Search NASA⌕ Search

SEARCH · Search NASA

Results for “flexibility metric”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Focal Gray Matter Plasticity as a Function of Long Duration Head Down Tilted Bed Rest: Preliminary Results

Long duration spaceflight (i.e., 22 days or longer) has been associated with changes in sensorimotor systems, resulting in difficulties that astronauts experience with posture control, locomotion, and manual control. The microgravity environment is an important causal factor for spaceflight induced sensorimotor changes. Whether these sensorimotor changes are solely related to peripheral changes from reduced vestibular stimulation, body unloading, body fluid shifts or that they may be related to structural and functional brain changes is yet unknown. However, a recent study reported associations between microgravity and flattening of the posterior eye globe and protrusion of the optic nerve [1] possibly as the result of increased intracranial pressure due to microgravity induced bodily fluid shifts [3]. Moreover, elevated intracranial pressure has been related to white matter microstructural damage [2]. Thus, it is possible that spaceflight may affect brain structure and thereby cognitive functioning. Long duration head down tilt bed rest has been suggested as an exclusionary analog to study microgravity effects on the sensorimotor system [4]. Bed rest mimics microgravity in body unloading and bodily fluid shifts. In consideration of the health and performance of crewmembers both in- and post-flight, we are conducting a prospective longitudinal 70-day bed rest study as an analog to investigate the effects of microgravity on brain structure [5]. Here we present results of the first six subjects. Six subjects were assessed at 12 and 7 days before-, at 7, 30, and ~70 days in-, and at 8 and 12 days post 70 days of bed rest at the NASA bed rest facility in UTMB, Galveston, TX, USA. At each time point structural MRI scans (i.e., high resolution T1-weighted imaging and Diffusion Tensor Imaging (DTI)) were obtained using a 3T Siemens scanner. Focal changes over time in gray matter density were assessed using the voxel based morphometry 8 (VBM8) toolbox under SPM. Longitudinal processing in VBM8 includes linear registration of each scan to the mean of the subject and subsequently transforming all scans in to MNI space by applying the warp from the mean subject to MNI to the individual gray matter segmentations. Modulation was applied so that all images represented the volume of the original structure in native space. Voxel wise analysis was carried out on the gray matter images after smoothing, using a flexible factorial design with family wise error correction. Focal changes in white matter microstructural integrity were assessed using tract based spatial statistics (TBSS) as part of FMRIB software library (FSL). TBSS registers all DTI scans to standard space. It subsequently creates a study specific white matter skeleton of the major white matter tracts. For each subject, for each DTI metric (i.e. fractional anisotropy (FA), mean diffusivity (MD), axial diffusivity (AD), and radial diffusivity (RD)), the maximum value in a line perpendicular to the skeleton tract is projected to the skeleton. Non-parametric permutation based t-tests and ANOVA's were used for voxel-wise comparison of the skeletons. For both VBM and TBSS, comparison of pre bed rest measurements did not show significant differences. VBM analysis revealed decreased gray matter density in bilateral areas including the frontal medial cortex, the insular cortex and the caudate (see Figure) from 'pre to in bed rest'. Over the same time period, there was an increase in gray matter density in the cerebellum, occipital-, and parietal cortex, including the precuneus (see Figure). The majority of these changes did not recover from 'during to post bed rest'. TBSS analysis did not reveal significant changes in white matter microstructural integrity after correction for multiple comparisons. Uncorrected analyses (p<.015) revealed an increase in RD in the cerebellum and brainstem from pre bed rest to the first week in bed rest that did not recover post bed rest. Extended bed rest, which is an analog for microgravity, can result in gray matter changes and potentially in microstructural white matter changes in areas that are important for neuro motor behavior and cognition. These changes did not recover at two weeks post bed rest. Whether the effects of bed rest wear off at longer times post bed rest, and if they are associated with behavior are important questions that warrant further research.

Koppelmans, V.↗

NASA’s Space Launch System: Launch Capability for Lunar Exploration and Transformative Science

Excitement is building for the first launch of NASA’s Space Launch System (SLS), a unique exploration asset for the agency’s Artemis lunar program as well as for a new generation of science missions. SLS is designed for an array of missions beyond Earth’s orbit. The flexible system, which can be configured for Orion, cargo or Orion with co-manifested payload missions, offers high escape velocities to send more mass to deep space destinations. When configured with an 8.4 m-diameter fairing, SLS offers unmatched payload volume for human exploration and science missions. The initial Block 1 variant will insert at least 26 metric tons (t) to trans-lunar injection (TLI) and the more powerful Block 1B vehicle will launch 34-37 t to TLI using a new-development upper stage. Much of the initial SLS Block 1 vehicle is complete, including the upper stage and payload section, the core stage, engines and the solid rocket boosters. The first mission, Artemis I, launching from modernized and upgraded facilities at Kennedy Space Center (KSC), will be an uncrewed test flight of SLS, Orion and ground processing, with a primary objective of testing Orion’s heat shield at lunar re-entry velocity. Artemis I will have accommodations for 13 6U CubeSat payloads. These CubeSat missions will be deployed along the upper stage disposal trajectory after Orion separates from the vehicle. A rare opportunity for CubeSats to be deployed beyond low Earth orbit (LEO), Artemis I CubeSat missions range from searching for hydrogen and other volatiles on the lunar South Pole to studying the acceleration mechanisms of solar and interplanetary particles from a heliocentric trajectory. With manufacturing of the initial vehicle complete, fabrication and procurement is progressing for the second flight of SLS and Orion, Artemis II. Also an SLS Block 1 and Orion flight launching from KSC, Artemis II will mark the return of American astronauts to deep space with a lunar flyby-free return trajectory mission. With the Artemis III flight, NASA has the goal to land the first woman and the next man on the Moon. Infrastructure beyond SLS will be required for this effort, including elements of the lunar Gateway as well as lunar rovers, landers and additional commercially supplied launch services. SLS, as the only vehicle with the capability to lift 26 t of mass to TLI in its initial Block 1 variant, will remain a key component of this new-era exploration program. Future variants – Block 1B and Block 2 –will lift 34-45 t to TLI. This paper will discuss the status of testing and integration for the Artemis I vehicle, manufacturing progress for the second vehicle and the manifest outlook for primary, co-manifested and secondary payloads in the current deep space exploration environment.

