Search NASA⌕ Search

SEARCH · Search NASA

Results for “fleet scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Vehicle to Micro-Grid: Leveraging Existing Assets for Reliable Energy Management (Poster)

Fort Carson, a United States Army installation located south of Colorado Springs, Colorado, is seeking to be a net-zero energy facility. As part of this initiative, the base will be constructing a micro-grid that ties to various forms of renewable energy. To reduce petroleum consumption, Fort Carson is considering grid-connected vehicles (GCVs) such as pure electric trucks to replace some of itson-base truck fleet. As the availability and affordability of distributed renewable energy generation options increase, so will the GCV options (currently, three all-electric trucks are available on the GSA schedule). The presence of GCVs on-base opens up the possibility to utilize these vehicles to provide stability to the base micro-grid. This poster summarizes work to estimate the potentialimpacts of three electric vehicle grid interactions between the electric truck fleet and the Fort Carson micro-grid: 1) full-power charging without management, 2) full-power charging capability controlled by the local grid authority, and 3) full-power charge and discharge capability controlled by the local grid authority. We found that even at relatively small adoption rates, the control ofelectric vehicle charging at Fort Carson will aid in regulation of variable renewable generation loads and help stabilize the micro-grid.

24 POWER TRANSMISSION AND DISTRIBUTION↗

An exploratory study to determine the integrated technological air transportation system ground requirements of liquid-hydrogen-fueled subsonic, long-haul civil air transports

An exploratory study was conducted to evaluate the feasibility and cost impact of implementing a liquid-hydrogen-fueled (LHz), air transport support system at Chicago-O’Hare International Airport. The study assumed an available supply of hydrogen to the airport boundary. It also assumed that the present widebody fleet at O’Hare was replaced by 400 passenger, LH2-fueled aircraft operating on the current frequency schedule and route network. The LH2 aircraft configurations used in this study were developed during a previous NASA-sponsored study. A baseline air terminal concept was developed which permitted airlines and the airport to operate JP- or LH2-fueled aircraft at common terminal gates. The concept included installation of a hydrogen liquefaction and storage facility on airport property, as well as the fuel distribution system. The capital investment and hydrogen-related operating costs to the airlines were estimated. The study concluded that the system would be technically and operationally feasible at O’Hare, and that economics would be a prime factor in future decisions regarding the use of LH2 as an air transport fuel. Research and technology recommendations were made to improve component efficiency/reliability. The study also concluded that additional investigation should be conducted on the implementation of a nationwide or worldwide LH2 air transportation system, to understand fully the operational and economic implications of the total system, before decisions could be made relative to committing to this option.

Hydrogen↗

Shared automated vehicle fleet operations for first-mile last-mile transit connections with dynamic pooling

Shared automated vehicles (SAVs) have the potential to promote transit ridership by providing efficient first-mile last-mile (FMLM) connections through reduced operational costs to fleet providers and lower out-of-pocket costs to riders. To help plan for a future of integrated mobility, this paper investigates the impacts of SAVs serving FMLM connections, as a mode that provides flexibility in access/egress decisions and is well coordinated with train station schedules. To achieve this objective, a novel dynamic pooling algorithm was introduced to match SAVs with riders while coordinating the riders' arrival times at the light-rail station to a known train schedule. Microsimulations of SAVs and travelers throughout two central Austin neighborhoods show how larger service areas, higher levels of SAV demand, and longer arrival times between successive trains require larger SAV fleet sizes and higher SAV utilization rates to deliver close traveler wait times. Four-person SAVs appear to perform similar to 6-seat SAVs but will cost less to provide. Using a dynamic pooling algorithm tightly coordinated with train arrivals (every 15 min) delivers 87% of travelers to their stations in time to catch the next train, whereas uncoordinated assignments deliver just 58% of travelers in time.

