Application of Sequential Design of Experiments (SDoE) to Large Pilot-Scale Solvent-Based CO2 Capture Process at Technology Centre Mongstad (TCM)

The United States Department of Energy’s Carbon Capture Simulation for Industry Impact (CCSI2) program has developed a framework for sequential design of experiments (SDoE) that aims to maximize knowledge gained from budget- and schedule-limited pilot scale testing. SDoE was applied to the planning and execution of campaigns for testing CO2 capture systems at pilot-scale in order to optimally allocate resources available for the testing. In this methodology, a stochastic process model is developed by quantifying the parametric uncertainty in submodels of interest; for a solvent-based CO2 capture system, these may include physical properties and equipment performance submodels (e.g., mass transfer, interfacial area). This uncertainty is propagated through the full process model, over variable operating conditions, for estimating the resulting uncertainty in key model outputs (e.g., percentage of CO2 capture, solvent regeneration energy requirement). In developing a data collection plan, the predicted output uncertainty is incorporated into an algorithm that seeks simultaneously to select process operating conditions for which the predicted uncertainty is relatively high and to ensure that the entire space of operation is well represented. This test plan is then used to guide operation of the pilot plant at varying steady-state conditions, with resulting process data incorporated into the existing model using Bayesian inference to refine parameter distributions. The updated stochastic model, with reduced parametric uncertainty from data collected, is then used to guide additional data collection, thus the sequential nature of the experimental design. The SDoE process was implemented at the pilot test unit (12 MWe in scale) at Norway’s Technology Centre Mongstad (TCM) in a summer 2018 test campaign with aqueous monoethanolamine (MEA). During the test campaign, the varied operating conditions included the flowrates of circulated solvent, flue gas, and reboiler steam and the CO2 concentration in the flue gas. The process data were used to update probability distributions of mass transfer and interfacial area parameters of a stochastic process model developed by the CCSI2 team. Two iterations of the SDoE process were executed, resulting in the uncertainty in model predicted CO2 capture percentage decreasing by an average of 58.0 ± 4.7% over the full input space of interest. This work demonstrates the potential of the SDoE process for model refinement through reduction in process model parametric uncertainty, and ultimately risk in scale-up, in CO2 capture technology performance.

carbon capture↗

Inexpensive and durable aerogel-based VIP cores

The goal of this project was development of low-cost aerogels to be used as cores of Vacuum Insulated Panels (VIP). The specific aims were: 1. Aerogels to be based on phenolic chemistry to minimize flammability. 2. Aerogels to be in monolithic form and to have mechanical properties sufficient to allow their use as cores of VIPs without collapsing after evacuation. 3. Aerogels to have a cost per kg lower than the cost of fumed silica, one of the most common VIP cores. The achievements are: 1. Phenolic aerogels have been fabricated in monolithic form with thermal conductivity of 0.023 W/m·K, density ~ 0.25 g/cm 3 and a modulus of compression > 10 MPa. The aerogels can withstand the stresses of VIP evacuation without any appreciable deformation. 2. Drying of aerogels was carried in the initial stages of the project via sublimation of frozen solvents, following the procedure described in M. F. Bertino and T. Selden, “Fabrication of Aerogels and Aerogel Composites by Ambient Pressure Sublimation of Frozen Solvents”, PCT/US20/39485. Monoliths as large as 30 x 30 x 2 cm can be fabricated with the proprietary ambient fabrication technique which are free of cracks and warping. 3. Cost analysis was carried out and refined multiple times, cost drivers were identified, and the fabrication procedure was streamlined. Our cost model yields an aerogel cost of $\$$5.78/kg, which compares well with the price of fumed silica ($\$$6.2/kg FOB New York as of March 2023). 4. The monoliths can be cut into custom shapes and used as VIP cores. Cores fabricated with our technique have a thermal conductivity λ = 0.011 W/m·K at a pressure >10 mbar. 5. A variant of the technology yielded fireproof materials, described in M. F. Bertino, T. Moon, G. Waller, J. Ko and D. Clifford, “Fireproof thermal insulation”, Provisional Patent Application 63/415,386. 6. A spin-off company was created (ThermaGel Innovations, Inc.) which licensed technologies developed under this award. PI Bertino is a board member of the newco which is now raising capital to build a pilot plant.

