Search NASA⌕ Search

SEARCH · Search NASA

Results for “independent system operator”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Small Hydropower Interconnections: Analysis of Interconnection Processes

Small hydropower projects have faced the challenge of navigating the process to interconnect their generation source to electricity distribution and transmission grids. Small hydropower developers have found interconnection procedures to be opaque and ultimately result in unexpected cost surprises and long timelines. Noting these challenges, the U.S. Department of Energy Water Power Technologies Office enlisted Pacific Northwest National Laboratory (PNNL) and Oak Ridge National Laboratory (ORNL) to investigate the small hydropower interconnection landscape across the United States. After reviewing the status of small hydropower (“Small Hydropower Interconnections: Small Hydropower in the United States”) and the interconnection procedures across the United States (“Small Hydropower Interconnections: State Interconnection Processes”) in the first two white papers of this series, this paper uses recent data from small hydropower interconnection applications to benchmark the efficacy of the process. Using data from interconnection queues hosted by utilities, balancing authorities, independent system operators (ISOs), and regional transmission organizations (RTOs), this paper provides context for the costs, timelines, and types of upgrades required for small hydropower projects. Interconnection applications and study reports for small hydropower projects were analyzed to collect key pieces of information about the interconnection process, timeline, costs, and type of upgrades required for interconnection. Information sourced from the reports was entered into an Interconnection Benchmarking database (IBdb), which may be found in Appendix A.1. Information from this database was used to evaluate the performance and challenges associated with interconnecting small hydropower projects. This white paper presents a description of the sources contained in the interconnection database (Section 2.0), an analysis of the interconnection timeline (Section 3.0), an evaluation the cost of interconnection upgrades (Section 4.0), and a description of the types of infrastructure upgrades (Section 5.0). The final paper in this series (“Small Hydropower Interconnections: Best Practices”) will use the analysis described here to outline best practices for interconnection processes that will help overcome barriers to future small hydropower development.

13 HYDRO ENERGY↗

Small Hydropower Interconnections: Best Practices

Small hydropower projects have been the predominant source of capacity growth of U.S. hydropower for more than a decade, and they present the most cost-effective and environmentally permissible avenues for hydropower growth (DOE 2016; Johnson et al. 2018). However, interconnection to electricity distribution and transmission grids is a persistent barrier due to cost surprises and schedule overruns. As a culmination to research into the status and requirements of small hydropower interconnection across the United States, this paper presents the best practices for setting interconnection standards that can improve the process for small hydropower developers. As part of the analysis, the interconnection costs are compared between small hydropower, solar, and wind. The analysis of the small hydropower interconnection landscape across the United States was carried out by Pacific Northwest National Laboratory (PNNL) and Oak Ridge National Laboratory (ORNL) with support from the U.S. Department of Energy Water Power Technologies Office. The research team was guided by a Technical Advisory Group (TAG) and gleaned data from publicly available sources, such as the HydroSource database (ORNL 2020) and interconnection queues hosted by utilities, balancing authorities, independent system operators (ISOs), and regional transmission organizations (RTOs). The results of this work are shared in a series of papers detailing the state of small hydropower in the United States (“Small Hydropower Interconnections: Small Hydropower in the United States”), the variety of state interconnection processes to connect power generators with the grid (“Small Hydropower Interconnections: State Interconnection Processes”), and an analysis of the interconnection processes (“Small Hydropower Interconnections: Analysis of Interconnection Processes”). In this, the final paper in the series, best practices for interconnection processes (“Small Hydropower Interconnections: Best Practices”) are identified from the solar energy and distributed wind energy industries that are transferrable to small hydropower development. This information will help overcome barriers to future small hydropower development.