33 ADVANCED PROPULSION SYSTEMS↗

The Empirical Effect of Fleet Optimization on Synchronization and Rebound Effects in Heat Pump Water Heaters

Demand response is a growing concept in light of the internet of things and an increasing need for grid flexibility. Water heaters are one of the preferred devices for providing demand response for grid services and peak management due to their capability to store energy. The efficient use of water heaters for demand response requires consideration of the associated load effects such as synchronization of device schedules and rebound effect. These effects present a significant challenge. Despite the importance of the mentioned effects for water heater queuing and scheduling, there has been no effort to quantify and empirically validate their impact. This study attempts to address this gap by offering two methods - Ward clustering and Euclidean K-means - to evaluate the extent of synchronization in a fleet of 42 water heaters in Atlanta, GA. Using the aforementioned methods on the measured data, we find evidence of convergence of water heater loads as a result of optimization compared to an idle period and analyzed their impact.

demand response↗

Inventory of Radioactive Waste in Canada - 19336

Since 1999, the Government of Canada has been conducting a regular exercise of gathering and compiling Canada's radioactive waste inventory and projection data from waste owners and making it available to the public in the form of a triennial Inventory Summary Report. The goal of this data collection exercise has been to support federal policy development, support the Canadian Nuclear Safety Commission's regulatory activities, provide consolidated radioactive waste information for the nuclear industry, promote transparency, and meet Canada's international commitments and growing demands internationally for radioactive waste data. The detailed national inventory report provides an overview of the production, accumulation and future projections of radioactive waste in Canada. Since the coming into force of the Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management in June 2001, the data collection and reporting cycle has been aligned to provide the waste inventory data required for Canada's triennial National Report for the Joint Convention. This paper presents Canada's radioactive waste inventory and projection data as of the end of December 2016, and summarizes key findings from the analysis of the data. For this reporting cycle, the waste data collected was expanded to include more detailed information on the decommissioning schedules and associated waste volume projections for nuclear power plants, and research and prototype reactors, as well as plans for transitioning waste inventories from storage to long-term management and disposal facilities, based on current schedules for establishing these facilities in Canada. With this additional information, the Government of Canada and Canadian stakeholders are better able to understand the waste disposal capacity and schedules required to accommodate all nuclear fuel waste and radioactive waste that will be produced by Canada's existing fleet of nuclear power plants and research reactors. The collection and analysis of projected waste volumes to be emplaced in long-term management facilities is in line with and will support the proposed methodology of presenting waste inventories in terms of management strategy and disposal routes by the Organization for Economic Cooperation and Development Nuclear Energy Agency Expert Group on Waste Inventorying and Reporting Methodology. The paper describes some of the uses that are made of the waste inventory information, as well as Canada's approach to national inventory data collection and its experience and lessons learned. Canada continues to modernize the format of the Inventory Summary Report with the goal of disseminating the technical information into an attractive and public-friendly report. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Shuttle interaction study extension

Plans for space shuttle missions as they effect the Space Operation Center (SOC) were examined. Shuttle fleet utilization, traffic analysis, SOC assembly operations, SOC propellant storage, and flight support facilities were studied with cost estimates, and completion schedules included.

Source record↗

EXODUS: Integrating intelligent systems for launch operations support

Kennedy Space Center (KSC) is developing knowledge-based systems to automate critical operations functions for the space shuttle fleet. Intelligent systems will monitor vehicle and ground support subsystems for anomalies, assist in isolating and managing faults, and plan and schedule shuttle operations activities. These applications are being developed independently of one another, using different representation schemes, reasoning and control models, and hardware platforms. KSC has recently initiated the EXODUS project to integrate these stand alone applications into a unified, coordinated intelligent operations support system. EXODUS will be constructed using SOCIAL, a tool for developing distributed intelligent systems. EXODUS, SOCIAL, and initial prototyping efforts using SOCIAL to integrate and coordinate selected EXODUS applications are described.

