Search NASASearch

SEARCH · Search NASA

Results for “energy planning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

350 records · Page 6

Ares I-X Ground Diagnostic Prototype

Automating prelaunch diagnostics for launch vehicles offers three potential benefits. First, it potentially improves safety by detecting faults that might otherwise have been missed so that they can be corrected before launch. Second, it potentially reduces launch delays by more quickly diagnosing the cause of anomalies that occur during prelaunch processing. Reducing launch delays will be critical to the success of NASA's planned future missions that require in-orbit rendezvous. Third, it potentially reduces costs by reducing both launch delays and the number of people needed to monitor the prelaunch process. NASA is currently developing the Ares I launch vehicle to bring the Orion capsule and its crew of four astronauts to low-earth orbit on their way to the moon. Ares I-X will be the first unmanned test flight of Ares I. It is scheduled to launch on October 27, 2009. The Ares I-X Ground Diagnostic Prototype is a prototype ground diagnostic system that will provide anomaly detection, fault detection, fault isolation, and diagnostics for the Ares I-X first-stage thrust vector control (TVC) and for the associated ground hydraulics while it is in the Vehicle Assembly Building (VAB) at John F. Kennedy Space Center (KSC) and on the launch pad. It will serve as a prototype for a future operational ground diagnostic system for Ares I. The prototype combines three existing diagnostic tools. The first tool, TEAMS (Testability Engineering and Maintenance System), is a model-based tool that is commercially produced by Qualtech Systems, Inc. It uses a qualitative model of failure propagation to perform fault isolation and diagnostics. We adapted an existing TEAMS model of the TVC to use for diagnostics and developed a TEAMS model of the ground hydraulics. The second tool, Spacecraft Health Inference Engine (SHINE), is a rule-based expert system developed at the NASA Jet Propulsion Laboratory. We developed SHINE rules for fault detection and mode identification. The prototype uses the outputs of SHINE as inputs to TEAMS. The third tool, the Inductive Monitoring System (IMS), is an anomaly detection tool developed at NASA Ames Research Center and is currently used to monitor the International Space Station Control Moment Gyroscopes. IMS automatically "learns" a model of historical nominal data in the form of a set of clusters and signals an alarm when new data fails to match this model. IMS offers the potential to detect faults that have not been modeled. The three tools have been integrated and deployed to Hangar AE at KSC where they interface with live data from the Ares I-X vehicle and from the ground hydraulics. The outputs of the tools are displayed on a console in Hangar AE, one of the locations from which the Ares I-X launch will be monitored. In a previous publication, we discussed how we selected the three tools based primarily on their ability to be certified for human spaceflight and described our plans for the prototype. This abstract is due October 23, 2009, and the Ares I-X launch is currently scheduled for October 27, 2009. If this abstract is accepted, then the full paper will describe how the prototype performed before the launch. It will include an analysis of the prototype's accuracy, including false-positive rates, false-negative rates, and receiver operating characteristics (ROC) curves. It will also include a description of the prototype's computational requirements, including CPU usage, main memory usage, and disk usage. If the prototype detects any faults during the prelaunch period then the paper will include a description of those faults. Similarly, if the prototype has any false alarms then the paper will describe them and will attempt to explain their causes. Also, the paper will describe the three tools and how they are used in the prototype. It will include a description of the TEAMS models of the Ares I-X first-stage TVC and associated ground hydraulics and how we adapted the TVC model for use in real-time diagnostics. It will describe the SHINE rules used for fault detection and mode identification and the software architecture that interfaces the various pieces of existing software that are part of the prototype to one another. It will describe how we selected the sensor values and commands that were used to train the IMS model and how we optimized the number of clusters in the IMS model. It will include screen shots of the graphical display that we developed in Java to display the outputs of the three tools. Because Ares I-X data was not yet available to us while we were developing the prototype, we used historical data from the Space Shuttle's Solid Rocket Booster (SRB) TVCs and the associated ground hydraulics to train IMS and to test the entire prototype. Because most of the failure modes that we modeled have never occurred in the Shuttle we inserted simulated failures into the Shuttle data. The Ares I-X first-stage TVC is very similar to the SRB TVC and we expect the data will be very similar. After the launch, we will determine how similar the data actually is and report how any differences in the data affected the diagnostic accuracy of the prototype. Finally, although we did not get the prototype certified, we designed it in a way that it could be certified and wrote a preliminary certification plan. The paper will include a brief summary of how we considered the need for certification in the design of the prototype, how we tested the prototype before deploying it to Hangar AE, and how we would propose to get it certified if it were deployed as an operational system. The paper will conclude with a description of some of the challenges we faced and some of the lessons learned in developing and deploying the prototype.

