Search NASA⌕ Search

SEARCH · Search NASA

Results for “design development test”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Testing to Transition the J-2X from Paper to Hardware

The J-2X Upper Stage Engine (USE) will be the first new human-rated upper stage engine since the Apollo program of the 1960s. It is designed to carry the Ares I and Ares V into orbit and send the Ares V to the Moon as part of NASA's Constellation Program. This paper will provide an overview of progress on the design, testing, and manufacturing of this new engine in 2009 and 2010. The J-2X embodies the program goals of basing the design on proven technology and experience and seeking commonality between the Ares vehicles as a way to minimize risk, shorten development times, and live within current budget constraints. It is based on the proven J-2 engine used on the Saturn IB and Saturn V launch vehicles. The prime contractor for the J-2X is Pratt & Whitney Rocketdyne (PWR), which is under a design, development, test, and engineering (DDT&E) contract covering the period from June 2006 through September 2014. For Ares I, the J-2X will provide engine start at approximately 190,000 feet, operate roughly 500 seconds, and shut down. For Ares V, the J-2X will start at roughly 190,000 feet to place the Earth departure stage (EDS) in orbit, shut down and loiter for up to five days, re-start on command and operate for roughly 300 seconds at its secondary power level to perform trans lunar injection (TLI), followed by final engine shutdown. The J-2X development effort focuses on four key areas: early risk mitigation, design risk mitigation, component and subassembly testing, and engine system testing. Following that plan, the J-2X successfully completed its critical design review (CDR) in 2008, and it has made significant progress in 2009 and 2010 in moving from the drawing board to the machine shop and test stand. Post-CDR manufacturing is well under way, including PWR in-house and vendor hardware. In addition, a wide range of component and sub-component tests have been completed, and more component tests are planned. Testing includes heritage powerpack, turbopump inducer water flow, turbine air flow, turbopump seal testing, main injector and gas generator, injector testing, augmented spark igniter testing, nozzle side loads cold flow testing, nozzle extension film cooling flow testing, control system testing with hardware in the loop, and nozzle extension emissivity coating tests. In parallel with hardware manufacturing, work is progressing on the new A-3 test stand to support full duration altitude testing. The Stennis A-2 test stand is scheduled to be turned over to the Constellation Program in September 2010 to be modified for J-2X testing also. As the structural steel was rising on the A-3 stand, work was under way in the nearby E complex on the chemical steam generator and subscale diffuser concepts to be used to evacuate the A-3 test cell and simulate altitude conditions.

Byrd, Tom↗

System test and flight results from infrared astronomical satellite external thermal subsystem

The Infrared Astronomical Satellite (IRAS) received its system level thermal testing in a solar simulator in September and October 1982 and was launched in January 1983. In order to reduce costs and meet a tight launch schedule, a system thermal test approach was employed which combined the goals of thermal design development tests, thermal balance tests, and thermal vacuum qualification tests. This approach relied heavily on the use of a computer-controlled automatic data handling and heater control system which reduced reliance on human monitoring of test data in comparison to past projects. The validity of this approach has been borne out by flight results. During the whole mission most temperatures were within the desired range and close to predictions. Included under the external thermal subsystem are room temperature electronics and radiatively cooled surfaces with temperatures below 100 and 200K.

Salazar, R. P.↗

The International Space Station Space Radiation Environment: Avionics Systems Performance in Low-Earth Orbit Single Event Effects (SEE) Environments

