Search NASA⌕ Search

SEARCH · Search NASA

Results for “grout”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Recommended Updates to Solubility Controls for Modeling Leaching of Technetium, Uranium, Neptunium, Plutonium, and Iodine from the Residual Waste Layer of Closed Savannah River Site High Level Waste Tanks

The objective of this report is to relate waste leaching experiments by the Savannah River National Laboratory (SRNL) to performance assessment modeling of release of several radionuclides from residual waste in closed high-level waste tanks. SRNL leached residual waste from Tanks 18F and 12H with solutions simulating the modeled evolution of pore fluids in residual waste layers of closed tanks through various stages of grout degradation. Tc-99, uranium isotopes, Np-237, plutonium isotopes, and I-129 were analyzed in the leachate multiple times over 90 days.

07 ISOTOPE AND RADIATION SOURCES↗

Modeling of Chemical Slurry Rheology in DWPF Sludge Batch (SB) 10 Simulants

The Defense Waste Processing Facility (DWPF) treats high-activity radionuclides from sludge through a process called vitrification. This process converts radioactive liquid waste currently stored in tank farms into a solid glass form that is suitable for long-term storage and disposal. Due to the complexities involved in vitrifying this waste within each operation of the Chemical Processing Cell (CPC), waste rheology is studied to characterize the fluid-mechanical properties as it passes through the CPC and into the Melter. To better understand the waste and validate flow behavior, slurry rheology of simulants that represents the waste was studied at various acid stoichiometry percentages and solids concentrations to determine the simulant’s yield stress and viscosity. This research work has been supported by the DOE-FIU Science & Technology Workforce Development Initiative, an innovative program developed by the U.S. Department of Energy’s Office of Environmental Management (DOE-EM) and Florida International University’s Applied Research Center (FIU-ARC). During the spring of 2022, a DOE Fellow intern, Brendon Cintas, spent 10 weeks doing a summer internship at Savannah River National Laboratory (SRS) under the supervision and guidance of Dan Lambert, Chemical Flowsheet Development. The intern’s project was initiated on June 6, 2022, and continued through August 11, 2022 with the objective of assisting scientists at SRNL’s Rheology and Grout Laboratory at Aiken Country Technology Lab (ACTL) better understand the sludge composition on the rheology of a simulant slurry using a HAAKE RheoStress 6000 rheometer and extrapolate the results to the real-waste data.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Composite Analysis for Low-Level Waste Disposal in the Hanford Site Central Plateau (FY 2020) (Rev. 2)

