Search NASA⌕ Search

SEARCH · Search NASA

Results for “femp”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

American Recovery and Reinvestment Act (ARRA) FEMP Technical Assistance - United States Pacific Command (PACOM) Guam, Task 3.3: Building Retuning Training

Document describes an onsite workshop and building retuning training conducted in Guam in August 2010. Document reports on issues identified during an audit of several buildings and recommendations to save energy throughout the site. During the workshop, it became apparent that as site personnel maintain the facilities at Guam, the following retuning efforts and strategies should be prioritized: (1) Controlling the mechanical systems operational hours and zone temperature set points appeared to present the best opportunities for savings; (2) Zone temperature set points in some buildings are excessively low, especially at night, when the zone temperatures are so cold that they approached the dewpoint; and (3) Manually-set outside air dampers are providing excessive outside air, especially for spaces that are unoccupied. Two of the larger schools, one on the Naval Base and one on Anderson AFB, are in need of a significant recommissioning effort. These facilities are relatively new, with direct digital controls (DDC) but are significantly out of balance. The pressure in one school is extremely negative, which is pulling humid air through the facility each time a door is opened. The draft can be felt several feet down the halls. The pressure in the other school is extremely positive relative to the outside, and you can stand 20-feet outside and still feel cool drafts of air exiting the building. It is recommended that humidity sensors be installed in all new projects and retrofitted into exist facilities. In this humid climate, control of humidity is very important. There are significant periods of time when the mechanical systems in many buildings can be unloaded and dehumidification is not required. The use of CO{sub 2} sensors should also be considered in representative areas. CO{sub 2} sensors determine whether spaces are occupied so that fresh air is only brought into the space when needed. By reducing the amount of outside air brought into the space, the humidity load is also substantially reduced. CO{sub 2} and humidity sensors, combined with outside air sensors, can be used to predict whether conditions are amenable to mold growth and to automatically adjust systems to help prevent mold without using extra energy. The goal of this training is to give the building operators the knowledge needed to make positive changes in the operation of building systems. As class participants apply this knowledge, building systems will run more efficiently, occupant comfort should improve, while saving energy and reducing greenhouse gas emissions.

54 ENVIRONMENTAL SCIENCES↗

FEMP Energy Efficiency and Indoor Environmental Quality Assessment Guide

The purpose of this document is to provide a thorough guidance when preparing for an energy and indoor environmental quality (IEQ) assessment. It provides step-by-step instructions, detailed insights, and practical examples for the various phases of an energy and IEQ assessment.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

American Recovery and Reinvestment Act (ARRA) FEMP Technical Assistance Federal Aviation Administration – Project 209 Control Tower and Support Building Oakland, CA

This report represents findings of a design review team that evaluated construction documents (at the 70% level) and operating specifications for a new control tower and support building that will be build at Oakland, California by the Federal Aviation Administration (FAA). The focus of the review was to identify measures that could be incorporated into the final design and operating specification that would result in additional energy savings for the FAA that would not have otherwise occurred.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

American Recovery and Reinvestment Act (ARRA) FEMP Technical Assistance Federal Aviation Administration Project 209 - Control Tower and Support Building, Las Vegas, NV

This report represents findings of a design review team that evaluated construction documents (at the 70% level) and operating specifications for a new control tower and support building that will be built in Las Vegas, Nevada by the Federal Aviation Administration (FAA). The focus of the review was to identify measures that could be incorporated into the final design and operating specification that would result in additional energy savings for the FAA that would not have otherwise occurred.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

American Recovery and Reinvestment Act (ARRA) FEMP Technical Assistance U.S. General Services Administration – Project 195 John Seiberling Federal Office Building and U.S. Courthouse, Akron, Ohio

This report documents the findings from an onsite audit of the John Seiberling Federal building located in Akron, Ohio. The Federal landlord for this building is the General Services Administration (GSA). The focus of the audit was to identify various no-cost or low-cost energy efficiency opportunities that, once implemented, would reduce in either electrical and gas consumption and increase the operational efficiency of the building. This audit also provided an opportunity to identify potential capital cost projects that should be considered in the to acquire additional energy (electric and gas) and water savings to further increase the operational efficiency of the building.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

American Recovery and Reinvestment Act (ARRA) FEMP Technical Assistance US General Serices Administration - Project 193, John W. Bricker Federal Building, Columbus, OH

This report documents the findings from an onsite audit of the John W. Bricker Federal building located in Columbus, Ohio. The Federal landlord for this building is the General Services Administration (GSA). The focus of the audit was to identify various no-cost or low-cost energy efficiency opportunities that, once implemented, would either reduce electrical and gas consumption or increase the operational efficiency of the building. This audit also provided an opportunity to identify potential capital cost projects that should be considered in the future to acquire additional energy (electric and gas) and water savings to further increase the operational efficiency of the building.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

ARRA FEMP Technical Assistance -- Federal Aviation Administration Project 209 -- Control Tower and Support Building, Palm Springs, CA

