Search NASA⌕ Search

SEARCH · Search NASA

Results for “nuclear waste remediation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Remediation of Temporary Storage Sites in Support of the Port Hope Area Initiative - 20295

The Port Hope Area Initiative is a community-based solution for the long-term management of historic low level radioactive waste (LLRW) resulting from 60 years of uranium and radium processing operations in the Town of Port Hope which is located in Ontario, Canada. The Eldorado refinery, on the north shore of Lake Ontario, began refining radium-226 from pitchblende ore, later transitioning to the refining of uranium. Through the history of the operation, LLRW was deposited throughout the town of Port Hope as a result of fugitive emissions from the plant and/or through the re-use of process residues as building material and backfill. Historical clean-up activities conducted in the late 1970's involved the remediation of approximately 400 properties and the relocation of 100,000 cubic metres of contaminated soil to a disposal facility in Chalk River operated by Atomic Energy of Canada Limited (AECL). Owing to space limitations at that disposal facility, any LLRW identified through construction monitoring since that time has been stored in the community at three temporary storage sites located throughout the town. These include: the Centre Pier mound that contained approximately of 19,800 m{sup 3} of LLRW-impacted soil that originated from the construction of a new water treatment plant; two mounds located at a licensed storage facility containing LLRW obtained from residential clean-up activities (11,000 m{sup 3}); and a small pad adjacent to the municipal sewage treatment plant containing 2200 m{sup 3} of LLRW-containing sludge. With the construction of a new long-term waste management facility (LTWMF) that has been designed to house all of the LLRW identified within Port Hope, the three sites were early candidates for remediation. The clean-up of the three temporary storage sites was a significant milestone for the Port Hope Area Initiative. After a decade of planning and consultation, this work represents the first sites in the municipality to be remediated with the waste being safety removed and transferred to the newly constructed LTWMF. This paper discusses the challenges associated with the clean-up activities for these three sites and the strategies employed to address those challenges. These included weather-related challenges, owing to the seasons over which the work was conducted as well as those associated with working within a closely-knit community. Canadian Nuclear Laboratories (CNL), working on behalf of the federal government, has worked diligently to develop a positive and trusting relationship with the community. Consequently, the successful execution of this project needed to be sensitive to, and respectful of the needs of the community. In addition to the usual Health, Safety and Environment training, project staff received community awareness training that spoke to the history of this community-based initiative and the expected behavior when working within the community. Transportation routes were defined based on safety and the need to minimize disruption to local traffic while haul-times where scheduled around school bus hours to enhance public safety. The successful completion of this first of many remediation projects to be completed under the Port Hope Area Initiative reflected years of careful planning. Nevertheless, there were a number of 'lessons learned' that have been applied on other ongoing projects be completed under the Port Hope Area Initiative. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

US EPA Superfund Remediation Program Update: Revisions to Risk and Dose Assessment Models - 20368

The U.S. Environmental Protection Agency (EPA) Superfund remedial program is finishing up a significant number of revisions to its guidance for the risk assessment process at radioactively contaminated Superfund sites. The six Preliminary Remediation Goal (PRG) and Dose Compliance Concentration (DCC) internet-based calculators for radiation risk and dose assessment at Superfund sites are being reformatted to match the chemical calculators and improve the user experience, revised to add a new peak risk and dose output option, and to add some adjustment options for external exposure. A new Radon Vapor Intrusion Screening Level (RVISL) calculator is expected to be finished in 2020, will be similar to the Vapor Intrusion Screening Level (VISL) for chemical calculator that was finished in 2018. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

ISR Restoration Methods and Applicability to Groundwater Remediation at Abandoned Uranium Mills - 20342

There are numerous abandoned uranium mining and mill sites in the southwestern US. Surface remediation was undertaken in the 1980's and 90's to cover mill tailings and minimize infiltration of meteoric precipitation into the subsurface These actions have reduced the availability of tailings contaminants but many of these sites have persistent groundwater contamination, primarily due to the disposal of tailings and process fluids in unlined impoundments during the mill's operational life. Active in situ recovery (ISR) uranium mining and wellfield restoration practices are examined to determine the factors that contribute to the success of groundwater restoration. Hydrologic characteristics, geochemistry, ore body quality, regulatory requirements and the aboveground components of uranium production and water treatment are considered. While there is no such thing as a typical abandoned mill site, the potential use of ISR restoration methods is evaluated for viability as a remedial alternative to mine and mill sites that have residual contaminated groundwater plumes. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Panel Session 115: Collaboration Across Borders to Deliver Cleanup and Decommissioning Challenges