36 MATERIALS SCIENCE↗

Plasma Wall Interaction with 3-D Plasma Boundaries

The interaction of the edge plasma and the material surfaces is one of the most critical challenges on the path to harness fusion power as new, fundamental energy source. This challenge typically combines the thrust to reach high density, low temperature (detached) plasmas in front of the divertor target plates as well as understanding the plasma material interaction (PMI) in particular in this regime. The combination of both research thrusts represents an extraordinarily challenging subject encompassing spatial scales spanning nanometers to meters in all states of matter and across a broad energy range. Modeling capabilities, which help to interpret data from nowadays experiments and enable extrapolation to future devices are urgently required. This is in particular true for toroidal magnetic confinement devices with three-dimensional (3D) plasma boundaries. Such plasma boundary geometries occur in tokamaks, when small amplitude magnetic perturbations are used to stabilize the unruly edge plasma or in stellarators, that are inherently 3D plasma confinement devices. In this project, the impact of 3D plasma boundaries on the plasma material interaction (PMI) was assessed. This work focused on plasma boundary conditions, in which high-density conditions at the material surfaces yield mitigation of the otherwise immense heat and particle loads that these materials would see. These so-called high recycling and eventually detached plasma regimes are of great interest for future reactor operation. In the project, key features that are unique to 3D boundaries were explored in comparison to canonically assumed axisymmetric plasma edge situations in tokamaks. In particular, the relevance of the 3D boundary situation in the extrapolation to the plasma boundary solution at ITER, the next step fusion energy experiment under construction as a multi-national, world-wide large-science experiment in southern France, has been explored. The EMC3-EIRENE plasma edge fluid and kinetic neutral transport code has been advanced to cope with the challenging and unprecedented conditions in the ITER boundary plasma including 3D fields that are planned to be used to suppress harmful edge instabilities, the so-called edge localized modes. This is a vital integration challenge for ITER and the results from this grant have provide a leading capability for this assessment. It was shown that the detachment process in a 3D edge solution for ITER follows the recycling regimes that are known from axisymmetric solutions, but that multiple plasma exhaust channels connected to the material surfaces are established which feature individual recycling characteristics. Because these channels touch the material surfaces in the divertor in a 3D geometry, the compatibility with the plasma material interaction (PMI), including erosion and impurity generation has been found to be an important part of the integration challenge. To address this, the fully 3D plasma material interaction code ERO2 has been adapted to these ITER specific geometries and a homogeneous mixing model was implemented, that allows to consider the mixing of Be and Was used at ITER in the PMI modeling. This model enhancement has been used to study non-local migration of Be in the JET ITER like wall configuration and it has been shown that with this model such complex migration processes in ITER relevant plasma shapes and with ITER relevant plasma boundary conditions can be addressed. The combined modeling approach using EMC3-EIRENE as a plasma boundary transport code and the ERO2 specialized PMI model will be an asset for the continued preparations of ITER operation as well as for Fusion Pilot Plant efforts that have emerged in the U.S. during the evolution of this grant. The predictive capability of this numerical tool has been validated at the DIII-D US national fusion facility. Here, dedicated plasma edge diagnostics were implemented to measure the impurity household around a 3D edge plasma during ELM suppression by 3D fields. Dedicated experiments with local material probes using these diagnostics and the state-of-the-art suite of boundary measurements at DIII-D have shown that the 3D perturbation of the plasma edge that is excreted by such 3D control fields yield a perturbation of the plasma boundary flux structure and hence also of the resulting PMI. The 3D boundary plasma is composed out of helical magnetic flux channels that intersect the divertor targets at an angle relative to the main guiding field, i.e., the toroidal magnetic field component of the tokamak. A similar effect has been measured as well on limiter surfaces during the startup campaign at the new stellarator experiment Wendelstein 7-X. These experiments ad initial analysis with the ERO plasma material interaction model, suggested that the place of erosion for a given particle from the surface and its re-deposition can be different in such 3D field geometries yielding potentially a significant level of net-erosion. This is not the case for axisymmetric solutions, where it was shown in the past that the eroded particles are effectively re-deposited into gaps produced by erosion at the same position and hence the net-erosion levels are small. For ITER, the quest to suppress the ELMs and at the same time maintain the integrity of the divertor is an issue, which these fundamental findings will help to resolve. The coupling of this work to the extrapolation in the ITER program has been addressed by both the PI and the lead numerical scientist being ITER Science Fellows in the duration of the contract and forward. A second focus in the exploration of 3D boundary effects on tokamaks and stellarators has been set on the measurement of helium exhaust features with such 3D fields. This is important because He represents the ash of the fusion process and needs to be exhausted. It was shown that 3D field application compatible with suppression of ELMs yields an increase of the helium exhaust performance. The ratio of the effective helium confinement time over the energy confinement time was reduced by almost 50% which demonstrated that the impact of helium accumulation in the plasma core with respect to the confinement of energy to sustain the fusion reaction is significantly improved with such 3D control fields. It was shown that this is the case for tokamaks as well as stellarators. At the Large helical Device in Japan, a similar enhancement of the helium exhaust features when small amplitude additional 3D fields were applied was measured. This is an important additional function of 3D field application and its impact on ITER is presently being studied in combination with investigations of helium exhaust in 3D field geometries of stellarator devices.