13 HYDRO ENERGY↗

HIPPO – A Software Platform for Electricity Market Research and Development

The goal of this project is to provide Regional transmission organizations (RTOs) and independent system operators (ISOs) a market design and prototyping software, High-Performance Power-Grid Optimization (HIPPO), that they can evaluate electricity market design options, calculate market planning strategies and operational performance. With the high standards and strict reliability requirements for operating power systems, impacts of new technologies need to be fully investigated prior to any consideration for adoption. A market design and prototyping software tool which can be used to prototype electricity market design options, to calculate market planning strategies and operational performance with high precision, and to investigate the impacts for integrating future power grid technologies will be valuable to RTOs/ISOs who operate power systems, to vendors like GE and ABB who provide the market solvers, and to market participants and researchers who are actively doing market research. HIPPO is a such tool that can be used to improve the current market operations and provide capabilities for rigorous forward-looking design and prototyping of next-generation energy markets. HIPPO has a high-resolution model for the day-ahead SCUC, which was validated with MISO and GE-Grid Solutions. HIPPO is built with parallel and distributed computing capabilities and can be executed in both multi-thread and high-performance computing (HPC) settings. This capability provides fast solution speed necessary to handle the larger and more complex SCUC problems of real-world cases and the potentially growing size and complexity of future scenarios. In addition, HIPPO has a concurrent optimizer (CO) which manages multiple algorithm executions simultaneously and leverages the advantages from different algorithms. This structure provides flexibility to better benchmark competing approaches. Highly accurate market model, fast solution technologies and flexible model and algorithm control are the features which will make HIPPO an extensible platform for developing and testing multiple approaches to meet a wide range of future market needs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Impact of FERC Order 2222 on DER Participation Rules in US Electricity Markets

Electricity markets in the bulk grid are beginning to implement market mechanisms that support the procurement of flexible capabilities from wide range of technologies, including distributed energy resources (DERs). The flexibility of these resources will help counterbalance supply uncertainties from large-scale integration of variable renewable generation. To encourage development of distributed and aggregated market participants, FERC Order 2222 was issued in September 2020 to require each Independent System Operator (ISO) in the US to implement rules that enable broader participation from aggregations of DERs in the bulk market. The following paper first describes the generic design of ISO markets before introducing the new market participation rules that ISOs have proposed for compliance with Order 2222. The paper then describes how software performance issues may continue to affect the eligibility requirements and offer structures for DER aggregations participating in ISOs, noting that continued research on computational methods may help reduce burdens for DER integration. The prospects for transmission and distribution system coordination is second major issue discussed, which will require minor changes to existing processes in the short term. In the longer term, there is more opportunity for more wide-ranging reforms, such as the development of a Distribution System Operator (DSO) framework. Newly proposed market rules may affect how Transactive Energy Systems (TES) will help facilitate efficient formation of DER aggregations and operation of the individual DERs within an aggregation. Within the TES context, the challenge is to fully understand how resource eligibility and operational and planning coordination methods will affect the design and implementation of TES.

24 POWER TRANSMISSION AND DISTRIBUTION↗

FERC Order No. 2222 and Considerations for Distributed Wind

The Federal Energy Regulatory Commission (FERC) issued Order No. 2222 in October 2020. The rule directs Regional Transmission Organizations and Independent System Operators (ISOs) to amend their tariffs and participation models to accommodate heterogeneous distributed energy resource (DER) aggregations in the wholesale energy markets that they operate, including capacity, energy, and ancillary service markets. The Commission issued the rule to better capture the benefits provided by DERs deployed in the United States, whose use has been expanding rapidly. The Commission defines DERs as “any resource located on the distribution system, any subsystem thereof or behind a customer meter,” including but not limited to “electric storage resources, distributed generation, demand response, energy efficiency, thermal storage, and electric vehicles and their supply equipment.” The rule aims to increase DER participation in wholesale markets by allowing the creation of DER aggregations, in which multiple DERs that are too small to meet minimum capacity requirements for wholesale markets individually would be able to participate in markets as a single unit. As of June 20, 2023, all ISOs have filed initial compliance plans and a number have begun implementation. Compliance dates range from 2024 to 2029, with Midcontinent ISO having the latest date of compliance proposed for 2029. Southwest Power Pool still has an outstanding date, having no final order yet from FERC, but a target date of the third quarter of calendar year 2025. The rule, which is technology agnostic and requires ISOs to create participation plans that accommodate different DERs, provides an opportunity for distributed wind market expansion. In addition, distributed wind can bring benefits to heterogenous DER aggregations. These benefits include resource diversity (i.e., a complementary generation profile to other types of distributed generation), its small footprint and ability to be co-located with load, and its potential to provide frequency response, voltage support, and black start services, among other ancillary services. This report provides a status update on FERC Order No. 2222, the current state of ISO compliance, and information relevant to the distributed wind industry as DER aggregators and other stakeholders expand their participation to wholesale energy markets.