International Space Station

Artemis I Orion ESM Propulsion System Engine Performance

NASA's Orion spacecraft transports humans and cargo into cislunar space for the Artemis program. The European Service Module (ESM), supplied by ESA and its European industry partners, provides Orion with power and in-space propulsion. The Orion-ESM propulsion system is a bipropellant hypergolic propulsion system using monomethyl hydrazine (MMH) and nitrogen tetroxide (MON-3). Primary translational propulsion is provided by the Orbital Maneuvering System Engine(OMS-E), with backup translational propulsion provided by eight Auxiliary thrusters (AUX). Attitude control and small translational maneuvers are provided by twenty four Reaction Control System (RCS) engines. The 2022 Artemis I mission was the first integrated flight test of the Orion-ESM spacecraft and its propulsion system. The OMS-E used on Artemis I was a refurbished Space Shuttle OMS-E that previously flew on nineteen missions ranging from STS-41G in 1984 to STS-112 in 2002. The Auxiliary engines are modified Aerojet Rocketdyne R4D-11 engines produced specifically for the Orion program. The RCS engines are Ariane Group engines originally used for the Automated Transfer Vehicle (ATV) program. This paper will discuss the unique operational requirements for each engine on Orion and the development and qualification effort sat both the engine and system-level that were completed to enable a successful Artemis I mission. Next the paper will evaluate the in-flight performance of the engines during the Artemis I mission showing nominal performance as expected. Additionally, comparisons to models will be presented showing very good correlation. Finally, the paper will address the plan for the engines on future Orion missions and the evolution of the system operation.

Liquid Propulsion Systems

Artemis I Orion ESM Propulsion System Engine Performance

NASA's Orion spacecraft transports humans and cargo into cislunar space for the Artemis program. The European Service Module (ESM), supplied by ESA and its European industry partners, provides Orion with power and in-space propulsion. The Orion-ESM propulsion system is a bipropellant hypergolic propulsion system using monomethyl hydrazine (MMH) and nitrogen tetroxide (MON-3). Primary translational propulsion is provided by the Orbital Maneuvering System Engine(OMS-E), with backup translational propulsion provided by eight Auxiliary thrusters (AUX). Attitude control and small translational maneuvers are provided by twenty four Reaction Control System (RCS) engines. The 2022 Artemis I mission was the first integrated flight test of the Orion-ESM spacecraft and its propulsion system. The OMS-E used on Artemis I was a refurbished Space Shuttle OMS-E that previously flew on nineteen missions ranging from STS-41G in 1984 to STS-112 in 2002. The Auxiliary engines are modified Aerojet Rocketdyne R4D-11 engines produced specifically for the Orion program. The RCS engines are Ariane Group engines originally used for the Automated Transfer Vehicle (ATV) program. This paper will discuss the unique operational requirements for each engine on Orion and the development and qualification effort sat both the engine and system-level that were completed to enable a successful Artemis I mission. Next the paper will evaluate the in-flight performance of the engines during the Artemis I mission showing nominal performance as expected. Additionally, comparisons to models will be presented showing very good correlation. Finally, the paper will address the plan for the engines on future Orion missions and the evolution of the system operation.