3D plasma edge transport↗

Modeling and Analysis of the Transport and Disposal of Beryllium Moderator Blocks and Greater than Class C (GTCC) Waste

Radioactive waste in the United states is categorized based on its source, radioactivity, and security risk. The categorization method employed by the Nuclear Regulatory Committee (NRC) for low-level radioactive waste is not currently applied to any waste generated by the Department of Energy (DOE) or disposed of in DOE facilities. As a result, there is a large volume of DOE-generated waste with characteristics similar to the NRC’s “Greater than Class C” (GTCC) waste category which presently do not have a path for long-term disposal. Much of this waste cannot undergo the standard commercial disposition process due to it being categorized as Transuranic (TRU) waste under DOE guidelines, due to elevated concentrations of key fission products. Possible solutions to this dilemma are explored in the Environmental Impact Statement for the “Disposal of Greater-Than-Class-C Low Level Radioactive Wave” (EIS-0375). This paper analyzes several EIS possible paths for disposal for this “orphaned” waste. One example that highlights this categorization issue is the spent beryllium cladding that has been extracted from the Advanced Test Reactor (ATR) at Idaho National Laboratory (INL) throughout its operational lifetime. These beryllium blocks surround the reactor’s main chambers and components and serve as neutron moderators. This paper will use this particular waste form to analyze the economic and technological viability of transporting and storing this material under the storage and transportation criteria of the Waste isolation Pilot Plant (WIPP), which was deemed the most feasible disposition path according to the EIS. The example of this waste form used in this paper that highlights this categorization issue is the spent beryllium cladding extracted from Idaho National Laboratory’s (INL) Advanced Test Reactor (ATR). These beryllium blocks surround the reactor’s components and serve as neutron moderators, and thus have accumulated high concentration of high-activity transuranic isotopes. This paper analyzed the viability of transporting and storing this material under the storage and transportation criteria of the five primary disposition paths covered in EIS-0375. An array of calculations was carried out to assess the viability of the various disposition paths for the beryllium shipments as well as other waste shipments that fall within the GTCC category. Modeling with MCNP 6.2 was conducted to determine whether the beryllium blocks could be safely stored and transported within a 72-B cask; the standard shipping container for remote-handled, transuranic waste, while also meeting regulatory limits at various disposition paths. A cost analysis of the transportation and long-term disposal paths mentioned in the EIS was also carried out using available data and information from similar waste shipments. Lastly, a geochemical analysis of the various geological repository discussed in the EIS was also carried out using the Geochemists Workbench Release 14. Long-term disposal of the beryllium blocks at the Waste Isolation Pilot Plant (WIPP) proved to be the most cost-effective long-term disposition option of the ones considered in the EIS. A dose rate calculation at both contact and remote-handling distances indicate that the analyzed beryllium shipments should not exceed the exposure limits at any of the considered locations. Greater-than-class-C waste has been left in a regulatory state of limbo for years, resulting in backlogs of inventory across several research sites in the United States. Due to its high activity and presence of transuranic isotopes, it is imperative to ensure that it remains inaccessible and sequestered both in its short-term interim as well as a long-term geologic time scale. The information and assessments done in the paper could potentially serve as a reference for any future shipments of this waste form at the WIPP facility as well as other disposition paths that may be considered in the future.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Performance Evaluation of Intelligent Solar Control Software Through Hardware-in-the-Loop (CRADA Final Report)

