Search NASA⌕ Search

SEARCH · Search NASA

Results for “ground delay program”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Using an Automated Air Traffic Simulation Capability for a Parametric Study in Traffic Flow Management

Flight delays occur when demand for capacity-constrained airspace or airports exceeds predicted capacity. Demand for capacity-constrained airspace or airports can be controlled by a series of Traffic Management Initiatives (TMIs), which use departure and airborne delays, as well as pre-departure and airborne reroutes, to manage access to the constrained resources. Two systems exist in current and planned future operations to address imbalances between demand and capacity. The Collaborative Trajectory Options Program (CTOP) reduces demand to constrained resources by assigning strategic departure delay and pre-departure reroutes. Reroutes are selected from Trajectory Options Sets (TOSs) submitted by airlines. As flights approach the constrained resource, the Time-Based Flow Management System (TBFM) is used to assign tactical delay to satisfy constraints. This paper describes experiments performed to study the impact of varying levels of airline participation in CTOP via submission of TOSs on ground delay and flight time, and the impact of departure uncertainty on TBFM delays. Results suggest that as CTOP participation increases, average ground delays decrease for all airlines, but to the greatest extent for airlines participating in CTOP. A threshold in CTOP participation, which varies with the constraint capacity, is identified beyond which there is relatively little further reduction in average ground delays. Similarly, given the likely level of CTOP participation, the capacity reduction for which CTOP would be an appropriate TMI is also identified. Results also suggest that high average departure errors and high variability in departure error can make the prioritization of TBFM internal departures in TBFM metering and scheduling infeasible. Departure errors at current levels are, however, acceptable.

CTOP↗

Using an Automated Air Traffic Simulation Capability for a Parametric Study in Traffic Flow Management

Flight delays occur when demand for capacity-constrained airspace or airports exceeds predicted capacity. Demand for capacity-constrained airspace or airports can be controlled by a series of Traffic Management Initiatives (TMIs), which use departure and airborne delays, as well as pre-departure and airborne reroutes, to manage access to the constrained resources. Two systems exist in current and planned future operations to address imbalances between demand and capacity. The Collaborative Trajectory Options Program (CTOP) reduces demand to constrained resources by assigning strategic departure delay and pre-departure reroutes. Reroutes are selected from Trajectory Options Sets (TOSs) submitted by airlines. As flights approach the constrained resource, the Time-Based Flow Management System (TBFM) is used to assign tactical delay to satisfy constraints. This paper describes experiments performed to study the impact of varying levels of airline participation in CTOP via submission of TOSs on ground delay and flight time, and the impact of departure uncertainty on TBFM delays. Results suggest that as CTOP participation increases, average ground delays decrease for all airlines, but to the greatest extent for airlines participating in CTOP. A threshold in CTOP participation, which varies with the constraint capacity, is identified beyond which there is relatively little further reduction in average ground delays. Similarly, given the likely level of CTOP participation, the capacity reduction for which CTOP would be an appropriate TMI is also identified. Results also suggest that high average departure errors and high variability in departure error can make the prioritization of TBFM internal departures in TBFM metering and scheduling infeasible. Departure errors at current levels are, however, acceptable.

integrated demand management↗

Supervising Remote Humanoids Across Intermediate Time Delay

The President's Vision for Space Exploration, laid out in 2004, relies heavily upon robotic exploration of the lunar surface in early phases of the program. Prior to the arrival of astronauts on the lunar surface, these robots will be required to be controlled across space and time, posing a considerable challenge for traditional telepresence techniques. Because time delays will be measured in seconds, not minutes as is the case for Mars Exploration, uploading the plan for a day seems excessive. An approach for controlling humanoids under intermediate time delay is presented. This approach uses software running within a ground control cockpit to predict an immersed robot supervisor's motions which the remote humanoid autonomously executes. Initial results are presented.

Hambuchen, Kimberly↗

Towards Supervising Remote Dexterous Robots Across Time Delay

The President s Vision for Space Exploration, laid out in 2004, relies heavily upon robotic exploration of the lunar surface in early phases of the program. Prior to the arrival of astronauts on the lunar surface, these robots will be required to be controlled across space and time, posing a considerable challenge for traditional telepresence techniques. Because time delays will be measured in seconds, not minutes as is the case for Mars Exploration, uploading the plan for a day seems excessive. An approach for controlling dexterous robots under intermediate time delay is presented, in which software running within a ground control cockpit predicts the intention of an immersed robot supervisor, then the remote robot autonomously executes the supervisor s intended tasks. Initial results are presented.

