Search NASA⌕ Search

SEARCH · Search NASA

Results for “dispatch schedule”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Predicting Ground Delay Program at an Airport Based on Meteorological Conditions

In this paper, we present two supervised-learning models, logistic regression and decision tree, to predict occurrence of ground delay program at an airport based on meteorological conditions and scheduled traffic demand. Such predictive capabilities can help the Federal Aviation Administration traffic managers and airline dispatchers to prepare mitigation strategies to reduce the impact of adverse weather. The models are applied to predict ground delay program occurrence at two major U.S. airports: Newark Liberty Intl. and San Francisco Intl. airports. The logistic regression model estimates the probability that a ground delay program will occur during a given hour. Decision tree, on the other hand, classifies an hour as a ground delay program or not based on the input variables. Results indicate that both models perform significantly better than a purely random prediction of ground delay program occurrence at the two airports. The logistic regression model performs better than the decision tree model. The degree to which various input variables impact the probability of ground delay program vary between the two airports. While the enroute convective weather is a dominant factor causing ground delay programs at New York airports, poor visibility and low cloud ceiling caused by marine stratus are major drivers of ground delay programs at San Francisco Intl. airport.

traffic flow management↗

Multi-stage charging and discharging of electric vehicle fleets

Fleets of electric vehicles will likely shift electricity demand, and the effect of upstream charging emissions will come from generation sources that are dispatched in response. This study proposes a multi-stage charging and discharging problem to translate low-cost energy transactions into vehicle dispatch decisions. A day-ahead charging optimization problem minimizes electricity purchases and marginal emissions damages, with energy transactions becoming targets in an optimization-based dispatch strategy for an on-demand shared autonomous electric vehicle (SAEV) fleet. The framework was tested for Austin, Texas, using an agent-based simulator. Fleets can schedule charging to lower daily power costs (averaging 15.5% or $\$0.79$/day/SAEV) while reducing health damages from generation-related pollution (2.8% or $\$0.43$/day/SAEV). Finally, fleet managers can increase profits ($\$8$ per SAEV per day) by adopting a multi-stage charging and discharging strategy that can serve more passengers per day than price-agnostic dispatch strategies.

33 ADVANCED PROPULSION SYSTEMS↗

Automated power management and control

A comprehensive automation design is being developed for Space Station Freedom's electric power system. A joint effort between NASA's Office of Aeronautics and Exploration Technology and NASA's Office of Space Station Freedom, it strives to increase station productivity by applying expert systems and conventional algorithms to automate power system operation. The initial station operation will use ground-based dispatches to perform the necessary command and control tasks. These tasks constitute planning and decision-making activities that strive to eliminate unplanned outages. We perceive an opportunity to help these dispatchers make fast and consistent on-line decisions by automating three key tasks: failure detection and diagnosis, resource scheduling, and security analysis. Expert systems will be used for the diagnostics and for the security analysis; conventional algorithms will be used for the resource scheduling.

Dolce, James L.↗

Economic dispatch for electricity merchant with energy storage and wind plant: State of charge based decision making considering market impact and uncertainties

Here this paper investigates how the market impact of electricity merchants and uncertainty of wind generation affect their co-optimized scheduling policy, specifically for merchants who have both energy storage and wind plants. In the existing literature, merchants' trading actions are usually assumed not to affect market prices; however, a large-scale energy storage merchant's actions can affect market prices. To this end, we approximate the electricity price by a linear function of the quantity of power traded by the merchant in the reward function to achieve decision-making incorporating the market impact. This paper utilizes the dynamic programming approach to analyze merchants' optimal multi-period decision-making incorporating market impact, uncertain wind generation, and energy storage constraints. First, our results demonstrate that for a merchant with co-located energy storage facilities and wind power plants, the energy storage's feasible state of charge (SOC) range can be segmented into four possible sub-ranges by three analytically developed SOC reference points. The unique optimal trading decision can be achieved by comparing the current energy inventory and the SOC references of the next period. Second, our results show that market impact and uncertainties substantially change the optimal storage scheduling policy by impacting the values of the reference points. To mitigate the negative effect of the merchant's market impact on buying and selling actions, the merchant may reduce the amount of generating or pumping electricity each period to maximize profit. Moreover, we identify and investigate the trade-off between market price and transaction quantity. Our findings provide co-optimized scheduling guidance for electricity merchants with co-located energy storage and renewable power plants systems.