17 WIND ENERGY↗

Integration of Hybrids into Wholesale Power Markets

With growing commercial activity around utility-scale hybrid storage projects in the Unites States, independent system operators (ISOs) and regional transmission organizations (RTOs) are faced with making decisions on how to represent such emerging technology resources in the market clearing software through the definition of hybrid resource participation models. System operators are facing increasing uncertainties around efficient and reliable ways to operate these resources given the ambiguity around their impacts, particularly when high levels of hybrid resources are present. This study aimed to evaluate and compare the performance implications of different hybrid resource participation models in a realistic wholesale electricity market setting with significant deployment of hybrid resources, and to provide the industry with metrics that quantify the advantages and disadvantages of different participation options using realistic electricity market simulations. The different participation models are compared in terms of the impact to reliability of the overall system, the ability of the market to access the full capabilities of hybrid resources as measured by the economic efficiency, and asset profitability.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Waiting in Queue: A Historical Evaluation of Interconnection Policy

Both states and Independent System Operators (ISO)/Regional Transmission Organizations (RTO) have struggled with long wait times in interconnection queues. As a result, numerous reforms have been proposed to expedite the connection of new resources to the grid. This paper conducts a quantitative analysis of two of these policies: one providing detail hosting capacity information in Massachusetts, the other experimenting with cost allocation in New York. We find that both policies led to a statistically significant decrease in the times projects spend pending in interconnection queues, with New York seeing a small drop in days pending, and Massachusetts seeing a much larger one. We also include an analysis of how energy storage is impacts queue time in these states. These results can help inform regulators who are weighing reforms to interconnection policies, with the goal of reducing wait times.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Third-Party Aggregation Rulemaking in MISO and SPP Footprints

The report highlights key considerations for retail regulators in the footprints of the Southwest Power Pool (SPP) or Midcontinent Independent System Operator (MISO) in states that previously opted out of allowing third-party aggregation participation under FERC Order 719 and that may want to explore reversing the decision due to a changing policy environment under new FERC orders (i.e., 2222) and/or tightening resource adequacy constraints. Through a document review and a series of 27 interviews with regulators, aggregators, and other industry professionals, this document provides a high-level policy overview of the retail regulator’s role in a selection of processes, rules, and regulations to better understand how states have treated and/or integrated aggregators into wholesale markets. The report summarizes findings in two sections: General Findings and Specific Policy Findings. The General Findings offer high level takeaways such as the fact that 17 of the 20 states in MISO and SPP footprints opted out of third party aggregations following Order 719. Additionally, there is only one state that is fully restructured in the MISO and SPP footprints whereas the rest are vertically integrated, and the majority of third-party aggregations in the U.S. take place in restructured states outside of these footprints. Even so, third-party aggregations do take place in MISO and SPP albeit in small numbers and in an ad hoc regulatory environment. The specific policy findings delve deeper into specific examples of state actions on the topics of jurisdiction, registration and licensing, data governance, dual participation, and dispute resolution. Tables in each category organize state actions into Tiers I-III, which roughly correspond to the possible level of involvement or possible change necessary by state regulators and/or legislators to implement these actions. The tier level does not indicate any value judgement, as each state has respective regulatory limitations and each decision comes with various tradeoffs. One main tradeoff is between simplicity and quick implementation versus comprehensive and prolonged implementation. In many cases, actions in Tier I could be implemented without significant changes by relying on the use of existing processes for an aggregator context. On the other hand, many actions in Tier III are more narrowly designed to address aggregators specifically, but often require more significant changes including the involvement of additional parties through stakeholder engagement or legislative action. In some cases, these tiers are discrete. However, state regulators may also choose to progress through these various tiers sequentially as they phase in aggregators while learning from their experience. With the ability to stack bulk system level services, distributed energy resource aggregations in MISO and SPP could provide various private benefits (e.g., increased value streams to the owner) as well as societally beneficial grid services (e.g., peaking capacity, ancillary services, and other services that increase the grid’s overall operational efficiency). In deciding how to best to enable these benefits, states and retail regulators must weigh various tradeoffs if considering reversing a previous opt out.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Exploring Wholesale Energy Price Trends: The Renewables and Wholesale Electricity Prices (ReWEP) tool (Ver. 2024.1)

