Search NASA⌕ Search

SEARCH · Search NASA

Results for “formulation team”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Development of Li-Metal Battery Cell Chemistries at NASA Glenn Research Center

State-of-the-Art lithium-ion battery technology is limited by specific energy and thus not sufficiently advanced to support the energy storage necessary for aerospace needs, such as all-electric aircraft and many deep space NASA exploration missions. In response to this technological gap, our research team at NASA Glenn Research Center has been active in formulating concepts and developing testing hardware and components for Li-metal battery cell chemistries. Lithium metal anodes combined with advanced cathode materials could provide up to five times the specific energy versus state-of-the-art lithium-ion cells (1000 Whkg versus 200 Whkg). Although Lithium metal anodes offer very high theoretical capacity, they have not been shown to successfully operate reversibly.

battery↗

The Evolution of Team-X: 25 Years of Concurrent Engineering Design Experience

Established in 1995 in response to NASA’s “Faster, Better, Cheaper” era, Team-X was born from a need to perform rapid space mission design for principal investigator-led competed proposals. The success and sustainability of Team-X over the 25 years that have followed is directly attributable to the Team-X business model and its evolution over time. While dozens of organizations and institutions have emulated the Team-X design process, there are nuances to the Team-X business model that are unique to JPL, and explain why it is different than other concurrent design teams. One of the key components of a business model is the customer segments that are served. Team-X was founded to conduct the Pre-Phase A work necessary to formulate a portfolio of multiple planetary mission concepts, but has since expanded to include the capability to conduct studies for Earth science, astrophysics, and heliophysics missions as well as Human Exploration and Operations missions and space technology development. Team-X delivers value to its clients both in terms of speed and cost. Team-X has also added value by creating teams to enable the development of Instrument and SmallSat Concepts. Value has further been enhanced through a revision of its process for reviews and the addition of pre-design architecting capabilities. Other aspects of the Team-X infrastructure, in addition to study process, have enabled it to succeed for over a quarter century. From our most important resource, the people, our tools, especially for cost estimating, as well as our increasing capable IT infrastructure have contributed to our capability to meet the demands of our clients. The Team-X business model and its evolution over time, position it well for success in the decades to come.

Murphy, Jonathan↗

The Application of Lean Thinking Principles and Kaizen Practices for the Successful Development and Implementation of the Ares I-X Flight Test Rocket and Mission

On October 28, 2009 the Ares I-X flight test rocket launched from Kennedy Space Center and flew its suborbital trajectory as designed. The mission was successfully completed as data from the test, and associated development activities were analyzed, transferred to stakeholders, and well documented. Positive lessons learned from Ares I-X were that the application of lean thinking principles and kaizen practices are effective in streamlining development activities. Ares I-X, like other historical rocket development projects, was hampered by technical, cost, and schedule challenges and if not addressed boldly could have resulted in cancellation of the test. The mission management team conducted nine major meetings, referred to as lean events, across its elements to assess plans, procedures, processes, requirements, controls, culture, organization, use of resources, and anything that could be changed to optimize schedule or reduce risk. The preeminent aspect of the lean events was the focus on value added activities and the removal or at least reduction in non-value activities. Trained Lean Six Sigma facilitators assisted the Ares I-X developers in conducting the lean events. They indirectly helped formulate the mission s own unique methodology for assessing schedule. A core team was selected to lead the events and report to the mission manager. Each activity leveraged specialized participants to analyze the subject matter and its related processes and then recommended alternatives and solutions. Stakeholders were the event champions. They empowered and encouraged the team to succeed. The keys to success were thorough preparation, honest dialog, small groups, adherence to the Ares I-X ground rules, and accountability through disciplined reporting and tracking of actions. This lean event formula was game-changing as demonstrated by the success of Ares I-X. It is highly recommended as a management tool to help develop other complex systems efficiently. The key benefits for Ares I-X were obtaining unambiguous schedule margin, defining enabling options for risk reduction, and most importantly a stronger more unified team.