Reuse

Model Correlation and Thermal Analysis of xEMU Boot at Lunar South Pole Temperatures

The National Aeronautics and Space Administration (NASA) Artemis program plans to send astronauts to the lunar south pole, a region of the moon that is colder than previous lunar missions and low earth orbit operations. The spacesuit boots that will be used on these missions will be directly impacted by these extremely cold temperatures (down to ~50 K). To assess the performance of the Exploration Extravehicular Mobility Unit (xEMU) lunar boot in these extreme temperatures, the boot was tested at the Jet Propulsion Lab (JPL) in the Cryogenic Ice Transfer, Acquisition Development, and Excavation Laboratory (CITADEL) thermal vacuum (TVAC) chamber. This data was used to correlate thermal models to predict operational performance of the boots on the lunar south pole. This paper documents the data analysis, thermal boot model correlation, and operational predictions conducted using data from the xEMU TVAC test. Data from the test series was used to determine expected thermal conductances within the boot and between the boot and environment. These conductances were used to correlate a Thermal Desktop model of the xEMU boot across 10 different test points which varied external temperature, internal boot ventilation flowrate, and contact pressure. The correlated model was then used to predict operational performance in the lunar south pole. While the predictions indicate promising evidence for performance of the boots at the 100K test point, there is still substantial uncertainty in performance, particularly at the 48K test point. The results of this test series and model correlation stress the importance of improved testing for characterizing the expected thermal resistance between the outside of the boot and the lunar surface.

xEMU

Model Correlation and Thermal Analysis of xEMU Boot at Lunar South Pole Temperatures

The National Aeronautics and Space Administration (NASA) Artemis program plans to send astronauts to the lunar south pole, a region of the moon that is colder than previous lunar missions and low earth orbit operations. The spacesuit boots that will be used on these missions will be directly impacted by these extremely cold temperatures (down to ~50 K). To assess the performance of the Exploration Extravehicular Mobility Unit (xEMU) lunar boot in these extreme temperatures, the boot was tested at the Jet Propulsion Lab (JPL) in the Cryogenic Ice Transfer, Acquisition Development, and Excavation Laboratory (CITADEL) thermal vacuum (TVAC) chamber. This data was used to correlate thermal models to predict operational performance of the boots on the lunar south pole. This paper documents the data analysis, thermal boot model correlation, and operational predictions conducted using data from the xEMU TVAC test. Data from the test series was used to determine expected thermal conductances within the boot and between the boot and environment. These conductances were used to correlate a Thermal Desktop model of the xEMU boot across 10 different test points which varied external temperature, internal boot ventilation flowrate, and contact pressure. The correlated model was then used to predict operational performance in the lunar south pole. While the predictions indicate promising evidence for performance of the boots at the 100K test point, there is still substantial uncertainty in performance, particularly at the 48K test point. The results of this test series and model correlation stress the importance of improved testing for characterizing the expected thermal resistance between the outside of the boot and the lunar surface.

thermal analysis

3D Woven Mid-Density Carbon Phenolic (3MDCP) Full-Scale Heatshield Development for Mars Sample Return (MSR) Earth Entry System (EES)

The Mars Sample Return (MSR) mission will be returning samples of Martian soil to Earth. The samples will be returned in the Earth Entry System (EES). The EES capsule is protected by a new thermal protection system; the 3-Dimensionally Woven, Mid-Density, Carbon Phenolic (3MDCP) material which is derived from the Heatshield for Extreme Entry Environment Technology (HEEET). The baseline 3MDCP design is a single piece thermal protection system that avoids the manufacturing and certification challenges associated with a tiled configuration. A 3MDCP heatshield begins as a flat woven preform that is formed to the final heatshield shape and then infused with phenolic resin. A NASA Ames lead team, in collaboration with Spirit Textiles (formerly TEAM Inc.), Fiber Materials Inc. (FMI, a Spirit AeroSystems Company), and Kratos SRE, has been developing and demonstrating the processes to fabricate the 3MDCP heatshield and characterize the resulting properties. The process of forming the flat woven preform into the final heatshield shape, a sphere-cone geometry with a 52.5° cone angle, involves local but substantial movement of the yarns in the weave. This results in continuous fibers across the single piece heatshield, albeit with property variations between different regions of the heatshield. This presentation will provide a high-level status of 3MDCP development for the MSR EES heatshield. This will include an overview of the manufacturing processes with an emphasis on the impact of forming on fiber orientation, material properties, and performance. Results comparing preliminary formed and flat materials will be shown. Additionally, the presentation will layout the broader plan for property testing and tie-in to aerothermal performance.

