Search NASA⌕ Search

SEARCH · Search NASA

Results for “human system interface”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Summary of the Preliminary Optical ICHMI Design Study: A Preliminary Engineering Design Study for a Standpipe Viewport

This summary report examines an in-vessel optical access concept intended to support standoff optical instrumentation, control and human-machine interface (ICHMI) systems for future advanced small modular reactor (AdvSMR) applications. Optical-based measurement and sensing systems for AdvSMR applications have several key benefits over traditional instrumentation and control systems used to monitor reactor process parameters, such as temperature, flow rate, pressure, and coolant chemistry (Anheier et al. 2013). Direct and continuous visualization of the in-vessel components can be maintained using external cameras. Many optical sensing techniques can be performed remotely using open optical beam path configurations. Not only are in-vessel cables eliminated by these configurations, but also sensitive optical monitoring components (e.g., electronics, lasers, detectors, and cameras) can be placed outside the reactor vessel in the instrument vault, containment building, or other locations where temperatures and radiation levels are much lower. However, the extreme AdvSMR environment present challenges for optical access designs and optical materials. Optical access is not provided in any commercial nuclear power plant or featured in any reactor design, although successful implementation of optical access has been demonstrated in test reactors (Arkani and Gharib 2009). This report outlines the key engineering considerations for an AdvSMR optical access concept. Strict American Society of Mechanical Engineers (ASME) construction codes must be followed for any U.S. nuclear facility component (ASME 2013); however, the scope of this study is to evaluate the preliminary engineering issues for this concept, rather than developing a nuclear-qualified design. In addition, this study does not consider accident design requirements. In-vessel optical access using a standpipe viewport concept serves as a test case to explore the engineering challenges and performance requirements for sodium fast reactor (SFR) and high-temperature gas reactor (HTGR) AdvSMR applications. The expected environmental conditions for deployment are reviewed for both AdvSMR designs. Optical and mechanical materials that maximize component lifetime are evaluated for the standpipe viewport design under these conditions. Optical components and opto-mechanical designs that provide robust optical-to-metal seals and stress-free optical component mounting are identified, and then key performance specifications are developed for a sapphire optical viewport concept. Design strategies are examined that protect the internal optical surfaces from liquid-coolant condensation and impurity deposits. Finally, a conceptual standpipe viewport design that is suggestive of how this concept could be assembled using standard nuclear-qualified pipe components, is presented.

42 ENGINEERING↗

About the Complex Natural and Engineered Systems Pillar

Los Alamos National Laboratory is a world leader in applying multi-disciplinary science to complex systems within the Complex Natural and Engineered Systems (CNES) challenge areas. Our search for solutions requires science and technology innovation, as well as an integrated experiment, theory, and modeling and simulation approach. Our research and development spans from improving engineered systems such as nuclear weapons and the power grid, to understanding the interface of human and engineered systems from the subsurface to space, to studying how complex natural systems such as disease and climate impact humanity.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

A Computuerized Operator Support System Prototype

A report was published by the Idaho National Laboratory in September of 2012, entitled Design to Achieve Fault Tolerance and Resilience, which described the benefits of automating operator actions for transients. The report identified situations in which providing additional automation in lieu of operator actions would be advantageous. It recognized that managing certain plant upsets is sometimes limited by the operator’s ability to quickly diagnose the fault and to take the needed actions in the time available. Undoubtedly, technology is underutilized in the nuclear power industry for operator assistance during plant faults and operating transients. In contrast, other industry sectors have amply demonstrated that various forms of operator advisory systems can enhance operator performance while maintaining the role and responsibility of the operator as the independent and ultimate decision-maker. A computerized operator support system (COSS) is proposed for use in nuclear power plants to assist control room operators in addressing time-critical plant upsets. A COSS is a collection of technologies to assist operators in monitoring overall plant performance and making timely, informed decisions on appropriate control actions for the projected plant condition. The COSS does not supplant the role of the operator, but rather provides rapid assessments, computations, and recommendations to reduce workload and augment operator judgment and decision-making during fast-moving, complex events. This project proposes a general model for a control room COSS that addresses a sequence of general tasks required to manage any plant upset: detection, validation, diagnosis, recommendation, monitoring, and recovery. The model serves as a framework for assembling a set of technologies that can be interrelated to assist with each of these tasks. A prototype COSS has been developed in order to demonstrate the concept and provide a test bed for further research. The prototype is based on four underlying elements consisting of a digital alarm system, computer-based procedures, PI&D system representations, and a recommender module for mitigation actions. At this point, the prototype simulates an interface to a sensor validation module and a fault diagnosis module. These two modules will be fully integrated in the next version of the prototype. The initial version of the prototype is now operational at the Idaho National Laboratory using the U.S. Department of Energy’s Light Water Reactor Sustainability (LWRS) Human Systems Simulation Laboratory (HSSL). The HSSL is a full-scope, full-scale glass top simulator capable of simulating existing and future nuclear power plant main control rooms. The COSS is interfaced to the Generic Pressurized Water Reactor (gPWR) simulator with industry-typical control board layouts. The glass top panels display realistic images of the control boards that can be operated by touch gestures. A section of the simulated control board was dedicated to the COSS human-system interface (HSI), which resulted in a seamless integration of the COSS into the normal control room environment.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