Recent research has highlighted the potential for solar to act as a zero-marginal-cost and zero-emission flexibility resource on the bulk power system when operated with advanced control systems. To increase the performance of these systems, leading technologies, including machine learning (ML) and hierarchical inverter set point allocation, have been developed by Latimer Controls, Inc. to estimate the headroom of large PV plants for grid operation and control; however, these technologies lack comprehensive validation under real-world application scenarios. Latimer Controls, Inc. received two voucher awards for research at a national laboratory from the Department of Energy American Made Solar Prize Round 6. The National Renewable Energy Laboratory (NREL) was selected to collaborate with Latimer staff to conduct a performance evaluation of Latimer PV control software. The NREL team will develop a hardware-in-the-loop (HIL) testbed to perform testing and validation of the Latimer PV control technology in a de-risked yet realistic testbed environment. Latimer and NREL worked together to analyze the test data, draw conclusions from the results, and disseminate the resulting scientific findings. In this CRADA work, we propose to test and validate the real-world application of the Latimer Control solution in an HIL environment. We evaluate the performance of different flexible solar technologies in responding to automatic generation control signals in a closed-loop fashion. In particular, a data-driven potential high limit (PHL) estimation is developed for large solar plants to accurately estimate their headroom so that they have fast and short-time regulation and control capability to participate in grid services and respond to grid signals in real time (e.g., AGC). This PHL estimation algorithm is embedded in a hardware power plant controller (PPC) and tested with an IEEE-39 bus system model developed in RTDS. To account for the varying cloud conditions and diverse inverter dispatches, we developed a 135-MW PV plant with detailed modeling of 27 individual PV modules and inverters using RTDS. The real-world communications used in such big plants, such as ModBus TCP/IP for inverter level and DNP3 for plant level, were developed to emulate the real-world applications in big PV plants. The ML-based PHL estimation method is tested under nine separate weather scenarios against the ‘reference-control’ solution, hereafter referred to as the baseline solution. The baseline method reserves a subset of inverters (reference group) to operate at their PHL at all times and dispatches only the remaining inverters (control group) at curtailed levels to fulfill the flexibility need. Despite being successfully piloted by NREL in California in 2017 and Chile in 2020, there exist two gaps in the state of the art to fully unlock the flexibility of PV plants: a. There is a trade-off between the PHL estimation accuracy and the flexibility range. b. There lacks granularity in the PHL estimation to capture the variation across inverters. The Latimer solution seeks to address these gaps by applying machine learning methods to improve PHL estimation accuracy while accounting for variability at every inverter. Performance metrics were taken from the 2023 Georgia Power CARES utility-scale RFP. The results demonstrate that the ML-based approach outperforms the traditional baseline method in PHL estimation accuracy for 7 of 9 scenarios. The average PHL error across the nine scenarios was 7.40% for the ML-based method, 2.06% less than the 9.46% PHL error average across scenarios that was exhibited by the baseline method. Additionally, the PHL error was below 5% for at least 95% of the testing interval for 3 of 9 tested intervals with the ML approach, whereas it did not achieve this metric for any of the baseline tests. Overall, simulation results indicate the superior performance of an ML-based approach compared to the conventional baseline reference-control approach, showcasing its potential to support grid stability and operational efficiency. This laboratory HIL testing using real PPC, representative power system simulation models in real-time with detailed PV plant and inverter models, and real-world communication protocols gives us confidence that this machine learning based PHL estimation algorithm works well in the hardware PPC and therefore de-risks future field commissioning. The end goal of this project is to advance grid technology to address the grid operation challenges brought by solar plant’s variability and uncertainties in power generation.

14 SOLAR ENERGY↗

Brine Availability Test in Salt (BATS) FY24 Update

This report summarizes fiscal year 2024 (FY24) activities centered around a series of field tests in bedded salt at the Waste Isolation Pilot Plant (WIPP) funded by the Office of Spent Fuel and Waste Science and Technology in the Spent Fuel and Waste Disposition (SFWD) program of the US Department of Energy’s Office of Nuclear Energy (DOE-NE). High-level Purpose of Experiments: The Brine Availability Test in Salt (BATS) field tests are revealing both brine occurrence (i.e., where, and how much) and brine migration (i.e., how easily it moves) in the excavation damaged zone (EDZ). This understanding is foundational to develop a safety case for a future heat-generating waste repository in salt, and to starting up a generic repository program in salt to buy down risk. BATS seeks to predict how much brine can flow into both ambient and heated excavations (e.g., boreholes or rooms) in salt. This work is educating and empowering new repository scientists on two fronts: “design and execution of field tests” and “prediction and modeling of coupled processes.” DOE-NE capabilities in salt have grown and been tested through international modeling and benchmarking exercises (e.g., DECOVALEX, RANGERS, KOMPASS, and MEASURES; see Mills et al., 2024). The hands-on expertise we are building is a necessary step towards large-scale disposal demonstrations and eventual implementation.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Robust Crossfeed Design for Hovering Rotorcraft

