Search NASA⌕ Search

SEARCH · Search NASA

Results for “installed power”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Metal-Supported Ceria Electrolyte-based SOFC Stack for Scalable, Low-Cost, High-Efficiency and Robust Stationary Power Systems (Final Report)

This is the end of project report for the DOE Project DE-FE-0027844 “Metal-Supported Ceria Electrolyte-based SOFC Stack for Scalable, Low-Cost, High-Efficiency and Robust Stationary Power Systems”. The objectives of the project were to develop several technologies required for the mass adoption of Solid Oxide Fuel Cell systems for medium to large power generation applications. The key achievements of this project were: 1) Development of fuel cells with complete internal fuel reforming capability. 2) Fuel cell power scale up with production of cells with larger active areas. 3) Assembly of an integrated 5 kW modular stack platform capable of installation into medium to large power systems. 4) Demonstration of a 10 kW Fuel Cell Power System utilizing the integrated 5 kW modular stack platform. 5) Cost modelling to show system cost of $1,500/kW are achievable at production volumes. 6) Development of cathode air poison getters for reduced degradation and extended fuel cell life. 7) Assessment of fuel poison on anode degradation, particularly poisons frequently produced from the process of gasification of coal. The Cummins led Voice of Customer (VOC) work identified several significant markets for natural gas powered fuel cell systems, where the end customer is interested in reducing energy consumption and emissions, or increasing reliability of electrical supply. Data centers and truck Auxiliary Power Units (APU) were highlighted as 2 key future markets for fuel cell systems.

30 DIRECT ENERGY CONVERSION↗

Data Driven Approach to Analyzing The Impact of Power Plant Cycling on Air Preheater Degradation and Remaining Useful Life

Due to the increased penetration of renewable energy generation sources, and fluctuations of the oil and gas prices, modern coal burning power plants deal with increased variability in the demand for power generation. These varying demands result in their intermittent under-capacity operation (cycling). Periodical ramping down and back up to follow the daily power demands causes damages to the plant components reducing its operational life. In this paper we analyze the impact of cycling on a rotary Ljungstrom air preheater (APH) unit installed at a coal fire power plant in the US. An inefficient air preheater can significantly impact boiler performance. Due to the repeated boiler’s hot-cold start, the APH experiences fluctuating operating conditions that result in accelerated degradation mechanisms, such as dew-point corrosion, fouling/deposition plugging, and air heater leakage. The analysis in this paper utilizes field data related to APH basket replacement, and the number of cycles experienced by the boiler to model the life expectancy of the baskets. The data-driven model enables preventive maintenance strategies for the APH by predicting how long the APH baskets will last in a probabilistic sense. Furthermore, the analysis showed that an increase in cycling for a fixed operation time can reduce the APH basket remaining useful life by about 30%.

20 FOSSIL-FUELED POWER PLANTS↗

DATA DRIVEN APPROACH TO ANALYZING THE IMPACT OF POWER PLANT CYCLING ON AIR PREHEATER DEGRADATION AND REMAINING USEFUL LIFE

Due to the increased penetration of renewable energy generation sources, and fluctuations of the oil and gas prices, modern coal burning power plants deal with increased variability in the demand for power generation. These varying demands result in their intermittent under-capacity operation (cycling). Periodical ramping down and back up to follow the daily power demands causes damages to the plant components reducing its operational life. In this paper we analyze the impact of cycling on a rotary Ljungstrom air preheater (APH) unit installed at a coal fire power plant in the US. An inefficient air preheater can significantly impact boiler performance. Due to the repeated boiler’s hot-cold start, the APH experiences fluctuating operating conditions that result in accelerated degradation mechanisms, such as dew-point corrosion, fouling/deposition plugging, and air heater leakage.The analysis in this paper utilizes field data related to APH basket replacement, and the number of cycles experienced by the boiler to model the life expectancy of the baskets. The data-driven model enables preventive maintenance strategies for the APH by predicting how long the APH baskets will last in a probabilistic sense. The analysis showed that an increase in cycling for a fixed operation time can reduce the APH basket remaining useful life by about 30%.