A Computuerized Operator Support System Prototype

A report was published by the Idaho National Laboratory in September of 2012, entitled Design to Achieve Fault Tolerance and Resilience, which described the benefits of automating operator actions for transients. The report identified situations in which providing additional automation in lieu of operator actions would be advantageous. It recognized that managing certain plant upsets is sometimes limited by the operator’s ability to quickly diagnose the fault and to take the needed actions in the time available. Undoubtedly, technology is underutilized in the nuclear power industry for operator assistance during plant faults and operating transients. In contrast, other industry sectors have amply demonstrated that various forms of operator advisory systems can enhance operator performance while maintaining the role and responsibility of the operator as the independent and ultimate decision-maker. A computerized operator support system (COSS) is proposed for use in nuclear power plants to assist control room operators in addressing time-critical plant upsets. A COSS is a collection of technologies to assist operators in monitoring overall plant performance and making timely, informed decisions on appropriate control actions for the projected plant condition. The COSS does not supplant the role of the operator, but rather provides rapid assessments, computations, and recommendations to reduce workload and augment operator judgment and decision-making during fast-moving, complex events. This project proposes a general model for a control room COSS that addresses a sequence of general tasks required to manage any plant upset: detection, validation, diagnosis, recommendation, monitoring, and recovery. The model serves as a framework for assembling a set of technologies that can be interrelated to assist with each of these tasks. A prototype COSS has been developed in order to demonstrate the concept and provide a test bed for further research. The prototype is based on four underlying elements consisting of a digital alarm system, computer-based procedures, PI&D system representations, and a recommender module for mitigation actions. At this point, the prototype simulates an interface to a sensor validation module and a fault diagnosis module. These two modules will be fully integrated in the next version of the prototype. The initial version of the prototype is now operational at the Idaho National Laboratory using the U.S. Department of Energy’s Light Water Reactor Sustainability (LWRS) Human Systems Simulation Laboratory (HSSL). The HSSL is a full-scope, full-scale glass top simulator capable of simulating existing and future nuclear power plant main control rooms. The COSS is interfaced to the Generic Pressurized Water Reactor (gPWR) simulator with industry-typical control board layouts. The glass top panels display realistic images of the control boards that can be operated by touch gestures. A section of the simulated control board was dedicated to the COSS human-system interface (HSI), which resulted in a seamless integration of the COSS into the normal control room environment.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Electronic Visualization Laboratory's 50th Anniversary Retrospective: Look to the Future, Build on the Past

September 2023 marks the 50th anniversary of the Electronic Visualization Laboratory (EVL) at University of Illinois Chicago (UIC). EVL's introduction of the CAVE Automatic Virtual Environment in 1992, the first widely replicated, projection-based, walk-in, virtual-reality (VR) system in the world, put EVL at the forefront of collaborative, immersive data exploration and analytics. However, the journey did not begin then. Since its founding in 1973, EVL has been developing tools and techniques for real-time, interactive visualizations—pillars of VR. But EVL's culture is also relevant to its successes, as it has always been an interdisciplinary lab that fosters teamwork, where each person's expertise contributes to the development of the necessary tools, hardware, system software, applications, and human interface models to solve problems. Over the years, as multidisciplinary collaborations evolved and advanced scientific instruments and data resources were distributed globally, the need to access and share data and visualizations while working with colleagues, local and remote, synchronous and asynchronous, also became important fields of study. This paper is a retrospective of EVL's past 50 years that surveys the many networked, immersive, collaborative visualization and VR systems and applications it developed and deployed, as well as lessons learned and future plans.