17 WIND ENERGY↗

A coordination theory for intelligent machines

A formal model for the coordination level of intelligent machines is established. The framework of the coordination level investigated consists of one dispatcher and a number of coordinators. The model called coordination structure has been used to describe analytically the information structure and information flow for the coordination activities in the coordination level. Specifically, the coordination structure offers a formalism to (1) describe the task translation of the dispatcher and coordinators; (2) represent the individual process within the dispatcher and coordinators; (3) specify the cooperation and connection among the dispatcher and coordinators; (4) perform the process analysis and evaluation; and (5) provide a control and communication mechanism for the real-time monitor or simulation of the coordination process. A simple procedure for the task scheduling in the coordination structure is presented. The task translation is achieved by a stochastic learning algorithm. The learning process is measured with entropy and its convergence is guaranteed. Finally, a case study of the coordination structure with three coordinators and one dispatcher for a simple intelligent manipulator system illustrates the proposed model and the simulation of the task processes performed on the model verifies the soundness of the theory.

Wang, Fei-Yue↗

Multi-layered Energy Management Framework for Extreme Fast Charging Stations Considering Demand Charges, Battery Degradation, and Forecast Uncertainties

To achieve a cost-effective and expeditious charging experience for extreme fast charging station (XFCS) owners and electric vehicle (EV) users, the optimal operation of XFCS is crucial. It is however challenging to simultaneously manage the profit from energy arbitrage, the cost of demand charges, and the degradation of a battery energy storage system (BESS) under uncertainties. This paper, therefore, proposes a multi-layered multi-time scale energy flow management framework for an XFCS by considering long- and short-term forecast uncertainties, monthly demand charges reduction, and BESS life degradation. In the proposed approach, an upper scheduling layer (USL) ensures the overall operation economy and yields optimal scheduling of the energy resources on a rolling horizon basis, thereby considering the long-term forecast errors. A lower dispatch layer (LDL) takes the short-term forecast errors into account during the real-time operation of the XFCS. Per the latest research, monthly demand charges can be as high as 90% of the total monthly bills for EV fast charging stations; to this end, this paper takes the first attempt at the reduction of demand charges cost by considering the trade-off between the energy cost and monthly demand charges. Contrasting literature, this work allocates an energy reserve in the BESS stored energy to deal with the impact of short-term forecast errors on the optimized real-time operation of the XFCS. Moreover, degradation modeling considers the trade-off between short-term benefits and long-term BESS life degradation. As a result, case studies and a comparative analysis prove the efficacy of the proposed framework.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Federated Architecture for Secure and Transactive Distributed Energy Resource Management Solutions (FAST-DERMS)

This document provides system-level specifications for a federated architecture for secure and transactive distributed energy resource management solutions (FAST-DERMS), presents a solution, and describes operational concepts for the proposed solution. FAST-DERMS enables the provision of reliable, resilient, and secure transmission and distribution (T&D) grid services through the scalable aggregation and near-real-time management of utility-scale and small-scale distributed energy resources (DERs). We first present the principles and objectives of FAST-DERMS. Then, after discussing important system concepts, we present the specifications for FAST-DERMS and a solution that employs a distributed and federated control methodology in which the DERs connected to a single point of common coupling with the rest of the system, such as individual substations, are optimized coordinately to provide system-level grid services. FAST-DERMS aims to aggregate and coordinate the operations of DERs to support T&D grid operations. The key optimization and control component of this FAST-DERMS reference implementation is a flexible resource scheduler (FRS) that aggregates the DERs within a substation service area. These FRSs operate at the substation level and perform constrained economic dispatch of DERs, either directly or through a transactive market or aggregator, as shown in Figure ES-1. An FRS Coordinator at the distribution system operator (DSO) level aggregates distribution substations operated by FRSs and interfaces with the transmission system operator (TSO) to provide transmission services. FAST-DERMS also allows for the integration of the FRS Coordinator with an existing distribution utility management system that could be employed by the DSO to enhance distribution grid operations.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Dynamic Controllability and Dispatchability Relationships

