Search NASA⌕ Search

SEARCH · Search NASA

Results for “lessons learned process”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Experiences with Text Mining Large Collections of Unstructured Systems Development Artifacts at JPL

Often repositories of systems engineering artifacts at NASA's Jet Propulsion Laboratory (JPL) are so large and poorly structured that they have outgrown our capability to effectively manually process their contents to extract useful information. Sophisticated text mining methods and tools seem a quick, low-effort approach to automating our limited manual efforts. Our experiences of exploring such methods mainly in three areas including historical risk analysis, defect identification based on requirements analysis, and over-time analysis of system anomalies at JPL, have shown that obtaining useful results requires substantial unanticipated efforts - from preprocessing the data to transforming the output for practical applications. We have not observed any quick 'wins' or realized benefit from short-term effort avoidance through automation in this area. Surprisingly we have realized a number of unexpected long-term benefits from the process of applying text mining to our repositories. This paper elaborates some of these benefits and our important lessons learned from the process of preparing and applying text mining to large unstructured system artifacts at JPL aiming to benefit future TM applications in similar problem domains and also in hope for being extended to broader areas of applications.

text mining↗

Design and Development of NEA Scout Solar Sail Deployer Mechanism

The 6U (approximately10cm x 20cm x 30cm) cubesat Near Earth Asteroid (NEA) Scout, projected for launch in September 2018 aboard the maiden voyage of the Space Launch System (SLS), will utilize a solar sail as its main method of propulsion throughout its approximately 3 year mission to a near earth asteroid. Due to the extreme volume constraints levied onto the mission, an acutely compact solar sail deployment mechanism has been designed to meet the volume and mass constraints, as well as provide enough propulsive solar sail area and quality in order to achieve mission success. The design of such a compact system required the development of approximately half a dozen prototypes in order to identify unforeseen problems and advance solutions. Though finite element analysis was performed during this process in an attempt to quantify forces present within the mechanism during deployment, both the boom and the sail materials do not lend themselves to achieving high-confidence results. This paper focuses on the obstacles of developing a solar sail deployment mechanism for such an application and the lessons learned from a thorough development process. The lessons presented here will have significant applications beyond the NEA Scout mission, such as the development of other deployable boom mechanisms and uses for gossamer-thin films in space.

Sobey, Alexander R.↗

A Boresight Adjusment Mechanism For Use in Laser Altimeters

This paper describes the development of the Boresight Adjustment Mechanism (BAM) for the Geoscience Laser Altimeter System (GLAS) Instrument. The BAM was developed late in the integration and test phase of the GLAS instrument flight program. Thermal vacuum tests of the GLAS instrument indicated that the instrument-boresight alignment stability over temperature may be marginal. To reduce the risk that GLAS may not be able to meet the boresight alignment requirements an intensive effort was started to develop a BAM. Observatory-level testing and further evaluation of the boresight alignment data indicated that sufficient margin could be obtained utilizing existing instrument resources and therefore the BAM was never integrated onto the GLAS Instrument. However, the BAM was designed fabricated and fully qualified over a 4 month timeframe to be capable of precisely steering (less than 2 arcsec over plus or minus 300 arcsec) the output of three independent lasers to ensure the alignment between the transmit and receive paths of the GLAS instrument. The short timeline for the development of the mechanism resulted in several interesting design solutions. This paper discusses the requirement definition design, and testing processes of the BAM development effort how the design was affected by the extremely tight development schedule and the lessons learned throughout the process.

Hakun, Claef↗

A Boresight Adjustment Mechanism for use on Laser Altimeters

This paper describes the development of the Boresight Adjustment Mechanism (BAM) for the Geoscience Laser Altimeter System (GLAS) Instrument. The BAM was developed late in the integration and test phase of the GLAS instrument flight program. Thermal vacuum tests of the GLAS instrument indicated that the instrument boresight alignment stability over temperature may be marginal. To reduce the risk that GLAS may not be able to meet the boresight alignment requirements, an intensive effort was started to develop a BAM. Observatory-level testing and further evaluation of the boresight alignment data indicated that sufficient margin could be obtained utilizing existing instrument resources and therefore the BAM was never integrated onto the GLAS Instrument. However, the BAM was designed fabricated and fully qualified over a 4 month timeframe to be capable of precisely steering (< 1 arcsec over 300 arcsec) the output of three independent lasers to ensure the alignment between the transmit and receive paths of the GLAS instrument. The short timeline for the development of the mechanism resulted in several interesting design solutions. This paper discusses the requirement definition, design, and testing processes of the BAM development effort, how the design was affected by the extremely tight development schedule, and the lessons learned throughout the process.