This panel focused on where multiple countries have collaborated to solve difficult remediation and cleanup challenges through either formal or informal means. The focus was to share real examples of where collaboration has accelerated cleanup saving time and money. This could be through policy or process improvements, technology transfer or sharing R and D, or other means of collaborative efforts. Panelists with presentations: Canada-AECL Collaboration Across Borders (Richard Sexton, Alastair MacDonald); Collaboration Across Borders to Deliver Cleanup and Decommissioning Challenges (Anthony Banford); IAEA Perspective on International Collaboration in D and ER (Horst Monken Fernandes); How, Why and Benefits of Collaboration (Kurt Gerdes)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

US EPA Superfund Radon Vapor Intrusion Screening Level (RVISL) Electronic Calculator - 20340

Currently, there is no U.S. Environmental Protection Agency (EPA) guidance on correlating soil or groundwater levels of radon with indoor radon concentrations at Superfund sites. EPA is developing the Radon Vapor Intrusion Level Calculator (RVISL) Calculator which is an online tool. The RVISL calculator: (1) lists three radon isotopes (Rn-219, Rn-220 and Rn-222) known to pose a potential cancer risk through the inhalation pathway; (2) provides generally recommended risk and Applicable or Relevant and Appropriate Requirements (ARAR) based preliminary remediation goals (PRG) for groundwater, soil gas (exterior to buildings and sub-slab) and indoor air for default target risk and ARAR based levels and exposure scenarios; and (3) allows calculation of site-specific PRGs based on user-defined target risk and ARAR based levels and exposure scenarios. EPA developed the RVISL calculator to help risk assessors, remedial project managers, and others involved with risk assessment and decision making at radioactively contaminated sites. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Improving PCM Waste Management Through New Approaches to Screening for LLW Treatment and Disposal - 20145

A major step forward in the management of Plutonium Contaminated Material (PCM) Waste has been taken at the Sellafield site with the introduction of new capabilities to enable wastes previously conservatively designated as PCM Intermediate Level Waste (ILW) to be re-classified for treatment as Low Level Waste (LLW). The Sellafield site, located in the North West of England, within the United Kingdom (UK), has operated plutonium processing plants and waste facilities for almost 70 years. During this time management of the raw PCM waste produced has presented a variety of challenges. The waste is currently processed by high force waste compaction in the Waste Treatment Complex (WTC). The WTC converts 200 litre drums of raw PCM waste into a compacted, grout encapsulated monolith form within stainless steel containment, ready for emplacement within the UK's Geological Disposal Facility (GDF) when it becomes available. To help progress some of the wastes waiting for treatment, recent improvements have been made with the introduction of new waste assay instrumentation which enables the identification of a 'candidate' waste potentially suitable for disposal via the LLW treatment route. Opening a new LLW route for previously designated PCM has been a major advance in PCM waste management policy. It has required a range of technical assessment arrangements to be developed, tested and commissioned and involved the engagement of a wide range of stakeholders. In particular, very detailed technical analysis methods have been developed to ensure that there is a robust and conservative approach to the final sentencing of waste. Following completion of commissioning tests, the first 86 m{sup 3} of previously designated PCM waste was successfully treated through the LLW route and consigned to LLW disposal in June 2019. The direct benefit of sentencing waste to the correct waste route (LLW) is the significant cost savings across the complete range of waste management activities. This work is also strategically important for demonstrating to a range of stakeholders including workforce and regulators, that waste previously designated as PCM can be re-classified in a systematic and justifiable way without increasing risk to personnel or the wider environment. By ensuring that waste is being managed appropriately it will be possible to carry out more remediation work safely, in less time, and at a lower cost. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Middlesex South FUSRAP Site: Collaboration Towards Beneficial Reuse - 20338