An important issue for temporal planners is the ability to handle temporal uncertainty. Recent papers have addressed the question of how to tell whether a temporal network is Dynamically Controllable, i.e., whether the temporal requirements are feasible in the light of uncertain durations of some processes. We present a fast algorithm for Dynamic Controllability. We also note a correspondence between the reduction steps in the algorithm and the operations involved in converting the projections to dispatchable form. This has implications for the complexity for sparse networks.

controllability↗

Validation and Demonstration of Control System Functional Capabilities within the IES Plug-and-Play Simulation Environment

The concept of an integrated energy system (IES) is meant to combine different energy technologies in synergistic ways to achieve a more secure and economical energy supply. The RAVEN-based HYBRID framework is used to find the optimal installed capacity and the optimal economical dispatch of each component of the IES. The new RAVEN plugin for grid and capacity optimization (HERON) only addresses the limits that affect the production variables and the corresponding rates of variation (explicit constraints). However, other variables are subject to constraints, and the associated limits should be accounted for (implicit constraints). In particular, for the power dispatch problem, the optimization algorithm takes into account the limits on the electrical power output and the corresponding hourly power variations but does not consider other constraints on process variables whose response affects the service life of the IES. This report describes a scheme that allows accounting for implicit constraints without increasing the size of the optimization problem. To obtain a more accurate approximation of the nonlinear dynamic behavior, a parametric version of the dynamic mode decomposition with control (DMDc) algorithm was developed to derive the state-space representation matrices of the IES components at different scheduling parameter. Thanks to this approach, a more accurate approximation of the system response can be obtained, the limits imposed by thermal mechanical implicit constraints can be translated into power dispatch limits, and the feedbacks to HERON power dispatcher can be provided. To assess the developed methodology, a power dispatching test case composed of three power generating and storage units (Balance of Plant, Secondary Energy Source, Thermal Energy Storage) was developed. The power output of each one of the three units was optimized to meet the imposed time-dependent load demand trajectory and to maximize the IES profitability by meeting both the explicit and implicit constraints.

24 POWER TRANSMISSION AND DISTRIBUTION↗

The Hidden Flexibility of the Natural Gas Network for Electric Power Operations: A Case Study of a Near-Miss Winter Event

The U.S. power sector has become increasingly reliant on gas pipeline networks to deliver fuel to natural gas power plants. In addition to supplying relatively low-cost fuel, gas networks offer generators flexibility in their operations through the ability to deliver fuel when needed by using gas storage facilities or linepack if the gas network is at an operating point below its design capacity. However, disruptions or stress events on the gas network - like those occurring in the Northeast and Texas in recent years - can result in limitations on gas availability to generators at times when generation is in short supply. Here we examine a period of stress that occurred in the winter of 2022 in the Western United States. Using data on the region's natural gas pipeline network and electric generators, we build an integrated gas and electric model that closely replicates the actual dispatch of the period. We then evaluate the implications of removing flexibility employed by the gas network operator, which during that period curtailed scheduled gas deliveries to other parties to increase deliveries to natural gas power plants, which requested more gas than initially forecasted. We find that without the flexibility supplied by the gas network operator, there would have been curtailment of gas generation due to gas offtake constraints, requiring the power system operator to redispatch relying on more expensive generation or to potentially shed load. A sensitivity exploring a wind drought further exacerbates the strain, illustrating the potential challenge of managing gas and grid interactions as systems move to higher shares of variable renewable electricity. Based on this example, we discuss potential coordination strategies between the two system operators to ensure that the power system can successfully utilize and rely on the flexibility offered by natural gas networks.