Hakun, Claef↗

Mechanical Design of a Performance Test Rig for the Turbine Air-Flow Task (TAFT)

To support development of the Boeing-Rocketdyne RS84 rocket engine, a fill-flow, reaction turbine geometry was integrated into the NASA-MSFC turbine air-flow test facility. A mechanical design was generated which minimized the amount of new hardware while incorporating all test and instrUmentation requirements. This paper provides details of the mechanical design for this Turbine Air-Flow Task (TAFT) test rig. The mechanical design process utilized for this task included the following basic stages: Conceptual Design. Preliminary Design. Detailed Design. Baseline of Design (including Configuration Control and Drawing Revision). Fabrication. Assembly. During the design process, many lessons were learned that should benefit future test rig design projects. Of primary importance are well-defined requirements early in the design process, a thorough detailed design package, and effective communication with both the customer and the fabrication contractors. The test rig provided steady and unsteady pressure data necessary to validate the computational fluid dynamics (CFD) code. The rig also helped characterize the turbine blade loading conditions. Test and CFD analysis results are to be presented in another JANNAF paper.

Xenofos, George↗

Mechanical Design of a Performance Test Rig for the Turbine Air-Flow Task (TAFT)

To support development of the Boeing-Rocketdyne RS84 rocket engine, a full-flow, reaction turbine geometry was integrated into the NASA-MSFC turbine air-flow test facility. A mechanical design was generated which minimized the amount of new hardware while incorporating all test and instrumentation requirements. This paper provides details of the mechanical design for this Turbine Air-Flow Task (TAFT) test rig. The mechanical design process utilized for this task included the following basic stages: Conceptual Design. Preliminary Design. Detailed Design. Baseline of Design (including Configuration Control and Drawing Revision). Fabrication. Assembly. During the design process, many lessons were learned that should benefit future test rig design projects. Of primary importance are well-defined requirements early in the design process, a thorough detailed design package, and effective communication with both the customer and the fabrication contractors.

Forbes, John C.↗

Design and Development of NEA Scout Solar Sail Deployer Mechanism

The 6U (approximately 10cm x 20cm x 30cm) cubesat Near Earth Asteroid (NEA) Scout1, projected for launch in September 2018 aboard the maiden voyage of the Space Launch System (SLS), will utilize a solar sail as its main method of propulsion throughout its approximately 3 year mission to a Near Earth Asteroid (NEA). Due to the extreme volume constraints levied onto the mission, an acutely compact solar sail deployment mechanism has been designed to meet the volume and mass constraints, as well as provide enough propulsive solar sail area and quality in order to achieve mission success. The design of such a compact system required the development of approximately half a dozen prototypes in order to identify unforeseen problems, advance solutions, and build confidence in the final design product. This paper focuses on the obstacles of developing a solar sail deployment mechanism for such an application and the lessons learned from a thorough development process. The lessons presented will have significant applications beyond the NEA Scout mission, such as the development of other deployable boom mechanisms and uses for gossamer-thin films in space.

Sobey, Alexander R.↗

Design and Development of NEA Scout Solar Sail Deployer Mechanism

The 6U (approx.10 cm x 20 cm x 30 cm) cubesat Near Earth Asteroid (NEA) Scout1, projected for launch in September 2018 aboard the maiden voyage of the Space Launch System, will utilize a solar sail as its main method of propulsion throughout its approx.3-year mission to a Near Earth Asteroid. Due to the extreme volume constraints levied onto the mission, an acutely compact solar sail deployment mechanism has been designed to meet the volume and mass constraints, as well as provide enough propulsive solar sail area and quality in order to achieve mission success. The design of such a compact system required the development of approximately half a dozen prototypes in order to identify unforeseen problems, advance solutions, and build confidence in the final design product. This paper focuses on the obstacles of developing a solar sail deployment mechanism for such an application and the lessons learned from a thorough development process. The lessons presented will have significant applications beyond the NEA Scout mission, such as the development of other deployable boom mechanisms and uses for gossamer-thin films in space.