Adler, Richard M.↗

Wind Power Forecasting Error Frequency Analyses for Operational Power System Studies: Preprint

The examination of wind power forecasting errors is crucial for optimal unit commitment and economic dispatch of power systems with significant wind power penetrations. This scheduling process includes both renewable and nonrenewable generators, and the incorporation of wind power forecasts will become increasingly important as wind fleets constitute a larger portion of generation portfolios. This research considers the Western Wind and Solar Integration Study database of wind power forecasts and numerical actualizations. This database comprises more than 30,000 locations spread over the western United States, with a total wind power capacity of 960 GW. Error analyses for individual sites and for specific balancing areas are performed using the database, quantifying the fit to theoretical distributions through goodness-of-fit metrics. Insights into wind-power forecasting error distributions are established for various levels of temporal and spatial resolution, contrasts made among the frequency distribution alternatives, and recommendations put forth for harnessing the results. Empirical data are used to produce more realistic site-level forecasts than previously employed, such that higher resolution operational studies are possible. This research feeds into a larger work of renewable integration through the links wind power forecasting has with various operational issues, such as stochastic unit commitment and flexible reserve level determination.

17 WIND ENERGY↗

Optimal Managed Fast-Charging Model for Electric Vehicle Fleets with High Utilization and Multiple Charge-Acceptance Curves

A predictive control/scheduling optimization model is proposed for managed charging of an electric vehicle (EV) fleet - under time-of-use energy and demand prices, high vehicle utilization frequency (short dwell times), multiple charge- acceptance curves (configurable charging rates), and flexible vehicle demand. This context is particularly relevant for flight schools (small electric aircraft) or other commercial facilities where an EV fleet performs multiple operating and fast-charging sessions on the same day. The proposed model performs both the operational and charging scheduling of the vehicles, which is not typically done for residential managed charging and significantly increases problem complexity. The problem is formulated as a MILP model and a case study of a small fast-charging station is presented. Results demonstrate a significant reduction in operating cost, mainly from peak shaving during high demand price periods, achieved by coordinating the operation of different vehicles, chargers and charging rates.

ADVANCED PROPULSION SYSTEMS,ENERGY PLANNING, POLIC↗

Space Shuttle Rudder Speed Brake Actuator-A Case Study Probabilistic Fatigue Life and Reliability Analysis

The U.S. Space Shuttle fleet was originally intended to have a life of 100 flights for each vehicle, lasting over a 10-year period, with minimal scheduled maintenance or inspection. The first space shuttle flight was that of the Space Shuttle Columbia (OV-102), launched April 12, 1981. The disaster that destroyed Columbia occurred on its 28th flight, February 1, 2003, nearly 22 years after its first launch. In order to minimize risk of losing another Space Shuttle, a probabilistic life and reliability analysis was conducted for the Space Shuttle rudder/speed brake actuators to determine the number of flights the actuators could sustain. A life and reliability assessment of the actuator gears was performed in two stages: a contact stress fatigue model and a gear tooth bending fatigue model. For the contact stress analysis, the Lundberg-Palmgren bearing life theory was expanded to include gear-surface pitting for the actuator as a system. The mission spectrum of the Space Shuttle rudder/speed brake actuator was combined into equivalent effective hinge moment loads including an actuator input preload for the contact stress fatigue and tooth bending fatigue models. Gear system reliabilities are reported for both models and their combination. Reliability of the actuator bearings was analyzed separately, based on data provided by the actuator manufacturer. As a result of the analysis, the reliability of one half of a single actuator was calculated to be 98.6 percent for 12 flights. Accordingly, each actuator was subsequently limited to 12 flights before removal from service in the Space Shuttle.

Rudder↗

SSME component assembly and life management expert system

The space shuttle utilizes several rocket engine systems, all of which must function with a high degree of reliability for successful mission completion. The space shuttle main engine (SSME) is by far the most complex of the rocket engine systems and is designed to be reusable. The reusability of spacecraft systems introduces many problems related to testing, reliability, and logistics. Components must be assembled from parts inventories in a manner which will most effectively utilize the available parts. Assembly must be scheduled to efficiently utilize available assembly benches while still maintaining flight schedules. Assembled components must be assigned to as many contiguous flights as possible, to minimize component changes. Each component must undergo a rigorous testing program prior to flight. In addition, testing and assembly of flight engines and components must be done in conjunction with the assembly and testing of developmental engines and components. The development, testing, manufacture, and flight assignments of the engine fleet involves the satisfaction of many logistical and operational requirements, subject to many constraints. The purpose of the SSME Component Assembly and Life Management Expert System (CALMES) is to assist the engine assembly and scheduling process, and to insure that these activities utilize available resources as efficiently as possible.