Askins, B. R.↗

A Virtual Mission Operations Center: Collaborative Environment

The Virtual Mission Operations Center - Collaborative Environment (VMOC-CE) intent is to have a central access point for all the resources used in a collaborative mission operations environment to assist mission operators in communicating on-site and off-site in the investigation and resolution of anomalies. It is a framework that as a minimum incorporates online chat, realtime file sharing and remote application sharing components in one central location. The use of a collaborative environment in mission operations opens up the possibilities for a central framework for other project members to access and interact with mission operations staff remotely. The goal of the Virtual Mission Operations Center (VMOC) Project is to identify, develop, and infuse technology to enable mission control by on-call personnel in geographically dispersed locations. In order to achieve this goal, the following capabilities are needed: Autonomous mission control systems Automated systems to contact on-call personnel Synthesis and presentation of mission control status and history information Desktop tools for data and situation analysis Secure mechanism for remote collaboration commanding Collaborative environment for remote cooperative work The VMOC-CE is a collaborative environment that facilitates remote cooperative work. It is an application instance of the Virtual System Design Environment (VSDE), developed by NASA Goddard Space Flight Center's (GSFC) Systems Engineering Services & Advanced Concepts (SESAC) Branch. The VSDE is a web-based portal that includes a knowledge repository and collaborative environment to serve science and engineering teams in product development. It is a "one stop shop" for product design, providing users real-time access to product development data, engineering and management tools, and relevant design specifications and resources through the Internet. The initial focus of the VSDE has been to serve teams working in the early portion of the system/product lifecycle - concept development, proposal preparation, and formulation. The VMOC-CE expands the application of the VSDE into the operations portion of the system lifecycle. It will enable meaningful and real-time collaboration regardless of the geographical distribution of project team members. Team members will be able to interact in satellite operations, specifically for resolving anomalies, through access to a desktop computer and the Internet. Mission Operations Management will be able to participate and monitor up to the minute status of anomalies or other mission operations issues. In this paper we present the VMOC-CE project, system capabilities, and technologies.

Medina, Barbara↗

The Application of Lean Thinking Principles and Kaizen Practices for the Successful Development and Implementation of the Ares I-X Flight Test Rocket and Mission

On October 28, 2009 the Ares I-X flight test rocket launched from Kennedy Space Center and flew its suborbital trajectory as designed. The mission was successfully completed as data from the test, and associated development activities were analyzed, transferred to stakeholders, and well documented. A positive lesson learned from Ares I-X was that the application of lean thinking principles and kaizen practices was very effective in streamlining development activities. Ares I-X, like other historical rocket development projects, was hampered by technical, cost, and schedule challenges and if not addressed boldly could have resulted in cancellation of the test. The mission management team conducted nine major meetings, referred to as lean events, across its elements to assess plans, procedures, processes, requirements, controls, culture, organization, use of resources, and anything that could be changed to optimize schedule or reduce risk. The preeminent aspect of the lean events was the focus on value added activities and the removal or at least reduction in non-value added activities. Trained Lean Six Sigma facilitators assisted the Ares I-X developers in conducting the lean events. They indirectly helped formulate the mission s own unique methodology for assessing schedule. A core team was selected to lead the events and report to the mission manager. Each activity leveraged specialized participants to analyze the subject matter and its related processes and then recommended alternatives and solutions. Stakeholders were the event champions. They empowered and encouraged the team to succeed. The keys to success were thorough preparation, honest dialog, small groups, adherence to the Ares I-X ground rules, and accountability through disciplined reporting and tracking of actions. This lean event formula was game-changing as demonstrated by Ares I-X. It is highly recommended as a management tool to help develop other complex systems efficiently. The key benefits for Ares I-X were obtaining unambiguous schedule margin, defining enabling options for risk reduction, and most importantly a stronger more unified team.