Creech, Stephen D.↗

Resiliency in Future Cislunar Space Architectures

Resiliency is an aspirational metric, and it is a common goal for complex systems – be they engineered space architectures, geopolitical networks, or the human immune system. However, despite the ubiquitous desire for resiliency, the concept is surprisingly difficult to define and apply to future planning efforts. We assert that resiliency can emerge from a layered approach of deliberately chosen capabilities with overlap and flexibility that, in aggregate, result in a resilient system. The challenge is to identify capabilities that contribute to resiliency and to accurately characterize their value. Resiliency is discussed through the lens of future architecture planning, outlining how the National Aeronautics and Space Administration (NASA) can benefit from a shift in approach when transitioning focus to the cislunar environment.

Jason Hay↗

Implementing Scientific Simulation Codes Highly Tailored for Vector Architectures Using Custom Configurable Computing Machines

The motivation for this work comes from an observation that amidst the push for Massively Parallel (MP) solutions to high-end computing problems such as numerical physical simulations, large amounts of legacy code exist that are highly optimized for vector supercomputers. Because re-hosting legacy code often requires a complete re-write of the original code, which can be a very long and expensive effort, this work examines the potential to exploit reconfigurable computing machines in place of a vector supercomputer to implement an essentially unmodified legacy source code. Custom and reconfigurable computing resources could be used to emulate an original application's target platform to the extent required to achieve high performance. To arrive at an architecture that delivers the desired performance subject to limited resources involves solving a multi-variable optimization problem with constraints. Prior research in the area of reconfigurable computing has demonstrated that designing an optimum hardware implementation of a given application under hardware resource constraints is an NP-complete problem. The premise of the approach is that the general issue of applying reconfigurable computing resources to the implementation of an application, maximizing the performance of the computation subject to physical resource constraints, can be made a tractable problem by assuming a computational paradigm, such as vector processing. This research contributes a formulation of the problem and a methodology to design a reconfigurable vector processing implementation of a given application that satisfies a performance metric. A generic, parametric, architectural framework for vector processing implemented in reconfigurable logic is developed as a target for a scheduling/mapping algorithm that maps an input computation to a given instance of the architecture. This algorithm is integrated with an optimization framework to arrive at a specification of the architecture parameters that attempts to minimize execution time, while staying within resource constraints. The flexibility of using a custom reconfigurable implementation is exploited in a unique manner to leverage the lessons learned in vector supercomputer development. The vector processing framework is tailored to the application, with variable parameters that are fixed in traditional vector processing. Benchmark data that demonstrates the functionality and utility of the approach is presented. The benchmark data includes an identified bottleneck in a real case study example vector code, the NASA Langley Terminal Area Simulation System (TASS) application.

Rutishauser, David↗

NASA's Space Launch System Progress Report

Exploration beyond Earth will be an enduring legacy for future generations, confirming America's commitment to explore, learn, and progress. NASA's Space Launch System (SLS) Program, managed at the Marshall Space Flight Center, is responsible for designing and developing the first exploration-class rocket since the Apollo Program's Saturn V that sent Americans to the Moon. The SLS offers a flexible design that may be configured for the MultiPurpose Crew Vehicle and associated equipment, or may be outfitted with a payload fairing that will accommodate flagship science instruments and a variety of high-priority experiments. Both options support a national capability that will pay dividends for future generations. Building on legacy systems, facilities, and expertise, the SLS will have an initial lift capability of 70 metric tons (mT) and will be evolvable to 130 mT. While commercial launch vehicle providers service the International Space Station market, this capability will surpass all vehicles, past and present, providing the means to do entirely new missions, such as human exploration of asteroids and Mars. With its superior lift capability, the SLS can expand the interplanetary highway to many possible destinations, conducting revolutionary missions that will change the way we view ourselves, our planet and its place in the cosmos. To perform missions such as these, the SLS will be the largest launch vehicle ever built. It is being designed for safety and affordability - to sustain our journey into the space age. Current plans include launching the first flight, without crew, later this decade, with crewed flights beginning early next decade. Development work now in progress is based on heritage space systems and working knowledge, allowing for a relatively quick start and for maturing the SLS rocket as future technologies become available. Together, NASA and the U.S. aerospace industry are partnering to develop this one-of-a-kind asset. Many of NASA's space centers across the country will provide their unique expertise to the Space Launch System endeavor. Unique infrastructure to be used includes the Michoud Assembly Facility for tank manufacturing, Stennis Space Center for engine testing, and Kennedy Space Center for processing and launch. As this panel will discuss, the SLS team is dedicated to doing things differently-from applying lean oversight/insight models to smartly using legacy hardware and existing facilities. Building on the foundation laid by over 50 years of human and scientific space flight--and on the lessons learned from the Apollo, Space Shuttle, and Constellation Programs-the SLS team has delivered both technical trade studies and business case analyses to ensure that the SLS architecture will be safe, affordable, reliable, and sustainable.

