Search NASA⌕ Search

SEARCH · Search NASA

Results for “pilot modeling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

pbd-industrial-limit-of-performance (PBD limit of performance) v1.0.0

Software repository that contains models used for a paper about Platform-Based Design with limit of performance analysis for an industrial pilot study. This repository contains process and control models in Modelica and IDAES and scripts to develop an ML based controller that computes the control function that maximizes the techno-economic performance of cost and energy computed by the model. This software is meant to be released to reproduce the work described in a Journal publication that is now drafted with the working title "Energy System Limit of Performance Analysis using an Online Machine Learning Multi-Resolution Optimization Framework".

Amusat, Oluwamayowa [Lawrence Berkeley National La↗

Pilot-Scale Testing of an Integrated Circuit for the Extraction of Rare Earth Minerals and Elements from Coal and Coal Byproducts Using Advanced Separation Technologies

The primary objective of this project was to develop and demonstrate an integrated pilot-scale circuitry for recovering high-value rare earth elements (REEs) from coal and coal byproducts. The target performance was to produce a mixed REE product with content of at least two percent by weight on a dry mass basis in a cost-effective and environmentally benign manner. During the first nine months of the project period (Phase 2 Budget Period 2), pilot plant construction was completed including all field site startup activities such as permitting, engineering design, procurement/bidding, unit fabrication, site construction, equipment installation, module assembly, safety training, and circuit shakedown. During the remaining 21 months of project period (Phase 2 Budget Period 3), detailed field-testing activities were performed including feedstock sample collection and preparation, exploratory testing, circuit modification, detailed parametric study, and performance optimization. A detailed techno-economic analysis was performed based on the pilot plant testing findings which provided various scenarios for REE production. The project successfully accomplished the proposed target performance by producing mixed rare earth oxide (REO) with greater than 90% purity by weight in a continuous pilot scale operation from two distinctly different coarse refuse materials (i.e., West Kentucky No. 13 and Fire Clay coal seams), and at least three secondary sources (i.e., heap leach process and naturally formed acid mine drainage system). Project partners included the University of Kentucky, Virginia Tech, West Virginia University, Alliance Coal, Blackhawk Mining, Mineral Refining Company, and Mineral Separation Technologies. The pilot scale test facility was constructed at a former mining complex owned by Alliance Natural Resource Partners (Alliance Coal). The site was rehabilitated to accommodate the equipment installation, construction and fabrication, electrical power requirement, water line management and containment. The process units constructed and installed included X-ray sorting unit, crushing and grinding unit, physical separation unit, acid leaching unit, solvent extraction unit, and wastewater management unit. A rare earth mineral concentration unit was constructed as a standalone unit for flexible operation. A detailed environmental assessment and control plan was carried out to identify and quantify any potential impacts of the pilot-scale processing circuitry on the human and eco-system health and well-being. Corresponding mitigation strategies and control measures were provided. A conceptual flowsheet was developed to effectively remove thorium and uranium from high purity rare earth oxide mix or any potential radionuclide enriched stream. The two distinct feedstock materials were secured from the Blackhawk Mining Complex in eastern Kentucky where the Fire Clay (Hazard No. 4) seam is processed. The West Kentucky No. 13 (Baker) coarse refuse material was collected from an active process stream at an Alliance coal preparation plant located in western Kentucky. Characterization analysis indicated that both of feed materials generated from the two sources contained >300 ppm of TREEs on a dry whole mass basis which met the requirements for a qualified feed stock. The two feedstocks were further upgraded using a dual x-ray sorter to prepare the feed material for hydrometallurgical circuit. Thermal treatment on feed material prior to leaching was found to: 1) improve the leaching recovery of REEs, 2) increase the leaching kinetics, and 3) allow the leaching reaction to occur at lower acidity. Roasting at 600°C was selected as the pre-treatment condition for both West Kentucky No. 13 and Fire Clay coarse refuse material. Over 40% of leaching recovery was achieved by roasting West Kentucky No. 13 material having a top particle size of 3 mm in the pilot scale operation using 1.2M sulfuric acid leaching at 75OC. Initial pilot scale testing involved continuous operation of the pilot plant for 94 hours. The leaching unit was operated at solid-to-liquid ratio of 1 to 10 (w/v) using 0.5M sulfuric acid solution at a temperature of 75°C. The continuous solvent extraction circuit utilized rougher and cleaner units with DEHPA and TBP as the extractants. An innovative stripping circuit was developed to accumulate the REE concentration in the stripping solution to a level above 600 ppm. A bleed stream from the recycled strip solution was treated using oxalic acid precipitation which produced a high grade rare earth oxalate. The oxalate product was roasted to remove the oxalate which produced a rare earth oxide product having a purity greater 90%. Due to high