Johnson, Andrew E.↗

A Comparison of Three Types of Computer-Based Procedures: An Experiment Using the Rancor Microworld Simulator

The nuclear power industry has historically used paper-based procedures, but a shift towards computer-based procedures (CBPs) has the potential to reduce human errors, alleviate mental workload, and improve work performance. Twenty-seven participants were randomly assigned to one of three CBP types using the Rancor Microworld Simulator, and each performed two different types of operational scenarios (startup and loss of feedwater). The three CBP types varied in levels of digitalization. It was hypothesized that there would be less favorable impressions of the most basic procedures, and that these would demonstrate lower usability than types with greater digitalization. Overall, our predictions were partially supported with some interesting caveats, specifically with some performance benefits for CBPs that provided indicators but not embedded controls. We discuss our findings in terms of optimal levels of digitalization/automation within nuclear operations and suggest pathways for future directions.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

New controller for high voltage converter modulator at spallation neutron source

The Spallation Neutron Source (SNS) has developed a new control system for the High Voltage Convertor Modulator (HVCM) at the SNS to replace the original control system which is approaching obsolescence. The original system was based on controllers for similar high voltage systems that were already in use [1]. The new controller, based on National Instruments PXI/FlexRIO Field Programmable Gate Array (FPGA) platform, offers enhancements such as modular construction, flexibility and non-proprietary software. The new controller also provides new capabilities like various methods for modulator pulse flattening, waveform capture, and first fault detection. This paper will discuss the design of the system, including the human machine interface, based on lessons learned at the SNS and other projects. It will also discuss performance and other issues related to its operation in an accelerator facility which requires high availability. To date, 73% of the operational HVCMs have been upgraded to with the new controller, and the remainder are scheduled for completion by mid-2017.

Wezensky, Mark W↗

Adaptation of Commercially Available Robots for Conditioning and Packaging ILW at Sellafield - 18282

The Legacy Ponds and Silos at Sellafield site contain some of the most hazardous Intermediate Level Waste (ILW) in the UK. As part of a multi-billion pound decommissioning programme, this waste will be retrieved and transported across the site for conditioning and packaging in the Box Encapsulation Plant (BEP). Current plans are to commence plant active commissioning in 2022, which will represent a major milestone in the UK nuclear decommissioning programme. Within the plant, skips of waste will be transferred from the shielded transport package into standard 3 cubic metre ILW containers. Waste from the Pile Fuel Storage Pond and First Generation Magnox Storage Pond will be immobilised in cementitious grout before being transferred to an adjacent store. Waste from the Magnox Swarf Storage Silo will not be immobilised in grout, but will be packaged, providing multi-barrier containment. During the concept design, the project team selected commercially available robots as the most viable technology for carrying out the numerous dexterous and repetitive tasks involved in characterising, conditioning and packaging the waste within the shielded 'hot' cells. Significant technical challenges had to be overcome during the design to adapt a commercially available robot for use within a high radiation / high contamination environment, where human access is not safe even for short periods of time. These challenges included: - Designing robot assemblies that could be retrofitted into the existing cell structure that was constructed as part of an earlier project but never completed; - Designing robot assemblies that could be recovered to their 'transport' position without requiring manual intervention; - Designing robot assemblies that could be remotely removed and replaced with new ones if they failed part way through the plant operational life; - Designing through-wall service and power connections that allow maintenance and recovery; - Designing control systems and human-machine interfaces that enable both manual and automated operation of the robot, whilst avoiding collisions with the in-cell cranes and other in cell furniture; - Assessing the radiation tolerance of all items. Bespoke computer simulations and full-scale development trials have been carried out, using non-active test materials, in order to demonstrate the Technology Readiness Level (TRL) required by Sellafield Limited (SL) at each stage of the project [1]. The results of these trials have been recorded in both video and written form so that they can form part of the project's Knowledge Management database. Detailed designs and specifications for the robot assemblies have been updated to incorporate the recommendations from the development trials. Procurement and manufacture of robot assemblies has already commenced to deliver two waste handling robots, two waste container lidding / swabbing robots and associated critical spares. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Advanced human-machine interface for collaborative building control

A system for collaborative energy management and control in a building, including an energy management controller, one or more occupant HMIs that supports two-way communication between building occupants and a facility manager, and between building occupants and the energy management controller, and a facility manager HMI that supports two-way communication between the facility manager and the building occupants, and between the facility manager and the energy management controller, in which the occupant HMI allows building occupants to provide temperature preferences to the facility manager and the energy management controller, and the facility manager HMI allows the facility manager to configure an energy policy for the building as a set of rules and to view occupants' aggregated temperature preferences, and the energy management controller determines an optimum temperature range that resolves conflicting occupant temperature preferences and occupant temperature preferences that conflict with the facility manager's energy policy for the building.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

