A plan for spacecraft automated rendezvous

An automated rendezvous approach has been developed that utilizes advances in technology to reduce real-time/near real-time flight operations support personnel to an acceptable level that is near the minimum without jeopardizing the success of the mission. The on-board flight targeting uses a rule-based system to select the pursuit vehicle phasing orbits and uses precise navigation updates from the pursuit/target spacecraft made possible by the global positioning system receivers/processors on both spacecraft to adjust the phasing orbits and achieve rendezvous. The ascent-to-orbit targeting for the pursuit vehicle has been successfully decoupled from the on-orbit orbit transfer phasing targeting. Typical launch window data have been developed for the heavy lift launch vehicle and cargo transfer vehicle for a Space Station Freedom rendezvous mission.

Deaton, A. W.↗

Computer simulation for attitude disturbance torques for the Tiros-series.

Description of the Tiros-M Magnetic Attitude Prediction Program (TMMGAP), a simulation program designed to assist in the rotational motion control of the Tiros-series spacecraft. The subsystems of the program include input, attitude simulation, executive, attitude control and output components, simulating solar radiation pressure torque, gravity gradient torque, residual magnetic moment torque, and magnetic attitude control torques. The program provides data for prelaunch studies for launch window selection and mission planning, facilitates spacecraft spin axis reorientation after launch, provides spin axis control recommendations to meet mission constraints, and assists in the interpretation of cloud cover data. The program is characterized as effective in controlling spin axis and in processing picture data.

Sugai, I.↗

Titan/Centaur T/C-1 post flight evaluation report

The first Titan/Centaur launch vehicle, TC-1, was launched from the Eastern Test Range Complex 41 at 09:48:01.46 hours Eastern Daylight Time on February 11, 1974. The vehicle carried a dynamic mass model of the Viking spacecraft and a SPHINX spacecraft, intended to study high voltage interactions in space. This launch was a Proof Flight of a vehicle con- figuration integrating the Air Force Titan booster and the NASA Centaur upper stage. It also was the first flight of the Centaur Standard Shroud developed for the Titan/Centaur. The countdown for the launch proceeded normally except for an additional 45 minute hold which was required to resolve a question concerning interpretation of booster hydraulic system data. The launch window opened at 09:03:00 hours Eastern Daylight Time. The vehicle was launched o on a flight azimuth of 105°. The Titan boost phase of flight was satisfactory. Solid Motor operation, Stage I and Stage II operation were normal. Venting of the Centaur Standard Shroud during ascent was successful and shroud separation and jettison was accomplished without incident. At the completion of the Titan Stage II burn, the Centaur successfully separated from the Titan. At this time, the Centaur main engines were sequenced through the first planned starting cycle but failed to achieve steady state operation. The vehicle flight control system, not sensing vehicle acceleration, commanded engine shutdown, and recycled, as programmed, through a back-up engine start attempt. The second engine start attempt was also unsuccessful. The flight control system then placed the vehicle in a coast-phase mode and the vehicle continued downrange in free fall. The vehicle was destroyed by Range Safety when the impact point was approximately 2200 nautical miles downrange, 12 minutes, 28.5 seconds after liftoff.

S. V. Szabo, Jr.↗

Trajectory Design for the Microwave Anisotropy Probe (MAP)

The Microwave Anisotropy, Probe (MAP) is a Medium Class Explorers (MIDEX) Mission produced in partnership between Goddard Space Flight Center (GSFC) and Princeton University. The goal of the MAP mission is to produce an accurate fill-sky, map of the cosmic microwave background temperature fluctuations (anisotropy). The mission orbit is a Lissajous orbit about the L(sub 2) Sun-Earth Lagrange point. The trajectory design for MAP is complex, having many requirements that must be met including shadow avoidance, sun angle constraints, Lissqjous size and shape characteristics, and limited Delta-V budget. In order to find a trajectory that met the design requirements for the entire 4-year mission lifetime goal, GSFC Flight Dynamics engineers performed many analyses, the results of which are presented herein. The paper discusses the preliminary trade-offs to establish a baseline trajectory, analysis to establish the nominal daily trajectory, and the launch window determination to widen the opportunity from instantaneous to several minutes for each launch date.