concentrations of contaminant ions in the pregnant leach solution (PLS), a modified flowsheet was developed that involved pre-concentration of the REEs using multiple stages of precipitation and redissolution. The advantage of this process was improved removal of contamination before the downstream purification process and a significant cost reduction relative to the circuit that utilized the solvent extraction process. The modified circuitry included processes involving leaching, multistage precipitation, redissolution, and oxalate precipitation followed by roasting of the oxalate product. The circuit produced a mixed REO that was 92.96% pure from the initial test. A detailed parametric test plan was carried out which involved varying key parameters including solids feed rate, acid flowrate, acid concentration, multistage precipitation pH, redissolution pH, oxalate precipitation dosage and pH. The response variables included REE recovery, contaminant recovery, REO product grade and overall chemical consumption. Test results indicated that the acid-to-solid ratio is the key parameter to leaching efficiency as performance deteriorated with an increase in solids concentration. The optimal pH determined for REE precipitation and redissolution was 6.5 and 2.5, respectively. Additional tests were conducted to further improve the flowsheet. Recirculating a portion of the PLS to the feed of the leach tanks improved the leaching performance by lowering the pH of the leaching system and reducing the contamination recovery by shortening the residence time. Moreover, the removal of Al prior to REE precipitation significantly reduced the oxalic acid consumption in the oxalate precipitation circuit. The modified circuit produced over 90% grade REO by weight from both West Kentucky No. 13 and Fire Clay coarse refuse material in pilot scale continuous test programs. A case analysis model was developed to project the REE and major contaminants concentration in each PLS stream based on the leaching condition, pH cut point, and oxalic acid dosage. A correlation was established using empirical and semi-empirical models. Using the models, chemical consumption required for each stage was predicted based on the projected performance of the hydrometallurgy circuit. After identifying the optimum conditions, validation tests were carried out for the treatment of both West Kentucky No. 13 and Fire Clay coarse refuse materials in the pilot plant. The actual circuit performance and chemical consumptions were very close to the model predictions. Other than the two coarse refuse sources, several secondary feedstocks were also tested in the pilot plant facility. A “heap leach” system was constructed using the coarse refuse material generated from cleaning the West Kentucky No. 13 seam coal. Using the two stage SX rougher and cleaner circuit, a concentrate with a grade >90% REO was produced while recovering >97% of the REEs from the heap leach PLS. Naturally generated acid mine drainage (AMD) from West Kentucky No.13 mine was processed using the multistage precipitation circuit in the pilot plant in a test conducted for a period of 32 hours. The final grade of the mix RE oxide produced from the AMD was 90.84% with an overall circuit recovery of 64%. The primary source of REE was the selective precipitation steps involving iron and aluminum rejection. The hydrophobic-hydrophilic separation (HHS) process was proven to effectively recover coal from fine waste materials. For REM recovery, the HHS process was able to produce concentrates at grades of approximately 1.8% REE on an ash basis; however, recovery values were typically low, <10%, under the optimal conditions determined in the laboratory-scale testing. Staged testing of the pilot-scale HHS process for coal recovery and semi-continuous laboratory testing for REM testing showed that a total concentration ratio of more than 15x was observed for the REM recovery process. A circuit simulation package was developed for REE extraction and purification using a spreadsheet-based platform (Microsoft Excel). The REESim circuit simulation package is configured to track the mass and volume flows of components passing through a series of unit operations specified and configured by the user. The mass rates can then be utilized by the user to determine important performance indicators such as product mass yields, concentrate purity levels, element-by-element recoveries, and so forth. The techno-economic analysis showed that the roasting and leaching operations were the most expensive capital items, each contributing approximately 30% to the total capital cost. One notable contributor to the high production costs was the low REE recovery observed in the pilot scale trials. The product basket price was shown to have a strong influence on the economic viability of the scenarios, with the scandium price being the most significant influencer. Operating cost was shown to be extremely sensitive to REE recovery, REE feed grade, and leaching acid consumption. An analysis of ten different scenarios for a 500 t/h commercial operation revealed that three were economically favorable, producing internal rates of return varying from 27.7% to 33.1% and payback periods of 4 to 5 years. The project successfully developed and demonstrated a process to recover REEs from coal and coal byproducts in a pilot-plant operation which consistently produced over 90% grade REO mix from varies types of feedstocks. Commercialization analysis showed that the technology readiness level successfully achieved TRL 6 at the end of the project and demonstrated the need and the potential for scaling the process to further advance the technologies toward the goal of providing a domestic supply of REEs at a commercial scale.