Peter Edward Marshall

The Relevance of the VIPER Mission to NASA’s Artemis Human Exploration of the Moon

NASA has ambitious plans to send astronaut crews to the south polar region of the Moon and explore this lunar terrain with humans for the first time through a series of Artemis missions. Artemis will provide economic benefits, drive technological advancement, and inspire the next generation of explorers. Simultaneously, Artemis presents a unique opportunity for humans to conduct high-priority planetary science in situ in the south polar region of the Moon. Prior to human exploration, landed robotic precursor investigations can provide valuable information to reduce risk and maximize discovery and productivity of subsequent crewed missions. NASA’s Volatiles Investigating Polar Exploration Rover (VIPER) is a robotic mission designed to explore and characterize the lunar south polar region prior to crewed Artemis landed missions. VIPER is designed to explore multiple thermal regimes to characterize the lunar polar environment and regolith properties, and to explore for surface and subsurface ices. Each of these objectives are key for both scientific investigation and to detect and assess volatile deposits to support in situ resource utilization (ISRU) and a sustained human presence on the Moon. VIPER would also operate with a real-time mission operations architecture with relevance and feed-forward to Artemis crewed operations on the lunar surface. VIPER would provide key information regarding the lunar environment, scientific exploration, technologies, and real-time operations to optimize the valuable surface exploration time of Artemis crew members while simultaneously reducing risk to crew and increasing health and human safety on the lunar surface.

Jennifer L Heldmann

A Review of Pump Package Assembly Anomalies and Demonstration to Gain Motor Controller Replacement Capability

The International Space Station (ISS) generates heat within the US modules from systems used to operate the station, maintain crew health, and conduct science experiments in the orbiting laboratory. The Internal Thermal Control System (ITCS) collects this heat in water loops and transfers it to the external ammonia system for rejection to space. The ITCS uses six Pump Package Assemblies (PPA) as the motive force to circulate the water within the Lab, Node 2, and Node 3 (Node 1 is parasitic to the Lab and Node 3 ITCS loops). In the life of ISS, 3 PPAs have had to be replaced and 2 PPAs are currently showing signs of degradation. The first PPA to fail in 2003 was due to early coolant chemistry issues; the remaining pump failures and current pump degradations are determined to be related to the Pump/Fan Motor Controller (PFMC), with their individual signatures all being unique to this point. The PFMC of one of the failed PPAs was returned and testing confirmed its sub-components to be the root cause of the PPA failure. Due to the relative size and weight of the standalone PFMC in comparison to the integrated assembly, it is desired, from a launch and on-orbit stowage perspective, to replace the PFMC component of the degraded PPA instead of the entire PPA. The PPA was not designed for this capability, so on the ground demonstrations are planned using crew tools to show that the PFMC can be replaced on-orbit while maintaining full functionality. This paper will focus on the signatures of the two most recent PPA failures and the two PPAs showing signs of degradation, in addition to presenting the findings from the PFMC demonstration effort.