Askins, B. R.↗

Risk Reduction through Early Software Prototyping for the Mars Ascent Vehicle

Despite the critical nature flight software plays in the development of spacecraft, software development teams are often brought on to the project after initial requirements definition and design efforts have started, and well after the conceptual design phase has completed. The flight software development team for the Mars Ascent Vehicle has supported the project from project formulation and conceptual design into the formal design and development. This approach has allowed for the development of a robust software prototype that supported risk reduction in numerous areas for the project. Early software prototyping supported decision making in the areas of hardware selection and considerations, software architecture, and simulation requirements. The prototype software actively supported ongoing trade studies and analyses for the project and enable valuable collaboration across multiple subsystems as well as between MSFC and the Jet Propulsion Laboratory. This early development also allowed the team to leverage past projects’ lessons learned to make valuable process improvements.

Stefanie Justice↗

Developing the Next Generation of High-Performance Solid-State Batteries

The project team conducted cutting-edge battery research on electrode materials, electrolyte formulations, and cell designs for next-generation rechargeable lithium metal batteries designed for high energy density and safety. The research has focused on two separate but related technologies: 1) a high-temperature lithium metal battery designed for extreme environments, and 2) a high-energy lithium metal battery designed for more general applications (including aerospace, defense, transportation, electronics, etc.). We took these projects from the conceptual stage (an idea on paper) all the way to high performing lab prototypes and early commercial-format pouch and cylindrical cell prototypes. Both chemistries were improved substantially in terms of materials compatibility, lithium metal cyclability, high-voltage stability, high-temperature stability, and scalability.

25 ENERGY STORAGE↗

100+ RON Gasoline Blendstock for High Efficiency, Low Emissions (CRADA 493)

The PNNL/LanzaTech alcohol-to-Jet (ATJ) patented process converts ethanol from LanzaTech’s syngas fermentation process to low aromatic jet-range isoparaffins. Compounds are generated across a wide boiling range by the process. The project goal is to improve the viability of the ATJ process by increasing the RON of the gasoline fraction and determine what types of engines and vehicles can be fueled with this gasoline. PNNL experts’ team will investigate the impact of the process conditions and catalysts formulation on the blendstock composition in relation with the fuel properties. Co-optima capabilities for fuel properties measurements will be leveraged to assess the potential engines/ vehicles applications of the produced blendstock. A techno-economic-analysis will be conducted to assess the commercial viability of the process for generating a high RON gasoline-range fuel.

09 BIOMASS FUELS↗

A NASA Spaceliner 100 Propulsion Oriented Technology Assessment

In response to a NASA request, the National Space Propulsion Synergy Team (SPST) team agreed to provide technical and programmatic support to NASA in formulating a Spaceliner 100 Technology Program. The SPST offered a broad cross-section of expertise and experience. Its membership consists of senior level, volunteer representatives from across government, industry, and academia. The purpose of this paper is to provide a summary of the SPST support of SL100, which culminated in a propulsion technologies assessment and prioritization workshop conducted at MSFC. The results of this workshop and the follow-up analysis are part of this report. Also included, is a review of some "lessons learned" that were solicited from the workshop participants.