This document provides an updated Hanford Site composite analysis (CA). A Hanford Site CA was prepared and issued in 1998 (PNNL-11800) with an addendum provided in 2002 (PNNL-11800 Addendum 1). The CA was approved in 2002 (Frei, 2002) and has been maintained (DOE/RL-2000-29 and subsequent revisions) to support low-level waste disposal performance assessments (PAs) and disposal authorizations for facilities at the Hanford Site, including the following: Continued operation of the Environmental Restoration Disposal Facility (ERDF) and the 200 East and 200 West Low-Level Burial Grounds; Construction of the Integrated Disposal Facility (IDF); Forthcoming closure of tank residual waste systems such as Waste Management Area (WMA) C. The CA maintenance program resulted in a determination in 2015 (DOE/RL-2015-66) that the Hanford Site CA needed an update for the following reasons: While the initial Hanford Site CA has been maintained since 2001, the accumulation of basis changes reported in the annual summary reports over the succeeding 14 years merit evaluation in an updated analysis; The U.S. Department of Energy (DOE) Headquarters requested in a memorandum in 2015 (Gilbertson and Marcinowski, 2015) that “as soon as the relevant PAs are complete, the CA will be revised to account for all of the new information.” This updated Hanford Site CA accounts for the following new information: 1. Inclusion of a detailed Hanford Site baseline disposition that projects remedial activities through site closure. There have been significant changes through decision making in the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) process that were not available when the original CA was produced; 2. Inclusion of an updated inventory basis, new modeling capabilities, and new decisions reached in the associated record of decision (ROD) that was provided by issuance of DOE/EIS-0391 in fiscal year (FY) 2013. Development of a Hanford Site groundwater model from the baseline provided in a technical transfer of models for the Final Tank Closure and Waste Management Environmental Impact Statement (DOE/EIS-0391) commenced in FY 2014 and resulted in the plateau-to-river (P2R) groundwater flow model that is used in this updated Hanford Site CA; 3. Accounting for pump and treat systems, which were not evaluated in the initial CA. Pump and treat systems have had significant impact on groundwater flow system behavior, contaminant transport, and contaminant removal from Hanford Site groundwater. This process is accounted for in the use of the P2R model for this updated Hanford Site CA; 4. Inclusion of water-level data collected since the initial CA was completed. Data collected as the unconfined aquifer water levels continue to recede since the cessation of large liquid discharges in the late 1990s have led to marked improvement in understanding of the flow system for future conditions, particularly regarding northward flow potential in the critical Gable Gap area. The calibration in the latest version of the P2R model accounts for this information; 5. Inclusion of results from the revised ERDF PA completed in 2013 (WCH-5209) that account for updated inventory and expansion of the ERDF facility to about twice the size that was evaluated in the original CA; 6. Use of updated geoframeworks to provide the structural basis for numerical fate and transport models in the groundwater pathway of this updated CA. The geologic basis for groundwater models has continued to improve with additional data collection and interpretation with the creation and maintenance of the Hanford South Geoframework and the Central Plateau Vadose Zone Geoframework tools; 7. Incorporation of updated tank residual inventory estimates. Tank residual inventory estimates have improved with the incorporation of tank retrieval inventory data for those tanks that have completed retrieval. The CA inventory data package includes this updated information; 8. Incorporation of WMA C PA results. Two additional PAs for tank farm closure decisions are in preparation during the period required to prepare an updated Hanford Site CA: WMA C (FY 2016) and WMA A-AX (in preparation). The WMA C PA results are incorporated into the updated Hanford Site CA, and its grouted residuals model is used as the basis for a release model to account for the other tank farm systems modeling in this updated CA; 9. An update to the IDF PA was submitted in FY 2017 and has been reviewed and approved. The results of the IDF PA are incorporated into this updated CA; 10. Updated risk assessment scenarios. The risk assessment scenarios currently in use for Hanford Site CERCLA and Resource Conservation and Recovery Act of 1976 (RCRA) analyses differ from those evaluated in the initial Hanford Site CA. The representative person exposure scenario evaluated in this updated Hanford Site CA is consistent with recent PAs and CERCLA and RCRA analyses as the Hanford Site. This updated Hanford Site CA provides the following: A comparison of the updated Hanford Site CA all-pathway dose results with the performance measures during the compliance period, which is assumed to begin with site closure in calendar 2070 with the last scheduled disposal action and continue for 1,000 years postclosure (to calendar year 3069); A comparison of Hanford Site CA all-pathway dose results with the performance measures during the postcompliance period to address potential peaks beyond the compliance period. This is accomplished by evaluating dose in the period for 9,000 years following the compliance period (i.e., from calendar year 3070 to 12070).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Tank Waste LDR Organics Data Summary for Sample-and-Send (Rev.1A)