Single event effects (SEE) are those errors, anomalies, or failures in microelectronic devices caused by the passage of a single energetic charged particle through the device. Spacecraft SEE environments consist primarily of energetic charged particles; both primary particles originating in the natural environment and secondary particles (including secondary neutrons) produced by nuclear reactions of primary particles with spacecraft materials. The energetic charged particle components (electrons, protons, and atomic nuclei) of the spacecraft SEE environment include galactic cosmic rays (GCR), and planetary radiation belt charged particles, as well as solar energetic particle event (SPE) charged particles. The International Space Station (ISS) orbital altitude and inclination (~350 km to ~420 km at 51.6o inclination) results in a spacecraft SEE environment that varies dramatically with the location in Earth?s geomagnetic field. Geomagnetic GCR shielding diminishes with distance from the geomagnetic equator. Near + 51.6o latitude the ISS GCR environment has a high degree of similarity to the interplanetary GCR environment in cis-Lunar space.SEE environments supporting ISS avionics systems design, development, test, and verification are documented in SSP-30512, Space Station Ionizing Radiation Design Environment. Comparisons of overall ISS avionics systems in-flight performance with pre-flight verification report predictions have been previously reported and meet or exceed expectations in all cases.In this paper we report the results of more detailed investigations of the effects of geographic location, altitude, solar cycle, and shielding mass effects on the in-flight SEE performance of the ISS command and data handling system during the past 17 years. In addition, we report on the preflight testing and in-flight performance of the commercial-off-the-shelf lap top computers used on ISS. Finally, we present an assessment of ISS as an avionics SEE test and flight demonstration platform for exploration hardware destined for the cis-lunar or other inner solar system environments.

International Space Station↗

Affordable Development and Qualification Strategy for Nuclear Thermal Propulsion

Nuclear Thermal Propulsion (NTP) is a concept which uses a nuclear reactor to heat a propellant to high temperatures without combustion and can achieve significantly greater specific impulse than chemical engines. NTP has been considered many times for human and cargo missions beyond low earth orbit. A lot of development and technical maturation of NTP components took place during the Rover/NERVA program of the 60's and early 70's. Other NTP programs and studies followed attempting to further mature the NTP concept and identify a champion customer willing to devote the funds and support the development schedule to a demonstration mission. Budgetary constraints require the use of an affordable development and qualification strategy that takes into account all the previous work performed on NTP to construct an existing database, and include lessons learned and past guidelines followed. Current guidelines and standards NASA uses for human rating chemical rocket engines is referenced. The long lead items for NTP development involve the fuel elements of the reactor and ground testing the engine system, subsystem, and components. Other considerations which greatly impact the development plans includes the National Space Policy, National Environmental Policy Act, Presidential Directive/National Security Council Memorandum #25 (Scientific or Technological Experiments with Possible Large-Scale Adverse Environmental Effects and Launch of Nuclear Systems into Space), and Safeguards and Security. Ground testing will utilize non-nuclear test capabilities to help down select components and subsystems before testing in a nuclear environment to save time and cost. Existing test facilities with minor modifications will be considered to the maximum extent practical. New facilities will be designed to meet minimum requirements. Engine and test facility requirements are based on the driving mission requirements with added factors of safety for better assurance and reliability. Emphasis will be placed on small engines, since the smaller the NTP engine, the easier it is to transport, assemble/disassemble, and filter the exhaust during tests. A new ground test concept using underground bore holes (modeled after the underground nuclear test program) to filter the NTP engine exhaust is being considered. The NTP engine system design, development, test, and evaluation plan includes many engine components and subsystems, which are very similar to those used in chemical engines, and can be developed in conjunction with them Other less mature NTP engine components and subsystems (e.g., reactor) will be thoroughly analyzed and tested to acceptable levels recommended by the referenced standards and guidelines. The affordable development strategy also considers a prototype flight test, as a final step in the development process. Preliminary development schedule estimates show that an aggressive development schedule (without much margin) will be required to be flight ready for a 2033 human mission to Mars.

