Search NASA⌕ Search

SEARCH · Search NASA

Results for “load flexibility”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

End-Use Savings Shapes Upgrade Package Documentation: Wall and Roof Insulation and New Windows

Building on the successfully completed effort to calibrate and validate the U.S. Department of Energy's ResStock and ComStock models over the past 3 years, the objective of this work is to produce national data sets that empower analysts working for federal, state, utility, city, and manufacturer stakeholders to answer a broad range of analysis questions. The goal of this work is to develop energy efficiency, electrification, and demand flexibility end-use load shapes (electricity, gas, propane, or fuel oil) that cover a majority of the high-impact, market-ready (or nearly market-ready) upgrade measures, or upgrades. "Measures" refers to energy efficiency variables that can be applied to buildings during modeling. An end-use savings shape is the difference in energy consumption between a baseline building and a building with an energy efficiency, electrification, or demand flexibility upgrade applied. It results in a time-series profile that is broken down by end use and fuel (electricity or on-site gas, propane, or fuel oil use) at each time step. ComStock is a highly granular, bottom-up model that uses multiple data sources, statistical sampling methods, and advanced building energy simulations to estimate the annual subhourly energy consumption of the commercial building stock across the United States. The baseline model intends to represent the U.S. commercial building stock as it existed in 2018. The methodology and results of the baseline model are discussed in the final technical report of the End-Use Load Profiles project. This documentation focuses on an upgrade package of three end-use savings shapes upgrades - Window Replacement, Exterior Wall Insulation, and Roof Insulation, which we will refer to collectively as the "High Efficiency Envelope" package. More details on the individual upgrades can be found on the ComStock Measures Documentation page. An upgrade package applies two or more EUSS upgrades to a single building model simulation. Since ComStock is a bottom-up physics-based model, an upgrade package will go beyond aggregating or summing the individual upgrade results and produce novel results by simulating interactions between the upgrades. For example, pairing an envelope upgrade with an electrification upgrade would likely result in higher savings results than the sum of these upgrades individually, and the size of the heating, ventilating, and air conditioning (HVAC) equipment may be reduced if the envelope upgrade reduces the loads significantly.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

End-Use Savings Shapes Upgrade Package Documentation: LED Lighting, HP-RTU and ASHP-Boiler

Building on the successfully completed effort to calibrate and validate the U.S. Department of Energy's ResStock and ComStock models over the past 3 years, the objective of this work is to produce national data sets that empower analysts working for federal, state, utility, city, and manufacturer stakeholders to answer a broad range of analysis questions. The goal of this work is to develop energy efficiency, electrification, and demand flexibility end-use load shapes (electricity, gas, propane, or fuel oil) that cover a majority of the high-impact, market-ready (or nearly market-ready) upgrade measures, or upgrades. "Measures" refers to energy efficiency variables that can be applied to buildings during modeling. An end-use savings shape is the difference in energy consumption between a baseline building and a building with an energy efficiency, electrification, or demand flexibility upgrade applied. It results in a time-series profile that is broken down by end use and fuel (electricity or on-site gas, propane, or fuel oil use) at each time step. ComStock is a highly granular, bottom-up model that uses multiple data sources, statistical sampling methods, and advanced building energy simulations to estimate the annual subhourly energy consumption of the commercial building stock across the United States. The baseline model intends to represent the U.S. commercial building stock as it existed in 2018. The methodology and results of the baseline model are discussed in the final technical report of the End-Use Load Profiles project. This documentation focuses on an upgrade package of three end-use savings shapes upgrades - Light Emitting Diode (LED) Lighting, Heat Pump Rooftop Unit (RTU) (HP-RTU), and Air-Source Heat Pump (ASHP) Boiler, which we will refer to collectively as the "Interior Lighting and Heat Pump" package. More details on the individual upgrades can be found on the ComStock Measures Documentation page. An upgrade package applies two or more EUSS upgrades to a single building model simulation. Since ComStock is a bottom-up physics-based model, an upgrade package will go beyond aggregating or summing the individual upgrade results and produce novel results by simulating interactions between the upgrades. For example, pairing an envelope upgrade with an electrification upgrade would likely result in higher savings results than the sum of these upgrades individually, and the size of the heating, ventilating, and air conditioning (HVAC) equipment may be reduced if the envelope upgrade reduces the loads significantly.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Packages of Distributed Energy Technologies Demonstrating Demand Flexibility at Community Scale