03 NATURAL GAS↗

On Why It Is Impossible to Prove that the BDX90 Dispatcher Implements a Time-sharing System

The Software Implemented Fault Tolerance SIFT system, is written in PASCAL except for about a page of machine code. The SIFT system implements a small time sharing system in which PASCAL programs for separate application tasks are executed according to a schedule with real time constraints. The PASCAL language has no provision for handling the notion of an interrupt such as the B930 clock interrupt. The PASCAL language also lacks the notion of running a PASCAL subroutine for a given amount of time, suspending it, saving away the suspension, and later activating the suspension. Machine code was used to overcome these inadequacies of PASCAL. Code which handles clock interrupts and suspends processes is called a dispatcher. The time sharing/virtual machine idea is completely destroyed by the reconfiguration task. After termination of the reconfiguration task, the tasks run by the dispatcher have no relation to those run before reconfiguration. It is impossible to view the dispatcher as a time-sharing system implementing virtual BDX930s running concurrently when one process can wipe out the others.

Boyer, R. S.↗

Post-Disturbance Dynamic Distribution System Restoration with DGs and Mobile Resources

Distributed generations (DGs) can act as emergency power supplies when distribution systems suffer from outages. However, the generation capabilities of DGs are generally limited by a number of factors including weather conditions, fuel limitations, etc. In this context, mobile resources that are able to reallocate resources to desired locations are regarded as important complements to conventional fixed DGs in assisting distribution system restoration. In this paper, a distribution system restoration model with DGs and mobile resources is proposed. Firstly, the dispatch and allocation of mobile resources are modeled with respect to the characteristics of the traffic network. Then the developed mobile resource models are integrated into the distribution system restoration model to co-optimize the scheduling of DGs and mobile resources. Uncertainty factors are managed by a model predictive control approach so that system operators can dynamically adjust the restoration strategy with the up-to-date information. The effectiveness of the proposed method is validated through an IEEE 13-bus test system.

distributed generations (DGs)↗

An investigation of the use of temporal decomposition in space mission scheduling

This research involves an examination of techniques for solving scheduling problems in long-duration space missions. The mission timeline is broken up into several time segments, which are then scheduled incrementally. Three methods are presented for identifying the activities that are to be attempted within these segments. The first method is a mathematical model, which is presented primarily to illustrate the structure of the temporal decomposition problem. Since the mathematical model is bound to be computationally prohibitive for realistic problems, two heuristic assignment procedures are also presented. The first heuristic method is based on dispatching rules for activity selection, and the second heuristic assigns performances of a model evenly over timeline segments. These heuristics are tested using a sample Space Station mission and a Spacelab mission. The results are compared with those obtained by scheduling the missions without any problem decomposition. The applicability of this approach to large-scale mission scheduling problems is also discussed.

Bullington, Stanley E.↗

Agent-Based Coordination Scheme for PV Integration (ABC4PV)

Renewables and especially photovoltaics (PV) have benefitted significantly from a host of incentives and policies targeted toward enhanced integration and adoption of specific energy technologies. However, with the push to move forward into a subsidy-free market framework, behind-the-meter residential PV applications have generally struggled to retain their value (unlike utility scale and commercial projects) [1]. This project focused on developing control-theoretic solutions aimed at improving the integration and interaction of behind-the-meter residential PV with other distribution system assets (controllable and non-controllable) to enhance the integrated value of residential PV. To this end, a suite of decentralized control methodologies have been developed to enable effective coordination and control of behind-the-meter residential load customers’ PV, battery storage systems (BSS), controllable loads and other similar assets within a distribution feeder. This interaction aims at procuring energy savings and, thus, energy bill savings. The main source of savings is drawn from reducing the effect of demand charge pricing and is realized at the feeder level, assuming community level interaction and management among the aforementioned assets. Optimal control of the assets is implemented with a distributed optimization methodology, leveraging consensus-based algorithms. The results gathered from the optimal control simulations demonstrates that the savings can be duly achieved and the algorithm decision times (to dynamically control asset set points, for example) are fast. As for the overall efficiency of PV+BSS systems, to procure energy savings from curtailment of the demand charge pricing effects, the optimal control is set up so as to minimize the variance of the load for all customers, throughout a feeder and throughout time in a rolling horizon scheduling with model predictive control. The control takes into account inter-temporal electrochemical storage (battery) degradation costs: specifically, we have developed a long-term lifetime model for the BSS that weighs in the effect of the degradation factor in the dispatch formulations, thus, a considerable operating cost that affects energy decision making. The levelized cost of energy (LCOE – redefined for the purpose of quantifying asset integration effectiveness through the customers’ energy cost) is shown to be below the threshold set for the combined PV+BSS topology of $ 0.14/kWh for multiple cases of PV penetration all the way up to 50%, provided that a policy of shared ownership of and savings is in place. Further, the LCOE calculated for the case before the deployment PV+BSS systems is also achievable, i.e. the deployment of PV+BSS, if planned and scheduled optimally. will have no effect on customers’ energy costs. From the control methodology viewpoint, the developed consensus-based algorithms are shown to converge for a wide range of problem cases (spanning normal operating scenarios and contingencies), guaranteeing dispatch solutions under forecasting errors, communication break-downs and cyber-security attacks. The proposed control solutions are scalable and real-time implementable, with dispatch computations and device set-point updates converging in less than 2s in most practical instances of the above events.