Gerrish, Harold P., Jr.↗

Affordable Development and Qualification Strategy for Nuclear Thermal Propulsion

Nuclear Thermal Propulsion (NTP) is a concept which uses a nuclear reactor to heat a propellant to high temperatures without combustion and can achieve significantly greater specific impulse than chemical engines. NTP has been considered many times for human and cargo missions beyond low earth orbit. A lot of development and technical maturation of NTP components took place during the Rover/NERVA program of the 60's and early 70's. Other NTP programs and studies followed attempting to further mature the NTP concept and identify a champion customer willing to devote the funds and support the development schedule to a demonstration mission. Budgetary constraints require the use of an affordable development and qualification strategy that takes into account all the previous work performed on NTP to construct an existing database, and include lessons learned and past guidelines followed. Current guidelines and standards NASA uses for human rating chemical rocket engines is referenced. The long lead items for NTP development involve the fuel elements of the reactor and ground testing the engine system, subsystem, and components. Other considerations which greatly impact the development plans includes the National Space Policy, National Environmental Policy Act, Presidential Directive/National Security Council Memorandum #25 (Scientific or Technological Experiments with Possible Large-Scale Adverse Environmental Effects and Launch of Nuclear Systems into Space), and Safeguards and Security. Ground testing will utilize non-nuclear test capabilities to help down select components and subsystems before testing in a nuclear environment to save time and cost. Existing test facilities with minor modifications will be considered to the maximum extent practical. New facilities will be designed to meet minimum requirements. Engine and test facility requirements are based on the driving mission requirements with added factors of safety for better assurance and reliability. Emphasis will be placed on small engines, since the smaller the NTP engine, the easier it is to transport, assemble/disassemble, and filter the exhaust during tests. A new ground test concept using underground bore holes (modeled after the underground nuclear test program) to filter the NTP engine exhaust is being considered. The NTP engine system design, development, test, and evaluation plan includes many engine components and subsystems, which are very similar to those used in chemical engines, and can be developed in conjunction with them Other less mature NTP engine components and subsystems (e.g., reactor) will be thoroughly analyzed and tested to acceptable levels recommended by the referenced standards and guidelines. The affordable development strategy also considers a prototype flight test, as a final step in the development process. Preliminary development schedule estimates show that an aggressive development schedule (without much margin) will be required to be flight ready for a 2033 human mission to Mars.

Gerrish, Harold P., Jr.↗

Human-in-the-Loop Integrated Life Support Systems Ground Testing

Human exploration missions beyond low earth orbit will be long duration with abort scenarios of days to months. This necessitates provisioning the crew with all the things they will need to sustain themselves while carrying out mission objectives. Systems engineering and integration is critical to the point where extensive integrated testing of life support systems on the ground is required to identify and mitigate risks. Ground test facilities (human-rated altitude chamber) at the Johnson Space Center are being readied to integrate all the systems for a mission along with a human test crew. The relevant environment will include deep space habitat human accommodations, sealed atmosphere of 8 psi total pressure and 32% oxygen concentration, life support systems (food, air, water), communications, crew accommodations, medical, EVA, tools, etc. Testing periods will approximate those of the expected missions (such as a near Earth asteroid, Earth-Moon L2 or L1, the moon). This type of integrated testing is needed for research and technology development as well as later during the mission design, development, test, and evaluation (DDT&E) phases of an approved program. Testing will evolve to be carried out at the mission level fly the mission on the ground . Mission testing will also serve to inform the public and provide the opportunity for active participation by international partners.

Henninger, Donald L.↗

Human Exploration Missions - Maturing Technologies to Sustain Crews

Human exploration missions beyond low earth orbit will be long duration with abort scenarios of days to months. Providing crews with the essentials of life such as clean air and potable water means recycling human metabolic wastes back to useful products. Individual technologies are under development for such things as CO2 scrubbing, recovery of O2 from CO2, turning waste water into potable water, and so on. But in order to fully evaluate and mature technologies fully they must be tested in a relevant, high-functionality environment; a systems environment where technologies are challenged with real human metabolic wastes. It is for this purpose that an integrated systems ground testing capability at the Johnson Space Center is being readied for testing. The relevant environment will include deep space habitat human accommodations, sealed atmosphere of 8 psi total pressure and 32% oxygen concentration, life support systems (food, air, water), communications, crew accommodations, medical, EVA, tools, etc. Testing periods will approximate those of the expected missions (such as a near Earth asteroid, Earth ]Moon L2 or L1, the moon, and Mars). This type of integrated testing is needed not only for research and technology development but later during the mission design, development, test, and evaluation phases of preparing for the mission.

Mukai, Chiaki↗

Human in the Loop Integrated Life Support Systems Ground Testing

Human exploration missions beyond low earth orbit will be long duration with abort scenarios of days to months. This necessitates provisioning the crew with all the things they will need to sustain themselves while carrying out mission objectives. Systems engineering and integration is critical to the point where extensive integrated testing of life support systems on the ground is required to identify and mitigate risks. Ground test facilities (human-rated altitude chambers) at the Johnson Space Center are being readied to integrate all the systems for a mission along with a human test crew. The relevant environment will include deep space habitat human accommodations, sealed atmosphere capable of 14.7 to 8 psi total pressure and 21 to 32% oxygen concentration, life support systems (food, air, and water), communications, crew accommodations, medical, EVA, tools, etc. Testing periods will approximate those of the expected missions (such as a near Earth asteroid, Earth-Moon L2 or L1, the moon, Mars). This type of integrated testing is needed for research and technology development as well as later during the mission design, development, test, and evaluation (DDT&E) phases of an approved program. Testing will evolve to be carried out at the mission level fly the mission on the ground . Mission testing will also serve to inform the public and provide the opportunity for active participation by international, industrial and academic partners.