The US Department of Energy (DOE) Office of Legacy Management (LM) manages DoE's post-closure responsibilities and ensures the future protection of human health and the environment with respect to sites that have no continuing DOE mission after undergoing remediation. LM's beneficial reuse program promotes the LM strategic goal to sustainably manage and optimize use of public lands. The beneficial reuse program aims to repurpose former contaminated sites to restore the environment, protect the public health, revitalize communities, and spur economic growth. Benefits from the reuse of a site may increase the local tax base, facilitate job growth, utilize existing infrastructure, and enhance or protect natural resources. Beneficial reuse also promotes protectiveness by ensuring activities are compatible with long-term maintenance and protection of public health and the environment, as well as by retaining good stewardship of natural resources. LM actively participates in promoting the economic development vision of the surrounding communities by collaborating with local communities to promote regional or municipal initiatives. The Borough of Middlesex, New Jersey, has prepared the Lincoln Boulevard Redevelopment Plan, which will reinvent a once-viable downtown and enhance the quality of life for the community. The Middlesex South, New Jersey, Formerly Utilized Sites Remedial Action Program (FUSRAP) site lies within the boundaries of this redevelopment area. In support of this development plan, the Borough is interested in acquiring the site for its Department of Public Works and to increase street access in the future commercial district to be built near adjacent properties. The opportunity to put the FUSRAP site into productive use aligns with LM's mission and strategic goals. In support of beneficial reuse activities, DOE can dispose of excess real property using several mechanisms. The two disposal options applicable to the Middlesex south site include (1) utilizing the US General Services Administration (GSA) or (2) using the Title 10 Code of Federal Regulations Section 770, 'Transfer of Real Property at Defense Nuclear Facilities for Economic Development' (known as a '770 transfer') process. Using the 770 transfer requires economic development as the primary driver, and a specific redevelopment proposal must be submitted. If there is no interest in specific economic development, the GSA option becomes the default mechanism for disposal of the property. In the case of the Middlesex south site, the 770 transfer process is being utilized and the Borough has submitted its economic development proposal to LM. Although LM is encouraged by the opportunity to put the site into productive use, the Middlesex south site is currently on the US Environmental Protection Agency (EPA) National Priorities List and remediation is being performed by the US Army Corp of Engineers (USACE) under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). Consequently, any property transfer must meet the requirements under CERCLA Section 120(h), 'Property Transferred by Federal Agencies.' As the groundwater remedy will not be in place for several years, approval would be required from the US EPA administrator and the governor of the state of New Jersey to perform an early transfer of the site (before all response actions have been completed). The time frame for these approvals to occur under the normal process conflicts with the proposed redevelopment schedule; therefore, various options for expedited sale, transfer, or lease of portions of the site to the Borough were evaluated. The subsequent decision on a mutually beneficial path forward was the result of a collaborative effort between LM, USACE, the Borough and its redevelopment team, EPA, and the New Jersey Department of Environmental Protection. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Savannah River Site Composite Analysis (FY2019 Annual Review)

The Savannah River Site (SRS) is a Department of Energy (DOE) site encompassing approximately 310 square miles in South Carolina. It is bounded on the southwest by the Savannah River (SR) and is situated approximately 12 miles south of Aiken, South Carolina, and 15 miles southeast of Augusta, Georgia. Construction of and subsequent operations at the SRS began in 1951 under the direction of the Atomic Energy Commission. The primary mission of the SRS was to produce tritium and plutonium for the national nuclear weapons complex. Between 1953 and 1955, SRS brought five reactors and various support facilities into operation in support of its primary mission. Support facilities included two chemical separations plants, a heavy water extraction plant, a nuclear fuel and target fabrication facility, a tritium extraction facility and waste management facilities. With the declining need for a large nuclear weapons stockpile since the end of the Cold War, many SRS facilities no longer produce or process nuclear materials. All reactors were shut down by 1993. However, the SRS Tritium Extraction Facility continues to supply DOE with tritium. Additionally, operations at the K-Area Complex currently provide interim safe storage for much of DOE’s excess plutonium (Pu) and high enriched uranium, in a building which formerly housed K Reactor. As the SRS mission has changed, many surplus facilities are being dispositioned safely and economically. SRS has completed extensive decommissioning activities in D-Area, M-Area, P-Area, R-Area, and T-Area, with groundwater (GW) remediation ongoing. High-level waste tanks continue to be emptied and closed.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Use of Silver Chloride Injection in Remediation of Iodine-129 by In Situ Capture as Silver Iodide at the F-Area Seepage Basin - 20225