The presence of organic chemicals regulated under the Resource Conservation and Recovery Act (RCRA) Land Disposal Restrictions (LDR) adds complexity to treating and disposing of the low activity fraction of Hanford tank waste if a low temperature treatment method such as grouting is used (SRNL-STI-2020-00228). The complexity arises from the fact that the baseline vitrification method is considered by the Washington State Department of Ecology (Ecology) as providing adequate thermal treatment for organics; a status not automatically extended to a lowtemperature process, such as solidifying the waste in a cementitious waste form. In addition, the Environmental Protection Agency (EPA) LDR program is intended to ensure that wastes are properly treated prior to disposal. Proper treatment makes hazardous waste less harmful to groundwater by reducing the mobility and/or toxicity of the hazardous constituents in the waste. EPA guidance indicates that stabilization/solidification of waste for organics could be considered impermissible dilution under the LDR dilution prohibition. In addition, waste storage activities at Hanford have required transferring and blending waste within the tank system and these activities have potentially altered the concentrations of the hazardous constituents. The LDR dilution prohibition found in 40 Code of Federal Regulations (CFR) 268.3 states that “… no generator, transporter, handler, or owner or operator of a treatment, storage, or disposal facility shall in any way dilute a restricted waste or the residual from treatment of a restricted waste as a substitute for adequate treatment …”. Hence, if LAW is to be treated using low temperature stabilization (such as cementation), then it is important to demonstrate both how past storage activities have contributed to the removal (by vacuum evaporation), or destruction (by in situ decomposition) of the LDR organics and how future retrieval and waste feed preparation will contribute to their removal (by filtration and ion exchange). Demonstrating these processes helps validate that cementation without additional organic treatment does not necessarily represent impermissible dilution. To aid in implementing cementitious solidification of Low Activity Waste (LAW), WRPS has been developing a regulatory and processing LDR treatment variance strategy termed “Sampleand-Send” that relies, in part, on demonstrating that in situ decomposition reactions along with historic evaporation of tank waste has destroyed or removed most of the LDR organics possibly associated with Hanford Tank Waste (SRNL-STI-2020-00582, SRNL-STI-2021-00453, SRNL-STI-2022-00391). Under the Sample-and-Send concept, Hanford tank waste would be retrieved, processed through a Tank-Side Cesium Removal-like system, and staged as a candidate feed that would then be sampled to confirm the waste acceptance criteria is met for solidification in an LAW cementitious treatment facility. If it can be shown that LDR organics are at concentrations below the waste acceptance criteria (WAC) for cementitious stabilization and have been sufficiently removed (by historic evaporation or by filtration and ion exchange during Cs removal), destroyed (by historic in situ decomposition), or are not soluble in LAW above the WAC then additional organic treatment is not needed prior to creating a cementitious final waste form and the concept of Sample-and-Send would be proposed to establish a non-rulemaking site-specific treatment variance using the specified method of treatment “STABL” to remove sampling requirements of the waste form after treatment. Waste not meeting the WAC could either be routed to the Hanford Waste Treatment and Immobilization Plant for LAW vitrification, or further processed by evaporation or chemical oxidation before solidifying in a cementitious waste form. A key component in implementing the Sample-and-Send strategy is identifying which of the 207 LDR organic compounds associated with the RCRA Part A permit application waste codes for the Double Shell Tanks (DSTs) and Single Shell Tanks (SSTs) and any applicable Underlying Hazardous Constituents (UHCs) from 40 CFR 268.48 should be considered as potentially present and thus subject to regulation. In addition, it is also necessary to understand the solubility volatility, and reactivity of these compounds in LAW to identify which of the potentially present LDR organic compounds are not soluble above regulatory levels or are likely to have been removed by historic evaporation or destroyed by in situ decomposition reactions. If there are potentially present LDR organic compounds that have not been removed or destroyed and are soluble above regulatorily significant concentrations then a treatability variance may be needed for these species to eliminate any concerns pertaining to impermissible dilution. The spreadsheet accompanying this calculation report contains the data and logic computations needed to screen the list of 207 LDR organics associated with Hanford tank waste to identify those potentially present and to indicate which compounds may need to be included in a treatability variance.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Screening Evaluation of Sovereign NOH2O

Southwest Research Institute (SwRI) was contracted by Sovereign Hydroseal Energy, Inc to provide evaluation of the NOH2O polymer grout technology as a feasible tank bottom repair in support of Washington River Protection Solutions, LLC (WRPS) Solicitation #358012 Statement of Work (SOW) “Screening Evaluation of Sovereign NOH2O”, which a copy is located in Appendix A. The evaluation focused on screening the mechanical properties of NOH2O under normal, chemical and radiological conditions, which was identified as Task 2 of the SOW. Testing was performed in accordance with the SwRI Test Plan located in Appendix B.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Migration of 60 Co, 133 Ba, 137 Cs, and 152 Eu from cementitious wasteforms in field lysimeter experiments

