Search NASA⌕ Search

SEARCH · Search NASA

Results for “hermes”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Impact of Facility Pressure on the Wear of the NASA HERMeS Hall Thruster

This work presents an overview and summary of the results acquired during the final segment of the TDU-3 Long Duration Wear Test, which was completed in October 2018. The overall goal of this segment was to quantify the impact of facility pressure on the wear of the Hall Effect Rocket with Magnetic Shielding Technology Demonstration Unit Three (TDU-3) Hall thruster. This was accomplished by operating TDU-3 for approximately 270 hours at the nominal 600 V/12.5 kW operating condition while a bleed or auxiliary flow of xenon propellant was injected into the vacuum facility in order to raise the operating pressure to match that of another test facility in which previous wear segments had been performed. The performance, plume, stability, and wear results acquired at this elevated pressure (11.7 µTorr) are compared with the equivalent data previously taken at the nominal operating pressure (4.2 µTorr).

Frieman, Jason D.↗

Impact of Facility Pressure on the Wear of the NASA HERMeS Hall Thruster

This work presents an overview and summary of the results acquired during the final segment of the TDU-3 Long Duration Wear Test, which was completed in October 2018. The overall goal of this segment was to quantify the impact of facility pressure on the wear of the Hall Effect Rocket with Magnetic Shielding Technology Demonstration Unit Three (TDU-3) Hall thruster. This was accomplished by operating TDU-3 for approximately 270 hours at the nominal 600 V/12.5 kW operating condition while a bleed or auxiliary flow of xenon propellant was injected into the vacuum facility in order to raise the operating pressure to match that of another test facility in which previous wear segments had been performed. The performance, plume, stability, and wear results acquired at this elevated pressure (11.7 µTorr) are compared with equivalent data taken at the nominal operating pressure (4.2 µTorr) in the same facility as well at the elevated operating pressure in the other facility. Implications of these results for acquiring facility-independent service life estimates are discussed.

Frieman, Jason D.↗

Evidence of Counter-Streaming Ions near the Inner Pole of the HERMeS Hall Thruster

NASA is continuing the development of a 12.5-kW Hall thruster system to support a phased exploration concept to expand human presence to cis-lunar space and eventually to Mars. The development team is transitioning knowledge gained from the testing of the government-built Technology Development Unit (TDU) to the contractor-built Engineering Test Unit (ETU). A new laser-induced fluorescence diagnostic was developed to obtain data for validating the Hall thruster models and for comparing the behavior of the ETU and TDU. Analysis of TDU LIF data obtained during initial deployment of the diagnostics revealed evidence of two streams of ions moving in opposite directions near the inner front pole. These two streams of ions were found to intersect the downstream surface of the front pole at large oblique angles. This data points to a possible explanation for why the erosion rate of polished pole covers were observed to decrease over the course of several hundred hours of thruster operation.

Wensheng Huang↗

Inner Front Pole Cover Erosion in the 12.5 kW HERMeS Hall Thruster Over a Range of Operating Conditions

Erosion characteristics on the cover of the inner front pole in a 12.5 kW Hall thruster were measured over a wide range of operating conditions in tests of 6 to 14 hours duration using an accelerated test method and a very sensitive radioactive tracer-based erosion diagnostic. The operating points included the nominal 300 - 600 V conditions on a constant 20.8 A throttle curve, but included additional conditions at other currents spanning the throttling envelope and measurements at varying magnetic eld strength, facility pressure, and discharge voltage oscillation amplitude. The results show that the 300 V condition produces the highest wear rates on the 20.8 A throttle curve, but that rates actually increase with decreasing current. The wear rate was insensitive to discharge voltage ripple, but increased monotonically with magnetic eld strength, particularly near the inner radius of the pole cover. The inner region was also sensitive to facility pressure, showing lower rates at a higher pressure level. Separate experiments in which the energy distributions of ions generated by the hollow cathode were measured suggest that the cathode plume may be a source of energetic ions responsible for some of the erosion trends, in addition to ions originating in the thruster plume. The Hall thruster simulation code Hall2De is able to reproduce the erosion characteristics observed at 600 V, 20.8 A, but cannot currently match the rates measured at lower voltages and currents.

Lopez Ortega, Alejandro↗

Performance of the 12.5-kW Advanced Electric Propulsion System Engineering Test Unit Hall Thruster

This work presents a summary of the performance test campaign of the 12.5 kW Advanced Electric Propulsion System (AEPS) Engineering Test Unit 2 (ETU-2) thruster produced by Aerojet Rocketdyne. This test campaign had three major goals: to assess design compliance with thruster requirements, provide a comparison to the previously-tested NASA Hall Effect Rocket with Magnet Shielding (HERMeS) Technology Demonstration Units (TDUs) from which the AEPS ETU design was derived, and support AEPS application on the Power and Propulsion Element (PPE). Assessments of ETU-2 performance were conducted at discharge powers of 2.6 to 13.1 kW, which encompasses the original AEPS throttle conditions as well as those most relevant for AEPS application on PPE. The results from the test campaign indicate that ETU-2 performance meets or exceeds all AEPS thruster performance requirements and matches the values and trends previously measured with the HERMeS TDUs. In addition, similar to the HERMeS TDUs, ETU-2 performance showed minimal variation over approximately 1636 h of operating time due to the incorporation of magnetic shielding. Taken together, these results show that the AEPS design is successfully replicating the performance of the HERMeS TDUs to within the empirical uncertainty and meeting its performance requirements as the design progresses to its Critical Design Review.

