors as primary assurance for structural health has not been demonstrated to be feasible or the best solution. A sensor integration testbed was developed as a platform to evaluate the potential of multiple sensor types to enable decision making on airworthiness. We report on the initial runs of this testbed with multiple sensors attached to a common test article. Metal foil strain gauges, eddy current, fiber optic, guided wave (acoustic emission and ultrasonic) and carbon nanotube roving sensors were affixed to the test article. Baseline as well as post damage initiation and fatiguing data are presented and discussed. Despite the relative simplicity of the test article, the interpretation of the as-captured test data was generally not conclusive or did not have wide enough coverage. This result emphasizes the challenges and current limitations both in testing and the practical broad application of embedded sensors as the determinative elements in critical decision making on wide-scale structural health.

Vertical Lift Vehicles↗

Enhanced Accident Tolerant LWR Fuels: Metrics Development

The Department of Energy (DOE) Fuel Cycle Research and Development (FCRD) Advanced Fuels Campaign (AFC) is conducting research and development on enhanced Accident Tolerant Fuels (ATF) for light water reactors (LWRs). This mission emphasizes the development of novel fuel and cladding concepts to replace the current zirconium alloy-uranium dioxide (UO2) fuel system. The overall mission of the ATF research is to develop advanced fuels/cladding with improved performance, reliability and safety characteristics during normal operations and accident conditions, while minimizing waste generation. The initial effort will focus on implementation in operating reactors or reactors with design certifications. To initiate the development of quantitative metrics for ATR, a LWR Enhanced Accident Tolerant Fuels Metrics Development Workshop was held in October 2012 in Germantown, MD. This paper summarizes the outcome of that workshop and the current status of metrics development for LWR ATF.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Evaluation Metrics Applied to Accident Tolerant Fuels

The safe, reliable, and economic operation of the nation’s nuclear power reactor fleet has always been a top priority for the United States’ nuclear industry. Continual improvement of technology, including advanced materials and nuclear fuels, remains central to the industry’s success. Decades of research combined with continual operation have produced steady advancements in technology and have yielded an extensive base of data, experience, and knowledge on light water reactor (LWR) fuel performance under both normal and accident conditions. One of the current missions of the U.S. Department of Energy’s (DOE) Office of Nuclear Energy (NE) is to develop nuclear fuels and claddings with enhanced accident tolerance for use in the current fleet of commercial LWRs or in reactor concepts with design certifications (GEN-III+). Accident tolerance became a focus within advanced LWR research upon direction from Congress following the 2011 Great East Japan Earthquake, resulting tsunami, and subsequent damage to the Fukushima Daiichi nuclear power plant complex. The overall goal of ATF development is to identify alternative fuel system technologies to further enhance the safety, competitiveness and economics of commercial nuclear power. Enhanced accident tolerant fuels would endure loss of active cooling in the reactor core for a considerably longer period of time than the current fuel system while maintaining or improving performance during normal operations. The U.S. DOE is supporting multiple teams to investigate a number of technologies that may improve fuel system response and behavior in accident conditions, with team leadership provided by DOE national laboratories, universities, and the nuclear industry. Concepts under consideration offer both evolutionary and revolutionary changes to the current nuclear fuel system. Mature concepts will be tested in the Advanced Test Reactor at Idaho National Laboratory beginning in Summer 2014 with additional concepts being readied for insertion in fiscal year 2015. This paper provides a brief summary of the proposed evaluation process that would be used to evaluate and prioritize the candidate accident tolerant fuel concepts currently under development.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Dynamic System Scaling Applied to Zr-4 Cladding under RIA Conditions

The research and development lifecycle for new fuel designs currently has an ideal 20-25 year timeline. Efforts are currrently underway to accelerate fuel design and development using high performance fuel modeling codes and reduced scale experiments with new instrumentation techniques. However current tools available require a full scale prototype to be designed and tested for fuel qualification. The thermal-hydraulics community has leveraged scaling methodologies to use reduced scale integral effect test facilities (Westinghouse AP600/1000, NuScale Power Module) in lieu of building full scale prototypes for reactor design certification. Dynamic System Scaling (DSS) is a recent development to scaling methodologies that enable the tracking and quantification of dynamic scaling distortions experienced throughout a transient. Recent TREAT experiments performed reactivity initiated accident (RIA) pulses on UO2 fuel rodlets in Zr-4 cladding and were accompanied by BISON predictions for the cladding temperature. DSS is applied to pyrometer data of outer cladding temperatures and two BISON predictions after peak cladding temperature has been reached. One BISON case uses a constant gap conductance value between the fuel and cladding and the other using a conventional gap conductance model. Results from the DSS analysis show that there is good agreement between both BISON predictions and the experimental data and that there is not a significant distortion seen between using either gap conductance model.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Code Validation of a SBLOCA test in SMART Integral Test Loop