Singer, Joan A.↗

Integrated Surface Power Strategy for Mars

A National Aeronautics and Space Administration (NASA) study team evaluated surface power needs for a conceptual crewed 500-day Mars mission. This study had four goals: 1. Determine estimated surface power needed to support the reference mission; 2. Explore alternatives to minimize landed power system mass; 3. Explore alternatives to minimize Mars Lander power self-sufficiency burden; and 4. Explore alternatives to minimize power system handling and surface transportation mass. The study team concluded that Mars Ascent Vehicle (MAV) oxygen propellant production drives the overall surface power needed for the reference mission. Switching to multiple, small Kilopower fission systems can potentially save four to eight metric tons of landed mass, as compared to a single, large Fission Surface Power (FSP) concept. Breaking the power system up into modular packages creates new operational opportunities, with benefits ranging from reduced lander self-sufficiency for power, to extending the exploration distance from a single landing site. Although a large FSP trades well for operational complexity, a modular approach potentially allows Program Managers more flexibility to absorb late mission changes with less schedule or mass risk, better supports small precursor missions, and allows a program to slowly build up mission capability over time. A number of Kilopower disadvantages-and mitigation strategies-were also explored.

Rucker, Michelle↗

Monitoring Airspace Complexity and Determining Contributing Factors

The national airspace has evolved over many years to accommodate increased traffic demand [1] while simultaneously maintaining one of the safest forms of transportation [2], [3]. One of the reasons for this success is the ability of the system and the operators to adapt and accommodate to situations that routinely disrupt optimal operations. These situations may include: adverse weather, delays, early arrivals, equipment outages, and other factors that are outside the operators ability to control. These factors can lead to states where automation is unable to properly handle these issues and therefore air traffic controllers and pilots have to intervene, ultimately increasing communication between operators resulting in higher workload. As controller workload increases to handle sub-optimal operating conditions this can be viewed as an increase in complexity. The reasoning for this is because humans are now required to make tactical decisions in response to external factors, resulting in a departure from the strategic plan where operations would be more efficiently managed. Human operators control airspace complexity under rigid regulations that are constantly changing. The airspace is divided into sectors and the number of aircraft assigned to each controller is limited for safe handling. There has been past work that devised airspace complexity metrics in commercial aviation and related these metrics to controller workload (e.g., [4],[5]). The upper bounds on the system load are pre-determined. Such bounds on complexity make for a safe system, but the system cannot scale and adapt to autonomous, dense, and heterogeneous traffic, including the many types of Unmanned Aerial Vehicles (UAVs) envisioned to be added to the operations. We hypothesize that, as traffic density and heterogeneity grow, and other key metrics change, there will be phase transitions at which the way traffic should be managed changes significantly [6]. We offer a method for in-time detection of contributing factors that lead to phase transitions, characterized by increased complexity. To the best of our knowledge, there is no tool similar to our proposed effort that identifies such contributing factors or precursor patterns. To define the scope we are proposing to measure complexity from the viewpoint of the Terminal Radar Approach Control Facilities (TRACON) controller’s perspective. In particular we are analyzing arrivals into KSFO. With safety as the top concern for airspace operators, it is important to recognize that as density and heterogeneity grow, the focus of the system will change. Times of the day when the airspace has low density and heterogeneity, the flights will follow more efficient paths where the aircraft move on established routes that are more or less directly to the destination. However, when density and heterogeneity increases, the system will begin changing focus to avoiding conflicts and collisions and route the flights in a more flexible way. Higher flexibility requires more communication and coordination between controllers and pilots which the current automation is unable to handle. This paper proposes a novel approach that monitors airspace complexity at multiple scales, uses a Machine Learning-based tool that predicts when operations will transition to a regime of greater complexity, and identifies actions that can reduce the complexity while still maintaining efficient and safe operations. We demonstrate our proposed approach using data from multiple complementary sources. This includes, but is not limited to: historical aircraft surveillance data from NASA’s Sherlock Data Warehouse [7], METAR weather data, and airport configuration data from Aviation System Performance Metrics (ASPM). The surveillance data flight paths are sampled at a variable sample rate — increasing as the aircraft approaches the airport. This is due to how Sherlock manages flight track stitching between different radar facilities which have different sampling rates. The weather and performance data are logged at defined intervals throughout the day at a courser refresh rate. In addition to the logged data and metrics, we leverage pre-defined Standard Terminal Arrival Routes (STARs) procedures to characterize the path of each flight. Each flight files for one of these routes in the flight plan well before entering the terminal airspace, and approximately follows the route until it leaves the STAR, typically on the final fix of a runway transition. However, most flights do not always fly the full STAR procedure to completion [8], but the majority do adhere to the fixes within the common route of the procedure. Our approach leverages fixes in the common route of each of the STARs to build a reference path to the airport. This allows us to characterize the flight paths in what we are defining as the “maneuvering area” (the airspace between the STAR and before the flight is lined up on the runway’s final approach) to determine how off nominal the flights are to calculate its complexity