Newman, Lauri Kraft↗

Trajectory description

The Mariner 9 spacecraft was launched by an Atlas/Centaur launch vehicle (AC-23) on a direct-ascent trajectory from the Air Force Eastern Test Range (AFETR) launch complex 36B on May 30, 1971. Liftoff occurred at 22 h 23 min 04.5 s GMT, slightly more than 6 min after the opening of a 60-min launch window. The vehicle rose vertically for approximately 15 s, during which time, a programmed roll to a launch azimuth of 92.74 deg was performed. After the initial vertical rise, the vehicle, guided by the open-loop Atlas autopilot, began to pitch over into a zero-lift trajectory. The first of three main powered phases was terminated by booster engine cutoff (BECO) at 22 h 25 min 35.5 s. After the Atlas booster engine package was jettisoned 3 s later, the flight continued under the power of the Atlas sustainer engine and guided by the Centaur guidance system operating in a closed-loop mode.

Webb, W. A.↗

A Modular Nuclear Vehicle System with Multi-Mission Capability for Mars Stopover Missions

In depth studies conducted over the past two years have established a modular nuclear stage concept which offers multi-mission capability with a maximum of hardware commonality, i.e., a concept which minimizes total hardware development effort and investment in facilities while providing a logical development evolution from ground test systems to flight test and from initial to more ambitious space applications. Recent results oriented toward the definition and application of such a vehicle concept for the manned Mars landing mission are presented. The basic modular concept employing NERVA nuclear rocket engines is reviewed and the mission peculiar factors affecting the module sizes and number of modules required are discussed. Specific results presented are restricted primarily to the 1982 Mars landing mission via the opposition class mission mode since this is the earliest anticipated date for such a mission. The realistic effects of orbital launch windows are considered and brief discussions of orbital assembly and packaging options with a modular approach are given. Typical ground launch and orbital assembly operations are defined assuming an uprated Saturn V class launch vehicle and the connecting mode of orbital assembly, in which all modules are orbited fully loaded with propellant. The effect of a significant increase in nuclear engine specific impulse is discussed.

Harris, Ronald J.↗

STS-114: Discovery L-1 Countdown Status Briefing

The STS-114 Discovery countdown status briefing is shown. Jessica Rye, NASA Public Affairs, introduces the panel. Jeff Spaulding, NASA Test Director, talks about the launch window and vehicle readiness for the flight. Scott Higgenbotham, Payload Manager, expresses that there are no hardware issues affecting the launch, and Kathy Winters, Shuttle Weather Officer, gives the launch weather forecast and talks about weather issues that may or may not affect the launch.

Source record↗

Mission design for a ballistic slow flyby Comet Encke 1980

Preliminary mission analyses for a proposed 1980 slow flyby (7-9 km/s) of comet Encke are presented. Among the topics covered are science objectives, Encke's physical activity and ephemeris accuracy, trajectory and launch-window analysis, terminal guidance, and spacecraft concepts. The nominal mission plan calls for a near-perihelion intercept with two spacecraft launched on a single launch vehicle. Both spacecraft will arrive at the same time, one passing within 500 km from Encke's nucleus on its sunward side, the other cutting through the tail region. By applying a small propulsive correction about three weeks after the encounter, it is possible to retarget both spacecraft for a second Encke intercept in 1984. The potential science return from the ballistic slow flyby is compared with other proposed mission modes for the 1980 Encke flyby mission, including the widely advocated slow flyby using solar-electric propulsion. It is shown that the ballistic slow flyby is superior in every respect.

Farquhar, R. W.↗

A mission to rendezvous with Anteros

A modest mission to rendezvous with the earth-approaching asteroid, Anteros, is studied. A 10-day launch window of May 16 to 25, 1985 is suggested. The times of flight range from 402 to 455 days and the launch energies per unit mass range from 32.9 to 37.3 km/sq sec. Rendezvous can be achieved with a postlaunch change in velocity of from 562 to 1001 m/sec. A mass of at least 615 kg can be delivered into orbit about the asteroid by the Titan 34D/IUS Two-Stage with 50 to 100 kg available for scientific instrumentation. The 1985 opportunity is compared to the 1987 trajectory identified by Niehoff (1977). Rendezvous opportunities are examined in the space of launch and arrival true anomalies.