Integrated small modular reactors (iSMRs) are favored because of their unique characteristics, such as enhanced safety without any large break loss of coolant accidents (LBLOCAs), low initial construction costs, and multi-use of desalination and electricity generation. Many iSMRs have been developed thus far. In Korea, an iSMR called SMART was developed after a thorough validation of the components and systems, and finally received its design certificate in 2012 for the first time in the world. To ensure the performance of its safety systems, an integral test loop, SMART-ITL, is constructed. It contains the primary system, secondary system, passive safety systems, and an auxiliary system. The passive safety systems include a passive residual heat removal system (PRHRS), passive injection system with a core makeup tank (CMT) and a safety injection tank (SIT), and an automatic depressurization system (ADS). The height is preserved while the diameter is scaled down to 1:7. A series of SBLOCA tests have been performed with 4 trains of PRHRS, 1 train of CMT and SIT, and ADS. In parallel with the experiments, simulation of a representative test has been conducted to track the underlying thermal hydraulics. SMART-ITL is an integral test loop for SMART and a series of SBLOCA tests for confirming the performance of passive safety systems have been conducted. In this paper, a system code simulation on a SBLOCA test using SMART-ITL is presented. The reactor vessel water level, break flow rate, and CMT and SIT water levels are predicted well. (authors)

42 ENGINEERING↗

Personnel Certifications for the Design, Installation and Maintenance of Photovoltaic Systems. Final Technical Report

The North American Board of Certified Energy Practitioners (NABCEP) is the most respected, well-established, and widely recognized national certification organization for professionals in the field of renewable energy. NABCEP’s certifications were created to facilitate consumer protection, improve quality assurance, and help employers judge the skills of existing or potential employees. The certifications also allow individuals to differentiate themselves from others in their field and advance their careers while fostering increased recognition of the profession. Since NABCEP’s founding in 2002, all of its certification exams have been administered in paper-and-pencil format twice per year at 30 exam sites around the United States. The biannual test administration and relatively low number of exam sites make it challenging for many qualified renewable energy professionals to take NABCEP’s certification exams. The rigorous nature of the exam, which leads to many candidates failing the exam on their first and sometimes second attempts, combined with the low number of annual test administrations means that anyone who fails will need to wait another six months for the chance to retake the exam. These factors limited the potential growth of NABCEP’s certification programs and the resultant quality assurance within the renewable energy industry. Thanks to a generous grant by the Department of Energy’s Solar Training and Education for Professional (STEP) program, NABCEP recently began updating its Photovoltaic (PV) Installation Professional Exam and developing three new specialty certifications in PV design, PV installation, and PV commissioning & maintenance. One of the primary objectives of this STEP-funded project was to develop the exams using a computer-based testing (CBT) model to increase the number of exam administrations and available exam sites for NABCEP’s certification exams. To successfully complete this project, NABCEP partnered with Castle Worldwide, Inc. With more than 25 years of experience in test development, test administration, analysis of examinations, and has a staff of 70 experienced personnel, NABCEP was confident that Castle’s team was more than qualified to help NABCEP make the transition to CBT examinations. NABCEP and Castle Worldwide jointly developed a project management plan that included key deliverables, scope management, a work breakdown structure, roles and responsibilities, and a project schedule with milestones. The project schedule was carefully monitored to ensure that activities along the critical path were not delayed and, when deemed necessary, the project was crashed to add resources so that activities could occur in parallel. NABCEP and Castle Worldwide staff met weekly to discuss any potential schedule variances and activities which might delay the closing of the project. NABCEP also recruited 46 subject matter experts (SMEs) to work with Castle’s staff on this project. NABCEP staff, SME’s, and Castle staff worked together to develop the Job Task Analyses that form the basis for the certification exams, create new examination forms, conduct passing score studies, and complete a psychometrical analysis of potential exam items. NABCEP’s SMEs utilized Castle’s item development platform during face-to-face meetings, webinars, and remote item authoring to write, review, and approve exam items. Castle also used their software to psychometrically analyze existing exam items to confirm the reliability and validity of the NABCEP’s certification exams. On January 3rd, 2018, NABCEP’s began offering its PV Installation Professional certification exam via CBT. The exam was available at Castle’s nearly 600 exam sites in the United States. A large number of sites will help to ensure better access for solar professionals in rural and remote areas, which drives down the implicit costs of taking the certification exams. Thanks to the STEP grant and the robust partnership between NABCEP and Castle Worldwide, Inc., personnel certifications will be much more accessible and affordable for renewable energy professionals.

14 SOLAR ENERGY↗

Improvements to the Simplified Loads Methodology in IEC 61400-2: November 22, 2021 - November 21, 2022

The "Simplified Loads Model" (SLM) of IEC 61400-2 provides a simple methodology to assess the structural integrity of a small wind turbine (SWT). The SLM is unique to the small wind turbine standard. It was included to allow SWT manufacturers with limited resources to undertake integrity checks at a reasonable cost in time and resources and avoid the expense of detailed aeroelastic simulations. Unfortunately, the SLM has gained the reputation of being overly conservative and this has reduced its value to the SWT community and its use in SWT design and certification. Conservatism in design standards is needed but excessive conservatism is not. The aim of this report is to address the principal areas of excess conservatism and recommend changes to the SLM that preserve its simplicity but reduce the excess. The changes for the ultimate loads are consistent with their treatment in aeroelastic modelling for certification and with related codes for wind loading on structures. The recommendations for a new fatigue design load case are also based on aeroelastic simulations, in this case of five SWTs of varying configurations with rated power from 2.4 to 50 kW. It is also pointed out the design load case for yawed operation omits an important term. The recommended inclusion of this term would make the SLM slightly more conservative for this case.

17 WIND ENERGY↗