score. Determining airspace complexity is a concept that does not have a concrete answer. In designing this metric, we consider what increases the workload for the air traffic controllers. Consequently more specialized vectoring maneuvers results in higher workload. Accordingly, we start with a theory: each flight has a direct path it takes from the STAR’s common route to the final approach’s outer marker fix for the flight’s landing runway. It is important to note that the direct path is only used as a reference. If the majority of the flights have a large consistent offset as compared to other routes it does not necessarily mean that those flights have higher complexity. We are merely building a distribution based on this direct path for that particular STAR and runway pair to determine the normal mode of operations for that route. Flights that are in the upper tail of these distributions will result in higher complexity scores and flights that fly in the median will represent the normal mode of operations and therefore will have lower complexity scores. Since flights following each STAR route take different paths to the airport, we have a different distribution for each STAR route and therefore can model these distributions to compute a complexity score from their respective normalized distributions. To evaluate the effectiveness of our proposed airspace complexity metric we will compare against an established approach based on trajectory clustering [9]. This unsupervised learning technique consists of the following steps: (1) identify the general maneuvering areas (waypoints) by performing $\kappa$-means or DBSCAN clustering on locations where aircraft frequently turn based on the surveillance radar track data, (2) map flight trajectories onto sequences of waypoints, and (3) cluster the sequences based on their common subsequences. From a high-level perspective, this baseline model learns nominal operations in the airspace through the sequence of waypoints that are representative of where aircraft change direction and defines deviations from the nominal operations as “complex.” Therefore, more deviations from the nominal operations correspond to higher complexity values. For our validation, we re-implemented this technique and tune model hyper-parameters to correctly detect waypoints for the arrival traffic into the San Francisco bay area. We will compute the complexity measure over a one-year period using our proposed technique as well as the baseline. Our validation will be based on each technique’s ability to detect a set of undesirable outcomes (e.g., go-arounds, holding patterns, average time in the airspace, etc.). Since our current complexity metric is derived from the offset from the direct reference path, it’s important to understand what causes these offsets. In many of the flights with high offset distance, flights performing holding patterns and S turns can be observed. These maneuvering tactics are utilized to add distance between the aircraft and the destination runway to prevent multiple flights from having conflicting arrival times. In order to predict a rise in complexity (or the precursor to complexity), it’s necessary to be able to identify these potential conflicts (which in turn, result in higher offsets). To do this, we define a “representative flight” for each STAR route and runway pair. This flight is approximately the path the flight would take if there was a clear path with no other flights in the airspace — including the time remaining to the airport. We first identify the flights for a given STAR runway pair using the offset to the reference path distributions that fall between the 44-55 percentiles. This yields the flights that conform to the most normal mode of operation. Each of these flights is partitioned based on the percent complete from the entry point into the maneuvering areas from 0\% – 100\% complete. Then for each percent “bin”, we take the median value of the flight’s latitude/longitude coordinates, airspeed, and (non causal) time remaining to the airport to construct a lookup table for each percent complete bin on a given route. As a flight enters the maneuvering area, we can find the estimated arrival time of a flight to the airport by finding the closest point to the representative path’s percent complete bin (relative to the flight’s current position at any snapshot in the airspace) and therefore retrieve the corresponding remaining time left on the “representative path”. We assume that the flight will follow the representative path to completion when deriving these estimates. We can then compare these estimated arrival times against other flights for the same snapshot in time to identify potential conflicts. If more flights are estimated to arrive within a tolerance window than there are runways available, then we have a potential conflict. We can use this derived measure along with other factors expected to add disruption to the operation such as weather and runway configuration changes as an input to machine learning tools to detect precursors that increases in our complexity measure. This novel method will assist in uncovering insights into the contributing factors that lead to increased complexity that may allow for in-time responses to avoid reaching a high complexity state in the airspace.

complexity↗

Mission and Implementation of an Affordable Lunar Return

We present an architecture that establishes the infrastructure for routine space travel by taking advantage of the Moon's resources, proximity and accessibility. We use robotic assets on the Moon that are teleoperated from Earth to prospect, test, demonstrate and produce water from lunar resources before human arrival. This plan is affordable, flexible and not tied to any specific launch vehicle solution. Individual surface pieces are small, permitting them to be deployed separately on small launchers or combined together on single large launchers. Schedule is our free variable; even under highly constrained budgets, the architecture permits this program to be continuously pursued using small, incremental, cumulative steps. The end stage is a fully functional, human-tended lunar outpost capable of producing 150 metric tonnes of water per year enough to export water from the Moon and create a transportation system that allows routine access to all of cislunar space. This cost-effective lunar architecture advances technology and builds a sustainable transportation infrastructure. By eliminating the need to launch everything from the surface of the Earth, we fundamentally change the paradigm of spaceflight.

