Search NASA⌕ Search

SEARCH · Search NASA

Results for “final”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Final-Approach Spacing Aids (FASA) evaluation for terminal-area, time-based air traffic control

A jointly funded (NASA/FAA) real-time simulation study was conducted at NASA Langley Research Center to gather comparative performance data among three candidate final-approach spacing aid (FASA) display formats. Several objective measures of controller performance and their display eye-scan behavior as well as subjective workload and rating questionnaires were used. For each of two representative pattern-speed procedures (a 170-knot procedure and a 210-knot procedure with speed control aiding), data were gathered, via twelve FAA controllers, using four final-controller display format conditions (manual/ARTS 3, graphic marker, DICE countdown, and centerline slot marker). Measured runway separations were more precise with both the graphic marker and DICE countdown formats than with the centerline slot marker and both (graphic and DICE) improved precision relative to the manual/ARTS 3 format. For three separate rating criteria, the subject controllers ranked the FASA formats in the same order: graphic marker, DICE countdown, and centerline slot marker. The increased precision measured with the 210-knot pattern-speed procedure may indicate the potential for the application of speed-control aiding where higher pattern speeds are practical after the base-to-final turn. Also presented are key FASA issues, a rationale for the formats selected for testing, and their description.

Credeur, Leonard↗

Ubiquitous Low-FeO Relict Grains in Type II Chondrules and Limited Overgrowths on Phenocrysts Following the Final Melting Event

Type II porphyritic chondrules commonly contain several large (>40 microns) olivine phenocrysts; furnace-based cooling rates based on the assumption that these phenocrysts grew in a single-stage melting-cooling event yield chondrule cooling-rate estimates of 0.01-1 K/s. Because other evidence indicates much higher cooling rates, we examined type 11 chondrules in the CO3.0 chondrites that have experienced only minimal parent-body alteration. We discovered three kinds of evidence indicating that only minor (4-10 microns) olivine growth occurred after the final melting event: (1) Nearly all (>90%) type II chondrules in CO3.0 chondrites contain low-FeO relict grains; overgrowths on these relicts are narrow, in the range of 2-12 microns. (2) Most type II chondrules contain some FeO-rich olivine grains with decurved surfaces and acute angles between faces indicating that the grains are fragments from an earlier generation of chondrules; the limited overgrowth thicknesses following the last melting event are too thin to disguise the shard-like nature of these grains. (3) Most type II chondrules contain many small (<20 microns) euhedral or subhedral phenocrysts with central compositions that are much more ferroan than the centers of the large phenocrysts; their small sizes document the small amount of growth that occurred after the final melting event. If overgrowth thicknesses were small (4-10 microns) after the final melting event, it follows that large fractions of coarse (>40 microns) high-FeO phenocrysts are relicts from earlier generations of chondrules, and that cooling rates after the last melting event were much more rapid than indicated by models based on a single melting event. These observations are thus inconsistent with the "classic" igneous model of formation of type II porphyritic chondrules by near-total melting of a precursor mix followed by olivine nucleation on a very limited number of nuclei (say, <10) and by growth to produce the large phenocrysts during a period of monotonic (and roughly linear) cooling. Our observations that recycled chondrule materials constitute a large component of the phenocrysts of type II chondrules also imply that this kind of chondrule formed relatively late during the chondrule-forming period.

Wasson, John T.↗

A Final Approach Trajectory Model for Current Operations

Predicting accurate trajectories with limited intent information is a challenge faced by air traffic management decision support tools in operation today. One such tool is the FAA's Terminal Proximity Alert system which is intended to assist controllers in maintaining safe separation of arrival aircraft during final approach. In an effort to improve the performance of such tools, two final approach trajectory models are proposed; one based on polynomial interpolation, the other on the Fourier transform. These models were tested against actual traffic data and used to study effects of the key final approach trajectory modeling parameters of wind, aircraft type, and weight class, on trajectory prediction accuracy. Using only the limited intent data available to today's ATM system, both the polynomial interpolation and Fourier transform models showed improved trajectory prediction accuracy over a baseline dead reckoning model. Analysis of actual arrival traffic showed that this improved trajectory prediction accuracy leads to improved inter-arrival separation prediction accuracy for longer look ahead times. The difference in mean inter-arrival separation prediction error between the Fourier transform and dead reckoning models was 0.2 nmi for a look ahead time of 120 sec, a 33 percent improvement, with a corresponding 32 percent improvement in standard deviation.

