Search NASA⌕ Search

SEARCH · Search NASA

Results for “payload assembly”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Cleaning Genesis Mission Payload for Flight with Ultra-Pure Water and Assembly in ISO Class 4 Environment

Genesis mission to capture and return to Earth solar wind samples had very stringent contamination control requirements in order to distinguish the solar atoms from terrestrial ones. Genesis mission goals were to measure solar composition for most of the periodic table, so great care was taken to avoid particulate contamination. Since the number 1 and 2 science goals were to determine the oxygen and nitrogen isotopic composition, organic contamination was minimized by tightly controlling offgassing. The total amount of solar material captured in two years is about 400 micrograms spread across one sq m. The contamination limit requirement for each of C, N, and O was <1015 atoms/sq cm. For carbon, this is equivalent to 10 ng/cm2. Extreme vigilance was used in pre-paring Genesis collectors and cleaning hardware for flight. Surface contamination on polished silicon wafers, measured in Genesis laboratory is approximately 10 ng/sq cm.

Allton, Judith H.↗

NASA’s Exploration and In-Space Services (NExIS) Division OSAM-1 and Related Propellant Transfer Subsystem Progress through FY 2024 Presentation

NASA’s Exploration and In-Space Services (NExIS) Division has been developing technologies for the on-orbit servicing of satellites for decades (Hubble servicing missions) On-Orbit Servicing, Assembly and Manufacturing mission 1 (OSAM-1) had plans to robotically refuel a heritage satellite on-orbit (a.k.a. non-cooperative) Future plans of the OSAM-1 flight hardware will not be discussed The OSAM-1 Space Infrastructure Dexterious Robot (SPIDER) payload is designed to assemble a 3-meter communications antenna OSAM-1 Propellant Transfer Subsystem (PTS) development supports the nascent in-space refueling ISAM goals Reference “National In-Space Servicing, Assembly, and Manufacturing Implementation Plan” (Dec 2022 from White House Office of Science and Technology Policy) ISAM fluid transfer technology shortfalls still exist and are actively being addressed at NASA

PTS↗

Power system interface and umbilical system study

System requirements and basic design criteria were defined for berthing or docking a payload to the 25 kW power module which will provide electrical power and attitude control, cooling, data transfer, and communication services to free-flying and Orbiter sortie payloads. The selected umbilical system concept consists of four assemblies and command and display equipment to be installed at the Orbiter payload specialist station: (1) a movable platen assembly which is attached to the power system with EVA operable devices; (2) a slave platen assembly which is attached to the payload with EVA operable devices; (3) a fixed secondary platen permanently installed in the power system; and (4) a fixed secondary platen permanently installed on the payload. Operating modes and sequences are described.

Source record↗

Autonomous Mechanical Assembly on the Space Shuttle: An Overview

The space shuttle will be equipped with a pair of 50 ft. manipulators used to handle payloads and to perform mechanical assembly operations. Although current plans call for these manipulators to be operated by a human teleoperator. The possibility of using results from robotics and machine intelligence to automate this shuttle assembly system was investigated. The major components of an autonomous mechanical assembly system are examined, along with the technology base upon which they depend. The state of the art in advanced automation is also assessed.

Raibert, M. H.↗

Fluids and Combustion Facility: Combustion Integrated Rack Modal Model Correlation

The Fluids and Combustion Facility (FCF) is a modular, multi-user, two-rack facility dedicated to combustion and fluids science in the US Laboratory Destiny on the International Space Station. FCF is a permanent facility that is capable of accommodating up to ten combustion and fluid science investigations per year. FCF research in combustion and fluid science supports NASA's Exploration of Space Initiative for on-orbit fire suppression, fire safety, and space system fluids management. The Combustion Integrated Rack (CIR) is one of two racks in the FCF. The CIR major structural elements include the International Standard Payload Rack (ISPR), Experiment Assembly (optics bench and combustion chamber), Air Thermal Control Unit (ATCU), Rack Door, and Lower Structure Assembly (Input/Output Processor and Electrical Power Control Unit). The load path through the rack structure is outlined. The CIR modal survey was conducted to validate the load path predicted by the CIR finite element model (FEM). The modal survey is done by experimentally measuring the CIR frequencies and mode shapes. The CIR model was test correlated by updating the model to represent the test mode shapes. The correlated CIR model delivery is required by NASA JSC at Launch-10.5 months. The test correlated CIR flight FEM is analytically integrated into the Shuttle for a coupled loads analysis of the launch configuration. The analysis frequency range of interest is 0-50 Hz. A coupled loads analysis is the analytical integration of the Shuttle with its cargo element, the Mini Payload Logistics Module (MPLM), in the Shuttle cargo bay. For each Shuttle launch configuration, a verification coupled loads analysis is performed to determine the loads in the cargo bay as part of the structural certification process.