Dankhoff, W.↗

Adventures in Low Disc Loading VTOL Design

This memoir covers the first eight years of my 37 year career in VTOL aircraft design. It starts with family and how I came to be an engineer with a passion for aviation and a desire to make a difference. At MIT I acquired a solid understanding of basic physics, learned the basics of the various engineering disciplines and gained design experience. After over a decade on the East Coast I was homesick for Northern California. I decided to take a chance on working for the government instead of industry in order to return home. I was hired by Dr. Richard M. Carlson in March 1975 and joined a wonderful Army/NASA technical environment. The Interservice Helicopter Commonality Study was an important introduction to Joint Service aircraft design. The Advanced Attack Helicopter Source Selection Evaluation Board was an opportunity to learn acquisition system fundamentals and to lead a small team in a major technical evaluation. The Advanced Scout Helicopter Concept Formulation was an opportunity to learn how an aircraft development program is created and it formed a partnership between Dr. Carlson's Labs and Charlie Crawford's Development and Qualification directorate. The Army was Executive Service for the first year (1982) of the Joint Services Advanced Vertical Lift Aircraft (JVX) program. The JVX Joint Technology Assessment concluded that there was at least one design configuration, the tilt rotor, which could satisfy all JVX mission requirements with a high degree of inter-service commonality. The Navy became Executive Service at the end of the year and promptly released a JVX RFP to industry. This RFP resulted in the V-22 Osprey tilt rotor as the third type of VTOL aircraft to enter production and service. I was very lucky to have a useful role early in this program.

VTOL Design↗

New Mission Concepts for Astrophysics Large Area X-Ray Spectroscopy Mission

Work at SAO was performed under the overall direction of Dr. Harvey Tananbaum, the Principal Investigator for the program. Dr. Jay Bookbinder was responsible for day to day program coordination at SAO and liaison with GSFC. Dr. Nicholas E. White served as GSFC Technical Officer for the Grant. The effort was directed at formulating the general characteristics and scientific requirements of the contemplated mission. While funding and therefore effort was limited, nonetheless SAO was involved in a broad range of activities. These activities were defined by our SAO proposal to GSFC that were subsequently accepted and funded by this Grant. The main activities were: Support of mission studies. Support the development of science requirements. and Performance of selected engineering studies and trades. During this period, an integrated GSFC/SAO management team began to form and work together. Jean F. Grady was appointed Project Formulation Manager at GSFC and assumed the overall management direction of the project including coordination of work performed under the grant.

Tananbaum, Harvey↗

Low Emissions Alternative Power (LEAP) Project Office Business Team of the Aeropropulsion Research Program Office (ARPO) Org. 0140

The program for which I am working at this summer is Propulsion and Power/Low Emissions Alternative Power (P&P/LEAP). It invests in a fundamental TRL 1-6 research and technology portfolio that will enable the future of: Alternative fuels and/or alternative propulsion systems, non-combustion (electric) propulsion systems. P&P/LEAP will identify and capitalize on the highest potential concepts generated both internal and external to the Agency. During my 2004 summer at NASA Glenn Research Center, I worked with my mentor Barbara Mader, in the Project Office with the Business Team completing various tasks for the project and personnel. The LEAP project is a highly matrixed organization. The Project Office is responsible for the goals advocacy and dollar (budget) of the LEAP project. The objectives of the LEAP Project are to discover new energy sources and develop unconventional engines and power systems directed towards greatly reduced emissions, enable new vehicle concepts for public mobility, new science missions and national security. The Propulsion and PowerLow Emissions Alternative Power directly supports the environmental, mobility, national security objectives of the Vehicle Systems Program and the Aeronautics Technology Theme. Technology deliverables include the demonstration through integrated ground tests, a constant volume combustor in an engine system, and UAV/small transport aircraft all electric power system. My mentor serves as a key member of the management team for the Aeropropulsion Research Program Office (ARPO). She has represented the office on numerous occasions, and is a member of a number of center-wide panels/teams, such as the Space management Committee and is chair to the Business Process Consolidation Team. She is responsible for the overall coordination of resources for the Propulsion and Power Project - from advocacy to implementation. The goal for my summer at NASA was to document processes and archive program documents from the past years. I used the computer and office machines, and also worked with personnel in setting up a Cost Estimation Plan. I gained office experience in Word, Excel, and Power Point, with the completion of a variety of tasks. I made spreadsheets that pertained to the budget plan for Journey to Tomorrow, to name a few I have supported the office by tracking resource information: including programmatic travel, project budget at the center level to budgets for individual research sub-projects and grants. I also assisted the Program Support Office in their duties including, representing the office on numerous occasions on center-wide team/panels, such as the Space management committee, IFMP Budget Formulation, Journey to Tomorrow Committee, and the Vehicle Systems Program Business Process Team.