Henninger, Donald L.↗

Design, Development and Hotfire Testing of Monolithic Copper and Bimetallic Additively Manufactured Combustion Chambers

NASA and industry partners are working towards fabrication process development to reduce costs and schedules associated with manufacturing liquid rocket engine components with the goal of reducing overall mission costs. One such technique being evaluated is powder-bed fusion or selective laser melting (SLM) otherwise commonly referred to as additive manufacturing. The NASA Low Cost Upper Stage Propulsion (LCUSP) program was designed to develop processes and material characterization for the GRCop-84 copper-alloy commensurate with powder bed additive manufacturing, evaluate bimetallic deposition and complete testing of a full scale combustion chamber. As part of this development, the process has been transferred to industry partners to enable a long-term supply chain of monolithic copper combustion chambers. As a direct spin off of this program, NASA is working with industry partners to further develop the printing process for the GRCop-84 material in addition to the C-18150 (CuCrZr) material. To advance the process further and allow for optimization with multiple materials, NASA is also investigating the feasibility of bimetallic additively manufactured chambers. A 1.2k sized thrust-chamber was designed and developed to compare the printing process of the GRCop-84 and C-18150 SLM materials. A series of similar MCC liners also completed development with an Inconel 625 jacket bonded to the GRcop-84 liner evaluating direct metal deposition (DMD) laser and arc-based techniques. This paper describes the design, development, manufacturing and testing of these combustion chambers and associated lessons learned throughout the design and development process.

Gradl, Paul↗

Altitude Testing of Large Liquid Propellant Engines

The National Aeronautics and Space Administration entered a new age on January 14, 2004 with President Bush s announcement of the creation the Vision for Space Exploration that will take mankind back to the Moon and on beyond to Mars. In January, 2006, after two years of hard, dedicated labor, engineers within NASA and its contractor workforce decided that the J2X rocket, based on the heritage of the Apollo J2 engine, would be the new engine for the NASA Constellation Ares upper stage vehicle. This engine and vehicle combination would provide assured access to the International Space Station to replace that role played by the Space Shuttle and additionally, would serve as the Earth Departure Stage, to push the Crew Excursion Vehicle out of Earth Orbit and head it on a path for rendezvous with the Moon. Test as you fly, fly as you test was chosen to be the guiding philosophy and a pre-requisite for the engine design, development, test and evaluation program. An exhaustive survey of national test facility assets proved the required capability to test the J2X engine at high altitude for long durations did not exist so therefore, a high altitude/near space environment testing capability would have to be developed. After several agency concepts the A3 High Altitude Testing Facility proposal was selected by the J2X engine program on March 2, 2007 and later confirmed by a broad panel of NASA senior leadership in May 2007. This facility is to be built at NASA s John C. Stennis Space Center located near Gulfport, Mississippi. 30 plus years of Space Shuttle Main Engine development and flight certification testing makes Stennis uniquely suited to support the Vision For Space Exploration Return to the Moon. Propellant handling infrastructure, engine assembly facilities, a trained and dedicated workforce and a broad and varied technical support base will all ensure that the A3 facility will be built on time to support the schedule needs of the J2X engine and the ultimate flight of the first Ares I vehicle. The A3 facility will be able to simulate pre-ignition altitude from sea-level to 100,000 feet and maintain it up to 650 seconds. Additionally the facility will be able to accommodate initial ignition, shutdown and then restart test profiles. A3 will produce up to 5000 lbm/sec of superheated steam utilizing a Chemical Steam generation system. Two separate inline steam ejectors will be used to produce a test cell vacuum to simulate the 100,000 ft required altitude. Operational capability will ensure that the facility can start up and shutdown without producing adverse pressure gradients across the J2X nozzle. The facility will have a modern thrust measurement system for accurate determination of engine performance. The latest advances in data acquisition and control will be incorporated to measure performance parameters during hotfire testing. Provisions are being made in the initial design of the new altitude facility to allow for testing of other, larger engines and potential upper stage launch vehicles that might require vacuum start testing of the engines. The new facility at Stennis Space Center will be complete and ready for hotfire operations in late 2010.