McNelis, Mark E.↗

Orbital operations study. Volume 2: Interfacing activities analysis. Part 2: Structural and mechanical group

The activities of the structural and mechanical activity group of the orbital operations study project are discussed. Element interfaces, alternate approaches, design concepts, operational procedures, functional requirements, design influences, and approach selection are presented. The following areas are considered: (1) mating, (2) orbital assembly, (3) separation, EOS payload deployment, and EOS payload retraction.

Mattson, H. L.↗

Rigid "Sling" for topheavy loads

Easy-to-use gantry safely lifts topheavy loads. Gantry is designed for quick assembly and adjustment around payload.

Stewart, R. D.↗

Erectable/deployable concepts for large space system technology

Erectable/deployable space structure concepts particularly relating to the development of a science and applications space platform are presented. Design and operating features for an automatic coupler clevis joint, a side latching detent joint, and a module-to-module auto lock coupler are given. An analysis of the packaging characteristics of stacked subassembly, single fold, hybrid, and double fold concepts is given for various platform structure configurations. Payload carrier systems and assembly techniques are also discussed.

Agan, W. E.↗

Ames Research Center Life Sciences Payload Project for Spacelab Mission 3

The Research Animal Holding Facility, developed to support rodent and squirrel monkey animal husbandry in the Spacelab environment, is to be tested during the Spacelab Mission 3 flight. The configuration and function of the payload hardware elements, the assembly and test program, the operational rationale, and the scientific approach of this mission are examined. Topics covered include animal life support systems, the squirrel monkey restraint, the camera-mirror system, the dynamic environment measurement system, the biotelemetry system, and the ground support equipment. Consideration is also given to animal pretests, loading the animals during their 12 hour light cycle, and animal early recovery after landing. This mission will be the first time that relatively large samples of monkeys and rats will be flown in space and also cared for and observed by man.

Callahan, P. X.↗

Space launch systems - Current United States plans and the next logical steps through 2000

The United States space transportation plans are discussed with emphasis on returning the Titan and the Shuttle to operational status. In particular, Shuttle enhancements via advanced solid rocket boosters and replacement of solid rocket boosters by liquid rocket boosters are examined. The Shuttle-C vehicle is then discussed as the next logical step that could provide a heavy launch capability in the early 1990s. The Shuttle-C will provide assured and flexible access to space for large Centaur-class payloads, for Space Station assembly, and for planetary missions.

Branscome, Darrell R.↗

Using computer graphics to design Space Station Freedom viewing

An important aspect of planning for Space Station Freedom at the United States National Aeronautics and Space Administration (NASA) is the placement of the viewing windows and cameras for optimum crewmember use. Researchers and analysts are evaluating the placement options using a three-dimensional graphics program called PLAID. This program, developed at the NASA Johnson Space Center (JSC), is being used to determine the extent to which the viewing requirements for assembly and operations are being met. A variety of window placement options in specific modules are assessed for accessibility. In addition, window and camera placements are analyzed to insure that viewing areas are not obstructed by the truss assemblies, externally-mounted payloads, or any other station element. Other factors being examined include anthropometric design considerations, workstation interfaces, structural issues, and mechanical elements.

Goldsberry, B. S.↗

Mars mission effects on Space Station evolution

The permanently manned Space Station scheduled to be operational in low earth by the mid 1990's, will provide accommodations for science, applications, technology, and commercial users, and will develop enabling capabilities for future missions. A major aspect of the baseline Space Station design is that provisions for evolution to greater capabilities are included in the systems and subsystems designs. User requirements are the basis for conceptual evolution modes or infrastructure to support the paths. Four such modes are discussed in support of a Human to Mars mission, along with some of the near term actions protecting the future of supporting Mars missions on the Space Station. The evolution modes include crew and payload transfer, storage, checkout, assembly, maintenance, repair, and fueling.

Askins, Barbara S.↗

Requirements and concept for an on-orbit construction facility for phase 1 Space Station Freedom

A construction facility attached to NASA's Space Station Freedom (SSF) will be required for the accommodation of assembly activities for large payloads, as well as demonstration of the on-orbit construction of future spacecraft. This facility's capabilities must be sufficiently flexible to address the wide variety of future spacecraft needs without compromising the SSF's phase 1 configuration. The proposed construction facility concept will incorporate a storage module, a construction turntable, equipment-attachment platforms, a surrogate payload bay structure, and a portable workstation. Attention is given to this configuration's resulting mass properties and control characteristics.