Gong, Chester↗

What is the Final Verification of Engineering Requirements?

This slide presentation reviews the process of development through the final verification of engineering requirements. The definition of the requirements is driven by basic needs, and should be reviewed by both the supplier and the customer. All involved need to agree upon a formal requirements including changes to the original requirements document. After the requirements have ben developed, the engineering team begins to design the system. The final design is reviewed by other organizations. The final operational system must satisfy the original requirements, though many verifications should be performed during the process. The verification methods that are used are test, inspection, analysis and demonstration. The plan for verification should be created once the system requirements are documented. The plan should include assurances that every requirement is formally verified, that the methods and the responsible organizations are specified, and that the plan is reviewed by all parties. The options of having the engineering team involved in all phases of the development as opposed to having some other organization continue the process once the design has been complete is discussed.

Poole, Eric↗

Advanced Air Transportation Technologies Project, Final Document Collection

This CD ROM contains a compilation of the final documents of the Advanced Air Transportation Technologies (AAIT) project, which was an eight-year (1996 to 2004), $400M project managed by the Airspace Systems Program office, which was part of the Aeronautics Research Mission Directorate at NASA Headquarters. AAIT focused on developing advanced automation tools and air traffic management concepts that would help improve the efficiency of the National Airspace System, while maintaining or enhancing safety. The documents contained in the CD are final reports on AAIT tasks that serve to document the project's accomplishments over its eight-year term. Documents include information on: Advanced Air Transportation Technologies, Autonomous Operations Planner, Collaborative Arrival Planner, Distributed Air/Ground Traffic Management Concept Elements 5, 6, & 11, Direct-To, Direct-To Technology Transfer, Expedite Departure Path, En Route Data Exchange, Final Approach Spacing Tool - (Active and Passive), Multi-Center Traffic Management Advisor, Multi Center Traffic Management Advisor Technology Transfer, Surface Movement Advisor, Surface Management System, Surface Management System Technology Transfer and Traffic Flow Management Research & Development.

Mogford, Richard H.↗

Feasibility Study for Low Drag Acoustic Liners Final Report

This report documents the design and structural analysis as a final deliverable for the Phase 1 contract activity. Also included is a community noise test plan, which is a key deliverable for Phase 2. Finally, a high-level estimate (Phase 3 deliverable) is provided for the work statement of Phases 2-4, which covers the build of two inlet test articles, planning and execution of a flight test with the test inlets, as well as data analysis and final documentation. The two test inlets will be compared to the production baseline inlet configuration. There is also a plan to test one of the inlets "hardwalled" using speed tape or some other similar tape to block the acoustic perforations.

Riedel, Brian↗

Space Power Heritage Study Final Results

NASA space missions have long employed Radioisotope Power Systems (RPS) and solar-based power generation architectures. RPS have been used to enable or significantly enhance missions that venture deep into the solar system to distances from the sun which can make using solar architectures unfeasible and to areas where the sun is obscured due to shadows or atmospheric phenomena. The destination, however, is not the absolute factor of the determination of RPS or solar. This is highlighted by the Jupiter missions Galileo and Juno, which employed RPS and solar architectures, respectively. When baselining either RPS or solar architectures for a planetary mission, numerous factors must be considered, including scientific objectives, cost, schedule, and mass just to name a few. In an effort to better understand the decision-making process and provide insight for potential future missions, the NASA RPS Program Office tasked The Aerospace Corporation (Aerospace) to study historical missions that used RPS and solar architectures. Data was collected for a variety of RPS and solar missions to look for possible trends from the selected implementation. Additionally, mission case studies were developed based on interviews with mission personnel who were responsible for defining the power architecture of their mission. Informed by the data collected and case studies, two Measures of Effectiveness (MoEs) were produced: one based on cost of RPS versus solar, and one based on science mission cost effectiveness. The final results of this study have been captured in this briefing package which is available for full and open release. Additionally, a final report document also provides the same details of this package. This briefing package also includes an appendix which contains data not for public release which was used to provide detailed answers to questions raised during this study. The results of these inquiries are discussed in the report, but the proprietary data is not included. Finally, an executive summary package is also publicly available which was used to present the results of the study at the 2018 Aerospace Space Power Workshop.