The combination of increased electric load growth across all sectors, deferred electrical infrastructure investment, and other factors resulting in variable electric power supply, has created technical challenges to maintaining a resilient and reliable grid. Many federal, regional, and local efforts are in play to modernize the electric grid, including advancing building technologies and distributed energy resources (DERs) that are utilizing smarter controls to become responsive to both occupant and grid needs. This report reviews ten pilot projects demonstrating how groups of buildings combined with behind-the-meter (BTM) DERs such as electric vehicle (EV) charging, battery storage, flexible HVAC and domestic hot water systems, and photovoltaic systems can reliably and cost effectively provide grid services. Each of the ten pilot projects aim to deliver both energy efficiency and demand flexibility (DF) while supporting load growth. The ten demonstration teams are piloting flexible DER packages across diverse communities of residential and commercial buildings to address a variety of regional grid needs. The outcomes of these pilot projects will be used to inform future scaling through utility program development. This paper characterizes the ten teams, showcasing the decision-making process used by each group to develop their packages (Section 2), the grid services they plan to deliver (Section 3), the types of DER packages selected for deployment within building sectors (Section 4) and trends between building sector, DER types, and grid services In order to achieve community scale benefits, the pilot projects must utilize aggregated control mechanisms for coordinating buildings and DERs together. Several types of coordinated control architectures have evolved amongst the teams, influenced by use type, existing market conditions, and integration type. Three coordinated controls architectures have been characterized, highlighting their use cases, benefits, challenges, and tradeoffs in their design. These insights can aid utilities, control vendors, and developers in scaling community-level energy systems (Paul, 2024). Ultimately, the technology packages selected by the ten teams will be coordinated to provide power system services, also known as grid services. Insights from these demonstrations will be useful for grid operators, regulators, aggregators and other stakeholders as they look to deploy demand flexible resources as grid services in the future. The grid services that each team is targeting for demonstration are described in Section 3 and Section 4. Methods for evaluating the grid services have been described in the paper Metrics for Evaluating Grid Service Provision from Communities of Grid-interactive and Efficient Buildings and other DER (MacDonald, 2023). To identify technology packages for demonstration, Section 2 shows that project teams used a range of analysis approaches, including building energy modeling, AMI data analysis, cost-benefit frameworks, and utility pilot data. Some teams emphasized technical modeling to quantify grid impacts and demand reduction potential, while others prioritized economic evaluations, stakeholder input, or exploratory pilots to inform deployment decisions. This diversity reflects the need to tailor selection methods to project goals, available data, and organizational context. Section 5 discusses trends between the DER technologies deployed and the grid service provisions from each team. Residential buildings (multifamily and single family) lean towards technologies that enhance energy efficiency (e.g. weatherization upgrades, smart thermostats) and onsite power generation integration (e.g. solar PV). Commercial building demonstrations prioritize technologies that ensure operational reliability (e.g. battery storage) and centralized energy management systems and optimization solutions. Teams that are deploying controllable storage-based technologies are more likely to provide grid services that require a near real-time response. Teams incorporating load shifting technologies like smart thermostats with HEMs are likely to include energy markets participation and customer bill management offerings. Campus demonstrations are adopting diverse sets of DERs to emphasize renewable generation, paired with centralized control. This section also describes technologies that were considered during project planning but ultimately excluded from final deployment. These demonstrations reveal that effective DER package design should be tailored to building type, customer segment, and construction vintage. Multifamily buildings benefit from centralized HVAC upgrades and supervisory controls, while single-family homes are well-suited for individualized technologies like solar, storage, and smart home energy monitors. Commercial and campus settings prioritize EMIS integration and load optimization. New construction enables cost-effective integration of DER-ready infrastructure, whereas retrofits require deployments aligned with owner and tenant value streams. For utility program planners, early coordination with developers and building owners, paired with segmented and modular program offerings, can improve adoption, scalability, and grid impact.