01 COAL, LIGNITE, AND PEAT↗

Transforming Aeration Energy in Water Resource Recovery Facilities (WRRFs) through Suboxic Nitrogen Removal (Final Report)

The objective of this project was to advance two key technological components—aeration control strategies and process design methodologies—to support the development and broader adoption of suboxic biological nitrogen removal (SBNR). The project focused on achieving the following three goals: • Enhance Model Predictive Control (MPC) Technology: Advance the DO/Nmaster MPC platform from its initial 2018 pilot deployment at the Chico Water Resource Recovery Facility in California to full-scale integration. This included partnering with a blower technology commercialization partner and incorporating machine learning (ML) capabilities to enable nationwide deployment. • Bridge Knowledge Gaps in SBNR Process Design: Address fundamental gaps in SBNR process understanding through controlled pilot-scale testing at a dedicated pilot facility. These efforts supported the development of robust kinetic models to inform reliable SBNR control, operational strategies, and design frameworks. • Demonstrate Full-Scale Implementation of Low DO/SBNR with ML: Transition low dissolved oxygen (DO)/SBNR coupled with ML from pilot-scale trials to full-scale demonstration in flow-through biological nutrient removal (BNR) systems, with the goal of enabling scalable, nationwide adoption in activated sludge treatment processes. The project included demonstration of SBNR at the pilot scale as performed by Hampton Roads Sanitation District (HRSD) and at the full-scale as performed by the Los Angeles County Sanitation Districts' (LACSD) Pomona Water Reclamation Plant (POWRP).

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Assessment of a Detailed Biomass Pyrolysis Kinetic Scheme in Multiscale Simulations of a Single-Particle Pyrolyzer and a Pilot-Scale Entrained Flow Pyrolyzer

A detailed biomass pyrolysis kinetic scheme was assessed in the multiscale simulations of a single-particle pyrolyzer with slow pyrolysis and a pilot-scale entrained flow pyrolyzer with fast pyrolysis. The detailed kinetic scheme of biomass pyrolysis developed by the CRECK group consists of 32 reactions and 58 species. A multiscale simulation model was developed, where the CRECK kinetics was employed to simulate biomass pyrolysis reactions, a one-dimensional particle model was utilized to simulate the intraparticle transport phenomena, and the particle-in-cell (PIC) model was employed to simulate the hydrodynamics. The multiscale model was first applied to simulate a single-particle pyrolysis experiment. The simulation with nonisothermal particles matched the experimental data better than the simulation with isothermal particles. Then the multiscale model was applied to simulate the pilot-scale entrained flow pyrolyzer. In this case, the simulation with isothermal particles matched the experimental data better than the simulation with nonisothermal particles. The reason for this difference might be that the kinetics itself already partially included the intraparticle transport effect as it was fitted using both TGA data (slow pyrolysis of small size biomass) and fluidized bed data (fast pyrolysis of relatively large size biomass). This study provides some insights into biomass pyrolysis kinetics development and pyrolyzer multiscale simulation for a future study.