Study↗

Dawn's final mission at Ceres: navigation and mission design experience

On Oct. 31st, 2018, the Dawn spacecraft completed its space journey covering more than 11 years including exploration of Vesta and Ceres, two protoplanets in the main asteroid belt. After successfully completing its prime mission at the dwarf planet Ceres, the Dawn mission was extended twice to pursue new scientific objectives. The second extended mission at Ceres, and the final mission for Dawn, presented a series of challenges that were new to the experienced and accomplished Dawn navigation team. This paper discusses mission design and navigational experiences and challenges during Dawn’s final transfer and orbit at Ceres. Topics include reference orbit design of the final science orbit, mission design and planning for the transfer, periapsis targeting over a surface feature, and analysis for planetary protection requirements.

Karimi, Reza↗

Reconstruction of the Apollo 11 Moon Landing Final Descent Trajectory

Relatively limited data on the Apollo 11 pre-planned and as-flown trajectories are available in the open literature and in the NASA archives. Furthermore, a single report appears to be the only source containing plots comparing the pre-planned and as-flown final approach and landing trajectories. The plots in that report, however, are small and difficult to read, and contain data that are insufficient for directly reconstructing the final landing trajectory. In this report, several published graphics are digitized, and then a variety of least-squares and Kalman filter estimators are applied using kinematic equations and simplified dynamic equations to reconstruct the final descent trajectory. The reconstructed trajectory is important in the crew training effort for program Artemis, which intends to send humans back to the moon, as well as other studies focusing on landing on extraterrestrial worlds.

Apollo 11↗

Advancing the Science of Both Coastal Ocean Biophysics and Atmospheric Pollution Chemistry: A Final Report to the Nasa Earth Science Division by the GEO-CAPE Team

The 2007 Decadal Survey (DS) included the recommendation for the Geostationary Coastal and Air Pollution Events (GEO-CAPE) mission to launch in 2013–2016 to advance the science of both coastal ocean biophysics and atmospheric-pollution chemistry. In 2009 the NASA Earth Science Division (ESD) initiated study activities for GEO-CAPE and 8 other near- to medium-term missions to help determine the readiness of these conceptual missions to begin the formulation phase. In FY15 the GEO-CAPE mission study team completed a white paper summarizing the results of the pre-formulation work accomplished to date: https://geo-cape.larc.nasa.gov/pdf/GEO-CAPE_2009-2015_SummativeWhitePaper.pdf The team was directed to complete a final report in FY18. This document, prepared as an addendum to the FY15 white paper, serves as the GEO-CAPE final report and focuses only on FY16-18 activities and on summarizing the final state.

Geostationary Coastal and Air Pollution Events↗

FINAL TECHNICAL AND ECONOMIC FEASIBILITY STUDY ON THE APPLICATION OF A HEAT INTEGRATED POST-COMBUSTION CO2 CAPTURE SYSTEM WITH HITACHI ADVANCED SOLVENT INTO EXISTING COAL-FIRED POWER PLANT