Buchan, Robert W.↗

Robotics Algorithms Provide Nutritional Guidelines

On July 5, 1997, a small robot emerged from its lander like an insect from an egg, crawling out onto the rocky surface of Mars. About the size of a child s wagon, NASA s Sojourner robot was the first successful rover mission to the Red Planet. For 83 sols (Martian days, typically about 40 minutes longer than Earth days), Sojourner - largely remote controlled by NASA operators on Earth - transmitted photos and data unlike any previously collected. Sojourner was perhaps the crowning achievement of the NASA Space Telerobotics Program, an Agency initiative designed to push the limits of robotics in space. Telerobotics - devices that merge the autonomy of robotics with the direct human control of teleoperators - was already a part of NASA s efforts; probes like the Viking landers that preceded Sojourner on Mars, for example, were telerobotic applications. The Space Telerobotics Program, a collaboration between Ames Research Center, Johnson Space Center, Jet Propulsion Laboratory (JPL), and multiple universities, focused on developing remote-controlled robotics for three main purposes: on-orbit assembly and servicing, science payload tending, and planetary surface robotics. The overarching goal was to create robots that could be guided to build structures in space, monitor scientific experiments, and, like Sojourner, scout distant planets in advance of human explorers. While telerobotics remains a significant aspect of NASA s efforts, as evidenced by the currently operating Spirit and Opportunity Mars rovers, the Hubble Space Telescope, and many others - the Space Telerobotics Program was dissolved and redistributed within the Agency the same year as Sojourner s success. The program produced a host of remarkable technologies and surprising inspirations, including one that is changing the way people eat

Source record↗

In-Space Transportation for NASA's Evolvable Mars Campaign

As the nation embarks on a new and bold journey to Mars, significant work is being done to determine what that mission and those architectural elements will look like. The Evolvable Mars Campaign, or EMC, is being evaluated as a potential approach to getting humans to Mars. Built on the premise of leveraging current technology investments and maximizing element commonality to reduce cost and development schedule, the EMC transportation architecture is focused on developing the elements required to move crew and equipment to Mars as efficiently and effectively as possible both from a performance and a programmatic standpoint. Over the last 18 months the team has been evaluating potential options for those transportation elements. One of the key aspects of the EMC is leveraging investments being made today in missions like the Asteroid Redirect Mission (ARM) mission using derived versions of the Solar Electric Propulsion (SEP) propulsion systems and coupling them with other chemical propulsion elements that maximize commonality across the architecture between both transportation and Mars operations elements. This paper outlines the broad trade space being evaluated including the different technologies being assessed for transportation elements and how those elements are assembled into an architecture. Impacts to potential operational scenarios at Mars are also investigated. Trades are being made on the size and power level of the SEP vehicle for delivering cargo as well as the size of the chemical propulsion systems and various mission aspects including Inspace assembly and sequencing. Maximizing payload delivery to Mars with the SEP vehicle will better support the operational scenarios at Mars by enabling the delivery of landers and habitation elements that are appropriately sized for the mission. The purpose of this investigation is not to find the solution but rather a suite of solutions with potential application to the challenge of sending cargo and crew to Mars. The goal is that, by building an architecture intelligently with all aspects considered, the sustainable Mars program wisely invests limited resources enabling a long-term human Mars exploration program.

Percy, Thomas K.↗

Tall Lunar Tower (TLT) Powering Exploration at the Moon's South Pole

Animation of a conceptual Lunar mission for the Tall Lunar Tower (TLT) robotic in-space assembly system. The landing, deployment, and operation of the tower assembly system is shown. A successful tower assembly and solar power payload is depicted at the lunar south pole. The video is intended to convey how an engineering development unit (EDU) demonstrated at NASA Langley Research Center may look when operated on the Lunar surface. The EDU models are shown in place of flight hardware. The animation was produced by the Advanced Concepts Laboratory with models provided by the TLT team.

Tall Lunar Tower↗

System and Methods for Deploying Payloads

Embodiments of the present invention include systems for launching primary or secondary payloads or actuating other launch vehicle or payload or instrumentation devices. The system includes an adapter assembly and at least one sequencer mounted to the adapter assembly. The sequencer includes: controller boards, each of the controller boards having a controller for controlling deployment of the payloads and data files; output ports coupled to the controller boards and configured to transmit signals from the controller boards to dispensers therethrough, deployment mechanisms containing the payloads, the adapter assembly having channels for accommodating the dispensers; and a detector coupled to the controller boards and adapted to detect an external signal and, in response to the external signal, to send an initiation signal to the controller boards. The system also includes at least one power supply coupled to the sequencer and adapted to provide an electrical power to the sequencer.

Ghassemieh, Shakib M.↗

System and methods for deploying payloads

Embodiments of the present invention include systems for launching primary or secondary payloads or actuating other launch vehicle or payload or instrumentation devices. The system includes an adapter assembly and at least one sequencer mounted to the adapter assembly. The sequencer includes: controller boards, each of the controller boards having a controller for controlling deployment of the payloads and data files; output ports coupled to the controller boards and configured to transmit signals from the controller boards to dispensers therethrough, deployment mechanisms containing the payloads, the adapter assembly having channels for accommodating the dispensers; and a detector coupled to the controller boards and adapted to detect an external signal and, in response to the external signal, to send an initiation signal to the controller boards. The system also includes at least one power supply coupled to the sequencer and adapted to provide an electrical power to the sequencer.

42 ENGINEERING↗