Hulkower, N. D.↗

Shuttle rendezvous and proximity operations

Shuttle rendezvous and proximity operations trajectory control techniques are reviewed and it is noted that they have been affected by many factors including Shuttle system design constraints such as limited forward RCS and single point radar failures. Crew training requirements and mission operations constraints such as large launch windows, flexibility, and contingency profile interrupts are also integral factors. The resulting trajectory control design primarily uses ground support for the launch and orbit adjust phases, standardized crew techniques utilizing onboard software for the relative navigation flight phase, and mission unique manual control for a flexible proximity operations phase.

Pearson, Don J.↗

Thermal Protection System Design of Aerocapture Systems for Uranus Orbiters

The National Academies Planetary Science and Astrobiology Decadal Survey recently identified Uranus and Neptune - the Ice Giants - as the priority destinations for science. A mission to Uranus, the highest priority destination due to proximity to Earth, is viable with existing launch vehicle providers during launch windows starting in 2031. However, a nominal interplanetary trajectory (between 12 and 15 years) would still necessitate more than half the initial launch mass in propellant to achieve orbital insertion. Aerocapture, a method of orbital control that directs aerodynamic forces generated on a vehicle by the planet's atmosphere, allows mission designers to achieve the desired orbital state while saving time to the final destination and increasing the available mass for the science payload. Achieving orbital insertion via aerocapture requires novel algorithms for Guidance, Navigation and Control, and mass-efficient Thermal Protection Systems (TPS) performing in an atmosphere unlike any other NASA has flown through. Multiple TPS in NASA's repertoire are suitable for the unique aerothermal environment on the forebody, and the results of predicted sizing and challenges in implementation are discussed below. Results for aftbody TPS made by NASA as well as commercial vendors are discussed, along with the discussion of alternative solutions that may save time, reduce complexity, and increase mass-efficiency for the recommended Uranus Orbiter and Probe mission.

Uranus↗

Thermal Protection System Design of Aerocapture Systems for Uranus Orbiters

The National Academies Planetary Science and Astrobiology Decadal Survey recently identified Uranus and Neptune - the Ice Giants - as the priority destinations for science. A mission to Uranus, the highest priority destination due to proximity to Earth, is viable with existing launch vehicle providers during launch windows starting in 2031. However, a nominal interplanetary trajectory (between 12 and 15 years) would still necessitate more than half the initial launch mass in propellant to achieve orbital insertion. Aerocapture, a method of orbital control that directs aerodynamic forces generated on a vehicle by the planet's atmosphere, allows mission designers to achieve the desired orbital state while saving time to the final destination and increasing the available mass for the science payload. Achieving orbital insertion via aerocapture requires novel algorithms for Guidance, Navigation and Control, and mass-efficient Thermal Protection Systems (TPS) performing in an atmosphere unlike any other NASA has flown through. Multiple TPS in NASA's repertoire are suitable for the unique aerothermal environment on the forebody, and the results of predicted sizing and challenges in implementation are discussed below. Results for aftbody TPS made by NASA as well as commercial vendors are discussed, along with the discussion of alternative solutions that may save time, reduce complexity, and increase mass-efficiency for the recommended Uranus Orbiter and Probe mission.

Uranus↗

Mission design for a ballistic slow-flyby of comet Encke 1980

Preliminary mission analyses for a proposed 1980 slow flyby (7 to 9 km/sec) of comet Encke are presented. Among the topics covered are: science objectives, Encke's physical activity and ephemeris accuracy, trajectory and launch-window analysis, terminal guidance, and spacecraft concepts. The nominal mission plan calls for a near-perihelion intercept with two spacecraft using a single launch vehicle. Both spacecraft arrive at the same time, one passing within 500 km from Encke's nucleus on its sunward side, the other cutting through the tail region. By applying a small propulsive correction about three weeks after the encounter, it is possible to retarget both spacecraft for a second Encke intercept in 1984. The potential science return from the ballistic slow flyby is compared with other proposed mission modes for the 1980 Encke flyby mission including the widely advocated slow flyby using solar-electric propulsion. It is shown that the ballistic slow flyby is superior in every respect.

Farquhar, R. W.↗

High-C3 Applications for NASA's Space Launch System

For numerous high-interest science targets in the outer solar system and elsewhere, the limits of available launch vehicles have placed significant constraints on mission designs. Even for the current generation of heavy-lift launch vehicles, baseline capabilities still impose limitations, for example, the outer solar system in areas such as launch window availability, transit time, science payload mass, time at destination, etc. Initial studies show benefits for ultra-high C3 missions from configurations of NASA’s Space Launch System(SLS) adding third or fourth payload stages.