Spudis, Paul↗

Probabilistic Prognosis of Non-Planar Fatigue Crack Growth

Quantifying the uncertainty in model parameters for the purpose of damage prognosis can be accomplished utilizing Bayesian inference and damage diagnosis data from sources such as non-destructive evaluation or structural health monitoring. The number of samples required to solve the Bayesian inverse problem through common sampling techniques (e.g., Markov chain Monte Carlo) renders high-fidelity finite element-based damage growth models unusable due to prohibitive computation times. However, these types of models are often the only option when attempting to model complex damage growth in real-world structures. Here, a recently developed high-fidelity crack growth model is used which, when compared to finite element-based modeling, has demonstrated reductions in computation times of three orders of magnitude through the use of surrogate models and machine learning. The model is flexible in that only the expensive computation of the crack driving forces is replaced by the surrogate models, leaving the remaining parameters accessible for uncertainty quantification. A probabilistic prognosis framework incorporating this model is developed and demonstrated for non-planar crack growth in a modified, edge-notched, aluminum tensile specimen. Predictions of remaining useful life are made over time for five updates of the damage diagnosis data, and prognostic metrics are utilized to evaluate the performance of the prognostic framework. Challenges specific to the probabilistic prognosis of non-planar fatigue crack growth are highlighted and discussed in the context of the experimental results.

Leser, Patrick E.↗

A Year of Progress: NASA's Space Launch System Approaches Critical Design Review

NASA's Space Launch System (SLS) made significant progress on the manufacturing floor and on the test stand in 2014 and positioned itself for a successful Critical Design Review in mid-2015. SLS, the world's only exploration-class heavy lift rocket, has the capability to dramatically increase the mass and volume of human and robotic exploration. Additionally, it will decrease overall mission risk, increase safety, and simplify ground and mission operations - all significant considerations for crewed missions and unique high-value national payloads. Development now is focused on configuration with 70 metric tons (t) of payload to low Earth orbit (LEO), more than double the payload of the retired Space Shuttle program or current operational vehicles. This "Block 1" design will launch NASA's Orion Multi-Purpose Crew Vehicle (MPCV) on an uncrewed flight beyond the Moon and back and the first crewed flight around the Moon. The current design has a direct evolutionary path to a vehicle with a 130t lift capability that offers even more flexibility to reduce planetary trip times, simplify payload design cycles, and provide new capabilities such as planetary sample returns. Every major element of SLS has successfully completed its Critical Design Review and now has hardware in production or testing. In fact, the SLS MPCV-to-Stage-Adapter (MSA) flew successfully on the Exploration Flight Test (EFT) 1 launch of a Delta IV and Orion spacecraft in December 2014. The SLS Program is currently working toward vehicle Critical Design Review in mid-2015. This paper will discuss these and other technical and programmatic successes and challenges over the past year and provide a preview of work ahead before the first flight of this new capability.

Askins, Bruce↗

An Overview of Aeropropulsion Wind Tunnel Productivity Improvements at the NASA Lewis Research Center

Enhancing wind tunnel test productivity in terms of increased efficiency, reduced cost, and expanded flexibility is a high-priofity goal of the NASA Lewis Research Center's Aeropropulsion Facilities and Experiments Division. Over the past several years, several significant productivity improvements were implemented: test times were shortened by using facility and test article automation; additional flexibility was provided to the research customer by using the remote-access control room and by expanding facility operating envelopes; facility throughput was greatly increased and electric power cost for facility operation reduced by using the three-shift operation. One method being used to reduce electric power costs and expand the facility operating envelop in the 8- by 6-Foot Supersonic Wind Tunnel is operating the drive system with only one of the three drive motors. Metrics are being used to document several categories of facility utilization, which in turn allows tracking of test productivity. This paper provides an overview of the productivity improvements already in place in the large wind tunnels at NASA Lewis and presents plans for future improvements.

Arrington, Allen↗

Conformal Ablative Thermal Protection System for Planetary and Human Exploration Missions:An Overview of the Technology Maturation Effort

The Office of Chief Technologist, NASA identified the need for research and technology development in part from NASAs Strategic Goal 3.3 of the NASA Strategic Plan to develop and demonstrate the critical technologies that will make NASAs exploration, science, and discovery missions more affordable and more capable. Furthermore, the Game Changing Development Program is a primary avenue to achieve the Agencys 2011 strategic goal to Create the innovative new space technologies for our exploration, science, and economic future. The National Research Council (NRC) Space Technology Roadmaps and Priorities report highlights six challenges and they are: Mass to Surface, Surface Access, Precision Landing, Surface Hazard Detection and Avoidance, Safety and Mission Assurance, and Affordability. In order for NASA to meet these challenges, the report recommends immediate focus on Rigid and Flexible Thermal Protection Systems. Rigid TPS systems such as Avcoat or SLA are honeycomb based and PICA is in the form of tiles. The honeycomb systems are manufactured using techniques that require filling of each (38 cell) by hand, and in a limited amount of time all of the cells must be filled and the heatshield must be cured. The tile systems such as PICA pose a different challenge as the low strain-to-failure and manufacturing size limitations require large number of small tiles with gap-fillers between the tiles. Recent investments in flexible ablative systems have given rise to the potential for conformal ablative TPS. A conformal TPS over a rigid aeroshell has the potential to solve a number of challenges faced by traditional rigid TPS materials. The high strain-to-failure nature of the conformal ablative materials will allow integration of the TPS with the underlying aeroshell structure much easier and enable monolithic-like configuration and larger segments (or parts) to be used. By reducing the overall part count, the cost of installation (based on cost comparisons between blanket and tile materials on shuttle) should be significantly reduced. The conformal ablator design will include a simplified design of seams between gore panels, which should eliminate the need for gap filler design, and should accommodate a wider range of allowable carrier structure imperfections when compared to a rigid material such as PICA.The Conformal TPS development project leverages the past investments made by earlier projects with a goal to develop and deliver a TRL 5 conformal TPS capable of 250 Wcm2 for missions such as MSL or COTS missions. The capabilities goal for the conformal TPS is similar to an MSL design reference mission (250 Wcm2) with matching pressures and shear environments. Both conformal and flexible carbon-felt based materials were successfully tested in stagnation aerothermal environments above 500 Wcm2 under earlier programs. Results on a myriad of materials developed during FY11 were used to determine which materials to start with in FY12. In FY12, the conformal TPS element focused on establishing materials requirements based on MSL-type and COTS Low Earth orbit (LEO) conditions (q 250 Wcm2) to develop and deliver a Conformal Ablative TPS. In FY13, development and refining metrics for mission utilization of conformal ablator technology along with assessment for potential mission stakeholders will be carried out.