Control law design for rotorcraft fly-by-wire systems normally attempts to decouple angular responses using fixed-gain crossfeeds. This approach can lead to poor decoupling over the frequency range of pilot inputs and increase the load on the feedback loops. In order to improve the decoupling performance, dynamic crossfeeds may be adopted. Moreover, because of the large changes that occur in rotorcraft dynamics due to small changes about the nominal design condition, especially for near-hovering flight, the crossfeed design must be 'robust'. A new low-order matching method is presented here to design robust crossfeed compensators for multi-input, multi-output (MIMO) systems. The technique identifies degrees-of-freedom that can be decoupled using crossfeeds, given an anticipated set of parameter variations for the range of flight conditions of concern. Cross-coupling is then reduced for degrees-of-freedom that can use crossfeed compensation by minimizing off-axis response magnitude average and variance. Results are presented for the analysis of pitch, roll, yaw and heave coupling of the UH-60 Black Hawk helicopter in near-hovering flight. Robust crossfeeds are designed that show significant improvement in decoupling performance and robustness over nominal, single design point, compensators. The design method and results are presented in an easily used graphical format that lends significant physical insight to the design procedure. This plant pre-compensation technique is an appropriate preliminary step to the design of robust feedback control laws for rotorcraft.

Catapang, David R.↗

Reconstruction of the Room D, B, G, and Q Closure Histories at the Waste Isolation Pilot Plant

Experimental measurements of room closure in salt repositories are valuable for understanding the evolution of the underground and for validating geomechanical models. Room closure was measured during a number of experiments at the Waste Isolation Pilot Plant (WIPP) during the 1980's and 1990's. Most rooms were excavated using a multi-pass mining sequence, where each pass necessarily destroyed some of the mining sequence closure measurement points. These destroyed points were promptly reinstalled to capture the closure after the mining pass. After the room was complete, the mining sequence closure measurement stations were supplemented with remotely read closure measurement stations. Although many aspects of these experiments were thoroughly documented, the digital copies of the closure data were inadvertently destroyed, the non-trivial process of zeroing and shifting the raw closure measurements after each mining pass was not precisely described, the various closure measurements within a given room were not directly compared on the same plot, and the measurements were collected for several years longer than previously reported. Consequently, the hand-written mining sequence closure measurements for Rooms D, B, G, and Q were located in the WIPP archives, digitized, and reanalyzed for this report. The process of reconstructing the mining sequence closure histories was documented in detail and the raw data can be found in the appendices. Within the mid-section of a given room, the reconstructed closure histories were largely consistent with other mining sequence and remotely read closure histories, which builds confidence in the experiments and suggests that plane strain is an appropriate modeling assumption. The reconstructed closure histories were also reasonably consistent with previously published results, except in one notable case: the reconstructed Room Q closure histories 30 days after excavation were about 45 % less than the corresponding closures reported in Munson's 1997 capstone paper.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Robust crossfeed design for hovering rotorcraft

Control law design for rotorcraft fly-by-wire systems normally attempts to decouple angular responses using fixed-gain crossfeeds. This approach can lead to poor decoupling over the frequency range of pilot inputs and increase the load on the feedback loops. In order to improve the decoupling performance, dynamic crossfeeds may be adopted. Moreover, because of the large changes that occur in rotorcraft dynamics due to small changes about the nominal design condition, especially for near-hovering flight, the crossfeed design must be 'robust.' A new low-order matching method is presented here to design robost crossfeed compensators for multi-input, multi-output (MIMO) systems. The technique identifies degrees-of-freedom that can be decoupled using crossfeeds, given an anticipated set of parameter variations for the range of flight conditions of concern. Cross-coupling is then reduced for degrees-of-freedom that can use crossfeed compensation by minimizing off-axis response magnitude average and variance. Results are presented for the analysis of pitch, roll, yaw, and heave coupling of the UH-60 Black Hawk helicopter in near-hovering flight. Robust crossfeeds are designed that show significant improvement in decoupling performance and robustness over nominal, single design point, compensators. The design method and results are presented in an easily-used graphical format that lends significant physical insight to the design procedure. This plant pre-compensation technique is an appropriate preliminary step to the design of robust feedback control laws for rotorcraft.