Safe and effective storage of radioactive waste is essential to protect environmental health. Due to the potential for accidental releases and the severity of the associated risks, it is imperative to further understand radionuclide transport should an accident occur. This work analyzed the vadose zone migration of radionuclides from cementitious wasteforms at the Savannah River Site after ten years. The observed radionuclides are prominent constituents of radioactive waste or analogs for other groups or series of radionuclides. Lysimeters were first analyzed in 2016 using a collimated high-purity germanium gamma-ray spectrometer to non-destructively measure the concentration of each radionuclide in the sediment column as a function of depth. Following these measurements, the lysimeters were redeployed in the field for another 4 years. All radionuclides in all lysimeters were observed to transport further during the redeployment period; however, the extent of migration varied with the material used for introduction. Except for 137 Cs, migration through the sediment control system increased with decreasing ionic potential (ionic charge/radius); migration order: 152 Eu< 137 Cs< 60 Co< 133 Ba. Overall, the cementitious wasteforms were observed to decrease radionuclide migration extent relative to the filter paper. In both cementitious wasteforms, the migration extent increased in the order 152 Eu< 133 Ba< 60 Co< 137 Cs. However, less migration was measured when the radionuclides were incorporated into a reducing grout wasteform. The novelty of this paper is the demonstration of a technique capable of creating non-destructive measurements over decade time scales. Ultimately, this work provides insight into the long-term migration of alkali, alkali earth, divalent transition metal, and trivalent actinide element isotopes.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Saltstone Paddles and Augers Materials of Construction Study

The Saltstone Production Facility (SPF) uses a 10-inch READCO continuous, co-rotating twin-screw mixer to mix the dry premix with the low-level radioactive waste (LLW) salt solution to produce fresh saltstone grout. The paddles and augers within the mixer degrade via erosion in the region where the salt solution is introduced into the mixer. After the paddles/augers erode to a point where the throughput impacts operations, the mixer is disassembled, the effected paddles/augers are replaced, and the mixer is reassembled. Saltstone Engineering indicated that this effort requires an approximately three-week outage. The objective of this task is to assess alternative materials of construction (MOCs) that will provide better erosion characteristics and decrease the frequency in which the paddles and augers need replacement. Previous Astralloy V studies looked only at Charpy Impact and Rockwell Hardness Testing. Each of these will be examined for different alloys as well as Miller Testing (abrasion to determine wear) which will provide a good assessment of an alloy’s erosion/wear characteristics. The following facts concerning the current and proposed alloys for Saltstone Paddles and Augers are provided in this report. • Current Astralloy V material and alloy E52100 had the most favorable Miller Testing Results. • Charpy Impact Testing did not correlate with Miller Testing Results. • Hardness Testing correlated with Miller Testing results meaning that higher hardness will provide more favorable wear resistance. • Further investigation of E52100 and various tool grade steels is recommended for achieving wear resistant properties.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Characterization of Tank 15H Sample in Support of Preliminary Cease Waste Removal and Closure Mode Determination

The Savannah River National Laboratory (SRNL) was requested by Savannah River Mission Completion (SRMC) to provide sample preparation and analysis of Tank 15H characterization samples. These samples follow an interest in exploring avenues to condense the extensive sampling of the Tank Closure process. One such pathway would be to collect a sample during an earlier waste removal campaign for analysis to determine comparability to the later residual tank inventory determined through Residual Material sampling and characterization prior to grouting. Six Tank 15H samples (HTF-15-24-9, HTF- HTF-15-24-10, HTF-15-24-11, HTF-15-24-12, HTF&#x2;15-24-13, and HTF-15-24-14) were delivered to SRNL in May of 2024. These six Tank 15H samples were taken as close as possible to the solids layer of the Tank 15H. These six Tank 15H samples were combined to form one composite sample for characterization due to the lack of sufficient solids fraction.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Conceptual Model Testing Related to SDU 6 Drainwell Observations