09 BIOMASS FUELS↗

Conceptual design of HTS magnets for fusion nuclear science facility

Second-generation high temperature superconductors (HTS) are available for producing >20 T at the magnet bore compared to 13–16 T for lower temperature superconducting (LTS) toroidal field magnets proposed in recent fusion energy systems studies (FESS) of Fusion Nuclear Science Facility (FNSF). HTS may enable higher fusion power density and smaller device size. High current density cables of multi-layered REBCO tapes have achieved >10 kA at 4–20 K operation in short sample tests for fusion. High current density cables are required for engineering design of FNSF to allow space for interior plasma components. High current density HTS magnets are particularly attractive in reducing the size of a fusion device, beneficial for compact tokamaks, due to their space constraints. Successful HTS magnet development may enable the design of smaller and cheaper fusion pilot plants with a mission of demonstrating net electricity. It may also offer significant cost and performance advantages in non-fusion applicants such as nuclear magnetic resonance (NMR) and magnetic resonance imaging (MRI). Furthermore, we developed HTS magnet design concepts for a compact FNSF radial build in order to define the coil size, winding pack mechanical loading and engineering requirements. Partnering with vendors in the US, PPPL is also testing high current cable prototypes aiming at enabling low cost cable technology toward 100 A/mm 2 engineering current density over the winding pack desired in high field model coil development for compact fusion pilot plants.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Isobutanol Octane Blending Model with Gasoline: Cooperative Research and Development Final Report, CRADA Number CRD-17-00689

The purpose of this agreement between the National Renewable Energy Laboratory (NREL) and Gevo, under the DOE Small Business Vouchers Pilot, is to develop a predictive octane blending model for isobutanol and blendstocks for oxygenated blending (BOBs). Validated models of ethanol octane blending effects are currently used in refinery blending models. While it is known that isobutanol increases octane when blended into BOBs, the effect is non-linear, and dependent on hydrocarbon blendstock properties. Because no predictive model currently exists for isobutanol and BOBs, blenders must perform expensive and time-consuming tests to determine the octane effect on each batch of finished fuel. NREL will make basic measurements of research octane number (RON) and motor octane number (MON) of finished gasoline-isobutanol blends prepared in a broad range of BOBs. The key properties and detailed composition of BOBs utilized will be measured by NREL. Using these measured fuel properties, NREL will develop a predictive octane blending model for isobutanol in BOBs that can be used by terminals to further reduce barriers to market penetration of isobutanol.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Modeling and Uncertainty Quantification of CESAR1 Solvent System for Post-Combustion Capture

This presentation is focused on the development of the CESAR1 solvent system model by the CCSI2 team and validation with pilot plant data from Technology Centre Mongstad. It also serves as an update of previous work by incorporating a new thermodynamic model of the system developed by collaborators from Heriot-Watt University through the SCOPE program. Finally, it includes some discussions on future directions of the project including collaboration with SCOPE to add the capability of amine emissions prediction along with some parametric uncertainty quantification work on the submodels.