24 POWER TRANSMISSION AND DISTRIBUTION↗

OC7 Project Phase II: Code Comparison and Experimental Validation of Hydroelastic Effects and Member-Level Loads in Floating Structures

This paper presents results from Phase II of the OC7 project, focusing on hydroelastic modeling and member-level load prediction for a flexible floating offshore structure. Numerical predictions from 11 academic and industrial partners are validated against experimental measurements obtained from a 1:70-scale test of the VolturnUS-S semisubmersible platform. A comprehensive set of verification and validation cases is examined. The results demonstrate that hydrodynamic added mass has a significant impact on predicted elastic natural frequencies. Under regular wave excitation, the numerical models reproduce platform motions and mooring line tensions with good accuracy. Member-level loads are also predicted with reasonable accuracy. Some discrepancies are observed for potential-flow models not accounting for higher-order effects associated with the instantaneous wetted surface.

17 WIND ENERGY↗

Hybrid Energy Management with Real-Time Control of a High-Power EV Charging Site

Decarbonization of transportation systems is driving higher capacity energy storage and faster charging power requirements in electric vehicles (EVs). Given the potential advantages - such as increased efficiency, reduced inverter capacity, and less total cable mass - there is a demand in the industry for more DC distribution for high-power charging (HPC) hubs. However, the cost-effective, adaptive, and robust operation of the DC-coupled HPC hub necessitates a robust site energy management system (SEMS). Validating SEMS operation using a digital twin of an HPC hub in a real-time simulator (RTS) platform is crucial before field deployment. In this study, we propose a hybrid energy management site controller designed to achieve high-level, long-term operational objectives while managing low-level power sharing control between hub assets. We develop a centralized model predictive controller (MPC) to optimize hub operating points and use these points to update the droop parameters of the site energy storage system (ESS). This approach ensures the hub follows an optimal operating point while maintaining the flexibility to respond to load surges. We tested and verified our proposed approach both offline and on a Controller Hardware-in-the-loop (C-HIL) simulation platform integrated with a SEMS framework, demonstrating real-time site operation and validating a cost-effective and robust site controller.

ADVANCED PROPULSION SYSTEMS↗

Geographically Distributed Co-Simulation for the Interplay of Integrated Energy Systems and Power Grid

The increased penetration of renewable generation induces unbalanced demand-supply on a power grid, while integrated energy systems (IES) can provide high part-load efficiency and high flexibility to support grid resilience. To study the transients and improve dynamic operability, it’s important to investigate the interplay between IES and power grid concurrently using real-time co-simulation approaches. In this presentation, we showed the previous co-simulation test between NETL and INL and discussed how this co-simulation can be beneficial for both IES and power grid research. In addition, we gave an overview about the SuperLab2.0 project, which was a federated national platform to address future power grid challenges. (Virtual presentation to the MILLENNIUM CLEAN and SUSTAINABLE POWER workshop 2025).

Co-simulation↗

Insights Into Seismicity Associated With Flexibly Operating Enhanced Geothermal System From Real‐Time Distributed Acoustic Sensing

Enhanced Geothermal Systems (EGS) have the capacity to broaden the accessible resource pool for geothermal power generation. Traditionally viewed as a “baseload” resource, their flexible operation might also enable dispatchable load‐following generation and long‐term energy storage, aligning them with the evolving landscape of decarbonized electricity systems. However, increasing permeability and extracting energy during EGS operations can induce microseismic events; for many prior EGS efforts, some associated seismicity has been observed. While energetically beneficial, the flexibility of EGS operations prompts our inquiry into whether new types of operations will yield previously unseen seismicity patterns. We demonstrate the use of distributed acoustic sensing (DAS) with real‐time edge computing to monitor seismicity during a pilot test of a cyclically operated EGS facility at the Blue Mountain geothermal field. Our focus lies in uncovering seismicity insights from the real‐time microseismic catalog, particularly during load‐following dispatchability tests simulating flexible EGS operation. Here, we find that variations in pore pressure consistently correlate with seismicity, and that controlling pressure cycles during flexible operations appears to constrain microseismic activity during subsequent cycles. The spatio‐temporal evolution of microseismic clouds recorded during cyclic injection cycles fits diffusive models over our available observation period. Additionally, seismicity elevation lags behind pore pressure increases, likely due to pressure diffusion to the fracture system boundary. Through real‐time monitoring, we offer novel insights into seismicity associated with flexibly operating EGS. Our findings suggest that leveraging DAS and edge computing can inform EGS operations and help mitigate induced seismicity.