Aaron Rodriguez

A Review of Pump Package Assembly Anomalies and Demonstration to Gain Motor Controller Replacement Capability

The International Space Station (ISS) generates heat within the US modules from systems used to operate the station, maintain crew health, and conduct science experiments in the orbiting laboratory. The Internal Thermal Control System (ITCS) collects this heat in water loops and transfers it to the external ammonia system for rejection to space. The ITCS uses six Pump Package Assemblies (PPA) as the motive force to circulate the water within the Lab, Node 2, and Node 3 (Node 1 is parasitic to the Lab and Node 3 ITCS loops). In the life of ISS, 3 PPAs have had to be replaced and 2 PPAs are currently showing signs of degradation. The first PPA to fail in 2003 was due to early coolant chemistry issues; the remaining pump failures and current pump degradations are determined to be related to the Pump/Fan Motor Controller (PFMC), with their individual signatures all being unique to this point. The PFMC of one of the failed PPAs was returned and testing confirmed its sub-components to be the root cause of the PPA failure. Due to the relative size and weight of the standalone PFMC in comparison to the integrated assembly, it is desired, from a launch and on-orbit stowage perspective, to replace the PFMC component of the degraded PPA instead of the entire PPA. The PPA was not designed for this capability, so on the ground demonstrations are planned using crew tools to show that the PFMC can be replaced on-orbit while maintaining full functionality. This paper will focus on the signatures of the two most recent PPA failures and the two PPAs showing signs of degradation, in addition to presenting the findings from the PFMC demonstration effort.

Aaron Rodriguez

Hot Water, Cold Reality: Feasibility Assessment of Iodine Removal in Heated Spacecraft Potable Water Systems

The current eXploration Potable Water Dispenser (xPWD) design removes iodine upstream of the heated leg due to concerns with the Activated Carbon and Ion Exchange (ACTEX) functionality in hot water, leaving the downstream volume without residual biocide. The NESC determined that this non-iodinated volume is a concern for microbial growth during exploration missions and proposed 33 biocide architecture options for future missions that could address this concern. The top-ranked architecture out of the report was Option 1: moving the iodine removal media as close to the dispensing needle as possible to minimize the wetted components without biocide in the xPWD. Three main challenges were identified with this proposed configuration. First, the hot water at 175 ± 25 °F is a concern for the potential physical degradation of the ion exchange resin and lowered adsorption capacity in activated carbon. Second, moving the ACTEX or alternative sorption media closer to the dispense needle increases the unheated volume downstream of the heater, challenging the ability for dispensed water to meet temperature requirements. Finally, bubbles evolved from dissolved gas coming out of solution in the heater could clog or reduce the efficiency of the sorption media. To address the first challenge, more thermally robust ion exchange resins were identified and adsorption capacity tests were planned and will be discussed in a companion ICES paper (ICES-2026-5). To address the dispense temperature concerns, allowable bed size and architectural configuration changes are proposed. The value of adding phase separators to remove bubbles and potential implementation schemes are discussed. These findings support the development of potable water systems resilient to microbial risks during long-duration space missions.

Biocide

Hot Water, Cold Reality: Feasibility Assessment of Iodine Removal in Heated Spacecraft Potable Water Systems

The current eXploration Potable Water Dispenser (xPWD) design removes iodine upstream of the heated leg due to concerns with the Activated Carbon and Ion Exchange (ACTEX) functionality in hot water, leaving the downstream volume without residual biocide. The NESC determined that this non-iodinated volume is a concern for microbial growth during exploration missions and proposed 33 biocide architecture options for future missions that could address this concern. The top-ranked architecture out of the report was Option 1: moving the iodine removal media as close to the dispensing needle as possible to minimize the wetted components without biocide in the xPWD. Three main challenges were identified with this proposed configuration. First, the hot water at 175 ± 25 °F is a concern for the potential physical degradation of the ion exchange resin and lowered adsorption capacity in activated carbon. Second, moving the ACTEX or alternative sorption media closer to the dispense needle increases the unheated volume downstream of the heater, challenging the ability for dispensed water to meet temperature requirements. Finally, bubbles evolved from dissolved gas coming out of solution in the heater could clog or reduce the efficiency of the sorption media. To address the first challenge, more thermally robust ion exchange resins were identified and adsorption capacity tests were planned and will be discussed in a companion ICES paper (ICES-2026-5). To address the dispense temperature concerns, allowable bed size and architectural configuration changes are proposed. The value of adding phase separators to remove bubbles and potential implementation schemes are discussed. These findings support the development of potable water systems resilient to microbial risks during long-duration space missions.