Sharma, Himanshu↗

Chapter 14 - Reliability of Wind Turbines

The global wind energy industry has grown at a fast pace during the past half-decade. Advancements from design and manufacturing to operation and maintenance have led to reduced capital and maintenance costs, which make wind power an indispensable source for a comprehensive solution to global electricity needs. Once wind turbines are installed, the opportunity to lower wind power costs is mainly through improved operation and maintenance practices. Modern wind turbines are equipped with tens or hundreds of measurement channels and are generating an abundance of data, with lot of efforts being put into data analysis by both the research community and the industry. One type of analysis is through the exploration of reliability engineering methods based on readily available data or maintenance records collected at typical wind power plants. If adopted and conducted appropriately, these analyses can quickly save operation and maintenance costs in a potentially impactful manner. The wind industry has adopted this discipline more broadly in recent years. This chapter discusses wind turbine reliability by highlighting the methodology of reliability engineering life data analysis. It first briefly discusses the fundamentals of wind turbine reliability and the current industry status. Then, the reliability engineering method for life analysis, including data collection, model development, and forecasting, is presented in detail and illustrated through two case studies. The chapter concludes with some remarks on potential opportunities to improve wind turbine reliability. An owner and operator's perspective is taken and mechanical components are used to exemplify the potential benefits of reliability engineering analysis to improve wind turbine reliability and availability.

database↗

Regional Representation of Wind Stakeholders' End-of-Life Behaviors and Their Impact on Wind Blade Circularity

Wind plant power has seen tremendous growth in the US and worldwide, representing the most significant renewable energy installed capacity besides hydropower. While wind power enables decarbonizing the electricity grid, the rising amount of end-of-life (EOL) wind blades - which are arduous to recycle - present a challenge for landfills if disposed of whole and a missed opportunity to recover valuable composite materials. The circular economy (CE) concept proposes strategies to rethink, reuse and recover products, components, and materials. However, transitioning to a CE implies changing how business models, supply chains, and behaviors deal with products and waste; changes arduously captured with traditional methods used to assess circularity such as life cycle assessment or material flow analysis (MFA). Here we present an agent-based model (ABM) that captures behavioral aspects impacting wind blade circularity in the US. The ABM also accounts for wind plant projects and landfills heterogeneity - a characteristic not easily included in top-down approaches such as MFA, input-output analysis, or system dynamics. Results show that recycling is divided as most recycling facilities are on the eastern side of the country, a challenge that could be alleviated by shredding blades before transportation. Recycling programs from the wind industry could also seed recycling behaviors within wind plant owners. Better yet, new blade designs could increase circularity if original equipment manufacturers accept the risks involved with the investments needed to adapt the production lines.