The Renewables and Wholesale Electricity Prices (ReWEP) visualization tool from Berkeley Lab has been updated with nodal electricity pricing and wind and solar generation data through the end of 2023. ReWEP users can explore trends in wholesale electricity prices and their relationship to wind and solar generation. ReWEP includes nodal pricing trends across locations, regions, and different timeframes. The tool consists of maps, time series, and other interactive figures that provide: (1) a general overview of how average pricing, negative price frequency, and extreme high prices vary over time, and (2) a summary of how pricing patterns are related to wind and solar generation. Interactive functionality allows investigation by year, season, time of day, and region, where region is defined as the Independent System Operators (ISO) or Regional Transmission Organizations (RTO) region. ReWEP also contains prices throughout much of the western United States from the Western Energy Imbalance Market and the Western Energy Imbalance Service Market.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Exploring Wholesale Energy Price Trends: The Renewables and Wholesale Electricity Prices (ReWEP) tool (Ver. 2024.1)

The Renewables and Wholesale Electricity Prices (ReWEP) visualization tool from Berkeley Lab has been updated with nodal electricity pricing and wind and solar generation data through the end of 2023. ReWEP users can explore trends in wholesale electricity prices and their relationship to wind and solar generation. ReWEP includes nodal pricing trends across locations, regions, and different timeframes. The tool consists of maps, time series, and other interactive figures that provide: (1) a general overview of how average pricing, negative price frequency, and extreme high prices vary over time, and (2) a summary of how pricing patterns are related to wind and solar generation. Interactive functionality allows investigation by year, season, time of day, and region, where region is defined as the Independent System Operators (ISO) or Regional Transmission Organizations (RTO) region. ReWEP also contains prices throughout much of the western United States from the Western Energy Imbalance Market and the Western Energy Imbalance Service Market.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

The transmission ramifications of social and environmental siting considerations on wind energy deployment

Increasing the capacity of wind power is critical to achieving climate goals, however its continued deployment faces environmental and social siting challenges. For example, the United States government is increasingly emphasizing the importance of a just energy transition by considering the social impacts of energy and environmental justice (EEJ). In this study, we investigate the impact of considering available EEJ metrics and environmental impacts into siting wind power and transmission by applying SimWIND PRO . SimWIND PRO is an infrastructure optimization tool that can site wind energy technologies and transmission by concurrently considering wind resource potential, transmission costs, EEJ, and environmental impacts. We demonstrate the impacts of considering EEJ and environmental factors in the context of Midcontinent Independent System Operator’s (MISO) western region, which includes some of the best wind energy potential in the United States. We show that prioritizing EEJ and environmental considerations in wind deployment can result in exponentially more transmission deployment for the same amount of wind power delivered, and results in selecting different wind farm sites. Our results also show that, depending on how it is considered, it is possible that constraining sites based on EEJ and environmental factors can reduce the available capacity of wind energy enough that energy transition capacity targets cannot be met.