Catapang, David R.↗

Modifications to Solar Titan-130 Combustion Systems for Efficient, High Turndown Operation

The project team of Southwest Research Institute® (SwRI®), Solar Turbines Incorporated (Solar), the Electric Power Research Institute (EPRI), the University of California, Irvine (UCI), and the Georgia Institute of Technology (Georgia Tech) investigated methods to allow higher efficiency part-load operation of a Solar Titan 130 gas turbine. The objective was to develop a low-emission combustion system capable of sustaining combustion and avoiding lean blowout during high turndown operation, which would allow the gas turbine to operate as efficiently as possible at part load. Currently, electric utility markets are beginning to experience substantial increases in renewable energy generation. Some of these renewable energy sources have highly variable output in an uncontrolled manner. In order to maintain grid stability, there is a need for power plants to ramp up power to the grid rapidly to make up for drops in renewable generation. This is often termed spinning reserve, but the size of this reserve may need to increase as renewable penetration into the electric utility market increases. Small combined heat and power (CHP) power plants provide a promising option for meeting this spinning reserve requirement. In order to operate in spinning reserve while still meeting the heat requirements for the CHP, the gas turbine needs to operate efficiently at very low loads. Efficient, high turndown operations in this engine are limited by the lean flammability limit of the premixed combustion system. This project sought enhance the lean operability range of the Titan 130 combustor. First, the project team participated in a brainstorming activity and ultimately selected two concepts to explore: fuel augmentation with hydrogen (H2) to improve the stability at lean operating conditions and modifications to the fuel nozzle to improve the emissions performance at lean operating conditions. Analytical and laboratory investigations were accomplished by UCI to investigate the efficacy of H2 addition at improving lean blow out (LBO) limits and the resulting emissions. These investigations used a variety of chemical reactor network (CRN) and CFD models, validated against laboratory data, to model the impact of H 2 and inform the experimental efforts accomplished by SwRI and Solar. Ultimately, both the CRN and CFD models yielded generally good agreement with the experimental data below a particular temperature threshold. Atmospheric tests of a full-scale T130 annular combustor were performed at SwRI facilities in San Antonio, Texas, to investigate the use of H 2 addition. For these tests, the T130 combustion system remained largely unchanged; minor modifications were performed to the fuel ducting to allow for the safe use of H 2 . The test ultimately demonstrated that the addition of H 2 to the fuel mixture significantly increased the AFR ratio at which the combustor could operate. This improvement to the LBO limit should allow for less use of compressor bleed and less throttling needed by the inlet guide vanes (IGV). This in turn could result in more efficient operation of the gas turbine at lower load points. The second modification explored in this work was a direct modification to the T130 injector. The project team hypothesized that modifications to the pilot of the T130 injector could provide lower emissions at high turn-down operations. These modifications were manufactured and explored by the team at Solar. High pressure rig tests, originally slated to occur at SwRI, were ultimately accomplished by Solar to maintain overall project budget and mitigate cost growth attributable to supply chain issues and inflation. The pressurized rig tests ultimately showed that the SwRI Project No. 18.24153 - DE-EE0008415 Page 2 Final Technical Report January 24, 2024 modifications did not significantly alter the performance of the combustion system at the high turn-down conditions; both the modified injectors and the baseline configuration exhibited elevated emissions comparted to the full-load operating condition. A final set of studies performed by EPRI investigated the benefit-cost of flexible CHP as well as a grid interconnection study for the California Independent System Operator (CAISO) grid. These studies considered: traditional CHP with no spinning reserve available for on-demand grid support, 50% flexible CHP where 50% of the machine’s capacity is consumed by on-site baseload operations while providing an additional 50% capacity for on-demand grid support, and 70% flexible CHP where 70% of capacity is consumed on-site by baseload operations and 30% is available for on-demand grid support. In all cases, the analyses showed a benefit-to-cost ratio greater than unity implying a positive net present value for all configurations. However, the traditional CHP showed the most economic benefit. These results are sensitive to several factors, many of which are not fully known and may vary over time. Thus site owners must be convinced that taking up the increased costs and risks from flexible CHP would be worth implementing. As the grid in California and across the country transition to incorporate larger renewable energy generation, flexible CHP can provide much needed operating reserves and dispatchability. Alternative fuel options, such as hydrogen blending and biofuels, may also lower carbon intensities of CHP. Flexible CHP should be examined in the evolving market to understand innovative business models, changes market rules and services, and new technologies.

20 FOSSIL-FUELED POWER PLANTS↗

Initial Simulations of Empty Room Collapse and Reconsolidation at the Waste Isolation Pilot Plant