The Savannah River Site (SRS) produced tritium, plutonium, and special nuclear materials for national defense, medicine, and the space programs. As part of operations, the F-Area Seepage Basins operated until 1988 for the disposition of deionized acidic wastewater from the F Separations Facility. The wastewater contained dilute nitric acid and low concentrations of non-radioactive metals, and radionuclides, with the major isotopes being Cs-137, Sr-90, U-235, U-238, Pu-239, Tc-99, I-129, and tritium. The seepage basins were closed in 1988 and backfilled and capped by 1991. The groundwater emanating from beneath the closed and capped seepage basins is acidic and contains elevated levels of both chemical and radiological contaminants. Releases from the groundwater plumes sourced from the F-Area Seepage Basins have impacted the water quality of Fourmile Branch, which is a small tributary to the Savannah River, a regional water source. A large pump-and-treat system was constructed in 1997 and operated until 2003 in an attempt to capture the releases to Fourmile Branch. The system in F Area and a similar system in H Area were expensive (∼$1.3 M/month) to operate and produced large quantities of radioactive waste, with concentrations of I- 129 too high to be disposed of at the SRS. In 2004, SRS replaced pump-and-treat with a funnel and gate system that along with operation of a base injection system at the gates reduces the flux of contaminants to the wetlands adjacent to Fourmile Branch. The alkaline solution injected into the aquifer neutralizes the acidic plume and immobilizes many of the cationic constituents. However, base injection is not effective in managing the release of iodine-129, an anionic contaminant. To address iodine-129 SRS and the Savannah River National Laboratory developed an in situ technology that uses ultra-fine ground silver chloride (AgCl) as an injectable capture medium for the sequestration of iodine-129. The AgCl amendment has a very small particle size and is designed to be injected into the contaminated aquifer to capture iodine-129. Dissolved iodine-129 forms a stable and highly insoluble solid (silver iodide) upon contact with AgCl. Laboratory studies, a field scale pilot test (2009), and three deployments (2011, 2015 and 2019) of AgCl have been successfully performed at the F-Area Seepage Basins. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Overview of the Long-Term Stewardship of the Remediated Uranium Mining and Milling Sites in Europe - 20079

Uranium mining in Europe began in the ' 40's for civil and military applications. The great majority of the uranium mines have now been closed and are going through the stages of decommissioning and/or rehabilitation. Today, the main uranium producers are outside the EU; only a few mines are still in operation inside the EU. In 2006, the situation of the uranium mines and mill tailings in Europe, identifying the tailings liabilities, their status, the plans for these sites and any associated hazards, was reported to the EC. The legacy of uranium mines and mill tailing disposals in the EU are located mainly in 12 Member States where, in total, 87 tailing objects were identified at 63 sites. The volume of each one of these tailings disposal varies from a few thousand to several tens of million m{sup 3}. The majority of these sites are no longer in operation. More than 40 tailing embankments have already been completely remediated. Approximately 20 are currently being remediated while for the remaining objects, remediation has yet to start. After ten years, and for a few cases where the respective projects have not yet been completed, it seems that most of Europe's uranium mines and milling legacies were remediated according to acceptable environmental standards. Nevertheless, Europe is about to face a new challenge that comes from the concluded remediation projects for which an effective set of measures for coordinated institutional control, known as 'long-term stewardship', is needed including, in most cases, continuous and active maintenance. Moreover, the uncertainty of what will happen to these sites if institutional control fails at some point in time is a major concern. This work presents a summary of the situation and current issues of the uranium mine and mill tailings in Europe and their remediation status. It addresses not only the management of existing uranium mine and mill legacies but also the methods and strategies that have been used to prevent the creation of new future legacy sites from uranium mines still in operation. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