17 WIND ENERGY↗

Modeling and Detection of Future Cyber-Enabled DSM Data Attacks

Demand-Side Management (DSM) is an essential tool to ensure power system reliability and stability. In future smart grids, certain portions of a customer’s load usage could be under the automatic control of a cyber-enabled DSM program, which selectively schedules loads as a function of electricity prices to improve power balance and grid stability. In this scenario, the security of DSM cyberinfrastructure will be critical as advanced metering infrastructure and communication systems are susceptible to cyber-attacks. Such attacks, in the form of false data injections, can manipulate customer load profiles and cause metering chaos and energy losses in the grid. The feedback mechanism between load management on the consumer side and dynamic price schemes employed by independent system operators can further exacerbate attacks. To study how this feedback mechanism may worsen attacks in future cyber-enabled DSM programs, we propose a novel mathematical framework for (i) modeling the nonlinear relationship between load management and real-time pricing, (ii) simulating residential load data and prices, (iii) creating cyber-attacks, and (iv) detecting said attacks. In this framework, we first develop time-series forecasts to model load demand and use them as inputs to an elasticity model for the price-demand relationship in the DSM loop. This work then investigates the behavior of such a feedback loop under intentional cyber-attacks. We simulate and examine load-price data under different DSM-participation levels with three types of random additive attacks: ramp, sudden, and point attacks. We conduct two investigations for the detection of DSM attacks. The first studies a supervised learning approach, with various classification models, and the second studies the performance of parametric and nonparametric change point detectors. Results conclude that higher amounts of DSM participation can exacerbate ramp and sudden attacks leading to better detection of such attacks, especially with supervised learning classifiers. We also find that nonparametric detection outperforms parametric for smaller user pools, and random point attacks are the hardest to detect with any method.

97 MATHEMATICS AND COMPUTING↗

Offshore Wind Farm Turbine and Energy Storage Optimization

Abstract This paper evaluates the technical and economic feasibility of repurposing decommissioned offshore oil and gas platforms as electrical substations for offshore wind projects in the U.S. Gulf of America, a region characterized by relatively low and highly variable wind speeds, extensive legacy offshore infrastructure, and exposure to merchant electricity markets. A unified techno-economic framework is developed using the Repurposing Offshore Infrastructure for Continued Energy (ROICE) Economic Model (REM) to integrate Gulfspecific wind resource assessment, commercial wind turbine performance, offshore infrastructure cost modeling, and wholesale electricity market exposure. Gulf wind speed data are vertically extrapolated to turbine hub height and combined with manufacturer power curves to compute annual energy production and capacity factors across a broad portfolio of commercial turbines, enabling identification of turbine designs best suited for low-wind offshore environments. Hourly electricity price data from the Midcontinent Independent System Operator (MISO) day-ahead market are incorporated to characterize revenue potential, price volatility, and the temporal alignment between wind generation and market conditions. In addition, a conceptual framework for offshore battery energy storage system (BESS) integration is developed to support future investigation of market-responsive energy shifting at repurposed platforms. Results from the turbine evaluation demonstrate that machines with lower cut-in wind speeds and earlier ‘rated-power’ characteristics significantly outperform larger, industry-standard offshore turbines for the same net power under Gulf wind conditions, underscoring the need for region-specific technology selection. Market analysis further reveals substantial price variability and limited intrinsic alignment between wind production and high-price periods, motivating consideration of operational flexibility mechanisms. While storage optimization is not implemented in this study, the REM framework establishes a transparent and replicable foundation for co-evaluating turbine selection, infrastructure constraints, and market exposure, providing a practical pathway for assessing the potential role of repurposed offshore platforms in enabling economically viable offshore wind development in the Gulf of America.