The Waste Isolation Pilot Plant (WIPP) is a geologic repository for defense-related nuclear waste. If left undisturbed, the virtually impermeable rock salt surrounding the repository will isolate the nuclear waste from the biosphere. If humans accidentally intrude into the repository in the future, then the likelihood of a radionuclide release to the biosphere will depend significantly on the porosity and permeability of the repository itself. Room ceilings and walls at the WIPP tend to collapse over time, causing rubble piles to form on floors of empty rooms. The surrounding rock formation will gradually compact these rubble piles until they eventually become solid salt, but the length of time for a rubble pile to reach a certain porosity and permeability is unknown. This report details the first efforts to build models to predict the porosity and permeability evolution of an empty room as it closes. Conventional geomechanical numerical methods would struggle to model empty room collapse and rubble pile consolidation, so three different meshless methods, the Immersed Isogeometric Analysis Meshfree, Reproducing Kernel Particle Method (RKPM), and the Conformal Reproducing Kernel method, were assessed. First, the meshless methods and the finite element method each simulated gradual room closure, without ceiling or wall collapse. All three methods produced equivalent room closure predictions with comparable computational speed. Second, the Immersed Isogeometric Analysis Meshfree method and RKPM simulated two-dimensional empty room collapse and rubble pile consolidation. Both methods successfully simulated large viscoplastic deformations, fracture, and rubble pile rearrangement to produce qualitatively realistic results. In addition to geomechanical simulations, the flow channels in damaged salt and crushed salt were measured using micro-computed tomography, and input into a computational fluid dynamics simulation to predict the salt's permeability. Although room for improvement exists, the current simulation approaches appear promising.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A combined biological and chemical flue gas utilization system towards carbon dioxide capture from coal-fired power plants (Final Report)

Photosynthetic algal cultivation has been intensively studied for CO 2 capture and utilization for several decades. The footprint for using algae to capture CO 2 emitted from carbon-intensive industrial processes (power plants, cement plants, and fermentation processes) is extremely large, which creates serious technical and economic hurdles that must be cleared if algal technologies are to be commercially implemented. Fortunately, algal biomass is rich in proteins, carbohydrates, and lipids, providing a good chemical source for organic absorbents and other value-added chemical feedstocks. In particular, amino acids from algal protein can be used to generate amino acid salt solutions that have been proven to be effective for capturing CO 2 . In order to take advantage of both algal cultivation and biomass utilization, the goal of the proposed project is to develop a combined biological and chemical system for coal-fired power plants for sequestering CO 2 in biological absorbents and generating value-added products. This approach significantly reduces the land and energy footprint of CO 2 capture, and minimizes capital and operational expenses. Three specific objectives are targeted: 1) optimizing the growth of the selected algal strain to maximize biomass accumulation from the coal-fired flue gas; 2) developing a cascade biomass utilization to produce amino acid absorbents, polyurethanes, biodiesel, and methane; and 3) conducting techno-economic analysis (TEA) and life cycle assessment (LCA) of the proposed process. Three key technical outcomes were achieved: (1) With the selected robust algal strain and unique photobioreactor design, long-term culture stability can be extended, and algal biomass productivity reached 0.5 g dry biomass/L/day year-round at a biomass concentration of 1.2 g/L in the pilot photobioreactor; (2) The biomass utilization process led to complete utilization of the algal biomass to produce amino acid salt absorbent, polyurethanes, and methane; and (3) The combined biological and chemical flue gas utilization process concluded a technically and economically feasible commercial-scale system that completely captures CO 2 in coal-fired flue gas with greatly reduced energy consumption.

01 COAL, LIGNITE, AND PEAT↗

Combustion Performance and Emissions Optimization through Integration of Miniaturized High Temperature Multi Process Monitoring System

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of coal-fired utility boilers in this project but can be applied to many other industries and applications as well. The new sensor design, leveraging the existing electrochemical noise-based monitoring system, is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data can be transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, five mMPMS were installed at a full-scale pulverized coal-fired plant, Basin Electric Power Cooperative’s Leland Olds Unit 1. The systems were demonstrated over a 6-week period during typical operation. Sensor measurements of deposit thickness were validated during the demonstration and subsequently leveraged to determine sensor-based boiler cleaning strategies. These strategies have the benefit of reduced thermal stresses on boiler tubes from over-cleaning and improved boiler water management. At the end of the project, continued development of the sensor technology was carried out at PacifiCorp’s Hunter Station. REI leveraged the permanent installation of the mMPMS in Unit 3 made possible by DOE funding on a separate program. The work at Hunter Plant focused on application of machine learning and artificial intelligence-based models for integration of sensor signals into control and optimization of Hunter Unit 3 processes.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗

Combustion Performance and Emissions Optimization Through Integration of a Miniaturized High-Temperature Multi Process Monitoring System