PWD

Review of European Microgravity Measurements

AA In a French/Russion cooperation, CNES developed a microgravity detection system for analyzing the Mir space station micro-g-environment for the first time. European efforts to characterize the microgravity (1/9) environment within a space laboratory began in the late seventies with the design of the First Spacelab Mission SL-1. Its Material Science Double Rack was the first payload element to carry its own tri-axial acceleration package. Even though incapable for any frequency analysis, the data provided a wealth of novel information for optimal experiment and hardware design and operations for missions to come. Theoretical investigations under ESA contract demonstrated the significance of the detailed knowledge of micro-g data for a thorough experiment analysis. They especially revealed the high sensitivity of numerous phenomena to low frequency acceleration. Accordingly, the payloads of the Spacelab missions D-1 and D-2 were furnished with state-of-the-art detection systems to ensure frequency analysis between 0.1 and 100 Hz. The Microgravity Measurement Assembly (MMA) of D-2 was a centralized system comprising fixed installed as well as mobile tri-axial packages showing real-time data processing and transmission to ground. ESA's free flyer EURECA carried a system for continuous measurement over the entire mission. All EURECA subsystems and experimental facilities had to meet tough requirements defining the upper acceleration limits. In a French/Russion cooperation, CNES developed a mi crogravity detection system for analyzing the Mir space station micro-g-environment for the first time. An approach to get access to low frequency acceleration between 0 and 0.02 Hz will be realized by QSAM (Quasi-steady Acceleration Measurement) on IML-2, complementary to the NASA system Spacelab Acceleration Measurement System SAMS. A second flight of QSAM is planned for the Russian free flyer FOTON.

H Hamacher

Multidisciplinary Design Optimization and Analysis of an Open Rotor Stage: Part 1

Successful design of open rotor propulsors requires effective analysis across multiple disciplines, including aerodynamics, acoustics, and structures. A viable design must not only be efficient but must also produce an acceptable level of noise and meet all static and dynamic structural requirements. For design and optimization, this is especially challenging because running high fidelity analyses is resource-intensive, and optimizing a design may require many thousands of cases to be analyzed. For this reason, the NASA team has applied design methodology that utilizes low-cost aerodynamic methods, machine learning models, and high-fidelity analyses when necessary. This includes standard two-dimensional methods such as throughflow analysis and quasi-3D blade-to-blade CFD, as well as some newly developed methods. Optimization using 3D CFD is necessary to maximize performance, and this is considered as well. All optimizations are carried out subject to structural constraints evaluated using finite element analysis. Doing this accurately requires a robust trunnion design, capable of pitching the blade between cruise and takeoff conditions while maintaining acceptable factor of safety. Hot to cold analysis must also be applied in order to correctly determine the as-manufactured shape. For acoustics, the unsteady pressures on the blade surfaces must be predicted, and this can be done either through full-annulus unsteady CFD or through a nonlinear harmonic method (NLH). NLH can run much faster, allowing some acoustic considerations to be made earlier in the design process. The design process is ongoing, and this presentation will review the current status and planned next steps. This part of the talk will focus on aerodynamic performance and be followed by a talk on structures and acoustics.