This report contains the results of a techno-economic assessment (TEA) conducted of a heat integrated post-combustion CO2 capture process with Hitachi advanced solvent for retrofit into an existing coal-fired power plant (but treated as greenfield plant on cost analysis). The process has been developed by the University of Kentucky Center for Applied Energy (UK CAER). EPRI was chiefly responsible for this analysis, with significant input from WorleyParsons, Hitachi Power Systems America (Hitachi) and UK CAER. The project also involves the design, fabrication, installation, testing, and analyses of a slipstream facility located at L&GE-KU’s E.W. Brown Generating Station to demonstrate the UK CAER carbon capture system that could utilize heat integration with the main power plant. The design, start-up, and baseline of the pilot system was performed with a generic 30 wt% MEA solvent to obtain data for direct comparison with the DOE/NETL Reference Case followed by testing Hitachi’s proprietary solvent H3-1. In this techno-economic analysis, two cases utilizing the UK CAER process are compared, using different approach temperatures and solvent, against the DOE/NETL Reference Case (Case 10). The results are shown comparing the energy demand for post-combustion CO2 capture and the net higher heating value (HHV) efficiency of the power plant integrated with the post-combustion capture (PCC) plant. A levelized cost of electricity (LCOE) assessment was performed showing the costs of the options presented in the study. The key factors contributing to the reduction of LCOE were identified as CO2 partial pressure increase at the flue gas inlet, thermal integration of the process, and performance of the Hitachi H3-1 solvent. Recent UK CAER process pilot-scale testing data and process simualtion data showed that the packing heights of absorber and stripper columns were significantly oversized in the prelimanary TEA (Task 2 of this project) and thus updated in this final TEA for the H3-1 case only. In addition, the solvent make-up cost for H3-1 was updated based on lattest test results. Finally, a heat integration with the main power plant was applied in this final TEA to increase overall energy effciency for both the MEA and H3-1 cases. Additonal reductions in capital and operational costs are expected but not taken into account here. Shorter columns result in reduced pressure drops, smaller blower head and pump hydraulic head requirements. An increase in overall energy efficiency resuls in a decreased size of the power plant, the CCS and a reduced parasitic steam requirement to the CCS. The net efficiency of the UK CAER integrated PC power plant with CO2 capture changes from 26.2% for the Reference Case 10 plant in 2010 revised DOE/NETL baseline report to 27.6% for the MEA options considered, and 29.1% for the options utilizing the Hitachi advanced solvent. The UK CAER Process + Hitachi case also produces an extra 30.9 MW of generation compared to the UK CAER Process + MEA case and total 60.9 MW more than DOE Case 10. LCOE ($/MWh) values are $172.08/MWh for the MEA option and $157.65/MWh for the Hitachi H3-1 solvent cases considered in comparison to $189.59/MWh in January 2012 dollar for the Reference Case 10. The UK CAER CCS process with MEA case lowers energy consumption for CO2 capture to 1340 Btu/lb-CO2 captured as compared to 1540 Btu/lb-CO2 in the Reference Case 10. The UK CAER CCS process with H3-1 case further lowers energy consumption for CO2 capture to 973 Btu/lb-CO2 captured, for an advantage of 36.8% less energy consumption than Case 10. The study also shows 38.1% less heat rejection associated with the carbon capture system from 3398 MBtu/hr (Case 10) to 2104 MBtu/hr for the UK CAER + MEA system. Heat rejection is reduced to 2464 MBtu/hr in the UK CAER + H3-1 case, for a 27.5 % decrease compared to Case 10. Modeling outputs show that in the UK CAER process, the cooling water that is 2-5°C cooler than conventional cooling tower water can be achieved for ambient conditions common to the midwest and other regions. The results from the techno-economic assessment show that the proposed technology can be investigated further as a viable alternative to conventional CO2 capture technology. The evaluation also shows the effect of the critical parameters on the LCOE, with the main variables being the approach temperature and CO2 partial pressure increase at the flue gas inlet. A summary of the key advantages of the UK CAER Process + H3-1 case for LCOE and other economic factors compared to the DOE Case 10 is as follows: • A lower variable operating cost by $1.56/MWh ($1.08MWh less than the UK CAER Process + MEA Case), a 11.7% reduction compared to the DOE Case 10 • A lower COE by $25.32MWh ($13.94/MWh lower than the UK CAER Process + MEA Case), a 16.9% reduction compared to the DOE Case 10 • A lower LCOE by $31.94/MWh ($17.51/MWh lower than the UK CAER Process + MEA Case), a 16.9% reduction compared to the DOE Case 10 • A lower cost of CO2 captured by $18.65/tonne CO2 ($9.44/tonne CO2 lower than the UK CAER Process + MEA Case), a 30.4% reduction compared to the DOE Case 10 • A lower cost of CO2 avoided by $34.95/tonne CO2 ($18.53 tonne CO2 lower than the UK CAER Process + MEA Case), a 38.7% reduction compared to the DOE Case 10