HERMeS↗

Reconfiguration of NASA GRC's Vacuum Facility 6 for Testing of Advanced Electric Propulsion System (AEPS) Hardware

The NASA Hall Effect Rocket with Magnetic Shielding (HERMeS) 12.5 kilowatt Hall thruster has been the subject of extensive technology maturation in preparation for development into a flight propulsion system. The HERMeS thruster is being developed and tested at NASA GRC and NASA JPL through support of the Space Technology Mission Directorate and is intended to be used as the electric propulsion system on the Power and Propulsion Element of the recently announced Deep Space Gateway. The Advanced Electric Propulsion System (AEPS) contract was awarded to Aerojet Rocketdyne to develop the HERMeS system into a flight system for use by NASA. To address the hardware test needs of the AEPS project, NASA GRC launched an effort to reconfigure Vacuum Facility 6 for high-power electric propulsion testing including upgrades and reconfigurations necessary to conduct performance, plasma plume, and system level integration testing. Results of the verification and validation testing with HERMeS Technology Demonstration Unit (TDU) 1 and TDU-3 Hall thrusters are also included.

ion engines↗

Reconfiguration of NASA GRC's Vacuum Facility 6 for Testing of Advanced Electric Propulsion System (AEPS) Hardware

The NASA Hall Effect Rocket with Magnetic Shielding (HERMeS) 12.5 kilowatt Hall thruster has been the subject of extensive technology maturation in preparation for development into a flight propulsion system. The HERMeS thruster is being developed and tested at NASA GRC and NASA JPL through support of the Space Technology Mission Directorate and is intended to be used as the electric propulsion system on the Power and Propulsion Element of the recently announced Deep Space Gateway. The Advanced Electric Propulsion System (AEPS) contract was awarded to Aerojet Rocketdyne to develop the HERMeS system into a flight system for use by NASA. To address the hardware test needs of the AEPS project, NASA GRC launched an effort to reconfigure Vacuum Facility 6 for high-power electric propulsion testing including upgrades and reconfigurations necessary to conduct performance, plasma plume, and system level integration testing. Results of the verification and validation testing with HERMeS Technology Demonstration Unit (TDU) 1 and TDU-3 Hall thrusters are also included.

life (durability)↗

Reconfiguration of NASA GRC's Vacuum Facility 6 for Testing of Advanced Electric Propulsion System (AEPS) Hardware

The NASA Hall Effect Rocket with Magnetic Shielding (HERMeS) 12.5 kW Hall thruster has been the subject of extensive technology maturation in preparation for development into a flight propulsion system. The HERMeS thruster is being developed and tested at NASA GRC and NASA JPL through support of the Space Technology Mission Directorate (STMD) and is intended to be used as the electric propulsion system on the Power and Propulsion Element (PPE) of the recently announced Deep Space Gateway (DSG). The Advanced Electric Propulsion System (AEPS) contract was awarded to Aerojet-Rocketdyne to develop the HERMeS system into a flight system for use by NASA. To address the hardware test needs of the AEPS project, NASA GRC launched an effort to reconfigure Vacuum Facility 6 (VF-6) for high-power electric propulsion testing including upgrades and reconfigurations necessary to conduct performance, plasma plume, and system level integration testing. Results of the verification and validation testing with HERMeS Technology Demonstration Unit (TDU)-1 and TDU-3 Hall thrusters are also included.

Peterson, Peter Y.↗

12.5kW Advanced Electric Propulsion System Thruster Development Testing

Since 2012, NASA has been developing the12.5kW Hall Effect Rocket with Magnetic Shielding (HERMeS)thruster to serve the need for deep space propulsion. Aerojet Rocketdyne (AR)is developing the HERMeS Hall Current Thruster (HCT)into a flight capable design through the Advanced Electric Propulsion System (AEPS) program. In execution of this program, Aerojet Rocketdyne has designed, built and begun test of two Engineering Test Unit (ETU)HCTs, designated ETU-1 and ETU-2. This paper presents some of the preliminary results from theETU-1 thruster and draws comparisons to previous HERMeS Technology Demonstration Units (TDUs)and theETU-2 characterization unit. The ETU-1 thruster serves to evaluate the ETU design against dynamic and thermal environments while ETU-2 undergoes operational characterization and wear testing. The thruster has been exposed to acceptance and qualification-level vibration and shock testing and has undergone acceptance and characterization hot-firing to evaluate thruster performance after exposure to dynamic environments. The results have demonstrated that the dynamic environments have not had an adverse effect on performance and demonstrated that stability and operating characteristics remain unaffected. Together, ETU-1 and ETU-2 HCTs have demonstrated operating performance and characteristics in-family with each other and with the NASA HERMeS Technology Demonstration Units.