Morgan, Joshua↗

BETO 2021 Peer Review - 3.4.2.302 - Process Scale Up for Production Environments

This project supports the Department of Energy's Bioenergy Technology Office mission of transitioning bioenergy technologies to market by de-risking integration, developing scaling relations and modeling that de-risks scale up, and providing a feedback loop with lower TRL projects to understand process and technology fundamentals. Two objectives were pursued during this merit cycle. First, the Thermal and Catalytic Process Development Unit (TCPDU), a 0.5 ton/day pilot plant, was used to validate kinetic models developed by the Consortium for Computational Physics and Chemistry (CCPC). Validating the models accurately predict product yields and composition is a first step toward de-risking a common industry failure - taking too large of steps between scales. In addition, these models help with design and troubleshooting of new unit operations for the TCPDU. The second objective was to conduct the FY22 verification campaign around ex situ CFP. The primary challenge of this effort was the coordination of multiple national labs and projects. This was overcome by a dedicated leadership role and effective communication strategy between the projects. Currently the project is undergoing a pivot based on a stagegate decision to not conduct the verification campaign in the TCPDU and it is focused on closing out the CFP technology at a smaller scale by the end of the current fiscal year.

BIOMASS FUELS↗

A Domestic Program for Liquid Metal PFC Research in Fusion

While high-Z solid plasma-facing components (PFCs) are the leading candidates for reactors, it is unclear that they can survive the intense plasma material interaction (PMI). Liquid metals (LM) PFCs offer potential solutions since they are not susceptible to the same type of damage, and can be “self-healing”. Following the Fusion Energy System Study on Liquid Metal Plasma Facing Components study that recently was completed by Kessel et al. (Fusion Sci Technnol 75:886, 2019) a domestic LM PFC design program has been initiated to develop reactor-relevant LM PFC concepts. This program seeks to evaluate LM PFC concepts for a Fusion Nuclear Science Facility (FNSF) or a Compact Pilot Plant via engineering design calculations, modeling of PMI and PFC components and laboratory experiments. The latter involves experiments in dedicated test stands and confinement devices and seeks to identify and answer open questions in LM PFC design. The new national LM PFC program is first investigating lithium as the plasma facing material for a flowing divertor PFC concept. Several flow speeds will be evaluated, ranging from ~ cm/s to m/s. The surface temperature will initially be held below the strongly evaporative limit in the first design; higher temperatures with strong evaporation will be considered in future concepts. Other topics of interest include: understanding of the hydrogen and helium interaction with the liquid lithium; single effect experiments on wetting, compatibility and embrittlement; and prototypical experiments for control and characterization of flowing LM. A path to plasma and future tokamak exposure of these concepts will be developed.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

The composition of gases from a diffusion flame above longleaf pine needle fuel beds

The gas and tar composition of a diffusion flame from longleaf pine needles is currently poorly understood and more data are needed to fill in the gap between pyrolysis data and smoke plume data, thus improving physical and chemical modeling of wildland smoke formation. A pilot experiment to measure light gas and tar composition of such a flame is described for three flame regions: persistent flame (flame base), intermittent flame, and smoke plume. Flame gases from 24 experimental fires were collected in canisters and analyzed using EPA method TO-14A for CO 2 , CO, H 2 , CH 4 , and C 2 to C 7 hydrocarbon gases. Condensed gas (tar) samples were collected and analyzed using GC/MS. Other light gases were measured using FTIR spectroscopy. Results from compositional data analysis suggest significant differences in (relative) concentration of compounds detected in the three regions of the flame. Statistical tests for differences in flame zones were performed using the canister data: Concentration of hydrocarbons relative to CO and CO 2 decreased from the persistent flame zone above the pyrolyzing needles through the intermittent flame region into the flame-free plume. This was likely due to both chemical reactions (oxidation) occurring in the flame as well as the introduction of air into the flame/plume by entrainment.