Maynard, Bryon T.↗

Test program, helium II orbital resupply coupling

The full scope of this program was to have included development tests, design and production of custom test equipment and acceptance and qualification testing of prototype and protoflight coupling hardware. This program was performed by Ball Aerospace Systems Division, Boulder, Colorado until its premature termination in May 1991. Development tests were performed on cryogenic face seals and flow control devices at superfluid helium (He II) conditions. Special equipment was developed to allow quantified leak detection at large leak rates up to 8.4 x 10(exp -4) SCCS. Two major fixtures were developed and characterized: The Cryogenic Test Fixture (CTF) and the Thermal Mismatch Fixture (Glovebox). The CTF allows the coupling hardware to be filled with liquid nitrogen (LN2), liquid helium (LHe) or sub-cooled liquid helium when hardware flow control valves are either open or closed. Heat leak measurements, internal and external helium leakage measurements, cryogenic proof pressure tests and external load applications are performed in this fixture. Special reusable MLI closures were developed to provide repeatable installations in the CTF. The Thermal Mismatch Fixture allows all design configurations of coupling hardware to be engaged and disengaged while measuring applied forces and torques. Any two hardware components may be individually thermally preconditioned within the range of 117 deg K to 350 deg K prior to engage/disengage cycling. This verifies dimensional compatibility and operation when thermally mismatched. A clean, dry GN2 atmosphere is maintained in the fixture at all times. The first shipset of hardware was received, inspected and cycled at room temperature just prior to program termination.

Hyatt, William S.↗

Enhancing Future Commercial Space Stations: Applying ISS Insights to Environmental Control and Life Support Systems (ECLSS) Development

The expansion of space exploration to commercial space stations represents a shift from government-led endeavors to a new competitive era driven by private companies and innovative forces. The journey to actualize these celestial outposts is fraught with difficulties, including the intricate establishment of Environmental Control and Life Support systems (ECLSS) within these commercial space stations. By applying the insights gleaned from the ISS, particularly during the initial conceptual design phase of the commercial developments, there is an opportunity to circumvent some of the teething issues and optimize the development process. Furthermore, applying insights from the ISS ECLSS design, development, test, and maintenance phases has the potential to enhance system compatibility and mitigate the challenges associated with upgrading a fixed design. This approach can lead to lower costs due to fewer iterations and streamlined processes. This paper will conduct an in-depth evaluation of the ECLS system from both system and operational perspectives with the aim to provide a knowledge capture for early-stage design considerations to bolster the development of sustainable, efficient, and habitable commercial space stations.

ISS↗

Enhancing Future Commercial Space Stations: Applying ISS Insights to Environmental Control and Life Support Systems (ECLSS) Development

The expansion of space exploration to commercial space stations represents a shift from government-led endeavors to a new competitive era driven by private companies and innovative forces. The journey to actualize these celestial outposts is fraught with difficulties, including the intricate establishment of Environmental Control and Life Support systems (ECLSS) within these commercial space stations. By applying the insights gleaned from the ISS, particularly during the initial conceptual design phase of the commercial developments, there is an opportunity to circumvent some of the teething issues and optimize the development process. Furthermore, applying insights from the ISS ECLSS design, development, test, and maintenance phases has the potential to enhance system compatibility and mitigate the challenges associated with upgrading a fixed design. This approach can lead to lower costs due to fewer iterations and streamlined processes. This paper will conduct an in-depth evaluation of the ECLS system from both system and operational perspectives with the aim to provide a knowledge capture for early-stage design considerations to bolster the development of sustainable, efficient, and habitable commercial space stations.