Bhown, Abhoyjit S.↗

p +p - electroproduction off protons in deuterium: measurements of quasi-free cross sections and kinematic probing of final state interactions

In this study, the process of pi+pi- electroproduction off protons bound in deuterium nuclei is explored. The exploration is performed through the analysis of experimental data on electron scattering off the deuteron target, collected in Hall B at Jefferson Lab with the CLAS detector. As a main result, the set of integrated and single-differential cross sections of the reaction yvp(n) -> p'(n')pi+pi- is obtained. The cross sections are extracted in the quasi-free regime, which implies that only events not affected by final state interactions are subject to selection. The measurements are performed in the kinematic region of the invariant mass W from 1.3 GeV to 1.825 GeV and photon virtuality Q2 from 0.4 GeV2 to 1 GeV2. Sufficient experimental statistics allows narrow binning, i.e. 25 MeV in W and 0.05 GeV2 in Q2, while maintaining an adequate statistical uncertainty. The extraction of quasi-free cross sections is accompanied by the kinematic probing of FSI between the reaction final hadrons and the spectator neutron in the aforementioned exclusive channel. In this probing the distributions of missing quantities are used in order to investigate the relative spread of events with FSI along the reaction phase space, trace the difference of FSI manifestations in different reaction topologies, reveal details on alterations of the hadron momentum in FSI, and isolate FSI contributions of various final hadrons. The performed examination is also capable of retrieving information on some underlying FSI mechanisms, among which the process of resonance formation in the intermediate state of pion-neutron interactions is particularly remarkable.

Skorodumina, Iuliia↗

Energy Efficient, Incrementally Scalable, Continuous Basalt Fiber Manufacturing Process (Final Technical Report)

This project focused on new materials, bushing materials, that had the ability to produce continuous basalt or glass fiber. The original scope of the project was designed to identify bushing materials and produce fiber, but that scope did change during the program. The team put significant work into bushing material development in the place of producing fiber. The final bushing materials had to be able to produce fiber and the final sets of the project saw single strands of fiber be produced. The final materials selected was a unique MMC bushing composition. Using advanced chemistry, the interface chemistry was tailored between metallic and ceramic powders. Powders and fibers were consolidated using cold isostatic pressing and electrified ceramic hot pressing to form a near net shape composite bushing.

36 MATERIALS SCIENCE↗

Study on the Strategy for Final Disposal and Reuse of Decontamination Wastes after the Fukushima Daiichi NPP Accident - 20426

After the Fukushima Daiichi NPP accident, a large area of East Japan was contaminated by radio-Cs. To discuss the final disposal of the contaminated wastes off-site and the required development of related technologies, it is important to understand the volume and radiation concentration of the wastes after various treatments. For a scientific investigation purpose, a research committee has been formed by the Society for the Remediation of Radioactive Contamination in the Environment, which is independent from the Ministry of Environment. This committee's work is focused on discussing various scenarios for the final disposal considering a mass balance evaluation of the entire process, economic evaluations, and stakeholder consultation for final consensus. The current discussions of this committee are herein reported. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

ECAR-6332 Rev 3 RELAP5-3D Thermal-Hydraulic Analysis of MARVEL Microreactor - Final Design

This document reports the thermal hydraulic analyses results for the MARVEL microreactor, final design, including dry criticality, normal operation, operational transients and a set of very-low probability transients caused by accident conditions. The ultimate scope of this document is to demonstrate the MARVEL microreactor thermal hydraulic performances and its inherent safety. First, the list of the operational and accidental transients with the corresponding acceptance criteria are recalled. Then, details of the final design, the key input parameters, the assumptions, and the methodology used for performing the deterministic safety analyses are presented. Finally, the analyses results are provided, demonstrating the satisfaction of the corresponding acceptance criteria.