Biomass↗

Advances and challenges in CO2 foam technologies for enhanced oil recovery in carbonate reservoirs

Utilization of surfactants for generating foam has the potential for fluid-mobility control during CO2 flooding processes, leading to improved oil recovery. This manuscript is a review of the most important aspects for the design of CO2-foams with mobility control in carbonate reservoirs, including recent advances in novel surfactants and analytical techniques for analysis of surfactant adsorption on carbonate minerals and their thermal stability. Several key parameters and properties regarding foam transport in porous media are reviewed such as, the minimum pressure gradient required for foam generation, the effects of the partition coefficient of a CO2-soluble surfactant on foam transport in rock cores, visualization of foam flow by either microfluidic or PET/CT imaging processes in heterogeneous or fractured systems and the effect of oil on foam transport under reservoir conditions. Also are discussed the most recent advances of two major foam modeling methods, including the semi-empirical STARS foam model and the population balance model, as well as CO2 foam pilot tests and the factors governing their successes.

Jian, Guoqing↗

Automated Transit Fleet Electrification Planning in Response to Route Dynamics, Vehicle Utilization, and Local Climate

Transit electrification is difficult, requiring the consideration of many factors including route dynamics, vehicle utilization, and local ambient temperatures. Incumbent planning tools typically rely upon static vehicle efficiency numbers which do not consider local factors specific to each fleet. This paper summarizes a collaboration between NREL and Microgrid Labs, which produced an automated sizing tool capable of producing vehicle battery and motor sizing for drop-in electrification. Furthermore, the workflow also exports the electric-vehicle supply equipment needed to support fleet electrification. The paper summarizes the model theory and includes a sample pilot study performed in support of the Via Mobility transit fleet.

33 ADVANCED PROPULSION SYSTEMS↗

RePOWERD: Restoration of Power Outage from Wide-area Severe Weather Disruptions

The purpose of the RePOWERD project is to develop a probabilistic and a simulation based power restoration forecasting model for tropical storms based on geographic utility service areas, impacts to energy infrastructures and transportation networks, time-varying customer outage number, crew information (i.e., crew size, crew staging requirements), and utility restoration plans. Energy infrastructure is a critical lifeline essential for the United States’ national and economic security. Like other critical infrastructures, this infrastructure is aging and is at a high risk of damages from extreme weather events. Based on the number of reported outages in EAGLE-I during 2020 and 2021, it is evident that the current energy infrastructure is not equipped to handle extreme event impacts and will contribute to significant outages. From a resilience perspective, it is essential to forecast restoration time in the event of a severe weather induced power outage to assist the US Department of Energy, emergency managers, and first responders with resource planning. This project contributes to this crucial need. This report details the models, that were developed in this pilot study, to determine the rate of restoration and estimated time of restoration (ETR) during tropical storm events within counties and utility service areas based on damage to energy infrastructures and total number of customers experiencing outages.

24 POWER TRANSMISSION AND DISTRIBUTION↗

The Impact of Ethylenediaminetetraacetic Acid (EDTA) on the Sorption of Nd(III), Th{sup (IV)}, and U(VI) onto Dolomite in WIPP-Relevant Brines, GWB and ERDA-6 - 20356