AEPS↗

Performance of the 12.5-kW Advanced Electric Propulsion System Engineering Test Unit Hall Thruster

This work presents a summary of the performance test campaign of the 12.5 kW Advanced Electric Propulsion System (AEPS) Engineering Test Unit 2 (ETU-2) thruster produced by Aerojet Rocketdyne. This test campaign had three major goals: to assess design compliance with thruster requirements, provide a comparison to the previously-tested NASA Hall Effect Rocket with Magnet Shielding (HERMeS) Technology Demonstration Units (TDUs) from which the AEPS ETU design was derived, and support AEPS application on the Power and Propulsion Element (PPE). Assessments of ETU-2 performance were conducted at discharge powers of 2.6 to 13.1 kW, which encompasses the original AEPS throttle conditions as well as those most relevant for AEPS application on PPE. The results from the test campaign indicate that ETU-2 performance meets or exceeds all AEPS thruster performance requirements and matches the values and trends previously measured with the HERMeS TDUs. In addition, similar to the HERMeS TDUs, ETU-2 performance showed minimal variation over approximately 1636 h of operating time due to the incorporation of magnetic shielding. Taken together, these results show that the AEPS design is successfully replicating the performance of the HERMeS TDUs to within the empirical uncertainty and meeting its performance requirements as the design progresses to its Critical Design Review.

Jason D Frieman↗

Progress Towards Microcalorimeter Gamma Spectroscopy Analysis for Nuclear Fuel Separations

The High Efficiency and Resolution Microcalorimeter Spectrometer, 400 pixels (HERMES-400) is an ultra-high resolution gamma-ray spectrometer at Idaho National Laboratory’s Materials and Fuels Complex. HERMES-400 is intended to enable precise nondestructive analysis of advanced fuel cycle materials. Key upgrades and repairs of the instrument were performed this year to improve performance. First, the fourth and final microcalorimeter detector module was installed, meeting the milestone for its integration into the system. Operation with all four modules enables higher detector efficiency than any previous microcalorimeter gamma-ray system. Second, a thinner magnetic shield was installed. This shields the sensitive microcalorimeter pixels from stray magnetic fields while allowing transmission of lower-energy gamma rays, which are important to isotopic analysis. Finally, the cryostat, which provides cooling of the modules to their operating temperature, was found to have a helium coolant leak, which was repaired. HERMES-400 is in a stable state to perform repeated, long-term gamma-ray measurements with good detector efficiency and energy resolution. In FY25, irradiated TRISO fuel and salts from advanced electrochemical recycling techniques are candidates for microcalorimeter measurements. A final upgrade of the magnetic shielding and vibration damping of the system is also planned to maximize the system performance.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Near-Surface Plasma Characterization of the 12.5-kW NASA TDU1 Hall Thruster

To advance the state-of-the-art in Hall thruster technology, NASA is developing a 12.5-kW, high-specific-impulse, high-throughput thruster for the Solar Electric Propulsion Technology Demonstration Mission. In order to meet the demanding lifetime requirements of potential missions such as the Asteroid Redirect Robotic Mission, magnetic shielding was incorporated into the thruster design. Two units of the resulting thruster, called the Hall Effect Rocket with Magnetic Shielding (HERMeS), were fabricated and are presently being characterized. The first of these units, designated the Technology Development Unit 1 (TDU1), has undergone extensive performance and thermal characterization at NASA Glenn Research Center. A preliminary lifetime assessment was conducted by characterizing the degree of magnetic shielding within the thruster. This characterization was accomplished by placing eight flush-mounted Langmuir probes within each discharge channel wall and measuring the local plasma potential and electron temperature at various axial locations. Measured properties indicate a high degree of magnetic shielding across the throttle table, with plasma potential variations along each channel wall being less than or equal to 5 eV and electron temperatures being maintained at less than or equal to 5 eV, even at 800 V discharge voltage near the thruster exit plane. These properties indicate that ion impact energies within the HERMeS will not exceed 26 eV, which is below the expected sputtering threshold energy for boron nitride. Parametric studies that varied the facility backpressure and magnetic field strength at 300 V, 9.4 kW, illustrate that the plasma potential and electron temperature are insensitive to these parameters, with shielding being maintained at facility pressures 3X higher and magnetic field strengths 2.5X higher than nominal conditions. Overall, the preliminary lifetime assessment indicates a high degree of shielding within the HERMeS TDU1, effectively mitigating discharge channel erosion as a life-limiting mechanism.

Lifetime↗