Hambuchen, Kimberly↗

Shield to Pin Coupling of Lightning-Like Transients on Payload Umbilical Cables on a Launch Pad

In this paper we describe in-situ testing of a long payload umbilical, on a launch site, injected with “lightning- like” transients and describe resulting pin-to-pin voltages. Injections and voltage measurements near the ground support equipment room, as well as at a location near the payload junction box, are made. The umbilical cables tested include an outer over-braid and the inner conductor coupling is examined for open circuit, short-circuit and various loads representative of spacecraft input impedances. This testing is important because the Kennedy Space Center (KSC) where the lightning occurrence is the highest in the United States, is the primary launch site for Launch Services Program spacecraft customers. Lightning planning is essential but developing a lightning plan is often overlooked or not adequately analyzed leaving the spacecraft vulnerable to time delays or even damage when lightning occurs. At other popular launch sites like Vandenberg Air Force Base (VAFB) where lightning occurs less often, although at the same or greater intensity when it does occur, lightning planning is often completely ignored by the spacecraft. The two major questions to be addressed in the lightning plan are what retesting should be done to establish a “goodness” level and what is the trigger criteria for this testing? The spacecraft will typically use a standard spacecraft check-out procedure to address the necessary retesting, but determining the trigger criteria is often an issue. For instance, a spacecraft needs to understand what their immunity is to a certain lightning magnitude and location. Determining the amount of current that can be coupled onto a spacecraft umbilical can be calculated by using worst case assumptions or measured with current probes and current measurement devices. Spacecraft can also determine what pin-to-pin voltages they are sensitive to, however pin-to-pin voltage measurements are not typically taken during the strike due to the invasive nature of this measurement. In this paper, we present detailed data on the shield to pin voltage transfer functions to provide insight to the spacecraft developers for lightning retest criteria planning. The results from this unique testing opportunity provide essential details on specific coupling mechanisms affecting spacecraft hardware that interfaces with the ground support equipment. This missing link between cable shield currents and payload susceptibility voltages has been methodically tested and representative data presented.

Trout, Dawn↗

Inserting New Technologies into Human-Computer Interfaces for Future Lunar and Mars Missions

Plans call for human cislunar operations and lunar surface access, to prepare for eventual Mars missions. NASA will also develop new opportunities in lunar orbit that provide the foundation and act as a gateway for human exploration deeper into the solar system. Current human spaceflight is complex and requires as many as fifty people to support the International Space Station (ISS) Mission Control Center (MCC) in Houston, Texas. These flight controllers in the front and back rooms of the MCC, serve as an extra pair of eyes overseeing the numerous station systems. Deep space missions - to the moon, Mars, and beyond - will be more complex and place challenging mission constraints on the crew. As the round-trip communication delays increase in deep space exploration, more on-board systems autonomy and functionality will be needed to maintain and control the vehicle. These mission constraints will change the Earth-based ground control approach and will demand efficient and effective human-computer interfaces (HCI) to control a highly complex vehicle or habitat system. All of this necessitates a different approach to designing and developing spacecraft and habitats. In the beginning of new human spaceflight programs, focus is typically on launch vehicle and uncrewed spacecraft design and development. The reasoning behind this focus to enable flight testing of an integrated launch vehicle and spacecraft system to ensure it will be safe enough to allow humans on board. This is an essential process for new spacecraft, however, the practical effect is a lack of funding for the spacecraft’s human interfaces development. It can be many years before the human interface development begins, putting it late in the spacecraft lifecycle, when almost all other spacecraft systems and subsystems are already in place. This forces the usage of existing and proven technologies for the HCI interfaces. We posit that putting the human first in a spacecraft design process will yield a more effective spacecraft for exploration and long duration missions. NASA Human Research Program (HRP) has identified inadequate HCI as a risk for future missions. New tools and procedures to aid the crew in operating a complex spacecraft will be required. This paper discusses ongoing activities in the development of the next generation HCI components and systems, and a new approach toward human interfaces for spacecraft.