02 PETROLEUM↗

Cooperation in Transmission Expansion Planning: Enhancing Grid Reliability and Efficiency Under a Changing Climate

Electricity grids are challenged to maintain reliability during more intense and frequent extreme weather events due to climate change. This challenge is exacerbated by multi-sector electrification and power sector decarbonization through increased reliance on variable renewable energy, which necessitates the expansion of transmission infrastructure. However, transmission expansion planning is often complicated by intertwined planning authorities and jurisdictions, and allocation of large capital investment needs. These factors cause authorities to manage transmission investments individually (i.e., only/mostly intraregional planning), which can lead to suboptimal transmission networks. This study investigates the potential benefits of cooperative transmission expansion planning (i.e., both intraregional and interregional planning that optimizes transmission investments across the entire physical system). Using sectoral and economic optimization, and machine learning models, it analyzes the impact of different levels of cooperation among transmission planning regions within U.S. Western Interconnection in 2019 and 2059 via an iterative investment process. Furthermore, it examines the effects of future climate change on transmission cooperation by simulating historical heat waves from 2019 under conditions of 2059. The results indicate that cooperative transmission planning leads to lower wholesale electricity prices, decreased energy outages, and reduced greenhouse gas emissions. However, the advantages of collaboration diminish during widespread heat waves, despite remaining beneficial especially for regions like California Independent System Operator with substantial solar installations. The study underscores the importance of transmission cooperation in reducing costs and enhancing reliability, emphasizing the need for strategic investments in storage to address challenges posed by future extreme weather events with varying spatial scales.

Capacity Expansion Model↗

Powered by dGen Webinar [Slides]

NLR's Powered By Webinar Series featuring NLR's dGen Modeling Tool. The Distributed Generation Market Demand (dGenTM) model simulates customer adoption of distributed energy resources for residential, commercial, and industrial entities in the United States or other countries through 2050. The model enables analysis at multiple geographic levels (national, state, and utility, or below) and offers sophistication in representation of decision-making regarding economic and behavioral considerations. Analysts have used dGen to answer questions about load forecasting and integrated resource planning, policy analysis, locational value of distributed energy resources, and more. dGen is open source, and various energy organizations - including independent system operators, regional transmission organizations, and the California Energy Commission - use the model internally.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Energy 101: Utilities [Slides]

The Energy 101: Utilities presentation, developed for the Energy Technology Innovation Partnership Project (ETIPP), provides an overview of utilities. It covers fundamental concepts, technologies, considerations, case studies, and additional resources.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Demand response providing ancillary services: A comparison of opportunities and challenges in US wholesale markets

Interest in using demand response (DR) resources to supply low cost reliability products to the bulk electricity system is on the rise due to the uncertain impacts of increasing penetrations of intermittent generation and recent rulings supporting demand side participation in wholesale markets from the Federal Energy Regulatory Commission. However, organized electricity and ancillary services markets are just beginning to support DR resources for ancillary services, and the set of rules and requirements for participation are unique to each market. This paper discusses the opportunities that exist in the ancillary service markets in each US Independent System Operator territory and identifies challenges to market participation for demand response resources. It compares resource requirements, limits to aggregation, measurement and verification, bidding requirements, market timelines, and the types of organizations that can play in the markets. Additionally, it uses market clearing prices and market size to compare what value may be extracted from these markets, and identifies how these prices are currently determined. Using these criteria, PJM and ERCOT have the most favorable conditions for demand response participation in ancillary service markets, and changes to rules that effect aggregation and minimum resource size could promote more participation in other AS markets across the US.

MacDonald, Jason↗

Probabilistic Forecasting of Generators Startups and Shutdowns in the MISO System Based on Random Forest

Solving security constrained unit commitment (SCUC) problems to plan an economical generation schedule for day-head electricity market has been an important research topic in recent years. Mixed integer programming method (MIP), the-state-of-art approach for solving SCUC problem, is known computationally hard when the number of binary status variables is large. In this paper, a machine learning-based algorithm - random forest (RF), was applied to forecast the startups (SU) and shutdowns (SD) hours of generators, based on historical hourly system condition observations in the Midcontinent Independent System Operator (MISO) system. The main purpose is to reduce the number of binary status variables, by fixing the SU/SD hours to a narrow range of high confidence. This would significantly reduce the size of the decision space, and therefore speed up SCUC solutions with reduced uncertainty.

Lin, Xinming↗