Buttler, Jennifer A.↗

An experimental paradigm for team decision processes

The study of distributed information processing and decision making is presently hampered by two factors: (1) The inherent complexity of the mathematical formulation of decentralized problems has prevented the development of models that could be used to predict performance in a distributed environment; and (2) The lack of comprehensive scientific empirical data on human team decision making has hindered the development of significant descriptive models. As a part of a comprehensive effort to find a new framework for multihuman decision making problems, a novel experimental research paradigm was developed involving human terms in decision making tasks. Attempts to construct parts of an integrated model with ideas from queueing networks, team theory, distributed estimation and decentralized resource management are described.

Serfaty, D.↗

DECOVALEX-2023: Task C Final Report

The Full-scale Emplacement (FE) heater experiment at the Mont Terri Underground Rock Laboratory (URL) was designed and conducted by Nagra to replicate an emplacement tunnel of Nagra’s reference repository design at 1:1 scale. Alongside testing the technical feasibility of constructing disposal tunnels, emplacing waste containers in the tunnels and then backfilling them, the main goals of the FE experiment are (1) to obtain a better understanding of the coupled effects of induced thermo-hydro-mechanical (THM) processes that may occur and (2) to validate existing coupled THM models (Müller et al., 2017). A key aspect of ensuring safety for repositories located in low-permeability rock involves minimizing any damage to the rock itself, thereby preserving its integrity and promoting a stable environment Amongst a number of processes that could damage the rock is the increase in pore pressure due to thermal loading caused by heat emitted from the waste. To reduce the potential damage of the rock, it is important to analyse the evolution of heat over time due to the heat load of the containers and assess possible consequences by coupled THM models. The aim of Task C of DECOVALEX-2023 was to build 3D numerical models of the FE experiment, focussing in particular on the heating induced pore pressure change in the Opalinus Clay. Data from a large number of sensors were available from the FE experiment for model comparison. These sensors measured temperature and relative humidity in the bentonite around the heaters, and temperature, pressure and displacement/strain in the surrounding Opalinus clay. Data were available from the start of excavation (April 2012) up to August 2020 for most sensors (more than 5 years from the start of heating in December 2014). To fulfil the overall aim of the task, the work was broken down into a number of steps, starting with simpler models to build confidence in each team’s approach and then moving to more complex models that better represent the FE experiment. Step 0 consisted of 2D benchmark models, gradually increasing the number of processes that are represented from thermal (T) only models in Step 0a, to coupled thermal hydraulic (TH) models in Step 0b with a representation of changing porosity, to coupled thermo-hydro-mechanical (THM) models in Step 0c, where porosity changes are calculated by the mechanical model. A detailed specification of processes, parameters, initial and boundary conditions was provided for this step, with the ambition that all teams would work towards close agreement in their model results, thus building confidence in the model implementations. vi It was not straightforward to achieve agreement between the teams, so additional steps (Step 0b2, 0b3, 0c2, 0c3) were added along with derivation of some analytical solutions against which the models could be compared. The reasons for the differences between teams were investigated and found to be caused primarily by different conceptual model assumptions (including temperature dependence of the thermal expansion of water), different model formulations (including porosity evolution) and differences in modelled domain sizes, boundary conditions and grid discretisation. This demonstrates that comparisons between multiple modelling teams and/or comparison with analytical results and experimental data are highly beneficial in providing an indication of uncertainty in model predictions. At the conclusion of Step 0, almost all teams had achieved a close agreement in model results and those that had not achieved an agreement knew the reason for this. Step 1 moved from 2D models to 3D models of the FE experiment without adding technical features like shotcrete or EDZ, and only considering the heating phase. Initially the 3D model was tightly specified to continue to build confidence in the model implementations (Step 1a). The results of Step 1a were compared to the data from the FE-experiment without the teams seeing the data. The teams were then provided with a sub-set of the data from the FE-experiment and invited to consider how best to use the large dataset for model comparison (Step 1b). Teams were then asked to use the data provided to calibrate their models, only changing material property values rather than adding features or processes to their models (Step 1c). In Step 1, teams were asked to only model the heating phase of the experiment, so pressure in the Opalinus Clay was reported as change in pressure since the initial conditions were specified rather than modelled. The change from 2D to 3D models was accompanied by an increase in the dispersion of results between the teams. Some of this was resolved during the task, but some remained and is potentially due to model discretisation. Calibration of parameters was useful in improving the fit of the models to the data but the remaining differences indicated that the models were missing features or processes. In Step 2, the teams were asked to update their models with additional features and processes as well as calibrating parameters to try and improve the fit of the models to the data. Teams were encouraged to represent ventilation of the open FE tunnel prior to backfilling with heaters and bentonite and in Step 2, the absolute pressure in the Opalinus Clay was compared between the teams. Teams took different approaches, but there was consideration of adding shotcrete and an EDZ into the model, representing stress change during excavation and different approaches to modelling ventilation of the FE tunnel. Overall, the documented results showed a very good agreement for temperature. The results for porewater pressure evolution showed a significant improvement for most teams compared to Step 1c with a good agreement to the measurements for several teams whereas some teams overpredicted the pressure increase and others overpredicted the drainage effect especially for the sensors close to the heater. Step 3 was an opportunity for teams to use the models developed in Step 1 and Step 2 to make predictions about the temperature and pressure changes that will be expected at the FE experiment over the next few years in light of the planned changes in thermal output of the heaters.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