Salazar, George A.↗

High-precision orbit determination for high-earth elliptical orbiters using the Global Positioning System

Orbit covariance analyses pertaining to the Japanese VLBI Space Observatory Program (VSOP) MUSES-B satellite and to the International VLBI Satellite are presented. It is determined that a combination of Doppler and GPS measurements can provide the orbit accuracy required to support advanced radio interferometric experiments. For the VSOP, the required orbit accuracy of 130 m is easily met with two-way Doppler as the primary type of data; the 0.4 cm/s VSOP velocity requirement is also feasible provided that precise ground calibrations of tropospheric delays and station coordinates are available. It is concluded that combining the data from a VSOP GPS flight instrument with the ground GPS and two-way Doppler data will significantly enhance orbit determination accuracy in position and velocity.

Lichten, S. M.↗

Application of Delay Tolerant Networking on the International Space Station

Networking between ISS payloads and the ground presents challenges given the delays in communication and frequent satellite handovers that occur in orbit. Delay Tolerant Networking (DTN) provides a method to store and forward information when the link is available without intervention by the user. While DTN is helpful for the ISS in Low Earth Orbit (LEO), it will become much more important for deep space missions where round trip delays make use of most standard network protocols impossible. The lessons learned from ISS and other programs will help improve standards and ultimately support future NASA deep space missions.

Delay Tolerant Networking↗

Rolling Horizon with K-Position Search Method for Strategic Deconfliction of Package Delivery UAS

This research focuses on the strategic deconfliction of unmanned aircraft systems (UAS) in an urban package delivery environment with two depots and multiple drop-off locations. Since the formulated mixed-integer nonlinear programming (MINLP) problem is non-deterministic polynomial-time (NP) hard, a heuristic algorithm called "rolling horizon with k-position search (KPS)" is used to compute the departure sequence and scheduled time of departure (STD) of each UAS at a depot, considering temporal constraints at en-route crossing waypoints and depots for strategic deconfliction. The simulation studies show that an increase in the value of k (local neighborhood search) in the KPS reduces the average ground delay at the cost of an increase in the computation time for a given number of UAS, size of the rolling horizon window, and number of depots involved in the local neighborhood search. The studies also show that for a given rolling horizon window, the computation time increases exponentially with an increase in the total number of UAS flights when serial processing the local neighborhood search of KPS (with k > 1) and drops by an order of magnitude upon performing the local neighborhood search of KPS using parallel processing instead of serial processing. The computation time drops with the reduction in air traffic complexity of a scenario for a given number of flights, k (local neighborhood search), and rolling horizon window.

UTM↗

Integrated Demand Management: Concepts and Procedures

This report provides a comprehensive description of the Integrated Demand Management concept. Motivation: NASA’s Integrated Demand Management (IDM) research explores the idea that, under certain conditions, time-based flow management (TBFM) arrival operations can benefit from the coordinated use of a strategic traffic management initiative (TMI) to “precondition” the inbound demand. The research was motivated by the observation that TBFM was usually turned off during convective weather, even in facilities where it was routinely used. Our hypothesis was that strategic adjustments to the inbound traffic so that it provided a better match to the off-nominal changes in capacity observed during these conditions could enable TBFM scheduling to continue to provide effective support for arrival traffic management. Concept: IDM proposes that a TMI (e.g., a Collaborative Trajectory Options Program, or CTOP) be used to adjust the rate and/or geographic distribution across flows of the traffic inbound to a high-demand, TBFM-managed airport before that traffic reaches the TBFM planning horizon. After this strategic preconditioning, TBFM can then tactically fine-tune the demand to deliver a well-managed, orderly feed to the destination airport. Coordinated use of these two flow management capabilities is intended to improve system performance in terms of: • Equity of ground delay assignment, avoiding excessive ground delay for TBFM-scheduled departures, without penalizing longer flights; • Throughput, by distributing traffic to maximize use of available capacity; • Predictability for operators, providing advance notice about the impact on individual flights; • Increased flexibility, supporting operator mitigation strategies such as slot swapping or trajectory options; • Efficiency of flight operations, using ground delay more effectively and reducing airborne delay. The operational description in this document highlights how the IDM concept builds upon already existing tools and procedures, and also indicates where tool enhancements could facilitate conduct of IDM operations. However, enhanced tools are not a requirement for concept introduction. In fact, initial deployment that focused on training procedures and rationale for coordinated use of TFMS and TBFM, without changes to existing tools, might be a simpler way to introduce and to familiarize traffic managers with the idea of preconditioning. The concept and procedures described in this document can hopefully provide useful guidance for introduction of IDM into field operations..