Robert W Stough↗

Development of an expert planning system for OSSA

This paper presents concepts related to preliminary work for the development of an expert planning system for NASA's Office for Space Science and Applications (OSSA). The expert system will function as a planner's decision aid in preparing mission plans encompassing sets of proposed OSSA space science initiatives. These plans in turn will be checked against budgetary and technical constraints and tested for constraint violations. Appropriate advice will be generated by the system for making modifications to the plans to bring them in line with the constraints. The OSSA Planning Expert System (OPES) has been designed to function as an integral part of the OSSA mission planning process. It will be able to suggest a best plan, be able to accept and check a user-suggested strawman plan, and should provide a quick response to user request and actions. OPES will be written in the C programming language and have a transparent user interface running under Windows 386 on a Compaq 386/20 machine. The system's sorted knowledge and inference procedures will model the expertise of human planners familiar with the OSSA planning domain. Given mission priorities and budget guidelines, the system first sets the launch dates for each mission. It will check to make sure that planetary launch windows and precursor mission relationships are not violated. Additional levels of constraints will then be considered, checking such things as the availability of a suitable launch vehicle, total mission launch mass required vs. the identified launch mass capability, and the total power required by the payload at its destination vs. the actual power available. System output will be in the form of Gantt charts, spreadsheet hardcopy, and other presentation quality materials detailing the resulting OSSA mission plan.

Groundwater, B.↗

STS-114: Discovery L-1 Countdown Status Briefing STS-114/Discovery L-2 Countdown Status Briefing

Bruce Buckingham from NASA Public Affairs introduces Jeff Spaulding, NASA Test Director and Kathy Winters, Shuttle Weather Officer in this L-2 countdown status briefing. Spaulding gives the Space Shuttle launch countdown status before lift-off on July 26th. He expresses that vehicle launch and ground systems are performing well and that there are no significant issues in preparation for the launch. The crew arrival time to the launching pad and the launch window for Discovery is also discussed. He ends his countdown status by expressing that the Discovery Orbiter is the safest Shuttle to date. Kathy Winters gives her weather forecast for the launch day. She presents a satellite picture of tropical storm Franklin and charts showing the STS-114 Tanking Forecast, Launch Forecast, Solid Rocket Booster (SRB) recovery, Continental United States (CONUS) launch, Transoceanic Abort Landing (TAL) launch, 24 and 48 Hour Delay, CONUS 24 and 48 hour delay, and TAL 24 and 48 hr delay. Questions from the news media about the mood of the test engineers as launch day is approached are answered. Jessica Rye from NASA Public Affairs introduces Pete Nikolento, NASA Test Director; Scott Higgenbotham, STS-114 Payload Mission Manager; and Kathy Winters, Space Shuttle Weather Officer in this L-1 Countdown Status Briefing. Nikolento expresses that the completion of the main engine system check-outs and servicing of on-board fuel-cell reactants have been completed. He also talks about pad closeouts and external cryogenic loads prior to launch. Scott Higgenbotham gives the payload status and Kathy Winters talks about her weather forecast for launch. Questions about the ecosensors, TAL sites, weather forecast and thoughts about return to flight are addressed.