14 SOLAR ENERGY↗

Enabling Low-Overhead HT-HPC Workflows at Extreme Scale using GNU Parallel

GNU Parallel is a versatile and powerful tool for process parallelization widely used in scientific computing. This paper demonstrates its effective application in high-performance computing (HPC) environments, particularly focusing on its scalability and efficiency in executing large-scale high-throughput high-performance computing (HT-HPC) workflows. Through real-world examples, we highlight GNU Parallel’s performance across various HPC workloads, including GPU computing, container-based workloads, and node-local NVMe storage. Our results on two leading supercomputers, OLCF’s Frontier and NERSC’s Perlmutter, showcase GNU Parallel’s rapid process dispatching ability and its capacity to maintain low overhead even at extreme scales. We explore GNU Parallel’s application in massive parallel file transfers using a scheduled Data Transfer Node (DTN) cluster, emphasizing its broad utility in diverse scientific workflows. Beyond its direct application as a viable workflow manager, GNU Parallel can be employed in conjunction with other workflow systems as a "last-mile" parallelizing driver and as a quick prototyping tool to design and extract parallel profiles from application executions. We then argue that the potential for GNU Parallel to transform workflow management at extreme scales is substantial, paving the way for more efficient and effective scientific discoveries.

Maheshwari, Ketan↗

A Generation-Storage Coordination Dispatch Strategy for Power System Based on Causal Reinforcement Learning

In the backdrop of global energy transformation, power systems integrating high proportions of renewable energy sources are facing unprecedented challenges in operational stability and dispatch efficiency. To address these challenges, this study introduces a generation-storage coordination real-time dispatch strategy based on Causal Power System Dynamic Reinforcement Learning (CPSDRL). Diverging from traditional reinforcement learning approaches, CPSDRL innovatively incorporates causal inference within the state prediction model - the crux of model-based reinforcement learning - thereby establishing the Power Causal Dynamic Model (PCDM). Assisted by the prior knowledge of power systems, the model significantly enhances prediction accuracy and reliability through a two-stage training process. Utilizing PCDM, this study further applies a direct policy search algorithm to optimize the real-time dispatch strategy. Experimental results indicate that the proposed method improves the stability of generation-storage coordination real-time dispatch and exhibits competitive advantages in sample efficiency and computational speed, compared to traditional model-based and model-free reinforcement learning algorithms. This method is expected to enhance the practicality and adaptability of causal reinforcement learning techniques in power system scheduling and control.

causal reinforcement learning↗

Stochastic Look-Ahead Commitment: A Case Study in MISO

This paper introduces the Stochastic Look Ahead Commitment (SLAC) software prototyped and tested for the Midcontinent Independent System Operator (MISO) look ahead commitment process. SLAC can incorporate hundreds of wind, load, and net scheduled interchange (NSI) uncertainty scenarios. It uses a progressive hedging method to solve a novel two-stage stochastic unit commitment. The first stage commitment decisions, made only for those generators whose decision to commit or not in each time period cannot be deferred, can cover the uncertainties within the next three hours. The second stage includes both the dispatch for each of the scenarios and the commitment decisions that can be deferred. Study results on 15 MISO production days show that SLAC may bring economic and reliability benefits under uncertainty.

MATHEMATICS AND COMPUTING↗