IDM↗

Radar Studies in the Solar System

We aid in study of the solar system by means of ground-based radar. We have concentrated on: (1) developing the ephemerides needed to acquire radar data at Arecibo Observatory and (2) analyzing the resultant data to: test fundamental laws of gravitation; determine the size , shape, topography, and spin vectors of the targets; and study the surface properties of these objects, through their scattering law and polarization characteristics. We are engaged in radar observations of asteroids and comets, both as systematically planned targets and as "targets of opportunity." In the course of the program, we have prepared ephemerides for about 80 asteroids and three comets, and the radar observations have been made or attempted at the Arecibo Observatory, in most cases successfully, and in some cases on more than one apparition. The results of these observations have included echo spectra for the targets and, in some cases, delay - Doppler images and measurements of the total round-trip delay to the targets. Perhaps the most dramatic of these results are the images obtained for asteroids (4179) Toutatis and 1989PB (Castalia), which were revealed to be double-lobed objects by the radar images. Besides these direct results, the radar observations have furnished information on the sizes and shapes of the targets through analysis of the Doppler width of the echoes as a function of time, and on the surface properties (such as composition, bulk density, and roughness) through analysis of the reflectivity and of the polarization state of the echoes. We have also refined the orbits of the observed asteroids as a result of the Doppler (and in some cases delay) measurements from the radar observations. Although the orbits of main-belt asteroids accessible to ground-based radar are quite well known from the available optical data, some near-Earth objects have been seen by radar very soon after their optical discovery (for example, 199OMF, just eight days after discovery). In such cases. the radar results ensure that the object in question can be anticipated and identified at the next apparition. We have also participated in radar studies of the terrestrial planets. The results of these studies have included both planetary topography profiles from the analysis of round-trip delays to points along the target Doppler equator and determinations of the target spin state. The latter is of special interest in the case of Venus, which is very close to, but not on, a multi-body spin-orbit resonance such that Venus rotates 12 times for every 8 Earth orbits and 13 Venus orbits. As a result, Venus presents nearly the same face toward Earth at each inferior conjunction. Our latest results confirm that the spin state of Venus is slightly off the resonance. The delay measurements from planetary 2 ranging have also been used in combination with other types of range data in testing general relativity with increasing accuracy. We have also been engaged in radar studies of planetary satellites. Using our ephemerides, Arecibo made radar observations of the Galilean satellites of Jupiter and of Mars' satellite Phobos during the favorable opposition seasons (1988-1992 for Jupiter and 1990 for Mars). An attempt was also made to observe Deimos, but without detecting an echo. In 1997, an attempt was made to observe Saturn's satellite Titan, using the newly upgraded Arecibo radar system for transmitting and the Goldstone radar for receiving, but no echo was detected. The study of satellites by radar is in many ways similar to that of asteroids. The results from these observations have included characterization of the surface properties from the reflectivity and polarization ratio, as well as (in the case of the large satellites of Jupiter) the variation of reflectivity with incidence angle.