GPS-Based Gamma Survey for Characterizing and Decommissioning NORM Sites - 20389

Gamma survey techniques are an especially powerful decommissioning tool at naturally occurring radioactive material (NORM) sites due to both the low cost to obtain data over a large spatial scale and the abundance of gamma emitters in the uranium and thorium decay series. Gamma surveys are executed by coupling a detector - most often a sodium iodide crystal - to a global positioning system (GPS), then reporting a location and gross gamma reading coincidentally to a data logger. Systems may be carried by workers or mounted to a car, all-terrain vehicle, or unmanned aerial system (UAS). The resulting data set provides a high-resolution but low precision map of the gamma radiation field over the area surveyed. Frequently this map is also correlated to soil concentrations of NORM radionuclides (most often, Ra-226) and/or exposure rate. Gamma survey parameters such as movement speed, transect spacing, and data logging frequency define the spatial resolution of the resulting surface, and can be optimized depending on the desired survey sensitivity. This paper examines gamma survey as a tool for decommissioning NORM sites and provides an overview of current gamma survey technology designed to improve the efficiency and effectiveness of the decommissioning process. Topics to be discussed in the paper include: - An overview of gamma survey systems, and the utility of different delivery vehicles depending on desired cost, desired spatial resolution, and site topography. - The influence of physical detector characteristics on detection sensitivity and survey planning. - The tradeoff between high-resolution and large spatial extent, but inherently uncertain data, and low-resolution, low spatial extent, but highly certain data, as well as the specific utility of each of these types of data during NORM facility decommissioning. - Confounding variables that may limit the utility of gamma survey at some sites (e.g., radon gas and spatial heterogeneity / hot spots), and methods to plan for and control these conditions. Results show that the confounding variables, such as radon and data output can greatly influence the overall data quality associated with the decommissioning process. In addition, the use of real-time and aerial survey platforms provides a method for ensuring proper spatial extent of the data. When applied thoughtfully, gamma survey is a powerful tool for detecting NORM radionuclides in the environment and a cost-effective technique for identifying areas requiring remediation. However, entities performing or using gamma survey as a decommissioning tool must be aware of both its advantages and its limitations before basing remediation or regulatory action on gamma survey results. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Full-Scale Implementation of Propane Biosparge System for In-Situ Remediation of 1,4-Dioxane - 20174

1,4-Dioxane is a common co-contaminant with chlorinated solvents but is not readily remediated via similar treatment approaches (e.g., sorption, reductive dechlorination). However, 1,4-dioxane can be cometabolically biodegraded in the presence of alkane gases and oxygen. At Vandenberg Air Force Base in California, USA, historical use of chlorinated solvents resulted in 1,4-dioxane in groundwater across three vertical groundwater zones. Between April 2013 and December 2016, laboratory testing and various field demonstrations were conducted by us, and others. The results from these tests showed in-situ propane biosparging as a promising technology for reduction of both chlorinated solvent and 1,4-dioxane concentrations, with up to 99 percent reduction in groundwater concentrations. Stable isotope probing (SIP) was also used in 2015 to verify that biodegradation was a (destructive) mechanism occurring in the subsurface.). The success of the propane biosparge demonstrations, and confirmation of the biodegradation mechanism via SIP, has led to the full-scale implementation of a propane biosparge treatment system at Site 24 at Vandenberg Air Force Base. The treatment area is a relatively small footprint (e.g., less than 61 meters (200 feet) long), with 83 new wells installed simultaneously across the three groundwater zones. Ultimately 93 wells will be connected to an above-ground treatment system the includes an air compressor, a propane tank, controls to ensure safe operating conditions, and nutrient amendment elements. This full-scale system is currently known to be among the first of its kind. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Challenge of Achieving Site Closure of a Complex Groundwater Plume - 20531