Chamarczuk, Michal [Rice Univ., Houston, TX (Unite↗

Demand response event simulator and risk-aware bidding tool for industrial customers

Incentive Based Demand Response (IBDR) program participation delivers financial benefits to the consumers and resiliency benefits to the electricity grid. Effectively participating in these programs as an industrial consumer requires bidding strategies that balance financial risk with operational constraints. Existing bidding tools tend not to fully incorporate stochastic IBDR event modeling, program specific baseline and payment/penalty calculations, or demand reduction process control schemes that account for the cascading impacts of shutdown in complex facilities. Here, this work presents an IBDR event simulator and risk-aware bidding framework tool integrating three key components: a flexible, parameterized demand response event generator that rigorously accounts for program structures and stochasticity, a demand response operational simulation model that generates explicit control strategies for load reduction, and a Monte Carlo simulator to evaluate financial risk for varied capacity bids. A case study at a wastewater treatment plant participating in PG&E's Capacity Bidding Program demonstrates the framework's utility. In the peak capacity price month of August, optimal bidding by the wastewater treatment plant nets a mean IBDR benefit of $101,000 (67% of the August electricity bill) with 0.4% probability of a financial loss. This framework enables industrial operators to make informed bidding decisions, negotiate better program terms with demand response load aggregators, and analyze energy flexibility investments at their facilities. Ultimately, this work reduces participation barriers in IBDR programs and supports the broader goal of enhancing grid reliability and renewable energy integration.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Moving Beyond Direct Load Control: A Maturity Model for Realizing the Promise of Demand Flexibility

This report discusses a new maturity model that regulators and utilities can use to guide and expand demand flexibility programs and enable the resources to provide more grid services. The model has six demand flexibility categories: planning and design; customer engagement; program operations; evaluation, measurement and verification; distributed energy resource orchestration; and data infrastructure. Within each category, capabilities are identified and described on a maturity scale that ranges from performing below expectations to improving on best practices.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Leveraging reVeal for Data Center Siting [Slides]

reVeal (the reV Extension for Analyzing Loads) is an open-source, flexible geospatial platform designed to characterize site suitability, with the goal of informing spatial downscaling and disaggregation of large-scale load projections.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Evaluating Thermostats' Deadbands Using HVAC Hardware-In-the-Loop Experiment for Advanced Control Strategies

Smart thermostats have gained significant popularity due to their potential for optimizing energy consumption and enhanced user control while ensuring occupants' comfort. The deadband, also referred to as temperature differential, is defined as the temperature difference between the desired setpoint and upper threshold or lower threshold for the HVAC equipment to turn on. It is a key factor influencing energy efficiency and user satisfaction. This paper presents a comparative analysis of the deadbands of five different smart thermostats, tested with a heat pump, aiming to identify variations in their deadband settings and implications for energy management. The experimental study was conducted using a HVAC hardware-in-theloop (HIL) system that integrates smart thermostats with physical HVAC equipment in a simulated house environment. The study explores the trade-offs between energy efficiency and occupant comfort and highlights how different thermostats participating in demand response event cycle differently based on their deadband settings. The findings offer valuable insights into how selecting the right thermostat or configuring smart thermostat with appropriate deadband settings can be leveraged to enhance demand response capabilities, shift loads effectively and improve operational flexibility in HVAC systems.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Evaluating Thermostats' Deadbands Using HVAC Hardware-In-the-Loop Experiment for Advanced Control Strategies: Preprint