MAMI: Modeling of the Magnetosphere-Ionosphere-Atmosphere System

Major emphasis of the investigation was the development of theoretical and numerical models of the aurora and of high latitude ionospheric processes. In particular: (1) the NCAR TIGCM (Thermosphere-Ionosphere Global Circulation Model) was updated to include mid and low latitude electrodynamics (this version is called TIE-GCM); (2) the NCAR TIE-GCM was modified to include a more realistic representation of the aurora; (3) the UAF auroral electron transport model was modified to include local acceleration processes; (4) a local ionospheric and auroral model (AURORA) was developed to allow detailed studies of the aurora; (5) a proton-hydrogen transport code has been developed to model proton aurora; and (6) a theory for the production of suprathermal atoms and ions in the upper atmosphere was developed and applied to studies of atomic nitrogen transport and helium escape on open field lines. These models enable us to devise schemes for tile interpretation and quantitative analysis of data obtained by the POLAR spacecraft. Parameterizations were formulated and are available to the GGS investigators. The UVI and VIS teams have adopted these parameterizations and include them in their data analysis. We have developed software for the quantitative interpretation of UVI and VIS images. After the launch of the POLAR satellite we used the image data from UVI and VIS in combination with ground based data from SuperDARN and incoherent scatter radars, magnetometers, and in situ observations from DMSP and NOAA satellites to characterize the state of the ionosphere. A number of event studies have been carried out in cooperation with other CGS theory teams.

Source record↗

Lidar-Polarimeter Retrieval OSSEs in Support of NASA's Aerosols and Clouds-Convection-Precipitation (ACCP) Study