Thermal protection materials↗

Vertiport Dynamic Density

Advanced Air Mobility (AAM) is envisioned to be another spoke in a region’s transportation system, supplementing ground-based travel with air-based travel. Eventually, air taxis will be pervasive, convenient, and affordable. As demand and operations tempo increase, congestion may arise. Several characteristics of AAM reduce the applicability of techniques used in today’s National Airspace System (NAS) to manage congestion. AAM will include both scheduled and non-scheduled, on-demand operations, challenging strategic deconfliction algorithms. Flights will be fairly short, traversing an urban area, not hundreds or thousands of miles, with corresponding low energy reserves, prohibiting excessive delays. Flight operators will need flexibility in operations, scheduling a flight only minutes before departure, or diverting to an alternate vertiport if it becomes advantageous, further adding to trajectory uncertainty that would challenge strategic deconfliction. Finally, operators will desire privacy to protect sensitive information or preserve competitive advantage, limiting early access to intent information. In this paper, we present an approach for managing congestion at vertiports by providing insight into the traffic situation to support operationally-advantageous and safe land or divert decisions. We propose a metric designed with usefulness and usability in AAM operations in mind. The metric uses the sociology concept of dynamic density (DD) that takes into consideration not only number of flights, but also the interaction of those flights with the vertiport’s limited resources, namely the landing pads and the parking spots. DD supports a Pilot in Command (PIC) with decisions about whether to proceed, expedite, delay, or divert; and supports air traffic control (ATC) and vertiport operators in airspace management and vertiport usage. We demonstrate the metric on a notional vertiport scenario. We also show that DD provides better insight into congestion and resulting flight delays than an aircraft count metric used in traditional air traffic management.

Lilly Spirkovska↗

Online Planning Algorithm

AVA v2 software selects goals for execution from a set of goals that oversubscribe shared resources. The term goal refers to a science or engineering request to execute a possibly complex command sequence, such as image targets or ground-station downlinks. Developed as an extension to the Virtual Machine Language (VML) execution system, the software enables onboard and remote goal triggering through the use of an embedded, dynamic goal set that can oversubscribe resources. From the set of conflicting goals, a subset must be chosen that maximizes a given quality metric, which in this case is strict priority selection. A goal can never be pre-empted by a lower priority goal, and high-level goals can be added, removed, or updated at any time, and the "best" goals will be selected for execution. The software addresses the issue of re-planning that must be performed in a short time frame by the embedded system where computational resources are constrained. In particular, the algorithm addresses problems with well-defined goal requests without temporal flexibility that oversubscribes available resources. By using a fast, incremental algorithm, goal selection can be postponed in a "just-in-time" fashion allowing requests to be changed or added at the last minute. Thereby enabling shorter response times and greater autonomy for the system under control.

Rabideau, Gregg R.↗

NASA's Space Launch System Begins Integration, Stacking in Preparation for Artemis I Launch