From its inception in the early 1950s through the end of the Cold War in the early 1990s, the Savannah River Site (SRS) produced nuclear materials for national defense in five reactors. Additionally, irradiated reactor fuel and target tubes were dissolved in nitric acid to recover plutonium and uranium using the PUREX (Plutonium Uranium Reduction EXtraction) process. Liquid waste from these chemical separations processes was then stored onsite in 51 underground tanks. Eight waste storage tanks have been operationally closed (i.e. cleaned and grouted) and the remaining tanks hold a mixture of liquids, insoluble solids, and precipitated salts (SRMC-LWP-2022-00001), the latter generated by evaporating water from the liquid waste. Waste is currently being retrieved from tanks and separated into 1) high-radioactivity, low-volume, and 2) low-radioactivity, high-volume components, principally through the Salt Waste Processing Facility (SWPF) (SRMC-LWP-2023-00001). The former waste stream is vitrified in the Defense Waste Processing Facility (DWPF), stored onsite, and destined for offsite disposal in a deep geologic repository. The latter stream is mixed with dry cementitious materials in the Saltstone Production Facility (SPF) and the wet slurry placed in onsite Saltstone Disposal Units (SDUs) within the Saltstone Disposal Facility (SDF), where it hardens into a cement waste form termed saltstone. A low-infiltration surface cover system will be placed over the SDF at closure, where SDUs will then be in the subsurface post-closure (SRR-CWDA-2019-00001).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Determination of 2,4-Dinitrophenol (2,4-DNP) in Simulated Radioactive Waste by High Performance Liquid Chromatography

The River Protection Project (RPP) at Hanford, Washington is evaluating an alternative treatment method for low activity tank waste (LAW) disposition. Specifically, grout solidification/immobilization for LAW needs to demonstrate adequate treatment for Land Disposal Restricted (LDR) Organic chemicals. LDR organic chemical pretreatment, such as evaporations testing and oxidation decomposition, are under assessment to reduce the LDR organic chemicals concentration in the LDR waste. 2,4-dinitrophenol was spiked into LAW simulated waste and monitored in these studies using High Performance Liquid Chromatography (HPLC). The development and implementation of this HPLC method is discussed in this presentation.

Dekarske, John R. [Savannah River National Laborat↗

Integrity Monitoring and Assessment, Prediction, Repair, and Corrosion Control of the Hanford Storage Tanks — 25213

BACKGROUND AND PROJECT TASKS Proposed work addresses focus area 1: Waste Retrieval, Transport and Closure, with particular focus on increasing volume available for tank storage 1) Refurbish/fortify existing double shell storage tanks (Tank Refurbish – Polymer Grout) 2) Robust monitoring tools for internal corrosion (Integrity Monitoring -Reference Electrodes) 3) Mitigate external corrosion (Degradation Prevention - Cathodic Protection) 4) Determine viability of constructing new tanks, and storage room creation by way of evaporation (Cost Benefit Analysis)

Shukla, Pavan K. [Savannah River National Laborato↗

Replacement of Fly Ash with Natural Pozzolans in Cementitious Waste Forms: Progress Report

The Department of Energy Environmental Management (DOE EM) Office is currently responsible for treating radioactive and mixed waste, environmental restoration, and closing contaminated tanks and facilities resulting from radioactive isotope production for defense applications during the Cold War. Cementitious reagents are the most widely used materials for (1) chemically stabilizing and encapsulating radionuclides and hazardous metals contaminated with radionuclides and Resource Conservation and Recovery Act (RCRA) hazardous metals and (2) solidifying radioactive and mixed wastewater for final disposal. Cementitious grouts and flowable concretes are also the most widely used materials for DOE waste tank and facility closures.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Macromolecules & Manufacturing Science