Design

Plume Impingement Software Module for Real-Time Proximity Operations

Successfully executing proximity operations in space, such as docking or in-orbit servicing, requires sophisticated spacecraft design that accounts for induced environments. As a chaser vehicle’s attitude control thrusters fire, they create rarefied plumes that can impact the target vehicle, with the potential to overload components, exceed thermal limits, and spin the target vehicle out of control. High-fidelity simulations of the thruster plume impingement environment require the direct simulation Monte Carlo (DSMC) method, but DSMC is too computationally expensive to simulate proximity operations that involve thousands of thruster firings. For this analysis to be tractable, engineering models of the plume flowfield and impingement events are used to simulate these trajectories [1]. Currently, on-orbit plume impingement environments are modeled through an inefficient open-loop analysis cycle where the vehicle’s flight controller and plume impingement teams iterate on the trajectories until they pass the target vehicle’s plume requirements. As complex on-orbit missions evolve and become more frequent, lengthy design cycles will become operational bottlenecks. To address this gap, this work develops an advanced plume impingement module capable of operating at real-time scale that can be integrated with existing mission planning tools and onboard flight systems. The plume module leverages state-of-the-art plume simulation techniques [2] to deliver fast, physics-based impingement predictions in a software architecture that can be tailored to diverse proximity operations scenarios. A prototype of this plume impingement module is built to demonstrate the feasibility of real-time performance. This prototype completes plume impingement calculations in microseconds per target geometry mesh point. The software serves as a foundational capability for plume-aware trajectory design, operational risk assessment, and future autonomous decision-making systems.

Plume Impingement

Surveyor Project Final Report: Part 1 - Project Description and Performance, Volume 1

The Surveyor Project planned and conducted seven unmanned lunar missions for which spacecraft were launched between May 1966 and January 1968. Each of the spacecraft was successfully launched with the then newly developed Atlas/Centaur vehicle which utilized for the first time a high-specific-impulse, liquid hydrogen/liquid oxygen fueled stage. Five of the spacecraft successfully soft-landed and returned a great quantity of engineering and scientific data on extensive postlanding operations, accomplishing all mission and project objectives. Four of the spacecraft soft-landed at selected mare sites to provide data which were required to support the Apollo Program. The final spacecraft was then successfully used for scientific investigation of a contrasting site in the rugged lunar highlands. Surveyor was a fully attitude-stabilized spacecraft designed to receive and execute a wide variety of earth commands, as well as to perform certain automatic functions including the critical terminal-descent and soft-landing sequences. Significant new and advanced subsystems that were developed and/or used in combination to enable Surveyor to execute the complex terminal phase of flight were: (1) a solid-propellant main retro motor, (2) throttlable liquid-propellant vernier engines (also used for midcourse velocity correction), (3) highly sensitive velocity- and altitude-sensing radars, and (4) an automatic closed-loop guidance and control system. The first Surveyor spacecraft carried a survey television camera which, together with other engineering instrumentation, obtained in-flight and postlanding data. The complement of instruments carried on later missions included various combinations of the following additional devices: (1) a soil mechanics/surface sampler instrument for picking, digging, and handling lunar surface material; (2) an alpha scattering instrument for performing a chemical analysis of the lunar surface material; and (3) magnets attached to the spacecraft for determining magnetic properties of the soil.

Jet Propulsion Laboratory

Surveyor Project Final Report: Part 1 - Project Description and Performance, Volume 2

The Surveyor Project planned and conducted seven unmanned lunar missions for which spacecraft were launched between May 1966 and January 1968. Each of the spacecraft was successfully launched with the then newly developed Atlas/Centaur vehicle which utilized for the first time a high-specific-impulse, liquid hydrogen/liquid oxygen fueled stage. Five of the spacecraft successfully soft-landed and returned a great quantity of engineering and scientific data on extensive postlanding operations, accomplishing all mission and project objectives. Four of the spacecraft soft-landed at selected mare sites to provide data which were required to support the Apollo Program. The final spacecraft was then successfully used for scientific investigation of a contrasting site in the rugged lunar highlands. Surveyor was a fully attitude-stabilized spacecraft designed to receive and execute a wide variety of earth commands, as well as to perform certain automatic functions including the critical terminal-descent and soft-landing sequences. Significant new and advanced subsystems that were developed and/or used in combination to enable Surveyor to execute the complex terminal phase of flight were: (1) a solid-propellant main retro motor, (2) throttlable liquid-propellant vernier engines (also used for midcourse velocity correction), (3) highly sensitive velocity- and altitude-sensing radars, and (4) an automatic closed-loop guidance and control system. The first Surveyor spacecraft carried a survey television camera which, together with other engineering instrumentation, obtained in-flight and postlanding data. The complement of instruments carried on later missions included various combinations of the following additional devices: (1) a soil mechanics/surface sampler instrument for picking, digging, and handling lunar surface material; (2) an alpha scattering instrument for performing a chemical analysis of the lunar surface material; and (3) magnets attached to the spacecraft for determining magnetic properties of the soil.