Shaprio, Irwin I.↗

The Spacelab-Mir-1 "Greenhouse-2" experiment

The Spacelab-Mir-1 (SLM-1) mission is the first docking of the Space Shuttle Atlantis (STS-71) with the Orbital Station Mir in June 1995. The SLM-1 "Greenhouse-2" experiment will utilize the Russian-Bulgarian-developed plant growth unit (Svet). "Greenhouse-2" will include two plantings (1) designed to test the capability of Svet to grow a crop of Superdwarf wheat from seed to seed, and (2) to provide green plant material for post-flight analysis. Protocols, procedures, and equipment for the experiment have been developed by the US-Russian science team. "Greenhouse-2" will also provide the first orbital test of a new Svet Instrumentation System (SIS) developed by Utah State University to provide near real time data on plant environmental parameters and gas-exchange rates. SIS supplements the Svet control and monitoring system with additional sensors for substrate moisture, air temperature, IR leaf temperature, light, oxygen, pressure, humidity, and carbon-dioxide. SIS provides the capability to monitor canopy transpiration and net assimilation of the plants growing in each vegetation unit (root zone) by enclosing the canopy in separate, retractable, ventilated leaf chambers. Six times during the seed-to-seed experiment, plant samples will be collected, leaf area measured, and plant parts fixed and/or dried for ground analysis. A second planting initiated 30 days before the arrival of a U.S. Shuttle [originally planned to be STS-71] is designed to provide green material at the vegetative development stage for ground analysis. [As this paper is being edited, the experiment has been delayed until after the arrival of STS-71.].

Non-NASA Center↗

Tonal Noise Prediction of a Distributed Propulsion Unmanned Aerial Vehicle

Noise is expected to be a major barrier of unmanned aerial vehicles (UAVs) to public acceptance. A noise prediction scheme is introduced in this paper and applied to a specific vehicle configuration, namely, the Greased Lightning-10. Results herein will be used to demonstrate the feasibility of incorporating a noise constraint within the flight control system of a distributed electric propulsion vehicle by modifying commands for low-noise operation over sensitive areas, e.g., communities, schools, etc. Steady loading and thickness noise signatures of single propellers are computed using the Propeller Analysis System of the NASA Aircraft NOise Prediction Program. The individual signatures are then superposed at far field observers after applying corrections for spherical spreading and phase delays based on straight ray propagation. Two-propeller source fields are verified using analytical directivity patterns of monopoles. Notional effects of rotation rate, rotation direction, and relative propeller phase are given. Under ideal circumstances and equivalent RPM, random phasing, which occurs in most small UAVs, can produce up to 20 decibels uncertainty in the tonal sound pressure level at a given ground observer. Additionally, directivity modification via relative propeller phase control is shown to have great potential as a noise reduction technique. This paper will focus on the forward flight mode but will also briefly discuss the vertical flight mode.

Pascioni, Kyle A.↗

Delivery Ring Spill Characterization and Impulse Study

High-intensity particle physics experiments require uniform beam extraction to prevent instantaneous rate spikes from overwhelming detector systems. By analyzing accelerator parameters and extracted beam dynamics, we directly inform spill regulation systems that make real-time adjustments to minimize non-uniformity. This Department of Energy Visiting Faculty Program project transitioned from characterizing Main Injector half-integer slow extraction for SpinQuest to Delivery Ring third-integer slow extraction for Mu2e. Working alongside the Fast Adaptive Neural Control (FANC) group, we developed an automated pipeline that aligns asynchronous instrument channels, embeds quality metrics, and isolates clean spill populations. Analyzing baseline spills alongside a dedicated quadrupole impulse study allowed us to quantify noise structures while mapping time-varying beam response and transit-delay dynamics. These empirical measurements directly ground digital twin models, supporting FANC’s deployment of real-time, FPGA-based neural network controllers in the Mu2e Spill Regulation System.

Dolen, James William [Purdue U., West Lafayette] (↗

Examination of Communication Delays on Team Performance: Utilizing the International Space Station (ISS) as a Test Bed for Analog Research

Operational conjectures about space exploration missions of the future indicate that space crews will need to be more autonomous from mission control and operate independently. This is in part due to the expectation that communication quality between the ground and exploration crews will be more limited and delayed. Because of potential adverse effects on communication quality, both researchers and operational training and engineering experts have suggested that communication delays and the impact these delays have on the quality of communications to the crew will create performance decrements if crews are not given adequate training and tools to support more autonomous operations. This presentation will provide an overview of a research study led by the Behavioral Health and Performance Element (BHP) of the NASA Human Research Program that examines the impact of implementing a communication delay on ISS on individual and team factors and outcomes, including performance and related perceptions of autonomy. The methodological design, data collection efforts, and initial results of this study to date will be discussed . The results will focus on completed missions, DRATS and NEEMO15. Lessons learned from implementing this study within analog environments will also be discussed. One lesson learned is that the complexities of garnishing a successful data collection campaign from these high fidelity analogs requires perseverance and a strong relationship with operational experts. Results of this study will provide a preliminary understanding of the impact of communication delays on individual and team performance as well as an insight into how teams perform and interact in a space-like environment . This will help prepare for implementation of communication delay tests on the ISS, targeted for Increment 35/36.