This report represents findings of a design review team that evaluated construction documents (at the 100% level) and operating specifications for a new control tower and support building that will be built in Palm Springs, California by the Federal Aviation Administration (FAA). The focus of the review was to identify measures that could be incorporated into the final design and operating specifications that would result in additional energy savings for the FAA that would not have otherwise occurred.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

American Recovery and Reinvestment Act (ARRA) - FEMP Technical Assistance - Federal Aviation Administration - Project 209 - Control Tower and Support Building, Boise, Idaho

This report documents an energy audit performed by Pacific Northwest National Laboratory (PNNL) and Redhorse Corporation (Redhorse) conducted on the Federal Aviation Administration (FAA) control tower and base building in Boise, Idaho. This report presents findings of the energy audit team that evaluated construction documents and operating specifications (at the 100% level) followed by a site visit of the facility under construction. The focus of the review was to identify measures that could be incorporated into the final design and operating specifications that would result in additional energy savings for FAA that would not have otherwise occurred.

99 GENERAL AND MISCELLANEOUS↗

American Recovery and Reinvestment Act ( ARRA) FEMP Technical Assistance, U.S. General Services Administration - Project 194 U.S. Custom Cargo Inspection Facility, Detroit, MI

This report documents the findings of an on-site audit of the U.S. Customs Cargo Inspection Facility (CIF) in Detroit, Michigan. The federal landlord for this building is the General Services Administration (GSA). The focus of the audit was to identify various no-cost or low-cost energy-efficiency opportunities that, once implemented, would reduce electrical and gas consumption and increase the operational efficiency of the building. This audit also provided an opportunity to identify potential capital cost projects that should be considered in the future to acquire additional energy (electric and gas) and water savings to further increase the operational efficiency of the building.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

American Recovery and Reinvestment Act (ARRA) FEMP Technical Assistance Federal Aviation Administration – Project 209 Control Tower and Support Building, Reno, Nevada

Pacific Northwest National Laboratory (PNNL) and Redhorse Corporation (Redhorse) conducted an energy audit on the Federal Aviation Administration (FAA) control tower and base building in Reno, Nevada. This report presents the findings of the energy audit team that evaluated construction documents and operating specifications (at the 100% level) and completed a site visit. The focus of the review was to identify measures that could be incorporated into the final design and operating specifications that would result in additional energy savings for the FAA that would not have otherwise occurred.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

American Recovery and Reinvestment Act (ARRA) FEMP Technical Assistance

The purpose of this document is to evaluate the opportunity for Letterkenny Army Depot (LEAD or the Depot) to utilize biogenic methane, which may be available in shale formations under the Depot, to provide a supplemental source of natural gas that could allow the Depot to increase energy independence. Both the Director and Deputy of Public Works at the Depot are supportive in general of a methane production project, but wanted to better understand the challenges prior to embarking on such a project. This report will cover many of these issues. A similar project has been successfully developed by the U. S. Army at Ft. Knox, KY, which will be explained and referred to throughout this report as a backdrop to discussing the challenges and opportunities at LEAD, because the geologic formations and possibilities at both sites are similar. Prior to discussing the opportunity at LEAD, it is important to briefly discuss the successful methane recovery operation at Ft. Knox, because it is applicable to the projected approach for the LEAD methane system. The Ft. Knox project is an excellent example of how the U. S. Army can use an onsite renewable resource to provide a secure energy source that is not dependent on regional energy networks and foreign oil. At Ft. Knox, the U. S. Army contracted (through a utility co-op) with an energy production company to drill wells, establish a distribution infrastructure, and provide the equipment needed to prepare and compress the produced methane gas for use by base operations. The energy production company agreed to conduct the exploratory investigation at Ft. Knox with no cost to the government, as long as they could be granted a long-term contract if a reliable energy resource was established. The Depot is located, in part, over an Ordovician Age shale formation that may have the potential for producing biogenic methane, similar to the Devonian Age shale found beneath Ft. Knox. However, the Ordovician Age Shale beneath the Letterkenny Depot is not known to have any currently producing gas wells.

04 OIL SHALES AND TAR SANDS↗

FEMP ESPC Project Development Resource Guide

Guide charts the Federal Energy Management Program process for providing project development support to agencies developing energy savings performance contract (ESPC) projects using the U.S. Department of Energy (DOE) indefinite-delivery, indefinite-quantity (IDIQ) ESPC. Within that process, the guide outlines: (1) the resources that Project Facilitators (PFs) and Federal Project Executives (FPEs) are required to use in their lead role in the delivery of project development services, and (2) minimum requirements for project documentation.