17 WIND ENERGY↗

DECOVALEX-2023: Task D Final Report

Task D of DECOVALEX-2023 is focused on the simulation of the coupled thermal hydraulic-mechanical (THM) behaviour in the full-scale engineered barrier system (EBS). The Horonobe EBS experiment is the demonstration of the full-scale EBS in the underground research laboratory (URL) (performed by JAEA in the Horonobe URL in Japan). Task D consisted of the three steps, a preliminary step (Step 0), simulation of the laboratory tests (Step 1) and simulation of the in-situ full-scale EBS experiment (Step 2). Since the Horonobe EBS experiment demonstrates the vertical emplacement option of the EBS, the experiment gallery is also backfilled with the backfill material. Therefore, interaction between the EBS and the backfill material can also be demonstrated, such as deformation (change of density) of the buffer material. The underground water in the Horonobe URL is saline. This fact adds chemical processes to THM behaviour. For example, mechanical properties (such as swelling pressure of the buffer material and backfill material) and hydraulic properties (such as permeability of the buffer material and backfill material) change depending on the water chemistry. Task D was therefore a challenging Task focused on not only the relatively simple THM behaviour but also complex THM behaviour including chemical processes. Six research teams (BGR, CAS, JAEA, KAERI, SNL and Taipower) participated the Task D. BGR, CAS, JAEA, KAERI and Taipower research teams selected a THM approach, while the SNL research team selected a TH approach. Step 1 involved the simulation of laboratory test results and was important to check the numerical codes developed by the research teams. Step 1 was divided into four sub steps. The simulation results through the Step 1 identified the parameters for simulation of the Step 2. Basic parameters of the materials (buffer material, backfill material, rock mass, concrete, sand) were provided by JAEA. Special parameters which research team needed were identified by back analysis of Step 1. Most notably the mechanical behaviour of swelling and displacement depended on the applied model (elastic model or elastoplastic model). Parameters such as Young’s modulus were found to need smaller values than characterised in the fundamental laboratory test results (Step 1-1, 1-2) for the elastic model. Although laboratory experiments are usually simple, test results contained some error. For example, if the saturation level is 100 % or higher, it should be considered an error. This situation was presented in the Step 1-3. A possible reason is that the buffer material is a mixture of bentonite and silica sand. When a specimen is cut to measure volume or weight, sand grains will affect the measurement data. In Step 2, boundary conditions such as temperature on the surface of the simulated overpack, heater power of the electrical heaters installed in the simulated overpack, injection pressure and inflow rate of the test water, were applied. The outer boundary conditions can be selected using measured data (injection pressure and inflow rate of the test water that is controlled by the injection systems installed in the sand layer around the buffer material and in the boundary between backfill material and concrete support). Since such measured data has some noise, research teams developed their own simplified boundary conditions. Inner boundary conditions can be selected using measured data as heater power and temperature on the surface of the simulated overpack. These data also contain some noise, so research teams developed their own simplified developed boundary conditions. Task D validated various approaches thorough the simulation of the in-situ full scale EBS system including backfill of the gallery: variations in the coupling processes (THM or THC), analysis codes, and boundary conditions. Temperature distribution in the buffer material was simulated well by all research teams. This means thermal behaviour is not sensitive to the simulation approaches. Although the water content distribution on the outside of the buffer material was well simulated by all research teams, the simulation results differ from the measured values inside the buffer material (at the centre and inside, near the simulated overpack). The buffer material is made from tap water, but in the in-situ experiment, saline groundwater infiltrates the buffer material. Therefore, the selection of the hydraulic parameters of the buffer material greatly affects the simulation results of the re saturation behaviour of the buffer material. In the Horonobe EBS experiment, measured values suitable for validating the simulation results were not obtained near the simulated overpack. When simulating the pressure and deformation of the buffer material, the measurement data is easily affected by the installation conditions of the measurement sensors, so verifying the measurement data itself remains an issue. Mechanical simulation results differ depending on whether they are considered as elastic or elastoplastic phenomena. The accuracy of measured in-situ data can be assessed by detailed analysis comparing sampling specimen analysis and measured data. The Horonobe EBS experiment is scheduled to be dismantled in the future (FY2026 and 2027). This detailed dismantling investigation will finally confirm the measured data.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Using Resin to Reduce Silica in Borated Fluid - 20072

The Electric Power Research Institute (EPRI) strongly recommends the concentration of silica in the reactor coolant be limited, potential ingress be carefully controlled, and frequently monitored to assess potential silica deposits on fuel cladding surfaces. Boraflex is a product with silicone rubber encasing a neutron absorber for criticality control, and it was installed in the majority of nuclear power plant spent fuel pools. Over time and in the presence of radiation, the silicone rubber lining degrades into silica (SiO{sub 2}) and hydrogen gas. Silica is somewhat soluble in water and spent fuel pool water communicates with other plant systems during refueling outages, leading to a buildup of silica in the reactor coolant and connected systems. Due to the prevalence of Boraflex racks in spent fuel pools, the presence of silica is a chronic nuclear industry concern. To address this concern, many nuclear plants have installed reverse osmosis skid systems to remove the silica from their spent fuel pools and, by extension, from reactor coolant. These skids are expensive to install and maintain. Arcadis personnel demonstrated that an iron-impregnated resin could be used to remove silica from borated systems without impacting the water quality. The resin was readily available, inexpensive, and easy to install in existing plant equipment. During a nuclear power plant's refueling outage the iron-impregnated resin proved to be effective in reducing the need for feed and bleed operations, with concurrent cost savings and reduction in required outage water management activities. Thus, the following savings were realized: - Eliminated the need to purchase, install, and maintain a reverse osmosis system avoiding more than $10 million in up-front capital cost and ongoing operating and maintenance costs. - Removed 9.57 kilograms (21 pounds) of silica dioxide from the primary system fluid. - Reduced the volume of feed and bleed from 70,000 gallons (2.65 E+05 liters) to 35,000 gallons (1.32 E+05 liters). - Saved $380,000 in water production and disposal costs. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Progress on the Proton Power Upgrade Project at the Spallation Neutron Source