An Evaluation of Departmental Radiation Oncology Incident Reports: Anticipating a National Reporting System

Purpose: Systems to ensure patient safety are of critical importance. The electronic incident reporting systems (IRS) of 2 large academic radiation oncology departments were evaluated for events that may be suitable for submission to a national reporting system (NRS). Methods and Materials: All events recorded in the combined IRS were evaluated from 2007 through 2010. Incidents were graded for potential severity using the validated French Nuclear Safety Authority (ASN) 5-point scale. These incidents were categorized into 7 groups: (1) human error, (2) software error, (3) hardware error, (4) error in communication between 2 humans, (5) error at the human-software interface, (6) error at the software-hardware interface, and (7) error at the human-hardware interface. Results: Between the 2 systems, 4407 incidents were reported. Of these events, 1507 (34%) were considered to have the potential for clinical consequences. Of these 1507 events, 149 (10%) were rated as having a potential severity of ≥2. Of these 149 events, the committee determined that 79 (53%) of these events would be submittable to a NRS of which the majority was related to human error or to the human-software interface. Conclusions: A significant number of incidents were identified in this analysis. The majority of events in this study were related to human error and to the human-software interface, further supporting the need for a NRS to facilitate field-wide learning and system improvement.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Ensuring operator reliability in digital control rooms - 102

The U.S. fleet of nuclear power plants is aging, and efforts are being made to modernize instrumentation and control systems including integration of digital human-machine interfaces (HMIs) into the control room. Automation and control technologies have advanced since original systems were installed in the plants. This presents unique opportunities and challenges in ensuring the replacements are a benefit to the operators and the overall safe and reliable operation of the plant. We discuss trends we have observed from assisting utilities in their modernization efforts. Automation and evolving control rooms come with their own host of problems that existing human factors and engineering methods fail to capture. Traditional approaches are analytical approaches to ensuring reliability. Here we discuss some of the shortfalls of these traditional approaches as plants become increasingly more complex. We suggest that ensuring reliability for modernized and next generation control room will require expanding the scope of what was traditionally considered human factors as well as exploring novel approaches and methodologies for dealing with complexity and rapidly advancing technology. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Design Guidance for Computer-Based Procedures for Field Workers

Nearly all activities that involve human interaction with nuclear power plant systems are guided by procedures, instructions, or checklists. Paper-based procedures (PBPs) currently used by most utilities have a demonstrated history of ensuring safety; however, improving procedure use could yield significant savings in increased efficiency, as well as improved safety through human performance gains. The nuclear industry is constantly trying to find ways to decrease human error rates, especially human error rates associated with procedure use. As a step toward the goal of improving field workers’ procedure use and adherence and hence improve human performance and overall system reliability, the U.S. Department of Energy Light Water Reactor Sustainability (LWRS) Program researchers, together with the nuclear industry, have been investigating the possibility and feasibility of replacing current paper-based procedures with computer-based procedures (CBPs). PBPs have ensured safe operation of plants for decades, but limitations in paper-based systems do not allow them to reach the full potential for procedures to prevent human errors. The environment in a nuclear power plant is constantly changing, depending on current plant status and operating mode. PBPs, which are static by nature, are being applied to a constantly changing context. This constraint often results in PBPs that are written in a manner that is intended to cover many potential operating scenarios. Hence, the procedure layout forces the operator to search through a large amount of irrelevant information to locate the pieces of information relevant for the task and situation at hand, which has potential consequences of taking up valuable time when operators must be responding to the situation, and potentially leading operators down an incorrect response path. Other challenges related to use of PBPs are management of multiple procedures, place-keeping, finding the correct procedure for a task, and relying on other sources of additional information to ensure a functional and accurate understanding of the current plant status (Converse, 1995; Fink, Killian, Hanes, and Naser, 2009; Le Blanc, Oxstrand, and Waicosky, 2012). This report provides design guidance to be used when designing the human-system interaction and the design of the graphical user interface for a CBP system. The guidance is based on human factors research related to the design and usability of CBPs conducted by Idaho National Laboratory, 2012 - 2016.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