ESPCs↗

Simulation Analyses in Support of DOE’s Fossil Fuel Rule for Single Component Equipment and Lighting Replacements

At the request of the US Department of Energy’s (DOE) Federal Energy Management Program (FEMP), Pacific Northwest National Laboratory (PNNL) conducted a series of building energy simulations using a large office model to investigate the potential savings that could be accrued from a typical chiller, boiler, or lighting replacement in a Federal office building. FEMP’s interest was in knowing whether or not single component replacements like these would have any chance of achieving the fossil- fuel-based energy consumption reduction requirements specified in Section 433 of the Energy Independence and Security Act (EISA) of 20071. Specifically, FEMP was interested in whether an older Federal building, built in the 1980s or 1990s and designed to meet energy standards in place at the time the building was designed, could meet the requirements of Section 433 of EISA for renovations. Many single component renovations like chiller replacements, boiler replacements, and lighting retrofits may meet the minimum cost requirement of Section 433 of EISA but may not offer any opportunity to achieve fossil-fuel-generated energy consumption reductions on the order of 55% or more. If single component renovations such as these would not achieve the necessary reductions, then FEMP would consider modifying rules based on Section 433 of EISA to exempt these types of single component renovations from the overall fossil-fuel-generated energy consumption reduction provisions. FEMP would instead require Federal agencies to ensure that these renovations use FEMP-designated efficiencies for chillers and boilers or the lighting power density requirements found in ASHRAE Standard 90.1-2010. The results of PNNL’s analysis indicated that it is unlikely that a combined boiler and chiller replacement, or an individual boiler or chiller replacement in an older existing Federal building would meet the requirements of Section 433 of EISA. While buildings can achieve up to 34% reduction in cooling and 11% reduction in heating load with this type of retrofit, these savings fall well short of the minimum savings specified in Section 433 of EISA. Similarly, a lighting retrofit in an older existing Federal building would also not likely meet the requirements of Section 433 of EISA. While buildings can save up to 52% on lighting loads, the whole buildings savings would be well short of the minimum savings specified in Section 433 of EISA.

Halverson, Mark A.↗

Supplement to M&V Guidelines: Measurement and Verification for Performance-Based Contracts Version 4.0

Measurement and verification (M&V) are key to determining and confirming the continued operation of, and savings associated with, performance-based contracts. The Federal Energy Management Program (FEMP) updates these guidelines to reflect the evolution of M&V to incorporate industry best practices and ensure that savings from these performance-based projects are properly planned, communicated, and realized. FEMP released M&V Guidelines: Measurement and Verification for Federal Energy Projects Version 3.0 in 2008. This document was developed with input from industry-government working groups, previous M&V guideline authors, and national laboratory subject matter experts. The document provided the methods and guidelines, with a focus on federal energy savings performance contracts (ESPCs). When FEMP released M&V Guidelines: Measurement and Verification for Performance-Based Contracts Version 4.0 in 2015, FEMP expanded the intended audience to include anyone (energy managers, procurement officers, and contractors) involved in implementing performance-based contracts. The streamlined M&V Guidelines Version 4.0 provided the procedures and guidelines needed to quantify savings resulting from installing energy-efficient equipment, water conservation, improved operation and maintenance (O&M), renewable energy, and cogeneration projects with a performance-based contract; however, it removed some of the associated details on topics such as developing regression models and sampling plans. The details and information provided in M&V Guidelines v. 3.0 are still pertinent to M&V for performance-based contracts. The objective is to keep FEMP M&V version 4.0 condensed, providing the reference document for specifying M&V methods and procedures and a resource for developing project-specific M&V plans; this supplement provides additional details. The content of this supplement has been updated to include pertinent revisions between M&V version 3.0 and M&V version 4.0 by providing details and updating the content to ensure relevancy.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

US Department of Energy Federal Energy Management Program Energy Treasure Hunt Toolkit

The US Department of Energy’s Federal Energy Management Program (FEMP) aims to assist federal agencies and their stakeholders with their energy-focused goals, opportunities, and barriers. The program offers various technical trainings and resources to its stakeholders. One of these resources is an energy treasure hunt program. This report presents the FEMP energy treasure hunt toolkit, a technical resource designed for systematic application for federal facilities seeking to optimize their energy and carbon usage. The toolkit was designed to help facilitate energy-focused kaizen events, identify energy-saving recommendations, analyze identified opportunities, and provide the tools needed to detect actionable projects to advance federal facilities. Through a collaboration with the Oak Ridge National Laboratory team that executed the industrial-focused Better Plants energy treasure hunt program, a similar treasure hunt toolkit was designed for FEMP. The purpose of this report is to provide an overview of the treasure hunt process and FEMP toolkit capabilities.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Desktop Audits: Overview, Case Studies, Guidance

The Energy Independence and Security Act (EISA) of 2007 requires that federal agencies audit 25% of their 3.1 billion square feet of covered facilities each year. Several newer, advanced options such as monitoring-based commissioning, fault detection and diagnostics, and energy management systems can help support data collection and analysis to be used for EISA compliance. The Federal Energy Management Program's (FEMP’s) Audit Decision Tree, Audit Definitions, and FEMP Guidance can be used by Agencies to determine the best approaches to evaluate their facilities. FEMP continues to develop additional resources to support agencies in meeting EISA compliance. This presentation gives an overview of desktop audits, including case studies and guidance.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