Jet Propulsion Laboratory

SERENE: Saturn Enceladus Return Explorer with Nuclear Electric Propulsion

A ‘quick’ Enceladus sample return mission concept was developed based on the scientist recommendations at the recent ‘Accelerating Space Science with Nuclear Technology Workshop’. The Nuclear Electric Propulsion spacecraft assumed a follow-on 40 kWe nuclear reactor using the demonstrated 40 kWe Fission Surface Power system, expected in the early 2030s. The NEP vehicle also utilized a set of NEXT-C ion thrusters as well as planned Artemis commercial launchers. By launching the 40 kW NEP vehicle on a Starship and adding the propellants of 15 tankers, the 27t probe could be sent on a direct trajectory to Saturn (no Earth or Jupiter flybys) where NEP was used for Saturn capture, spiral down, spiral up and return to the Earth. A small lander obtained the surface Enceladus sample. Using the 40 kW NEP provided a round-trip time of only 16.5 years. A second option was more attractive from a science perspective whereby the NEP vehicle would deliver a large, 6t chemical lander to low Enceladus orbit where it would grab and return a sample to Earth (similar to the recent Orbilander design but in reverse). After deploying the lander, the NEP vehicle would stay in Saturn space performing a moon tour by orbiting four more moons and mapping the large moon of Titan. This option took slightly longer (18.5 yrs) due to the chemical return leg limitations. Both options demonstrated the agility, payload capability, and sample return goals the workshop recommended. An all-chemical option with two stages was roughly analyzed but took 21.5 yrs and required a Jupiter gravity assist.

Nuclear Electric Propulsion

Improvement of Odor Control for the UWMS Hard-Sided Fecal Canister and the Alternate Fecal Canister

On longer range exploration missions, the mass and volume of critical hardware and consumables required to support crew will pose a big stowage challenge. This includes the hardware for the collection and storage of human metabolic solid waste. The amount of stowage needed for this hardware both before (empty) and after (full) use will be a significant burden on the overall spacecraft habitable volume, layout, and design. To help with this challenge, the National Aeronautics and Space Administration (NASA) Mars Campaign Office (MCO) Logistics Reduction (LR) Portfolio has developed a collapsible canister for the collection and containment of fecal deposits. The Alternate Fecal Canister (AFC) is a collapsible alternative to the exploration toilet Hard-sided Fecal Canister (HFC). The AFC in its empty state has a volumetric benefit to smaller vehicles on longer missions. The current designs for HFC and AFC were tested with human fecal material for odor containment at White Sands Test Facility (WSTF) where the tests on both were unsuccessful. The source of the lack of containment was isolated to a gasket used on both HFC and AFC. The gasket used was found to be open cell in design. This paper provides a summary of the materials selection and testing process to identify a replacement gasket material with the intention to replace the gaskets on both existing units as well as incorporate it into the designs going forward for future builds for exploration. Details will be provided on the design of the canisters interface with the odor bacteria lid which led to the selection of the thickness of the desired replacement. Finally, the paper will provide an update on the testing in advance of a return to WSTF for final testing and detail plans to complete testing and perform a demonstration on ISS with UWMS.

Toilet