The Proton Power Upgrade Project at the Spallation Neutron Source at Oak Ridge National Laboratory will increase the proton beam power capability from 1.4 to 2.8 MW. Upon completion of the project, 2 MW of beam power will be available for neutron production at the existing first target station with the remaining beam power available for the future second target station. The project will install seven superconducting RF cryomodules and supporting RF power systems and ancillaries to increase the beam energy to 1.3 GeV . The injection and extraction region of the accumulator ring will be upgraded, and a new 2 MW mercury target has been developed along with supporting equipment for high-flow gas injection to mitigate cavitation and fatigue stress. Equipment is being received from vendors and partner laboratories, and installation is underway with three major installation outages planned in 2022-2024. The project is planned to be completed in 2025.

43 PARTICLE ACCELERATORS↗

Progress on the Proton Power Upgrade Project at the Spallation Neutron Source

The Proton Power Upgrade Project at the Spallation Neutron Source at Oak Ridge National Laboratory will increase the proton beam power capability from 1.4 to 2.8 MW. Upon completion of the project, 2 MW of beam power will be available for neutron production at the existing first target station with the remaining beam power available for the future second target station. The project will install seven superconducting RF cryomodules and supporting RF power systems and ancillaries to increase the beam energy to 1.3 GeV . The injection and extraction region of the accumulator ring will be upgraded, and a new 2 MW mercury target has been developed along with supporting equipment for high-flow gas injection to mitigate cavitation and fatigue stress. Equipment is being received from vendors and partner laboratories, and installation is underway with three major installation outages planned in 2022-2024. The project is planned to be completed in 2025.

Barbier, Charlotte↗

Optimization of Archimedes Screw for Use in Hydroelectric Projects

In 2017, the Department of Energy’s (DOE) Water Power Technologies Office (WPTO) made federal funding available to several awardees to investigate and provide innovative technological solutions to reduce capital costs of installed hydroelectric facilities at non-powered dam’s (NPD’s) across the United States, while maintaining a high level of efficiency. Awardees were to develop specific technologies that showed promise of reducing installed capital cost (ICC) by at least 20% over a given baseline and maintain a water-to-wire efficiency of at least 80% at head levels of 50 feet or less and flows of 1000 cubic feet per second (cfs) or less. Canyon Hydro (Canyon) was selected as an awardee for this funding and worked to refine the implementation of the Archimedes screw turbine for use at these site conditions. Canyon and its project partners analyzed several dam inventory datasets to determine the most common head and flow range of current NPD’s in order to best select design conditions for a turbine that would perform successfully at common heads and flows. Computational Fluid Dynamic (CFD) analyses were conducted after site conditions had been selected to optimize the turbine geometry for efficiency. Through this effort we were able to estimate water-to-wire efficiency over a range of flows. Equipment design focused on concepts of modularity and pre-fabricated construction. These methodologies were used where possible to reduce costly on-site construction and shorten deployment timelines. Cost modeling was conducted with input from industry experts in general construction, pre-fabricated concrete construction, and composite fabrication. As a hydroelectric turbine manufacturer of 35 years, Canyon drew upon its own knowledge base in steel fabrication, water-to-wire component specification and ancillary systems to develop the remaining cost matrix for the project. As a result of these efforts, Canyon was able to present findings that indicated a modular Archimedes screw turbine system could be designed that reduced ICC by 23.9% and maintain a maximum water-to-wire efficiency of 82.3%, meeting the goals of the project.

13 HYDRO ENERGY↗

The infrared imaging video bolometer at Wendelstein 7-X

The radiated power distribution is a crucial aspect of heat transport, heat load mitigation, and plasma exhaust performance. An imaging video bolometer camera has been installed to measure the plasma radiated power in the divertor region of the Wendelstein 7-X (W7-X) stellarator. This diagnostic offers a wide-angle (40° × 68°) sampling of the plasma volume in both the poloidal and toroidal directions. The field-of-view is covered with a large number (> 500) of bolometer channels, providing imaging capability. The diagnostic design is introduced here together with its data analysis procedure. A set of laboratory experiments is performed to assess the thermal properties of the gold absorber foil and their spatial uniformity. Following installation, a heat source originating from the inertially cooled front of the diagnostic is identified and filtered out. The discharge data indicate a satisfactory signal-to-noise ratio as well as spatiotemporal resolution. These represent the first toroidally resolved images of the line-integrated radiated power in the W7-X island divertor. The diagnostic was then upgraded with a thinner platinum absorber and adjusted mirrors. Early data from the most recent experimental campaign employing the upgraded design show a considerable improvement in the diagnostic performance with more bolometer channels (> 1400), extended coverage, and increased spatial resolution.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Exceedance Probabilities and Recurrence Intervals for Extended Power Outages in the United States