Outline • SRNL Overview • Mission overview • Polymers enabling the mission • R&D Highlights • Polymers in radiation environments • Tooling in shielded cells • Packaging for nuclear material shipments • Polymers supporting tank waste remediation • Ref electrode • Epoxy and polymer grout • Polymers for fusion energy • Deuterium labelling • Polymers for additive manufacturing • Coalescence and blends: experimental and predictive • Process modelling and sorting through big data (peregrine and latticeJ)

Chatham, Camden [Savannah River National Laborator↗

Flow Regimes for Gas Migration in Liquid Stemming Columns

Some underground engineering projects require the design of an effective stemming column to confine pressurized gases within boreholes. While solid materials such as grout plugs are commonly used, their exothermic curing can damage diagnostic tools, particularly under harsh in situ conditions involving elevated pressure and temperature.

42 ENGINEERING↗

Special Analyses for the Hanford Integrated Disposal Facility Performance Assessment - 20102

In 2014, the Department of Energy (DOE) Office of River Protection and its contractors began to develop a performance assessment for the near-surface disposal of low-level and mixed low-level waste at the Hanford Site's Integrated Disposal Facility (IDF). The IDF is a doubly-lined landfill that was constructed between 2004 and 2006 to be the disposal facility for the vitrified low-activity waste that will be produced at the Waste Treatment and Immobilization Plant (WTP). IDF is also expected to receive solid secondary waste produced at the WTP and other solid wastes from site activities. The IDF has been in a preoperational state awaiting authorization from DOE and a RCRA permit modification from the State of Washington Department of Ecology to receive waste. Both the Disposal Authorization Statement and permit modification require a performance assessment demonstrating that the system of engineered and natural features will limit releases of radionuclides and hazardous chemicals from the IDF and be protective of human health and the environment. The simulated duration is 10,000 years. Based on the analyses presented in the 2017 Integrated Disposal Facility Performance Assessment, DOE issued a conditional Operating Disposal Authorization Statement for the IDF in June 2018. The long-term performance of the IDF to be protective of human health and the environment was evaluated under the requirements of DOE Order 435.1, Radioactive Waste Management. Computer simulations were performed to evaluate whether or not the IDF would comply with DOE requirements. In the time that has passed since the performance assessment was approved by DOE, new information has been discovered that had not been considered in the performance assessment. Since this new information has not been evaluated, the potential impact of the changes have not been taken into consideration in DoE's disposal authorization. DOE and its contractors follow a change control process to screen and, when necessary, evaluate new information that could potentially impact the conclusions of the completed performance assessment. This paper will describe the change control process and provide two examples of evaluations performed following the change control process. The first example evaluates a new waste form for liquid secondary waste that was not evaluated in the performance assessment. In the performance assessment, liquid secondary waste was assumed to be solidified with grout. A new recommendation to dispose of the liquid secondary waste after drying it to a powder was evaluated. The second example evaluates inventory implications from changes to the flow sheet that estimates the feed composition to the low-activity waste vitrification facility. The changes result in higher strontium concentrations in the vitrified waste stream. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Utilizing Commercial Submersible Mixer Pumps for Sludge Removal in Savannah River Site's Tank 26 - 20289