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of coal-fired utility boilers in this project but can be applied to many other industries and applications as well. The new sensor design, leveraging the existing electrochemical noise-based monitoring system, is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data can be transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, five mMPMS were installed at a full-scale pulverized coal-fired plant, Basin Electric Power Cooperative’s Leland Olds Unit 1. The systems were demonstrated over a 6-week period during typical operation. Sensor measurements of deposit thickness were validated during the demonstration and subsequently leveraged to determine sensor-based boiler cleaning strategies. These strategies have the benefit of reduced thermal stresses on boiler tubes from over-cleaning and improved boiler water management. At the end of the project, continued development of the sensor technology was carried out at PacifiCorp’s Hunter Station. REI leveraged the permanent installation of the mMPMS in Unit 3 made possible by DOE funding on a separate program. The work at Hunter Plant focused on application of machine learning and artificial intelligence-based models for integration of sensor signals into control and optimization of Hunter Unit 3 processes.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗

Combustion Performance and Emissions Optimization Through Integration of a Miniaturized High-Temperature Multi Process Monitoring System

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution of wall conditions in utility boilers. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of a coal-fired utility boiler in this project but can be applied to many other industries and applications as well. The new sensor design, leveraging the existing electrochemical noise-based monitoring system, is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data can be transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, five mMPMS were installed at a full-scale pulverized coal-fired plant, Basin Electric Power Cooperative’s Leland Olds Unit 1. The systems were demonstrated over a 6-week period during typical operation. Sensor measurements of deposit thickness were validated during the demonstration and subsequently leveraged to determine sensor-based boiler cleaning strategies. These strategies have the benefit of reduced thermal stresses on boiler tubes from over-cleaning and improved boiler water management. At the end of the project, continued development of the sensor technology was carried out at PacifiCorp’s Hunter Station. REI leveraged the permanent installation of the mMPMS in Unit 3 made possible by DOE funding on a separate program. The work at Hunter Plant focused on application of machine learning and artificial intelligence-based models for integration of sensor signals into control and optimization of Hunter Unit 3 processes.

42 ENGINEERING↗

High-Temperature Multi-Process Sensor Development and Demonstration at a Full-scale PC Combustion System

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution of wall conditions in utility boilers. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of a coal-fired utility boiler in this project but can be applied to many other industries and applications as well. The new sensor design, leveraging the existing electrochemical noise-based monitoring system, is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data can be transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, five mMPMS were installed at a full-scale pulverized coal-fired plant, Basin Electric Power Cooperative’s Leland Olds Unit 1. The systems were demonstrated over a 6-week period during typical operation. Sensor measurements of deposit thickness were validated during the demonstration and subsequently leveraged to determine sensor-based boiler cleaning strategies. These strategies have the benefit of reduced thermal stresses on boiler tubes from over-cleaning and improved boiler water management. At the end of the project, continued development of the sensor technology was carried out at PacifiCorp’s Hunter Station. REI leveraged the permanent installation of the mMPMS in Unit 3 made possible by DOE funding on a separate program. The work at Hunter Plant focused on application of machine learning and artificial intelligence-based models for integration of sensor signals into control and optimization of Hunter Unit 3 processes.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗

Combustion Performance and Emissions Optimization Through Integration of a Miniaturized High-Temperature Multi Process Monitoring System

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of coal-fired utility boilers in this project but can be applied to many other industries and applications as well. This project leveraged the existing electrochemical noise-based monitoring system and the new sensor design is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data is transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, five mMPMS were installed at a full-scale pulverized coal-fired plant, Basin Electric Power Cooperative’s Leland Olds Unit 1. The systems were demonstrated over a 6-week period during typical operation. Sensor measurements of deposit thickness were validated during the demonstration and subsequently leveraged to determine sensor-based boiler cleaning strategies. These strategies have the benefit of reduced thermal stresses on boiler tubes from over-cleaning and improved boiler water management. At the end of the project, continued development of the sensor technology was carried out at PacifiCorp’s Hunter Station. REI leveraged the permanent installation of the mMPMS in Unit 3 made possible by DOE funding on a separate program. The work at Hunter Plant focused on application of machine learning and artificial intelligence-based models for integration of sensor signals into control and optimization of Hunter Unit 3 processes.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗

Development of Miniaturized High Temperature Multi Process Monitoring System

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of coal-fired utility boilers in this project but can be applied to many other industries and applications as well. This project leveraged the existing electrochemical noise-based monitoring system and the new sensor design is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data is transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, the three mMPMS were installed at a full-scale pulverized coal-fired plant, PacifiCorp’s Hunter 3. The systems were demonstrated over 20,000 hours at the plant during regular operation. Also, the sensor data was fed to the plant’s advanced process control system to evaluate the corrosion control by the operation changes and utilized to understand the impacts of load cycling with different ramping up and down speeds. At the end of the project, the systems were converted to the permanent installation at the power plant to be used with the advanced process control system installed at the plant.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