Power outages cause significant economic and societal impacts. An increasing likelihood of extreme weather coupled with aging grid infrastructure is leading to a higher prevalence of extended power outages, which can leave customers without power for multiple days or even weeks. Planners at the facility, local, state, and federal levels are interested in resilience solutions to reduce the impacts of extended power outages. Resilience solutions—such as installing backup systems, integrating microgrid solutions, weatherizing buildings, and hardening distribution and transmission components—can reduce the consequences of extended power outages, but these solutions come with increased capital costs. Conducting cost-benefit analyses is important for determining which steps to take to mitigate the impact of power outages without investing in ineffective and cost-prohibitive resilience solutions. The expected benefits of resilience investments depend on the frequency of power outages of various durations, particularly extended outages lasting several hours, days, or weeks. A significant barrier to resilience planning is the lack of publicly available data on the frequency and duration of extended power outages. The absence of outage duration information severely limits the ability to conduct quantitative cost-benefit analyses of resilience investments. This report provides estimates of recurrence intervals and conditional exceedance probabilities for major power outages by U.S. region between 2015 and 2021. Additionally, we provide estimates for grid management, particularly outages caused by California’s public safety power shutoffs (PSPS), and for natural outages caused by major hurricanes. Outage recurrence intervals are the average number of years between outage events, and conditional exceedance probabilities are the likelihoods that a customer who experiences a major power outage will experience an outage exceeding a given duration. Major outage events are those that affect 10,000 or more customers, as defined by the U.S. Department of Energy’s (DOE’s) Electric Emergency Incident and Disturbance Report, called OE-417 (DOE 2020). These results can be applied to determine the likelihood of experiencing long-duration outages, which can be integrated into cost-benefit analyses of resilience solutions and broader energy resilience studies. We developed a methodology to estimate customer outage durations for extended outage events using publicly available data on customer outages. Shorter-duration power outages are relatively common, with customers experiencing on average more than one power outage each year lasting fewer than 12 hours. An outage event lasting between 1 day and 1 week is expected to occur between once every 16 years and once every 42 years, depending on the region, with an average recurrence rate of once every 32 years across the contiguous United States.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Grid connection barriers to renewable energy deployment in the United States

Bulk-power grid connection is an emerging bottleneck to the entry of wind, solar, and storage but has been understudied due to a lack of data. We create and analyze two novel interconnection datasets with more than 38,000 project-level observations that provide new information documenting interconnection challenges in the United States. Active grid connection requests are more than double the total installed capacity of the US power plant fleet (2,600 vs. 1,280 GW). The time required to secure a connection has increased by 70% over the last decade, and withdrawal rates remain high at 80%, suggesting a constrained transmission system that jeopardizes energy transition targets. Wide distributions of interconnection costs indicate the inherent uncertainty of the interconnection process. Interconnection requests that identify large transmission upgrades tend to withdraw from the process. These findings suggest the need for interconnection reforms, tighter links between long-term transmission planning and project-level interconnection processes, and more interconnection outcome transparency.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Software defined grid energy storage

Today, consumer battery installations are isolated, physical devices. Virtual power plants (VPPs) allow consumer devices to aggregate for grid services, but they are are vertically integrated, vendor controlled systems (e.g., Tesla’s VPP). Consumer batteries are therefore unable to participate in energy markets or other grid services outside what their vendor provides. We describe a software system that provides software control of multiple, networked battery energy storage systems in the electric grid. The system introduces two new ideas that enable flexible and dependable management of energy storage. The first is a virtual battery, which can either partition a battery or aggregate multiple batteries. The second is a reservation-based API which allows asynchronous control of batteries to meet contractual guarantees in a safe and dependable manner. Virtual batteries and a reservation-based API address the unique challenges of achieving high and efficient utilization of energy storage systems, including heterogeneity of battery systems such as varying C-rates, participation in energy markets, utility bill management systems, community resource sharing, and reliability. Using a testbed comprised of sonnen Inc. storage units installed in several homes and a lab, we demonstrate that virtualized batteries can seamlessly replace physical batteries, flexibly manage energy storage resources, isolate multiple clients using a shared battery, and create new energy storage applications.