Storage of legacy, transuranic waste at the Waste Isolation Pilot Plant (WIPP) requires accurate risk models for performance assessments. These models must predict the long-term fate and transport of contaminants in the WIPP and surrounding environment. Laboratory support is necessary for the development of an accurate model through better understanding of contaminant behavior in the WIPP. The WIPP is a deep geologic repository that is characterized by high ionic strength due to evaporite deposits in the Salado formation (porewaters up to 7.4 M). High concentrations of sodium chloride (NaCl), calcium chloride (CaCl{sub 2}), and magnesium chloride (MgCl{sub 2}) are particularly of concern due to their potential impact on solubility and ultimately transport of contaminants of concern. Additionally, ligands capable of forming strong complexes with metals are found in significant concentrations in the WIPP environment due to their disposal from waste processing and formation during degradation of repository components (e.g. cellulose degradation by calcium hydroxide in cement). Consequently, there is a need to investigate the fate and transport of contaminants in the WIPP environment with a focus on the effects of high ionic strength and strongly coordinating ligands. Contaminants of high concern include the actinides (U(VI), Pu(IV), and Am(III)). Laboratory support of the WIPP modeling efforts was provided by this research. A series of batch experiments were utilized to study the impact of ionic strength, contaminant concentration, and the presence of ethylenediaminetetraacetic acid (EDTA) on the sorption of Nd(III), Th(IV), and U(VI) onto dolomite, a carbonate mineral found within the Culebra formation. The Culebra formation is the most transmissive layer above the WIPP, making transport of contaminants the most likely route in previous risk assessments. Two brines specifically designed to imitate conditions within the WIPP environment were used in these experiments. The U.S. Energy Research and Development Administration Well 6 (ERDA-6, 95%) brine simulates a low Mg environment, while the generic weep brine (GWB, 95%) simulates the WIPP environment with a high Mg concentration. Mg is added to the repository in the form of MgO as an engineered barrier and is naturally present in some formations. It is expected to scavenge carbonate from solutions decreasing formation of the highly soluble and competitive uranium-carbonate complexes. EDTA is used during manipulations of nuclear materials due to its ability to form strong, stable complexes with the actinides and may be found in high concentrations (up to 0.08 mM) within the WIPP as waste canisters degrade. Further, it may provide additional avenues for unwanted transport of contaminants. Nd(III) and Th(IV) were used as stable analogues of Am(III) and Pu(IV), respectively, to represent the most common oxidation states of actinides in the WIPP environment in addition to U(VI). The potential for colloid formation was also investigated with low and high concentrations of contaminants (10 and 1000 μg/L) using three size-dependent particle separation steps. The results of this research provide a better understanding of potential behavior of actinides in the presence of EDTA and within WIPP-relevant brines. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Autoregressive distributed lag-based dynamic uniformity modeling and monitoring approaches for superconductor manufacturing

High-temperature superconductors (HTS), known for their high efficiency and low energy loss, have found profound applications across various fields, driving the demand for long, uniformly performing tapes. However, ensuring uniform performance over extended lengths of HTS tapes, often characterized by the consistency of critical current, remains challenging due to fluctuations in growth conditions during manufacturing. Here, to elucidate the mechanisms underlying variations in tape uniformity and enable real-time monitoring of associated parameters, we propose an Autoregressive Distributed Lag (ADL)-based Dynamic Uniformity Modeling and Monitoring (ADUM2) approach. This method integrates uniformity measurement, the identification of critical process parameters and real-time monitoring within the manufacturing process. The ADUM2 approach is applied to the advanced metal organic chemical vapor deposition (A-MOCVD) process, a pilot-scale method for superconductor manufacturing. Our model demonstrates superior performance compared to benchmark methods, accounting for over 80% of the total variance in the data and identifying 13 key process parameters influencing the uniformity of HTS tapes. This study offers significant insights into the high-temperature superconductor manufacturing process and holds the potential to facilitate the production of cost-effective, uniformly performing long superconducting tapes in the future.

autoregressive distributed lag analysis↗

Describing the Mechanism of Instability Suppression Using a Central Pilot Flame With Coupled Experiments and Simulations

Pilot flames are commonly used to extend combustor operability limits and suppress combustion oscillations in low-emissions gas turbines. Combustion oscillations, a coupling between heat release rate oscillations and combustor acoustics, can arise at the operability limits of low-emissions combustors where the flame is more susceptible to perturbations. While the use of pilot flames is common in land-based gas turbine combustors, the mechanism by which they suppress instability is still unclear. In this study, we consider the impact of a central jet pilot on the stability of a swirl-stabilized flame in a variable-length, single-nozzle combustor. Previously, the pilot flame was found to suppress the instability for a range of equivalence ratios and combustor lengths. We hypothesize that combustion oscillation suppression by the pilot occurs because the pilot provides hot gases to the vortex breakdown region of the flow that recirculate and improve the static, and hence dynamic, stability of the main flame. This hypothesis is based on a series of experimental results that show that pilot efficacy is a strong function of pilot equivalence ratio but not pilot flow rate, which would indicate that the temperature of the pilot products as well as the combustion intensity of the pilot flame play more of a role in oscillation stabilization than the length of the pilot flame relative to the main flame. Further, the pilot-flame efficacy increases with pilot-flame equivalence ratio until it matches the main-flame equivalence ratio; at pilot equivalence ratios greater than the main equivalence ratio, the pilot-flame efficacy does not change significantly with pilot equivalence ratio. To understand these results, we use large-eddy simulation (LES) to provide a detailed analysis of the flow in the region of the pilot flame and the transport of radical species in the region between the main flame and pilot flame. Furthermore, the simulation, using a flamelet/progress variable-based chemistry tabulation approach and standard eddy viscosity/diffusivity turbulence closure models, provides detailed information that is inaccessible through experimental measurements.