The Initial Development of a Computerized Operator Support System

A computerized operator support system (COSS) is a collection of resilient software technologies to assist operators in monitoring overall nuclear power plant performance and making timely, informed decisions on appropriate control actions for the projected plant condition. The COSS provides rapid assessments, computations, and recommendations to reduce workload and augment operator judgment and decision-making during fast- moving, complex events. A prototype COSS for a chemical volume control system at a nuclear power plant has been developed in order to demonstrate the concept and provide a test bed for further research. The development process identified four underlying elements necessary for the prototype, which consist of a digital alarm system, computer-based procedures, piping and instrumentation diagram system representations, and a recommender module for mitigation actions. An operational prototype resides at the Idaho National Laboratory (INL) using the U.S. Department of Energy’s (DOE) Light Water Reactor Sustainability (LWRS) Human Systems Simulation Laboratory (HSSL). Several human-machine interface (HMI) considerations are identified and incorporated in the prototype during this initial round of development.

99 GENERAL AND MISCELLANEOUS↗

Performance Evaluation of Augmented Teleoperation of Contact Manipulation Tasks

At Argonne National Laboratory, an enhanced telerobotic concept has been suggested by providing augmented virtual fixtures for precise and dexterous manipulation. The proposed technology incorporated a human-robot interface that can assist personnel on the processes of Deactivation and Decommissioning in sites of high radiation. It has been implemented on a dual-arm robot system, known as Baxter, by integrating the Robotic Operating System (ROS) with 3D sensors and visual-haptic operator interface. However, what remained before its practical utilization is the capability for precisely placing the virtual fixtures. To this end, the objectives involved camera calibration, which required hardware fabrication and setup, as well as modification and implementation of ROS. The goal of this Research and Development is to develop an augmented-reality- based operator interface for human-inclusive, intelligent, and autonomous robotic system for the Deactivation and Decommissioning (D and D) of radioactive sites. The objectives are to develop: Collaborative Robot; Multi-modal Mixed-Reality Human-Robot Interface; Intelligent and Autonomous Behaviors. In order to achieve this, Baxter's Head-Kinect camera and Left-Hand camera need to be calibrated to overlap the real environment with the simulated environment. Camera calibration, which is crucial for precisely placing the virtual fixtures, was successful after running the simulations. The real and simulated environments overlapped, permitting the utilization of augmented teleoperation and the dexterous manipulation of Baxter for D and D applications in nuclear sites. Future steps: Performance evaluation of augmented teleoperation of contact manipulation tasks: Multiple-Camera 3D Reconstruction and Automation. Oculus Interface: Augmented reality and machine learning for enhanced telerobotic operation (Augmented Tele-autonomy): Machine-learning techniques for complex and flexible autonomous robotic behaviors. Interactive remote operation of robotic systems. Mesh cutting with simulation and real robot.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Concept, implementation and commissioning of the automation system for the accelerator module test facility AMTF

The European XFEL project launched on June 5, 2007 will require about 103 accelerator modules as a main part of the XFEL linear accelerator. All superconducting components constituting the accelerator module like cavities and magnets have to be tested before the assembly. For the tests of the individual cavities and the complete modules an XFEL Accelerator Module Test Facility (AMTF) has been erected at DESY. The process control system EPICS (Experimental Physics and Industrial Control System) is used to control and operate the cryogenic plant and all its subcomponents. A complementary component of EPICS is the Open Source software suit CSS (Control System Studio). CSS is an integrated engineering, maintenance and operating tool for EPICS. CSS enables local and remote operating and monitoring of the complete system and thus represents the human machine interface. More than 250 PROFIBUS nodes work at the accelerator module test facility. DESY installed an extensive diagnostic and condition monitoring system. With these diagnostic tools it is possible to examine the correct installation and configuration of all PROFIBUS nodes in real time. The condition monitoring system based on FDT/DTM technology shows the state of the PROFIBUS devices at a glance. This information can be used for preventive maintenance which is mandatory for continuous operation of the AMTF facility. The poster will describe all steps form engineering to implementation and commissioning.

43 PARTICLE ACCELERATORS↗

Wind Energy Intrusion Detection System

SAND2022-14659 O The Wind Energy Intrusion Detection System uses a human-machine interface (HMI) to parse results and analyze for anomalies. Sandia National Laboratories is a multimission laboratory managed and operated by National Technology & Engineering Solutions of Sandia, LLC, a wholly owned subsidiary of Honeywell International Inc., for the U.S. Department of Energy’s National Nuclear Security Administration under contract DE-NA0003525.

Johnson, Jay↗