25 ENERGY STORAGE↗

The Recent Improvements of the SNS Extraction Kicker Power Supplies

A total of 14 extraction kickers., with one as the hot spare., are in service to extract protons out of the storage ring at the SNS. The jitter issue and the short lifetime of the switches were resolved after the thyratrons were replaced with solid state switches in 2018. This paper discusses the recent improvements. Two thyristor switches suffered overheating damage in separate incidents. One was due to the oil pump failure and the other was the result of a disconnected oil hose. An ultrasonic flow meter and a fiber optic temperature monitoring system have been installed for each extraction kicker power supply. The flow meter continuously monitors the entire tank oil flow. The temperature monitor detects the thyristor switch real-time temperatures in three locations. Fault thresholds are selected so that the thyristor switches are protected from overheating damage. Alarms are configured to alert staff to take actions before faults occur. In addition., the cause of an intermittent misfire issue was identified, and the solution was implemented. Lastly., a future oscilloscope upgrade and an oil level sensor are discussed.

Tan, Yugang↗

Outdoor Test Bed Performance of a Power Line Sensor Using a Real-Time Event Simulator

This report summarizes the design and application of an outdoor power line sensor testbed (OPLST) with a real-time simulator and power meter to compare a potential transformer (PT) and current transformer (CT) versus an advanced line-post sensor. The OPLST was created to validate advanced medium-voltage (20/34.5 kV) outdoor power line sensors used in electrical distribution systems. Electrical utilities have installed metering and relay-protection transformers like PTs and CTs for several decades. The PTs/CTs are iron core measurement transformers based on the electromagnetic induction principle and provide reliable data in normal grid operation. However, new outdoor power line sensors (OPLS) using other technologies like voltage divider, Rogowski coil and optical principles have become available and may have favorable performance and costs compared to PTs/CTs. Therefore, the importance of testing these technologies with the PT/CT, to compare the measured phase voltage/current at different power grid scenarios is crucial to understand the performance of these new OPLS. For this study a G&W Electric Model CVS-36-O power line sensor was chosen as the OPLS to test with voltage/current signals. An OPAL-RT Technologies Model OP4510 real-time simulator and Schweitzer Engineering Laboratories Model SEL-735 power meter were installed with the 20/34.5 kV OPLST to compare the measured transient events collected from an advanced OPLS and the PT/CT. This system is installed at the Distributed Energy Communications and Control (DECC) lab, Oak Ridge National Laboratory (ORNL). The simulator generated different power grid scenarios (electrical faults, capacitor bank operation, service restoration, etc.), and its analog-output signals were connected to the voltage/current amplifiers that feed the 20/34.5 kV aerial cable loop through the PT/CT devices. Additional PT/CT devices were also wired with the medium voltage aerial cable loop to measure the phase current/voltage signals and server as references. After each test, common format for transient data exchange (COMTRADE) files were collected from the SEL-735 power meter and used to compare the performance of the OPLS with the PT/CT. The behavior of analog signals, harmonic components, total harmonic distortion and crest factors were assessed and found favorable for the G&W sensor as compared to the reference PT/CT.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Design, Deployment, and Characterization of the World’s First Flexible Large Power Transformer