The Artemis era of human lunar exploration is nearing take-off as NASA’s new super heavy-lift launch vehicle, the Space Launch System (SLS), begins stack-ing and integration operations in mid-2020 at Kennedy Space Center (KSC) in Florida. With a planned upgrade path to progressively more powerful vehicles and availability in crew and cargo configurations, SLS provides a unique and flexible launch solution to send crew, large-scale infrastructure and robotic probes to deep space. The SLS Block 1 vehicle, the initial variant to fly, is optimized for lunar missions with a proven propulsion system consisting of four liquid hydrogen (LH2)/liquid oxygen (LOX)-fed RS-25 engines and twin five-segment solid rocket boosters (SRBs). The Block 1 vehicle can also be outfitted with an industry-standard 5 m-class payload fairing (the “cargo” configuration) and will launch at least 27 metric tons (t) of mass to trans-lunar injection (TLI). SLS is the backbone of NASA’s Artemis program, which will return the agency’s human spaceflight program to the Moon for the first time since 1972. For the Artemis I mission, SLS will send an uncrewed Orion spacecraft to TLI, where it will enter a distant retrograde lunar orbit and fly 38,000 nmi past the Moon – farther than any spacecraft built for humans has ever traveled. The SLS Block 1 vehicle for Artemis I completed manufacturing in 2019. Several elements, including the upper stage, have been delivered to the Exploration Ground Systems (EGS) program at KSC and are being prepped for integration and stack-ing. The five-segment solid rocket boosters – the largest and most powerful ever built for flight – are also complete. The booster motor segments for the Artemis I flight are scheduled to ship from prime contractor Northrop Grumman’s Utah facilities and begin stacking and integration at KSC in June 2020. The SLS core stage is the largest rocket stage NASA has ever built in terms of volume and height, and includes the avionics and the tanks that feed cryogenic propellant to the four RS-25s (formerly Space Shuttle Main Engines [SSMEs]). They have been modified with an updated controller and nozzle insulation to protect them from the hotter launch environment. The SLS core stage is currently being test-ed at NASA’s Stennis Space Center (SSC) in a series of “green run” tests to verify it meets design and performance requirements. Following the green run test series, which is scheduled to culminate with a full-duration hot-fire of the four RS-25 engines, the core stage will ship to KSC and be stacked between the sol-id rocket boosters in the Vehicle Assembly Building (VAB). Integration of the vehicle will continue with the upper stage, known as the Interim Cryogenic Propulsion Stage (ICPS) and the Launch Vehicle Stage Adapter (LVSA) on the core stage. Another adapter, the Orion Stage Adapter (OSA), connects SLS to Orion and provides housing for 13 6U CubeSat payloads manifested on Artemis I. The CubeSats will be released in deep space after Orion separates from the vehicle, and the flight marks the first ride share opportunity for independent small-sats to deep space. The second major SLS variant to come online, Block 1B, replaces the single-engine ICPS with a four-engine LH2/LOX Exploration Upper Stage (EUS). This more powerful upper stage, along with other vehicle up-grades, will enable the Block 1B vehicle to launch 38-42 t to TLI, depending on crew or cargo configuration. The final evolution of the vehicle, Block 2, will onramp evolved solid rocket boosters to increase mass to TLI to 43-46 t, de-pending on crew or cargo configuration. The Block 1B/Block 2 vehicles can be outfitted with an 8.4 m-diameter payload fairing in 19.1 m or 27.4 m lengths, to provide unprecedented volume for payloads. With the initial Block 1 vehicle completely manufactured and the core stage in final testing before shipping to KSC, the SLS Program and its industry partners have made significant progress manufacturing subsequent vehicles. For the second Block 1 vehicle, the solid rocket motor segments are complete, as are the RS-25 engines with controllers. All five major components of the Artemis II core stage – the forward skirt, LOX and LH2 tanks, intertank and engine section – are manufactured and technicians are installing subsystems at NASA’s rocket factory, Michoud Assembly Facility. The RL-10 engine for the Artemis II ICPS is complete and panels have been machined for its LH2 tank. In addition, panels are machined for the vehicle’s two adapters, with welding scheduled to begin in summer 2020. Flight hard-ware is also in production for the third SLS vehicle, with several booster motor segments cast. The pace of development on the EUS has increased, with the goal to complete Critical Design Review (CDR) in December 2020. Several EUS test rings have been machined at Michoud. The EUS is designed to exe-cute a variety of missions – human spaceflight, deployment of deep-space infra-structure, or high-C3 missions to the outer solar system – with crew and cargo configurations available beginning in the mid-2020s. The near-term goal for the nation’s powerful new space exploration asset, however, is to launch the Arte-mis program, and send the first woman and the next man to the lunar surface. At the Astrodynamics Specialist Conference, the SLS program will update the community on the progress of the initial Block 1 vehicle in final green run test-ing, integration and stacking. In addition, this paper will provide an update to the community on the manufacturing status of subsequent Block 1 and Block 1B vehicles.

Steve Creech↗

Potential Advantages of Conducting Short Duration Visits to the Martian Surface

Recent NASA concepts for human missions to Mars, including the Evolvable Mars Campaign and Design Reference Architecture 5.0, have focused on the conduct of missions with long duration stays on the Martian surface. The decision to focus on long duration missions (typically to a single site) is driven by a desire to increase the perceived sustainability of the human Mars campaign, predicated on the assumption that sustainability is best achieved by maximizing the level of activity on the surface, providing for continuous growth in operations, and promoting pioneering of Mars. However, executing a series of long duration missions to a single site is not the only option for human exploration of Mars that has been proposed. Other architectures have been evaluated that focus on missions with short duration surface stays, with each mission visiting a separate site on the surface. This type of architecture is less efficient in that elements are not typically reused from one mission to the next but requires a far less complex surface architecture. There are potentially valid arguments to be made that a short duration, multiple site approach could result in different types of advantages when compared to the long duration, single site approach to Mars exploration, particularly for initial human missions to Mars. These arguments revolve around four areas: Achieved Value, Risk Mitigation, Developmental Affordability, and Operational Affordability & Flexibility. The question of Achieved Value relates to the prioritization of goals for Martian exploration. As discussed, goals related to pioneering and expanding human presence are often referenced as justifications for the long duration approach. However, there are other competing goals, including science and exploration. While there is not a clear consensus among planetary scientists, many have argued that the value of being able to visit multiple sites could outweigh the value of continually visiting a single site. Risk Mitigation is a major concern for initial human missions to Mars. There are a number of hazards related to operating on the Martian surface that are not well characterized. It may be desirable to conduct a series of short duration missions to better understand the nature of these risks prior to committing to a long duration mission. Developmental Affordability relates to the ability of NASA and its partners to develop and deploy the proposed architecture. Any human missions to Mars will be among the most complex endeavors ever undertaken. The capabilities that must be developed to enable any human Mars missions are extremely challenging. The total design, development, test, and evaluation (DDT&E) budget required to develop just the essential capabilities alone will be substantial. If additional surface capabilities are required to support long duration surface stays, the development effort could be unaffordable. Operational Affordability & Flexibility relates to the continued costs to execute the Mars campaign. Long duration missions, even with some amount of in-situ resource utilization, require a significant level of resupply for every mission. This requires additional launches and in-space transportation assets, increasing the operational complexity and total operational cost. This paper will explore each of the four potential advantages of short duration missions in detail. The authors will present comparisons between proposed long duration and short duration architectures through an evaluation of relevant performance, cost, and risk metrics.