Sobey, Alexander R.↗

Preliminary Examination Process of Apollo Core 73002 - Insights and Lessons Learned From ANGSA for Future Sample Return Missions

Apollo Sample 73002 is part of a 2-foot long “drive tube” (73001/73002) of regolith that was collected from a landslide deposit near Lara Crater at the Apollo 17 site, Station 3. The double drive tube is believed to have penetrated a lunar landslide deposit that was transported from the slope of the South Massif into the TLV [1]. As part of the ANGSA (Apollo Next Generation Sample Analyses) initiative, preparing preliminary examination (PE) catalog of 73002 is a crucial first step for the early identification of material types such as rock fragments, and potential stratigraphy within the core. PE of Apollo core 73002 is distinct from science activities with the main goal to produces a sample catalog with a level of detail about sample characterization that is sufficient for the ANGSA PIs (and later on the lunar sample community) to select and request the samples to conduct their individual, scientific studies. Ultimately, the PE catalog of 73002 will help to establish a better understanding of the stratigraphy of the land slide deposit; the processes of the landslide including the trigger(s) and possibly number of landslide events, as well as the role of volatiles [1] and will aid in the careful preservation of the material for future studies [2].

Apollo↗

Flight Software Dictionary Development for the Mars2020 Rover

The Mars2020 project, developed and operated by the Jet Propulsion Laboratory (JPL), successfully landed the Perseverance rover and its flying companion Ingenuity on the surface of Mars on February 18th 2021. Perseverance combines heritage and cutting-edge flight software and hardware to accomplish crucial mission requirements related to Martian surface sampling. The design, development, and operation of NASA’s large strategic science missions require the ability to communicate spacecraft capabilities to hundreds of engineers across multiple disciplines. The interaction between flight and ground software development, Verification and Validation (V&V), Assembly, Test, and Launch Operations (ATLO), and management each demand quick understanding of unique slices of information for each discipline. This information includes the current capabilities of the flight system as well as future capabilities and their status as they are developed and tested. Despite the fundamental and critical nature of this information, the flight software dictionaries used to track it are a stumbling block for many projects. These dictionaries provide the cornerstone for the interpretation of data sent from the spacecraft, allowing for quick comprehension by engineers on the ground. During both spacecraft development and operations, flight software dictionary management includes significant challenges due to the large number of interfacing systems and the subtle yet distinct needs of each.The engineering of flight software dictionaries for Mars2020 had numerous challenges, most-notably: parallel dictionary development to support simultaneous separate flight software build campaigns for each mission phase (cruise and surface), managing requests for operations-enabling information without perturbing the heritage interface with the rover, and the introduction of new tools by the dictionary stakeholders that forced the dictionary team to innovate and redesign the heritage tool chain. These challenges generated guiding principles for the dictionary development effort: emphasize coding best practices and unit testing in the dictionary code development tool chain, use institutionally provided COTS (commercial-off-the-shelf) tools whenever possible, and maintain the heritage flight-ground interface all while advancing operations-enabling information via a loosely coupled interface.Throughout development and operations, the Mars2020 dictionary toolchain included IBM DOORS Next Generation, GitHub, Microsoft Excel, Docker, Jenkins, and a significant custom-built Python codebase. Significant interfaces included JPL’s command and control software, heritage flight software team tools and processes, and the many cloud-based ground tools developed for the mission.This paper will discuss the requirements for the Mars2020 dictionary development, the development team’s response to those requirements, lessons learned throughout the process, steps taken towards automated deliveries and continuous integration of stakeholder inputs, potential toolchain improvements for Mars2020, and key takeaways that could be applied to future missions.