Over the last three decades, DOE has made substantial progress in nearly every area of nuclear waste cleanup and has closed and transitioned 91 of the 107 sites in the EM complex. Several of the remaining groundwater plumes at Hanford, Los Alamos, Paducah, Oak Ridge, and Savannah River are complex and tend to have unique site or contaminant characteristics which provide an almost impossible challenge to remediate to regulatory levels. As a result, these complex sites will require a large investment to remediate. In order for DOE to achieve regulatory closure, a technically sound case must be developed and presented to regulators and stakeholders that clearly demonstrates that remedial goals have been or will be irreversibly achieved or that there is an alternate acceptable end-state. Five lines of evidence are required: - A conceptual site model that is as complete as possible, with the knowledge that it may continue to evolve with time; - Demonstration that trends in contaminant concentrations, or flux, versus time indicate that remedial goals will be achieved on schedule or within a reasonable time thereafter and that trends that deviate from this path are explainable by the conceptual model; - Demonstration that remobilization of attenuated contaminants is unlikely to occur in the future; - Explicit consideration of remedial contingencies, should deviations in the path toward remedial goals occur; - Development of an effective long-term monitoring plan to detect any conditions that might alter the path toward remedial goals. SRS has made significant progress in the remediation of contamination associated with the F-area and H-Area Seepage Basins, and it is currently developing a strategic closure path that addresses each of these lines of evidence and identifies both basic and applied scientific issues that will need to be addressed in order to obtain regulatory closure. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Evaluating Remediation Options for a Perched-Water Unit at the Hanford Site - 20378

At the U.S. Department of Energy's Hanford Site, liquid-phase waste was discharged using surface disposal features such as ponds, trenches, and cribs. These practices distributed contaminants in the subsurface, some of which are currently in the vadose zone above the groundwater. At the 200-DV-1 operable unit (OU) at the Hanford Site, a key feature is a perched-water zone. This perched-water zone contains several million liters of water contaminated with high concentrations of uranium, technetium-99 (Tc-99), and nitrate that serves as a continuing source of contamination to the underlying aquifer. Currently, a pumping system is used to remove contaminant mass from the perched-water zone. However, water extraction will become more challenging as the perched unit dewaters. As a result, residual contaminants remaining after pumping is no longer effective needs to be addressed with post-extraction mitigation approaches, appropriate monitoring, and selection of suitable remediation endpoints. Thus, a remedy evaluation needs to include the unique conditions of this perched-water zone. As part of the initial evaluation, a set of technologies have been preliminarily identified as potentially applicable to the perched-water zone, including in situ remediation technologies to sequester uranium and Tc-99 and to degrade nitrate. While there is sufficient information available for direct consideration of some of the reviewed technologies in a feasibility study, five in situ remediation technologies were identified as needing additional information on their effectiveness under the geochemical and contaminant conditions of the perched-water zone. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Pump-and-Treat Impacts on Aquifer Conditions and the Development of System-Wide Performance Strategies - 20377

The pump-and-treat (P and T) system on the Hanford Site's Central Plateau currently treats multiple contaminants within the 200-ZP-1 operable unit, including nitrate through its biological treatment processes. Although it was initially designed to support the 200-ZP-1 Remedial Action Objectives, the P and T system has evolved in use to address contaminants from other regions of the aquifer as well. The P and T influents are biogeochemically distinct, treating groundwaters with elevated concentrations of cyanide, uranium, technetium-99, and nitrate. Given the varying geochemical signatures from current and potential future sources, operational conditions, and amendments considered for treatment processes, there is a need to identify the impacts that the P and T effluent has on the aquifer, and how the aquifer affects P and T performance. To this end, laboratory efforts have focused on characterizing P and T effluent and its biogeochemical effects on the sediments through a series repacked column experiments. The P and T effluent is rich in particulate matter. A systematic inspection of this particulate matter in the P and T effluent showed significant levels of manganese/iron oxides, calcite crystals, relatively large organic matter molecules, and biomass. Therefore, the column experiments were designed and conducted for four different treatment systems: artificial groundwater, filtered P and T effluent, non-filtered P and T effluent, and chlorinated P and T effluent. Different levels of microbiologically- and geochemically-induced changes in the columns occurred and modified the flow systems. For example, physical filtration occurred in the sediments where the particulate material had accumulated in the top portion of the column. Reactive transport modeling of the laboratory experiments is being carried out so that the reaction network can be extrapolated to the field scale. These simulations will provide predictive evaluations of system performance based on P and T operational changes and aquifer mass loading and capacity estimates. This information can be used to address combined subsurface and operational challenges, such as the need for frequent well redevelopment to maintain injection capacity. This information also provides the technical basis for decisions related to the P and T system operations that support remedy optimization efforts and short- and long-term remedy decisions related to multiple operable units on the Hanford Site Central Plateau. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Automated Data Review of Analytical Laboratory Results at Los Alamos National Laboratory - 20299