Source record↗

Vibration and Acoustic Testing for Mars Micromission Spacecraft

The objective of the Mars Micromission program being managed by the Jet Propulsion Laboratory (JPL) for NASA is to develop a common spacecraft that can carry telecommunications equipment and a variety of science payloads for exploration of Mars. The spacecraft will be capable of carrying robot landers and rovers, cameras, probes, balloons, gliders or aircraft, and telecommunications equipment to Mars at much lower cost than recent NASA Mars missions. The lightweight spacecraft (about 220 Kg mass) will be launched in a cooperative venture with CNES as a TWIN auxiliary payload on the Ariane 5 launch vehicle. Two or more Mars Micromission launches are planned for each Mars launch opportunity, which occur every 26 months. The Mars launch window for the first mission is November 1, 2002 through April 2003, which is planned to be a Mars airplane technology demonstration mission to coincide with the 100 year anniversary of the Kittyhawk flight. Several subsequent launches will create a telecommunications network orbiting Mars, which will provide for continuous communication with lenders and rovers on the Martian surface. Dedicated science payload flights to Mars are slated to start in 2005. This new cheaper and faster approach to Mars exploration calls for innovative approaches to the qualification of the Mars Micromission spacecraft for the Ariane 5 launch vibration and acoustic environments. JPL has in recent years implemented new approaches to spacecraft testing that may be effectively applied to the Mars Micromission. These include 1) force limited vibration testing, 2) combined loads, vibration and modal testing, and 3) direct acoustic testing. JPL has performed nearly 200 force limited vibration tests in the past 9 years; several of the tests were on spacecraft and large instruments, including the Cassini and Deep Space One spacecraft. Force limiting, which measures and limits the spacecraft base reaction force using triaxial force gages sandwiched between the spacecraft and the test fixture, alleviates the severe overtest at spacecraft resonances inherent in rigid fixture vibration tests. It has the distinct advantage over response limiting that the method is not dependent on the accuracy of a detailed dynamic model of the spacecraft. Combined loads, vibration, and modal testing were recently performed on the QuikSCAT spacecraft. The combined tests were performed in a single test setup per axis on a vibration shaker, reducing test time by a factor of two or three. Force gages were employed to measure the true c.g. acceleration of the spacecraft for structural loads verification using a sine burst test, to automatically notch random vibration test input accelerations at spacecraft resonances based on predetermined force limits, and to directly measure modal masses in a base drive modal test. In addition to these combined tests on the shaker, the QuikSCAT spacecraft was subjected to a direct field acoustic test by surrounding the spacecraft, still on the vibration shaker, with rock concert type acoustic speakers. Since the spacecraft contractor does not have a reverberant field acoustic test facility, performing a direct field acoustic test -saved the program nearly two weeks schedule time that would have been required for packing / unpacking and shipping of the spacecraft. This paper discusses the rationale behind and advantages of the above test approaches and provides examples of their actual implementation and comparisons to flight data. The applicability of the test approaches to Mars Micromission spacecraft qualification is discussed.

Kern, Dennis L.↗

Follow That Satellite: EO-1 Maneuvers into Closed Formation With Landsat-7

As the Landsat-7 spacecraft continued NASA's historic program of earth imaging, begun over three decades ago, NASA launched the Earth Observing-1 (EO-1) spacecraft carrying examples of the next generation of Landsat-7 instruments. The validation method for these instruments was to have EO-1 fly in a close formation behind Landsat-7 on the same World Reference System path. From that formation hundreds of near coincident images would be taken by each spacecraft and compared to evaluate improvements in the EO-1 instruments. This paper will address the mission analysis required to launch and maneuver EO-1 into the formation with Landsat-7 where instrument validation was to occur plus a summary of completing the formation acquisition. EO-1 is required to operate one minute +/- 6 seconds behind Landsat-7 during the period of co-fly imaging with a cross track separation of within + 3 kilometers. This separation time can also be stated as a one minute +/- 6 seconds time difference in the Mean Local Time (MLT) at the descending nodes. Achieving the required MLT is heavily dependent on the time of launch. The EO-1 launch window, which had to accommodate the dual payloads of EO-1 and SAC-C, was very limited ranging from 0 to 22 seconds over the 16 day Landsat-7 WRS repeat cycle during which EO-1 was launched. Each EO-1 launch opportunity that occurred on a different day of a Landsat-7 16 day repeat cycle required a separate and distinct maneuver profile. These profiles varied significantly in duration and amount of onboard propellant required to achieve them. EO-1 launched on a day judged to have "medium" resource requirements for achieving the formation with Landsat-7. To phase EO-1 one minute behind Landsat-7 in the along track direction, a series of altitude adjusts separated by specific drift intervals were executed. Additional maneuvers slightly changed the EO-1 inclination to maintain the MLT requirements. Orbit maneuvers were planned and executed within errors of less than 1.5 percent and propellant usage was near nominal consuming 3.4 kilograms out of a launch and early orbit budget of 11 kilograms. The pre-launch 3 -sigma propellant budget allowed for 1+ years of EO-1 mission life. The success of the EO-1 launch and early orbit operations provided sufficient propellant for nearly 4 years of on orbit operations. Special action taken during the EO-1 maneuver period involved some maneuver re-planning to reduce concerns about a potential close approach between EO-1 and Landsat-7. The result of this re-planning was a safer close approach and improvement in future formation acquisition planning.

DeFazio, Robert↗