Smart thermostats have gained significant popularity due to their potential for optimizing energy consumption and enhanced user control while ensuring occupants' comfort. The deadband, also referred to as temperature differential, is defined as the temperature difference between the desired setpoint and upper threshold or lower threshold for the HVAC equipment to turn on. It is a key factor influencing energy efficiency and user satisfaction. This paper presents a comparative analysis of the deadbands of five different smart thermostats, tested with a heat pump, aiming to identify variations in their deadband settings and implications for energy management. The experimental study was conducted using a HVAC hardware-in-theloop (HIL) system that integrates smart thermostats with physical HVAC equipment in a simulated house environment. The study explores the trade-offs between energy efficiency and occupant comfort and highlights how different thermostats participating in demand response event cycle differently based on their deadband settings. The findings offer valuable insights into how selecting the right thermostat or configuring smart thermostat with appropriate deadband settings can be leveraged to enhance demand response capabilities, shift loads effectively and improve operational flexibility in HVAC systems.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

A Distributionally Robust Optimization Framework for Stochastic Assessment of Power System Flexibility in Economic Dispatch

Given the complexity of power systems, particularly the high-dimensional variability of net loads, accurately depicting the entire operational range of net loads poses a challenge. To address this, recent methodologies have sought to gauge the maximum range of net load uncertainty across all buses. In this paper, we consider the stochastic nature of the net load and introduce a distributionally robust optimization framework that assesses system flexibility stochastically, accommodating a minimal extent of system violations. We verify the proposed method by solving the flexibility of the economic dispatch problem on four distinct IEEE standard test systems. Compared to traditional deterministic flexibility evaluations, our approach consistently yields less conservative flexibility outcomes.

distributionally robust optimization↗

Critical design load case fatigue and ultimate failure simulation for a 10-m H-type vertical-axis wind turbine

While previous studies investigating critical VAWT design load cases have focused on large and relatively flexible Darrieus designs, the bulk of current commercial products seeking certification fall in the relatively small, stiff, and H-type configuration, such as the XFlow Energy Corporation turbine that this study compares against. Understanding the critical design load case impacts for both fatigue and ultimate failure for this size and type of VAWT are imperative for certification. The abil

Brownstein, Ian↗

evmc-supply-curves (Electric Vehicle Managed Charging Supply Curves) [SWR-25-69]

Data and a supporting lightweight Python package that describes possible costs for enabling EV managed charging from 2025 to 2050 for three dispatch mechanisms: Time-of-Use (TOU), Real Time Pricing (RTP), and direct load control (DLC) and four flexibility scenarios (Flat and Low, Mid, and High Flex).

Matsuda-Dunn, Reiko [National Renewable Energy Lab↗

Residential Home Decarbonization Using Advanced Micro-CHP

An efficient micro-combined heat and power (CHP) prototype was developed to provide heat and electricity for single-family homes and light commercial buildings. The unit can be installed independently at the point of energy consumption. Consequently, it enables cost-effectively and flexibly matching heat and electrical loads, simplifying distribution and installation processes, and recovering and storing waste heat as hot water. The analyzed results show that the micro-CHP using natural gas as fuel achieves 10.68%–32.80% CO2 reduction in the selected five home applications. The potential effect of H2 on decarbonization of these home was also evaluated, finding that the micro-CHP using a blended fuel with H2 and natural gas can further reduce CO2 emissions. However, the 50% CO2 reduction in the micro-CHP requires at least 70%–90% of H2 in the blend with natural gas. Overall, the micro-CHP technology demonstrates a solid potential to accelerate micro-CHP adoption in residential and light commercial markets, thereby promoting broader micro-CHP acceptance and use in the future for building decarbonization.

Gao, Zhiming [ORNL] (ORCID:0000000271397995)↗

EV Charging Infrastructure Energization An Overview of Approaches for Simplifying and Accelerating Timelines to Processing EV Charging Load Service Requests