Newport News Nuclear BWXT-Los Alamos, LLC (N3B) collects samples in support of the U.S. Department of Energy's (DOE) Office of Environmental Management (EM) Los Alamos Legacy Cleanup Contract (LLCC). N3B receives and reviews over 1.6 million sample data points annually in support of various ongoing environmental monitoring and remediation projects of the LLCC. N3B must demonstrate and document that reported external analytical laboratory data produced for the LLCC are of sufficient quality to fulfill their intended purpose and to support defensible decision making as described in EPA QA/G4 Guidance for the Data Quality Objectives Process 1994. In 2018, N3B assumed management of the LLCC along with the Environmental Information Management (EIM) database that contains all historical and current environmental data associated with the LLCC. The entire EIM database is shared between N3B, Triad National Security, LLC (Triad), and New Mexico Environment Department (NMED). These three parties jointly manage the database, its configuration, and changes / updates. All environmental data that are entered into EIM are updated and available, on a daily basis, in the linked public database Intellus New Mexico (Intellus). The quality and defensibility of the environmental data generated from sampling activities is a key component of an effective remediation process. Providing quality data is accomplished through a data assessment process that includes examination, verification, and validation. Examination is the assessment of completeness of the deliverables, identification of any reporting errors, and determining the usability of the data based on the laboratory's evaluation of its data as described in the case narrative received with the data. Verification consists of an evaluation of the Electronic Data Deliverables (EDD) data report to determine the extent to which the external analytical laboratories met method and contract-specific quality control and reporting requirements. Validation consists of determining the data quality and the extent to which the external analytical laboratories accurately and completely reported all sample and quality control results and satisfied all contract requirements. EIM contains an automatic Data Validation Module which performs automated data review (DVM ADR). DVM ADR is a tool to assist in the validation process. When DVM ADR is used in conjunction with manual examination of sample data packages, the combination of the two will meet and exceed the requirements of verification. N3B recognized an opportunity for process improvement, focusing on DVM ADR configuration and enhancements in EIM. Testing EIM's configuration provided proof of the DVM ADR's capabilities and flexibility to accurately perform routine data checks based on analytical methods and regulatory requirements. In addition, the DVM ADR module was improved through enhancements for all analytes, particularly upgrades for radiochemistry data. Extensive testing of the DVM ADR module occurred using EDDs from actual laboratory analyses on the EIM testing site. During this process, N3B manipulated EDD information to verify that the actual outcomes matched the expected outcomes. The results of this testing were shared with the database architects, and configuration improvements were identified to address these results. During this process, N3B identified that the radiochemical DVM ADR capabilities were underutilized, and so enhanced the DVM ADR functionality with respect to radioanalytical assessment. N3B environmental data uploads to Intellus on a daily basis from EIM, once the analytical data undergoes examination and verification. As such, it is important to have a high level of confidence in the quality and defensibility of the data. The process of manual examination, along with the DVM ADR, in conjunction with full validation of a percentage the data specified through the Data Quality Objectives greatly increases efficiency of data review and confidence level of the quality of the data, and gives the project managers, governmental offices, and the public expedited access to high-quality data. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Harvesting uranium from nuclear waste streams

Nuclear-fuel-cycle wastewater contains a considerable amount of uranium that must be removed. Here, a new electron-buffering adsorbent provides an economically efficient means of recycling uranium to address remediation and fuel resource needs.

Wiechert, Alexander I. [Oak Ridge National Laborat↗

Alternative Conceptual Models of the Subsurface at the Hanford Site

This report describes the use of a multipoint geostatistics (MPS) framework with multiple data types for developing alternative conceptual-mathematical models of the subsurface at the Hanford Site. Developing multiple conceptual-mathematical models of the site is important for assessing potential uncertainties related to the features, events, and processes that control the subsurface flow of groundwater and the transport of contaminants of concern (COCs). Evaluating the effects of these uncertainties can result in better site characterization, monitoring, and remedial decisions.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