The Savannah River Site (SRS) Liquid Waste System (LWS) safely manages, stores, treats, and dispositions liquid radioactive waste. The LWS consists of 51 underground waste storage tanks (eight of which are operationally closed and filled with grout), waste evaporators, treatment facilities, and solidification facilities, known as the Defense Waste Processing Facility (DWPF) and Saltstone Production Facility (SPF). One of the waste storage tanks, Tank 26, was placed into service in 1980 as an F Tank Farm (FTF) Evaporator Feed Tank. From 1980 to 2013, Tank 26 received F Canyon receipts and dilute supernate that was then transferred to the 242-16F FTF Evaporator for volume reduction. In 2013, the steam tube bundle failed in the FTF Evaporator, and the decision was made not to repair/resume evaporator operation. During operation of Tank 26, solids built up to a level of 2.03 m in the tank with a volume of 1062.9 kL. Due to the evaporator failure and subsequent shutdown, the solids in Tank 26 were selected to feed Sludge Batch 10, which is collected and prepped prior to being sent to DWPF for final disposition. To accomplish solids removal, Commercial Submersible Mixer Pumps (CSMPs) were selected to slurry the solids in preparation to be sent to Tank 51. Four CSMPs were installed in Tank 26 with each one installed in a separate quadrant of Tank 26. This work would mark the first deployment of CSMPs in an SRS waste tank. The CSMPs were developed in response to operational issues from previous mixing pumps and budgetary constraints. The CSMPs use the concept of modifying commercially available equipment for nuclear waste applications. The CSMPs consist of a 230-horsepower submersible mixing pump (manufactured by GPM, Inc.) joined to a mast fabricated at SRS. For this application, Savannah River Remediation (SRR) design services was challenged to provide a mast design that required no steel superstructure support system on top of Tank 26. Also, SRR design services provided a simplified Tank 26 riser interface that did not require extensive machine parts to adjust height of the suction screen of the CSMP within the tank. Other design improvements include no requirements for tank top radiation monitors and no requirements for flushing of the CSMPs during startup/shutdown operations. The CSMPs were operated at an initial height of 2.29 m above the Tank 26 bottom for 10 days. After sludge sounding, the CSMPs were lowered to a height of 1.52 m with no issues due to proper work planning and the simplified riser interface. With the CSMPs lowered to a level of 1.52 meters above the tank bottom, the CSMPs were operated for 12 days and another sounding was performed. The sounding level came back matching the disturbance depth results of the first pump run. Chemistry samples were analyzed while the tank was left to settle. The analysis revealed enough weight percent solids to provide good feed to Sludge Batch 10. Also, the results revealed the supernate within the mixture would provide good salt solution feed to Salt Waste Processing Facility (SWPF) Salt Batch 3. So, the plan was modified to let the disturbed solids settle and decant the salt solution for addition to SWPF Salt Batch 3. Then water will be added back to Tank 26, and the CSMPs run in order to wash the solids to decrease settling time prior to being sent to Tank 51 for Sludge Batch 10. Utilizing CSMPs for waste removal in an SRS Tank has provided a cost-effective means for further waste removal efforts. In addition, the CSMPs are easier to operate by utilizing a robust and simplified design. The CSMPs performed quite well with no process shutdown or delays during operation. As a result, CSMPs are integral to the future of removing radioactive waste from storage tanks at SRS. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Application of Process Chemical Modeling to Optimize Radioactive Waste Disposal at the Savannah River Site – 24242

The Liquid Waste Program (LWP) managed by Savannah River Mission Completion (SRMC) is responsible for the treatment and disposal of waste at the Savannah River Site (SRS). Radioactive waste at SRS is stored and processed at four key facilities – each with their respective functions to store, blend, grout, or vitrify waste. The tank farm, where waste is stored, consists primarily of legacy waste with new material incoming from the Accelerated Basin De-inventory program (ABD), which is managed by Savannah River Nuclear Solutions (SRNS). System planning is done by SRNS and SRMC to optimize ABD and LWP operations, respectively.

Georgiou, Andreas↗

Improving Elemental Mercury Recovery in DWPF by pH and Ionic Strength Studies Using Laboratory Scale Replica – 26141

In order to safely disposition nuclear material at large scales, the Savannah River Site (SRS) constructed the Salt Waste Processing Facility (SWPF) for the removal of actinides, the Saltstone facility for preparation of a low-level cementitious grout, and the Defense Waste Processing Facility (DWPF) for the vitrification of high-level waste (HLW). A few years after processing began, high concentrations of mercury were discovered in cementitious waste at the Saltstone facility which initiated a search for the source of mercury during processing at these SRS facilities. Mercury serves as a catalyst in the dissolution of spent nuclear fuel, aluminum-actinide alloys, for actinide recovery, but not enough is known about the behavior and properties of mercury within these process streams.

Pina, Jeanette [Savannah River National Laboratory↗