Pyrzak, Guy↗

Demonstration and Automation of Reflected Target Optical Measurement for Heliostats

Accurate optical surfaces are a primary driver of concentrated solar power plant performance. Errors in pointing and tracking mirrors, the canting of individual mirror facets, and the surface slope of the mirror itself can be caused by errors during assembly, transportation, wind loading, gravity, and many other sources. The tools that exist to measure these error sources today largely rely on fringe deflectometry (SOFAST, QDec, others), or photogrammetry with targets attached to the mirror surface. Since 2022, NREL has been developing a measurement method called the Reflected Target Non-intrusive Assessment (ReTNA) system. This system differs from most established methods in that we perform deflectometry with a pattern of coded targets, identified in space with photogrammetry. Reflected target systems have several advantages over traditional fringe deflectometry systems. Firstly, they can be operated in bright or ambient lighting, a challenge for fringe systems that use a projector and screen. Reflected target systems also can use a much lighter and less expensive target than projector-based systems. Lastly, 2D slope measurement can be solved from a single image, which leads to several advantages for accommodating faster measurements and smaller sized targets. These advantages make ReTNA particularly well-suited for applications where there are space or lighting constraints, like performing heliostat quality assurance on an assembly line. It's also useful when a lightweight, flexible system is needed, like for heliostat developers to quickly measure a new heliostat design at different orientations, to observe gravitational effects on the mirror surface shape. In the last year, significant improvements were made to this tool to make it more useful for these applications. These improvements were focused around validation of the ReTNA measurement system, and automation of the setup and measurement process. First, we present an improved ReTNA layout, for use on the heliostat assembly line. Next, we detail the various changes to the ReTNA software and computer vision methods to automate data collection in this new setup, and lessons learned from this process. The goal with this new setup is to perform a full heliostat surface characterization without removing the mirror from the assembly line. Lastly, we share results from several ReTNA validation studies undertaken over the last year. These include repeated ReTNA measurement on demonstration mirror facets, comparisons with other optical measurement tools, and some studies aimed at quantifying the uncertainty of ReTNA measurement under various constraints (mirror-target spacing, camera resolution, etc.). These results are compared with 2024 HelioCon performance targets, and our planned next steps for the ReTNA measurement system are presented.

CSP↗

REIMR: A Process for Utilizing Propulsion-Oriented 'Lessons-Learned' to Mitigate Development Risk

This paper is a summary overview of a study conducted a t the NASA Marshall Space Flight Center (MSFC) during the initial phases of the Space Launch Initiative (SLI) program to evaluate a large number of technical problems associated with the design, development, test, evaluation and operation of several major liquid propellant rocket engine systems (i.e., SSME, Fastrac, J-2, F-1). The results of this study was the identification of the "Fundamental Root Causes" that enabled the technical problems to manifest, and practices that can be implemented to prevent them from recurring in future engine development efforts. This paper will discus the Fundamental Root Causes, cite some examples of how the technical problems arose from them, and provide a discussion of how they can be mitigated or avoided.

Ballard, Richard O.↗

Anatomy of a Security Operations Center

Many agencies and corporations are either contemplating or in the process of building a cyber Security Operations Center (SOC). Those Agencies that have established SOCs are most likely working on major revisions or enhancements to existing capabilities. As principle developers of the NASA SOC; this Presenters' goals are to provide the GFIRST community with examples of some of the key building blocks of an Agency scale cyber Security Operations Center. This presentation viII include the inputs and outputs, the facilities or shell, as well as the internal components and the processes necessary to maintain the SOC's subsistence - in other words, the anatomy of a SOC. Details to be presented include the SOC architecture and its key components: Tier 1 Call Center, data entry, and incident triage; Tier 2 monitoring, incident handling and tracking; Tier 3 computer forensics, malware analysis, and reverse engineering; Incident Management System; Threat Management System; SOC Portal; Log Aggregation and Security Incident Management (SIM) systems; flow monitoring; IDS; etc. Specific processes and methodologies discussed include Incident States and associated Work Elements; the Incident Management Workflow Process; Cyber Threat Risk Assessment methodology; and Incident Taxonomy. The Evolution of the Cyber Security Operations Center viII be discussed; starting from reactive, to proactive, and finally to proactive. Finally, the resources necessary to establish an Agency scale SOC as well as the lessons learned in the process of standing up a SOC viII be presented.