The 2017 Decadal Survey (DS) highlighted Earth System Science themes, science and application questions, and several high priority objectives that have led to the inclusion of Aerosols (A) and Clouds-Convection-Precipitation (CCP) as Designated Observables (DOs). On June 1, 2018, several NASA centers (GSFC, LaRC, JPL, MSFC, GRC and ARC) submitted a joint Study Plan to the NASA Earth Science Division for the Aerosol (A) and Cloud, Convection, and Precipitation (CCP) Pre-formulation Study (A-CCP). The DS and the A-CCP team recognized the science merit in combining the A and CCP DOs for both enhancing the ability to address a number of science objectives and also to provide an expanded capability to address additional objectives beyond those addressed by individual DOs.A critical element of the A-CCP observing strategy is to make extensive use of new passive and active sensors as well as of the so-called Program-of-Record (PoR), complemented by a fully integrated sub-orbital component. Central to this observing system design is the adoption of a Value Framework in which quantitative assessment of the science benefits of space-and air-borne assets is a key element. Given pre-defined A-CCP science objectives and geophysical variables with desired accuracies, A-CCP relies on a spectrum of Observing System Simulation Experiments (OSSEs) aimed at addressing pixel level retrieval uncertainties and sampling trade-offs. In this talk we will discuss a subset of Retrieval OSSEs being considered for A-CCP, namely, synergistic lidar-polarimeter retrievals of particular relevance for the A-CCP aerosol science objectives. Starting with aerosol states from the GEOS-5 Nature Run (G5NR) sampled along specific satellite orbits, we simulate polarized radiances at the desired polarimeter wavelengths with the Vector Linearized Direct Ordinate Radiative Transfer (VLIDORT) model, alongside the lidar signal for the relevant lidars with realistic error characterization. Next, inversions are performed with the Generalized Retrieval of Aerosol and Surface Properties (GRASP) system and the accuracy of the retrieved geophysical variables are assessed. In this presentation we will highlight results for key architectures being considered for A-CCP.

da Silva, Arlindo↗

Altair Lunar Lander Development Status: Enabling Lunar Exploration

As a critical part of the NASA Constellation Program lunar transportation architecture, the Altair lunar lander will return humans to the moon and enable a sustained program of lunar exploration. The Altair is to deliver up to four crew to the surface of the moon and return them to low lunar orbit at the completion of their mission. Altair will also be used to deliver large cargo elements to the lunar surface, enabling the buildup of an outpost. The Altair Project initialized its design using a "minimum functionality" approach that identified critical functionality required to meet a minimum set of Altair requirements. The Altair team then performed several analysis cycles using risk-informed design to selectively add back components and functionality to increase the vehicle's safety and reliability. The analysis cycle results were captured in a reference Altair design. This design was reviewed at the Constellation Lunar Capabilities Concept Review, a Mission Concept Review, where key driving requirements were confirmed and the Altair Project was given authorization to began Phase A project formulation. A key objective of Phase A is to revisit the Altair vehicle configuration, to better optimize it to complete its broad range of crew and cargo delivery missions. Industry was invited to partner with NASA early in the design to provide their insights regarding Altair configuration and key engineering challenges. NASA intends to continue to seek industry involvement in project formulation activities. This paper will update the international coimmunity on the status of the Altair Project as it addresses the challenges of project formulation, including optinuzing a vehicle configuration based on the work of the NASA Altair Project team, industry inputs and the plans going forward in designing the Altair lunar lander.

Laurini, Kathleen C.↗

Design of an unmanned, reusable vehicle to de-orbit debris in Earth orbit

The space debris problem is becoming more important because as orbital missions increase, the amount of debris increases. It was the design team's objective to present alternative designs and a problem solution for a deorbiting vehicle that will alleviate the problem by reducing the amount of large debris in earth orbit. The design team was asked to design a reusable, unmanned vehicle to de-orbit debris in earth orbit. The design team will also construct a model to demonstrate the system configuration and key operating features. The alternative designs for the unmanned, reusable vehicle were developed in three stages: selection of project requirements and success criteria, formulation of a specification list, and the creation of alternatives that would satisfy the standards set forth by the design team and their sponsor. The design team selected a Chain and Bar Shot method for deorbiting debris in earth orbit. The De-orbiting Vehicle (DOV) uses the NASA Orbital Maneuvering Vehicle (OMV) as the propulsion and command modules with the deorbiting module attached to the front.

Aziz, Shahed↗