ISS↗

CPAS Parachute Testing, Model Development, & Verification

Capsule Parachute Assembly System (CPAS) is the human rated parachute system for the Orion vehicle used during re-entry. Similar to Apollo parachute design. Human rating requires additional system redundancy. A Government Furnished Equipment (GFE) project responsible for: Design; Development testing; Performance modeling; Fabrication; Qualification; Delivery

Romero, Leah M.↗

CECE: A Deep Throttling Demonstrator Cryogenic Engine for NASA's Lunar Lander

As one of the first technology development programs awarded under NASA's Vision for Space Exploration, the Pratt & Whitney Rocketdyne (PWR) Deep Throttling, Common Extensible Cryogenic Engine (CECE) program was selected by NASA in November 2004 to begin technology development and demonstration toward a deep throttling, cryogenic Lunar Lander engine for use across multiple human and robotic lunar exploration mission segments with extensibility to Mars. The CECE program leverages the maturity and previous investment of a flight-proven hydrogen/oxygen expander cycle engine, the RL10, to develop and demonstrate an unprecedented combination of reliability, safety, durability, throttlability, and restart capabilities in a high-energy, cryogenic engine. NASA Marshall Space Flight Center and NASA Glenn Research Center personnel were integral design and analysis team members throughout the requirements assessment, propellant studies and the deep throttling demonstrator elements of the program. The testbed selected for the initial deep throttling demonstration phase of this program was a minimally modified RL10 engine, allowing for maximum current production engine commonality and extensibility with minimum program cost. In just nine months from technical program start, CECE Demonstrator No. 1 engine testing in April/May 2006 at PWR's E06 test stand successfully demonstrated in excess of 10:1 throttling of the hydrogen/oxygen expander cycle engine. This test provided an early demonstration of a viable, enabling cryogenic propulsion concept with invaluable system-level technology data acquisition toward design and development risk mitigation for both the subsequent CECE Demonstrator No. 2 program and to the future Lunar Lander Design, Development, Test and Evaluation effort.

Giuliano, Victor J.↗

NASA Crew Exploration Vehicle, Thermal Protection System, Lessons Learned

The Orion (CEV) thermal protection system (TPS) advanced development project (ADP) was initiated in late 2006 to reduce developmental risk by significant investment in multiple heat shield architectural solutions that can meet the needs both the Low Earth orbit (LEO) and Lunar return missions. At the same time, the CEV TPS ADP was also charged with developing a preliminary design for the heat shield to meet the PDR requirement and at the time of the PDR, transfer the design to Lockheed- Martin, the prime contractor. We reported on the developmental activities of the first 18 months at the IPPW5 in Bordeaux, France, last summer. In June 08, at the time of the IPPW6, the CEV TPS ADP would have nearly completed the preparation for the Orion PDR and would be close to the original three-year mark. We plan to report on the progress at the Atlanta workshop. In the past year, Orion TPS ADP investment in TPS Technology, especially in PICA ablative Heat-shield design, development, testing and engineering (DDTE) has paid off in enabling MSL mission to switch from SLA 561 V heat shield to PICA heat shield. CEV TPS ADP considered SLA 561 V as a candidate for LEO missions and our testing identified failure modes in SLA and as a result, we dropped SLA for further evaluation. This close synergy between two projects is a highly visible example of how investment in technology areas can and does benefit multiple missions. In addition, CEV TPS ADP has been able to revive the Apollo ablative system namely AVCOAT honeycomb architecture as an alternate to the baseline PICA architecture and we plan to report the progress we have made in AVCOAT. CEV TPS ADP has invested considerable resources in developing analytical models for PICA and AVCOAT, material property measurements that is essential to the design of the heat-shield, in arcjet testing, in understanding the differences between different arc jet facilities, namely NASA Ames, NASA JSC and Air Force's AEDC, and in Non-Destructive Evaluation (NDE), and in integration of and manufacturing heat shield as a system. The capabilities of the two heat shield systems including failure modes via testing and analysis, once established, can serve the Probe Community and future mission designers to inner and outer planetary exploration very well. For example, missions to Venus, Mars and Titan can use either one of the system by selecting the mission design parameters that utilizes the full characteristics of these system to make use of system efficiency that will result in reduced heat shield mass, system robustness that will enhance mission success and cost. We plan to present significant progresses of the past three years and highlight the significant contributions CEV TPS ADP Project has made to advance the state of the art in Thermal Protection System technology that has and will continue to benefit future entry probe missions.

NASA Crew Exploration Vehicle↗