Wang, John↗

Human Factors Lessons Learned on the International Space Station

Experience on International Space Station (ISS) provides many important lessons for future space flight. NASA human factors engineers have been systematically collecting lessons learned from crew debriefs, as well as working with ground support teams to continuously improve crew operations. This paper describes the methods for collecting data from debriefs, lessons learned through that process, and an example of a technology development task funded through the Space Human Factors Engineering (SHFE) program element in response to an identified operational need. Each ISS increment crew spends many hours after the flight answering questions from the various subsystem leads. The Flight Crew Integration subsystem lead asks questions specific to human factors and habitability issues. In addition, crew comments on many other subsystems provide insight into interface designs, operability and maintainability. The debrief comments are unique to each crew, and must be categorized to provide operational lessons learned. Personal identifiers are removed and comments aggregated to separate consistent issues from personal preferences. Examples will be given, and the procedure for incorporating the lessons into requirements and guidelines for the next human space vehicle will be described. In flight, very few astronauts are medical doctors. Written medical procedures during flight need to be easy to follow and quick to understand. The problem was analyzed as part of a SHFE task. Organization was analyzed and reorganizations were created and tested. Results will be reported. The ISS is a very important analog for planning future long-term missions. Collection of data from debriefs, studying the lessons learned and focusing on requirements for future missions are examples of the accomplishments through the SHFE program.

Woolford, Barbara↗

Colorado State University (CSU) X-Band Precipitation Radar Plan Position Indicator Data Processed with Corrected Moments in Antenna Coordinates (CMAC) Value-Added Product Report

In 2010 the U.S. Department of Energy (DOE) Atmospheric Radiation Measurement (ARM) user facility procured 3- and 5-cm wavelength radars for documenting the macrophysical, microphysical, and dynamical structure of precipitating systems. To maximize the scientific impact, ARM supported the development of an application chain to correct for various phenomena in order to retrieve the “point” values of moments of the radar spectrum and polarimetric measurements. We have now used the lessons learned from the processing of the 3- and 5-cm wavelength radars obtained by ARM to help process X-band radar data from the Surface Atmospheric Integrated Field Laboratory (SAIL) field campaign. This report details the motivation, science, and progress to date as well as charting a path forward.

54 ENVIRONMENTAL SCIENCES↗

Shaping NASA's Kennedy Space Center Safety for the Future

With the completion of the Space Shuttle Program, the Kennedy Space Center (KSC) safety function will be required to evolve beyond the single launch vehicle launch site focus that has held prominence for almost fifty years. This paper will discuss how that evolution is taking place. Specifically, we will discuss the future of safety as it relates to a site that will have multiple, very disparate, functions. These functions will include new business; KSC facilities not under the control of NASA; traditional payload and launch vehicle processing; and, operations conducted by NASA personnel, NASA contractors or a combination of both. A key element in this process is the adaptation of the current KSC set of safety requirements into a multi-faceted set that can address each of the functions above, while maintaining our world class safety environment. One of the biggest challenges that will be addressed is how to protect our personnel and property without dictating how other Non-NASA organizations protect their own employees and property. The past history of KSC Safety will be described and how the lessons learned from previous programs will be applied to the future. The lessons learned from this process will also be discussed as information for other locations that may undergo such a transformation.

Kirkpatrick, Paul↗

Introduction of an Agile Systems Engineering Process to the NASA Armstrong Flight Research Center

This paper will provide background on the National Aeronautics and Space Administration (NASA) Aeronautics Research Mission Directorate (ARMD) ARMD Test Data Portal (ATDP) effort along with the rationale that motivated the ATDP team to consider implementing an agile systems engineering (SE) process. The primary motivation for using this new SE process was based on the desire to mitigate a major risk to project success. Since the agile SE process had never been used before at the NASA Armstrong Flight Research Center (AFRC), utilizing this new SE process required a trailblazing effort to introduce it to NASA AFRC leadership. As a result, the ATDP team chose to adhere to the agile SE process in addition to the trusted classical waterfall SE process on ATDP. Through successful execution of this hybrid SE process during Phase I, along with demonstrating the value and rigor of the agile SE process, NASA AFRC leadership ultimately permitted the ATDP project to solely use the agile SE process for developments beyond Phase I. While it is the opinion of the authors that the classical SE process is more effective for most projects at NASA AFRC, some projects may deem that the agile SE process is more advantageous. Although this paper is focused on introducing the agile SE process to NASA AFRC, lessons learned will be valuable to other organizations as well. Details of how the ATDP team implemented the agile SE process during Phase I will be summarized, along with how the team met all required classical SE milestones. Lessons learned throughout Phase I of this effort will also be highlighted.

Daniel S. Jones↗