21 - SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLAN↗

Studies of new Higgs boson interactions through nonresonant $HH$ production in the $ b\overline{b}\gamma \gamma $ final state in $pp$ collisions at $ \sqrt{s} $ = 13 TeV with the ATLAS detector

A search for nonresonant Higgs boson pair production in the $ b\overline{b}\gamma \gamma $ final state is performed using 140 fb –1 of proton-proton collisions at a centre-of-mass energy of 13 TeV recorded by the ATLAS detector at the CERN Large Hadron Collider. This analysis supersedes and expands upon the previous nonresonant ATLAS results in this final state based on the same data sample. The analysis strategy is optimised to probe anomalous values not only of the Higgs (H) boson self-coupling modifier κλ but also of the quartic HHVV (V = W, Z) coupling modifier κ 2V . No significant excess above the expected background from Standard Model processes is observed. An observed upper limit μHH < 4.0 is set at 95% confidence level on the Higgs boson pair production cross-section normalised to its Standard Model prediction. The 95% confidence intervals for the coupling modifiers are –1.4 < κ λ < 6.9 and –0.5 < κ 2V < 2.7, assuming all other Higgs boson couplings except the one under study are fixed to the Standard Model predictions. The results are interpreted in the Standard Model effective field theory and Higgs effective field theory frameworks in terms of constraints on the couplings of anomalous Higgs boson (self-)interactions.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Search for top squark pair production in a final state with two tau leptons in proton-proton collisions at $ \sqrt{s} =$ 13 TeV

A search for pair production of the supersymmetric partner of the top quark, the top squark, in proton-proton collision events at $ \sqrt{s} $ = 13 TeV is presented in a final state containing hadronically decaying tau leptons and large missing transverse momentum. This final state is highly sensitive to high-tan β or higgsino-like scenarios in which decays of electroweak gauginos to tau leptons are dominant. The search uses a data set corresponding to an integrated luminosity of 77.2 fb$^{−1}$, which was recorded with the CMS detector during 2016 and 2017. No significant excess is observed with respect to the background prediction. Exclusion limits at 95% confidence level are presented in the top squark and lightest neutralino mass plane within the framework of simplified models, in which top squark masses up to 1100 GeV are excluded for a nearly massless neutralino.[graphic not available: see fulltext]

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Measurement of the top quark pair production cross section in dilepton final states containing one $\tau$ lepton in pp collisions at $\sqrt{s}=$ 13 TeV

The cross section of top quark pair production is measured in the $\mathrm{t\bar{t}}\to (\ell\nu_{\ell})(\tau_\mathrm{h}\nu_{\tau})\mathrm{b\bar{b}}$ final state, where $\tau_\mathrm{h}$ refers to the hadronic decays of the $\tau$ lepton, and $\ell$ is either an electron or a muon. The data sample corresponds to an integrated luminosity of 35.9 fb$^{-1}$ collected in proton-proton collisions at $\sqrt{s}=$ 13 TeV with the CMS detector. The measured cross section is $\sigma_{\mathrm{t\bar{t}}} =$ 781 $\pm$ 7 (stat) $\pm$ 62 (syst) $\pm$ 20 (lum) pb, and the ratio of the partial width $\Gamma($t$\to\tau\nu_{\tau}$b) to the total decay width of the top quark is measured to be 0.1050 $\pm$ 0.0009 (stat) $\pm$ 0.0071 (syst). This is the first measurement of the $\mathrm{t\bar{t}}$ production cross section in proton-proton collisions at $\sqrt{s}=$ 13 TeV that explicitly includes $\tau$ leptons. The ratio of the cross sections in the $\ell\tau_\mathrm{h}$ and $\ell\ell$ final states yields a value $R_{\ell\tau_\mathrm{h}/\ell\ell}=$ 0.973 $\pm$ 0.009 (stat) $\pm$ 0.066 (syst), consistent with lepton universality.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