GE Research and its partner Prolec GE have designed, built and deployed in the field the world’s first flexible power transformer. The flexible power transformer is a transmission class 3-phase autotransformer configurable in impedance and in voltage which allows it to serve as a universal spare for multiple units in a given fleet. However, the key innovation in this new concept is the online adjustable leakage impedance which allows the transformer to change its impedance without interrupting the transmission line operation. The flexible power transformer can be designed with up to three low voltage transmission class ratings and up to 12 impedance values changeable both online and offline. This report provides an overview of the design, manufacturing, testing, and commissioning of the 165kV, 60MVA prototype built including the results of the field performance validation tests. The prototype was specified in collaboration with Cooperative Energy, the utility host. It was designed and tested in the factory according to IEEE standard C57.12.00 and followed all protocols for transportation, installation, and commissioning of a power transformer. In addition to the prototype, a flexible protection system capable of automatically adjusting its settings upon the transformer impedance was also developed and deployed in the for testing and validation. On September 3, 2021 the prototype was energized in Cooperative Energy’s substation in Columbia, Mississippi to become the world’s first flexible power transformer in operation. Its performances and impact on the grid operation were demonstrated through different field tests. Results obtained confirm that the impedance of the flexible transformer can be varied under load through its full range, from 4.3% to 9.3%, without adverse impacts on the line operation, the protection system, the transformer stability and health condition. Results also proved that the flexible transformer is very effective in controlling power transfer through the line or load sharing between units operating in parallel. Indeed, it was proven that higher impedances decrease the thruput power of the transformer while lower impedances increase it. Up to 26MW was controllable on a line loading of 45MVA. It was also possible to demonstrate that the variation of the transformer impedance has no effect on the circulating current between units in parallel, except a minor transient during the impedance change. It was also proven that the flexible protection relay can update its protection settings automatically when the impedance change was detected. The prototype has operated continuously for more than 12 months now with a peak load exceeding 50MVA corresponding to >80% of its ONAN power rating. No alarm, trip or sign of failure has been reported by the utility. In addition to the development and deployment of the flexible transformer prototype, investigations were carried out on new nanodielectric fluids to replace the mineral oil used in power transformers with the goal of reducing their footprint and weight. The key parameters that were targeted for improvement included the breakdown voltage to reduce clearances between windings and tank hence the footprint; viscosity and thermal conductivity to increase the cooling efficiency and therefore to reduce the winding material. Several nanodielectric mixtures with mineral oil including with alumina (Al2O3), titania (TiO2) and Borum Nitrate (BN) with different surfactants have been analyzed and tested. Unfortunately, despite encouraging results no nanofluid candidate has been found viable to replace mineral oil. With the formulations tested, breakdown voltages are generally similar to mineral oil at lower particle contents and worse at higher particle contents. Viscosity appreciably increased at particles concertation over 2 wt% and thermal conductivity increased slightly at 5wt% and appears to be 10-15% higher at 10 wt% particle content. It is recommended to continue investigations to find solutions that can help increase the power density of future flexible power transformers. Flexible power transformers can significantly help the future power grid by providing more flexibility and resiliency. Indeed, by providing voltage and impedance flexibility, flexible power transformers reduce the need for multiple spares, hence inventory costs for utilities. With their online controllable impedance, they can provide support to the grid and help manage short-circuit currents, power flow, line congestion, and grid stability which will become more important with higher penetrations of intermittent renewable resources. During the field validation tests, it was demonstrated that up to 26MW was controllable on a line loading of 45MVA when the transformer impedance was varied from its minimum to its maximum range. Also, with the impedance range, the short-circuit currents could be reduced by up to 38% at the load side of the transformer. With its controllable impedance, flexible transformers can be used in future strategies of grid resilience to help better prepare the grid to face forecasted severe events including storms, heat waves and contingencies. The flexible power transformers can also find role in other applications including high voltage transmission cables such as offshore wind farms where solutions for energizing the cables and managing the reactive power are of critical importance. The designed flexible power transformer is now fully validated and ready for commercialization. Further analysis on the benefits of flexible power transformers for grid stability and short-circuit management including current limiting capability, reclosure and line restoration, control of inrush current, sizing of flexible AC components (FACTS) would help its rapid adoption by the industry.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Design of a high power 8 MeV electron beam injector for the LERF

We present the beamline design for a high power 8 MeV electron injector to be installed at the Low Energy Recirculator Facility (LERF). The injector is designed to provide beam power of up to 80 kW for testing positron source target candidates. We discuss the results of beam dynamics simulations conducted using the General Particle Tracer (GPT) software, where electromagnetic beamline elements were optimized using multi-objective genetic algorithm tools. Additionally, we present preliminary studies on secondary particle generation from both rotating solid and free surface liquid metal jet targets described elsewhere in this workshop.

Lizarraga-Rubio, Victor [Thomas Jefferson National↗