Ali, M.↗

A Mars Exploration Discovery Program

The Mars Exploration Program should consider following the Discovery Program model. In the Discovery Program a team of scientists led by a PI develop the science goals of their mission, decide what payload achieves the necessary measurements most effectively, and then choose a spacecraft with the capabilities needed to carry the payload to the desired target body. The primary constraints associated with the Discovery missions are time and money. The proposer must convince reviewers that their mission has scientific merit and is feasible. Every Announcement of Opportunity has resulted in a collection of creative ideas that fit within advertised constraints. Following this model, a "Mars Discovery Program" would issue an Announcement of Opportunity for each launch opportunity with schedule constraints dictated by the launch window and fiscal constraints in accord with the program budget. All else would be left to the proposer to choose, based on the science the team wants to accomplish, consistent with the program theme of "Life, Climate and Resources". A proposer could propose a lander, an orbiter, a fleet of SCOUT vehicles or penetrators, an airplane, a balloon mission, a large rover, a small rover, etc. depending on what made the most sense for the science investigation and payload. As in the Discovery program, overall feasibility relative to cost, schedule and technology readiness would be evaluated and be part of the selection process.

Hansen, C. J.↗

Nuclear Waste Attributes of SMRs Scheduled for Near-Term Deployment

The purpose of this study is to evaluate the nuclear waste attributes of Small Modular Reactors (SMRs) scheduled for deployment within this decade using available data and established nuclear waste metrics, with the results compared to a reference large Pressurized Water Reactor (PWR). The current fleet of commercial nuclear reactors in the U.S. is composed of 92 large Light Water Reactors (LWR) with an average electricity generating capacity of over 1,000 MWe each. These large LWRs built on-site in massive construction projects have been the mainstay of the industry for the last 50 years. However, new construction soon is expected to include several designs of smaller reactors primarily fabricated in factories and installed in the field in modules. Some of these SMRs will also be LWRs, while some will use other coolants such as liquid metals, molten salts or gases, and different types of fuels. The technologies and economics of SMRs have been the focus of many studies, but there has been only minimal information published on the amount of nuclear waste different types of SMRs are expected to generate and no reports focused on near-term-deployable designs. In this study, the nuclear waste attributes of three small reactors scheduled for near-term-deployment, VOYGR TM (from NuScale Power), Natrium TM ab (from TerraPower), and Xe-100 (from X-energy), were assessed by comparing nuclear waste metrics with those of a reference large Pressurized Water Reactor (PWR).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

High-Fidelity Heavy-Duty Vehicle Modeling Using Sparse Telematics Data

Heavy-duty commercial vehicles consume a significant amount of energy due to their large size and mass, directly leading to vehicle operators prioritizing energy efficiency to reduce operational costs and comply with environmental regulations. One tool that can be used for the evaluation of energy efficiency in heavy-duty vehicles is the evaluation of energy efficiency using vehicle modeling and simulation. Simulation provides a path for energy efficiency improvement by allowing rapid experimentation of different vehicle characteristics on fuel consumption without the need for costly physical prototyping. The research presented in this paper focuses on using real-world, sparsely sampled telematics data from a large fleet of heavy-duty vehicles to create high-fidelity models for simulation. Samples in the telematics dataset are collected sporadically, resulting in sparse data with an infrequent and irregular sampling rate. Captured in the dataset was geospatial information, time series measurements, and vehicle-specific metadata from a subset of 96 vehicles from varied geographic regions across North America. A series of custom algorithms was developed to process vehicle data and derive both vehicle model input parameters and representative drive cycles. Derived models provide a basis on which to simulate real-world vehicles and iterate on vehicle aerodynamics, auxiliary power loads, transmission shift schedules, and other parameters to achieve reduced fuel consumption and increase energy efficiency. Notably, these models were developed without the use of expensive field data collection, using only data collected through fleet telematics. Processed representative drive cycles are used to validate the fuel economy of derived models. The models developed through this research allow for more representative vehicle simulations with increased flexibility regarding vehicle-to-vehicle variations.