Keeton, K. E.↗

Innovative Approaches to Using the International Space Station as a Mars Transit Analog

Human research on the International Space Station (ISS) crew has made significant advances in understanding of the effects of physiology on human health in space missions. However, ISS has not been as suitable for research on other hazards of human spaceflight such as isolation and communications delay. NASA recently completed a special assessment of whether modifications could be made to operations or facilities so that ISS could be used more effectively as an analog to simulate long-duration crew missions beyond low earth orbit. A cross-disciplinary team met to identify concept of operations, trade spaces, challenges, and opportunities to making ISS more operationally relevant as a Mars transit mission analog, and the results and implementation plans are summarized in this manuscript. In addition to the use case of 12-month missions (already in planning by the NASA ISS Program to bound expected Mars transit durations), three new use cases where ISS could provide valuable high-fidelity experience were identified. (1) Testing of operations procedures and medical care could be enhanced by demonstrating crew handling a simulated medical event in microgravity, autonomously, and with significant communications delay. (2) Isolation and confinement effects of deep space transit could be studied on ISS to validate current habitable volume requirements for Mars transit as well as provide context for evaluating the results of the extensive ground-based simulations in HERA and NEK. A trade study of possible operational and hardware changes that would make ISS applicable to these use cases was completed. (3) Surface operations after the physiological deconditioning of a long transit could be conducted to validate crew ability to perform critical ground tasks after 6-month Mars transit and aid in conceptual design of Mars surface element architectures. Each of the case studies includes a trade space between operational impacts on nominal ISS activities and degree of fidelity. A phased approach to implementation means that several "quick start" activities can be done in 2019-2020 at the same time as planning continues for more complex exploration analog options beginning as early as 2022. The team determined that many of these quick-start tasks could be done with available assets, entirely independent of other exploration system development timelines (such as Orion, Space Launch System). The consideration of the full suite of human spaceflight capabilities in the lunar vicinity can also be included as each step in human exploration serves as a simulation opportunity for some aspect of subsequent missions. Further discussions of options with the international community are critical for considering the benefits as well as impacts of simulation activities on ISS, as well as to better formulate future mission architectures.

Robinson, Julie A.↗

Ice sheet margins and ice shelves

The effect of climate warming on the size of ice sheet margins in polar regions is considered. Particular attention is given to the possibility of a rapid response to warming on the order of tens to hundreds of years. It is found that the early response of the polar regions to climate warming would be an increase in the area of summer melt on the ice sheets and ice shelves. For sufficiently large warming (5-10C) the delayed effects would include the breakup of the ice shelves by an increase in ice drainage rates, particularly from the ice sheets. On the basis of published data for periodic changes in the thickness and melting rates of the marine ice sheets and fjord glaciers in Greenland and Antarctica, it is shown that the rate of retreat (or advance) of an ice sheet is primarily determined by: bedrock topography; the basal conditions of the grounded ice sheet; and the ice shelf condition downstream of the grounding line. A program of satellite and ground measurements to monitor the state of ice sheet equilibrium is recommended.

Thomas, R. H.↗

Local flow management/profile descent algorithm. Fuel-efficient, time-controlled profiles for the NASA TSRV airplane

The Local Flow Management/Profile Descent (LFM/PD) algorithm designed for the NASA Transport System Research Vehicle program is described. The algorithm provides fuel-efficient altitude and airspeed profiles consistent with ATC restrictions in a time-based metering environment over a fixed ground track. The model design constraints include accommodation of both published profile descent procedures and unpublished profile descents, incorporation of fuel efficiency as a flight profile criterion, operation within the performance capabilities of the Boeing 737-100 airplane with JT8D-7 engines, and conformity to standard air traffic navigation and control procedures. Holding and path stretching capabilities are included for long delay situations.

Groce, J. L.↗