Stromgren, Chel↗

Design Considerations for Practical Li-S Batteries for Electric Aviation

The development of high-energy, high-safety, and high-power batteries beyond electric automotive standards is critical for future electric aviation applications. Non-volatile solid-state electrolytes (SSE) offer many promising advantages over traditional flammable liquid electrolytes. Solid-state electrolytes may be an enabling technology for certain battery chemistries by preventing detrimental interactions with liquid electrolytes, for example prevention of the dissolution of intermediates in lithium-sulfur common in traditional liquid organic solvents. However, significant manufacturing challenges must be overcome before the adoption of such technology. This research was conducted to identify processing techniques for producing solid-state battery components with practical dimensions and weights for enabling high specific energy cells. Traditional research has identified a range of very high theoretical ionic conductivities but are impractical due to their instability or inability to be manufactured. Electrolytes explored in this study were produced as sulfide-polymer composites with densified thicknesses below 40 micron using a tape-casting technique and thermoplastic elastomer binder. The combination of high chemical compatibility and flexibility produced robust films that had moderate impact on the ionic conductivity but was capable of dramatically reducing the parasitic mass. Despite minimal conductivity losses, films were produced 10-15 times thinner than comparable bulk powder electrolytes thus leading to overall lower film resistance. Conductivity is maintained above 0.2mS/cm for composite electrolytes. Through the analysis of materials based on their physical properties, such as density, practical cells can be designed. Based on this, low density sulfide-solid-state electrolytes are a promising candidate for achieving the energy and safety metrics for electric aviation, however, further optimization of cathode microstructure and composite processing will be required to achieve the high power metrics and will be the focus of further studies. Additionally, fabrication challenges arise when utilizing metallic lithium foil, due to its soft nature, as overflow and mechanical short circuit can occur on assembly which remains a challenge to overcome before metallic lithium anodes can be fully realized.

batteries↗

High-Altitude ADS-B/GPS LPV Flight Tests on a NASA ER-2 Research Airplane

The research presented in this paper describes the conceptual design of a system architecture that integrates Automatic Dependent Surveillance-Broadcast (ADS-B) and Global Positioning System (GPS) Localizer Performance Vertical (LPV) guidance technology onto a unique high-altitude research airplane: a United States Air Force (USAF) / Lockheed Martin (Bethesda, Maryland) Aeronautics U-2S airplane. The design features modern display capabilities to provide air-to-air surveillance and precision navigation, to adhere to Federal Aviation Administration (FAA) certification standards for operations in upper Class E airspace. The National Aeronautics and Space Administration (NASA) variant of the U-2S, now called the Earth Resources (ER-2) airplane, remains unrivaled in the art of sustained high-altitude flight for scientific expeditions. Capable of routinely cruising above flight level (FL) 650 that had been considered, at inception, the domain of only the most elite experimental research aircraft types. Nicknamed the Dragon Lady, this U-2S research testbed is still one of the most advanced aircraft in the world. The exceptional military design of the vehicle, security guidelines, and the performance envelope of the ER-2 posed unique challenges to the integration of modern civilian avionics. ADS-B epitomizes the next generation of surveillance technology, incorporating both air and ground aspects. ADS-B provides air traffic control (ATC) with a more accurate picture of the three-dimensional positioning of aircraft in various phases of flight, including en route, terminal, approach, and ground operations. The airborne surveillance system broadcasts its identification, position, altitude, velocity, and other information. GPS LPV represents a significant advancement in aviation technology, emphasizing the pivotal role that GPS and Performance-Based Navigation concepts will play in the foreseeable future. This technology represents a shift from sensor-based navigation to performance-based navigation, allowing for more flexible and efficient use of airspace. This research described herein is structured as follows: Section II, “Systems Background,” provides a systems background and description of an ADS-B and GPS LPV system equipped on the high-altitude ER-2 research airplane to satisfy the FAA airworthiness requirements for high-altitude flight operations. Section III, “Flight Test System,” describes the flight-test airplane systems. Section IV, “Analysis of GPS SBAS, Safety, and Ground Tests,” provides an overview of the GPS Satellite-Based Augmentation System (SBAS) and an analysis of the GPS LPV metrics, safety, and ground tests. Section V, “High-Altitude Flight Tests,” describes the high-altitude flight tests, including 3 flight-test results, analysis, human factors, and lessons learned. Section VI, the conclusion, draws insights from the lessons learned, discusses the design challenges associated with ADS-B and GPS LPV, and showcases the paramount significance of these pivotal technologies in aircraft surveillance and navigation.

Ricardo A. Arteaga↗