ADVANCED PROPULSION SYSTEMS↗

Stratospheric emissions effects database development

This report describes the development of a stratospheric emissions effects database (SEED) of aircraft fuel burn and emissions from projected Year 2015 subsonic aircraft fleets and from projected fleets of high-speed civil transports (HSCT's). This report also describes the development of a similar database of emissions from Year 1990 scheduled commercial passenger airline and air cargo traffic. The objective of this work was to initiate, develop, and maintain an engineering database for use by atmospheric scientists conducting the Atmospheric Effects of Stratospheric Aircraft (AESA) modeling studies. Fuel burn and emissions of nitrogen oxides (NO(x) as NO2), carbon monoxide, and hydrocarbons (as CH4) have been calculated on a 1-degree latitude x 1-degree longitude x 1-kilometer altitude grid and delivered to NASA as electronic files. This report describes the assumptions and methodology for the calculations and summarizes the results of these calculations.

Baughcum, Steven L.↗

Capital Requirements for the Air Transport Industry

In recent years the U.S. scheduled airline industry has been involved in the largest re-equipment program that involves the addition of hundreds of new aircraft to the airline fleet. The costs associated with the purchase of this new equipment, along with the other costs involving such matters as the environment and security, are presenting the carriers with significant financial challenges.

James, G. W.↗

Overview of the U.S. DOE Accident Tolerant Fuel Development Program

The United States Fuel Cycle Research and Development Advanced Fuels Campaign has been given the responsibility to conduct research and development on enhanced accident tolerant fuels with the goal of performing a lead test assembly or lead test rod irradiation in a commercial reactor by 2022. The Advanced Fuels Campaign has defined fuels with enhanced accident tolerance as those that, in comparison with the standard UO2-Zircaloy system currently used by the nuclear industry, can tolerate loss of active cooling in the reactor core for a considerably longer time period (depending on the LWR system and accident scenario) while maintaining or improving the fuel performance during normal operations and operational transients, as well as design-basis and beyond design-basis events. This paper provides an overview of the FCRD Accident Tolerant Fuel program. The ATF attributes will be presented and discussed. Attributes identified as potentially important to enhance accident tolerance include reduced hydrogen generation (resulting from cladding oxidation), enhanced fission product retention under severe accident conditions, reduced cladding reaction with high-temperature steam, and improved fuel-cladding interaction for enhanced performance under extreme conditions. To demonstrate the enhanced accident tolerance of candidate fuel designs, metrics must be developed and evaluated using a combination of design features for a given LWR design, potential improvements to that design, and the design of an advanced fuel/cladding system. The aforementioned attributes provide qualitative guidance for parameters that will be considered for fuels with enhanced accident tolerance. It may be unnecessary to improve in all attributes and it is likely that some attributes or combination of attributes provide meaningful gains in accident tolerance, while others may provide only marginal benefits. Thus, an initial step in program implementation will be the development of quantitative metrics. A companion paper in these proceedings provides an update on the status of establishing these quantitative metrics for accident tolerant LWR fuel.1 The United States FCRD Advanced Fuels Campaign has embarked on an aggressive schedule for development of enhanced accident tolerant LWR fuels. The goal of developing such a fuel system that can be deployed in the U.S. LWR fleet in the next 10 to 20 years supports the sustainability of clean nuclear power generation in the United States.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Atmospheric effects of stratospheric aircraft: An evaluation of NASA's interim assessment

The advent of high-speed civil transport aircraft (HSCT's) some 25 years ago generated considerable concern about potential impacts on the stratosphere. With interest in such aircraft again increasing, NASA initiated an assessment of the potential stratospheric impacts of a substantial increase in the use of HSCT's. This assessment was intended to examine, from the standpoint of present scientific understanding, the potential atmospheric impacts of a fleet of high-speed civil transports flying supersonically in the lower stratosphere. The program was initiated in 1991, and the bulk of its research is scheduled to be completed in 1995. In early 1993 NASA asked the National Research Council to review its efforts. This report documents its findings and recommendations.

Source record↗