The United States has seen significant growth in electric vehicle (EV) adoption, leading to increased demand for EV charging infrastructure. Over the past decade, EV charging infrastructure site developers, site hosts, and electric distribution utilities have navigated the process to integrate chargers onto the electric grid. Site developers and site hosts have raised the alarm that the integration process for high-powered EV charging projects does not meet the needs of the EV market for timeliness or cost. High-powered charging stations typically require a load service request or an agreement with the local utility to connect to the grid. The process of energizing a new high-powered charging site can be complex and time-consuming, often taking up to 2 years. This timeline is the result of current utility energization processes having been designed for construction projects that take longer to build (i.e., buildings). The specific challenges stem from various factors, including compartmentalization in application processes, the integration of EV charging process approvals with other distributed energy resources (DERs), and the need to ensure grid reliability. The energization process needs to evolve to meet the growing demand for high-powered EV charging. This white paper compiles information gathered through various conversations with key stakeholders, including utilities, utility regulators, EV charging operators, site developers, and authorities having jurisdiction (AHJ) as well as through an extensive literature review. This document identifies the challenges and provides potential solutions to streamline the process of connecting EV charging infrastructure to the power grid in the United States, serving as a starting point for future conversations around these solutions. The solutions noted in this white paper require collaborative efforts among utilities, regulators, and EV charging infrastructure developers to streamline the grid connection process for EV charging infrastructure. They are broadly organized into four areas: 1. Increase data access and transparency: Develop automated load service request tools, integrate hosting capacity and load service request analyses, incorporate EV adoption forecasts, and provide transparency on the processing queue. 2. Improve energization processes and timing: Create fast-track options based on prescreening criteria, provide flexibility or phased approvals in the load service request/interconnection process, build internal knowledge within utilities about EV charging technologies, and provide standardized workforce training. 3. Promote economic efficiency: Right size distribution components to accurately reflect the load requirements of EV charging infrastructure, make proactive investments in grid infrastructure based on EV adoption forecasts and growth projections, and consider energy equity and environmental justice factors such as equitable access to EV charging when planning infrastructure. 4. Improve grid reliability and resilience: Use load management/power control systems (PCS) at EV charging stations, adopt and implement harmonized standards for communication protocols and information models between the EV charging and grid control infrastructure, and address cybersecurity considerations by implementing robust security measures and standards for EV charging infrastructure—with particular emphasis on clarifying the security requirements for the interface to the grid. The objective of the solutions proposed in this white paper is to accelerate the timeline and decrease costs associated with connecting EV charging infrastructure to the grid. Electric utilities, utility regulators, EV charging infrastructure developers, and site hosts will first need to understand which solutions are available in their service territory, and if warranted, which combination of solutions would support their specific needs. Through the successful implementations of solutions at scale detailed here, industry will demonstrate a new and innovative ecosystem where timely deployment and energization of EV charging infrastructure with greater grid resiliency and reliability is a reality.

24 POWER TRANSMISSION AND DISTRIBUTION↗

End-Use Savings Shapes Measure Documentation: Dispatch Schedule Generation for Demand Flexibility Measures

This supplemental document describes the methodology used for determining the dispatch timing of various EUSS demand flexibility measures. Demand flexibility measures are designed to reduce/dispatch electricity demand in buildings during especially beneficial/critical times. The method used in this work utilizes predictions of building loads to generate a schedule that reflects the periods when the building's daily peak load occurs to support decision making in demand flexibility measures. The dispatch schedule generation method described in this document creates an hourly schedule that includes a load dispatch (peak) window for each day for a whole year based on load prediction, with options using different prediction methods: perfect prediction, bin-sampling method, fixed schedule, and outdoor air temperature (OAT)-based prediction method. The perfect prediction method performs a simulation to obtain the annual load profile as predicted load, representing the scenario of perfect load prediction. The bin-sampling method (1) categorizes days into representative bins by temperature characteristics, (2) performs simulations on sample days from each of those bins to create representative (or predicted) load, and (3) assigns representative loads for all days in a year based on the bin categorization. The fixed schedule method defines uniform start and end time of peak window with assumed fixed daily peak time, for all days in a season or a year. The OAT-based prediction method uses the statistics of OAT (minimum and maximum) as the indicators of peak load, with specified delay response time from building loads to temperature. Given the load prediction, daily peak periods are determined as a time window with specified length in each day that include the predicted daily peak load and with a secondary rule such as maximizing energy saving potential. The dispatch schedule generation method is not a standalone measure and is intended to be combined with other demand flexibility measures that could leverage the peak schedule and apply demand controls on specific systems or devices for demand response, such as measures described in "Measure Documentation - Thermostat Control for Load Shedding" and "Measure Documentation - Thermostat Control for Load Shifting".

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