42 ENGINEERING↗

Packages of Distributed Energy Technologies Demonstrating Demand Flexibility at Community Scale

The combination of increased electric load growth across all sectors, deferred electrical infrastructure investment, and other factors resulting in variable electric power supply, has created technical challenges to maintaining a resilient and reliable grid. Many federal, regional, and local efforts are in play to modernize the electric grid, including advancing building technologies and distributed energy resources (DERs) that are utilizing smarter controls to become responsive to both occupant and grid needs. This report reviews ten pilot projects demonstrating how groups of buildings combined with behind-the-meter (BTM) DERs such as electric vehicle (EV) charging, battery storage, flexible HVAC and domestic hot water systems, and photovoltaic systems can reliably and cost effectively provide grid services. Each of the ten pilot projects aim to deliver both energy efficiency and demand flexibility (DF) while supporting load growth. The ten demonstration teams are piloting flexible DER packages across diverse communities of residential and commercial buildings to address a variety of regional grid needs. The outcomes of these pilot projects will be used to inform future scaling through utility program development. This paper characterizes the ten teams, showcasing the decision-making process used by each group to develop their packages (Section 2), the grid services they plan to deliver (Section 3), the types of DER packages selected for deployment within building sectors (Section 4) and trends between building sector, DER types, and grid services In order to achieve community scale benefits, the pilot projects must utilize aggregated control mechanisms for coordinating buildings and DERs together. Several types of coordinated control architectures have evolved amongst the teams, influenced by use type, existing market conditions, and integration type. Three coordinated controls architectures have been characterized, highlighting their use cases, benefits, challenges, and tradeoffs in their design. These insights can aid utilities, control vendors, and developers in scaling community-level energy systems (Paul, 2024). Ultimately, the technology packages selected by the ten teams will be coordinated to provide power system services, also known as grid services. Insights from these demonstrations will be useful for grid operators, regulators, aggregators and other stakeholders as they look to deploy demand flexible resources as grid services in the future. The grid services that each team is targeting for demonstration are described in Section 3 and Section 4. Methods for evaluating the grid services have been described in the paper Metrics for Evaluating Grid Service Provision from Communities of Grid-interactive and Efficient Buildings and other DER (MacDonald, 2023). To identify technology packages for demonstration, Section 2 shows that project teams used a range of analysis approaches, including building energy modeling, AMI data analysis, cost-benefit frameworks, and utility pilot data. Some teams emphasized technical modeling to quantify grid impacts and demand reduction potential, while others prioritized economic evaluations, stakeholder input, or exploratory pilots to inform deployment decisions. This diversity reflects the need to tailor selection methods to project goals, available data, and organizational context. Section 5 discusses trends between the DER technologies deployed and the grid service provisions from each team. Residential buildings (multifamily and single family) lean towards technologies that enhance energy efficiency (e.g. weatherization upgrades, smart thermostats) and onsite power generation integration (e.g. solar PV). Commercial building demonstrations prioritize technologies that ensure operational reliability (e.g. battery storage) and centralized energy management systems and optimization solutions. Teams that are deploying controllable storage-based technologies are more likely to provide grid services that require a near real-time response. Teams incorporating load shifting technologies like smart thermostats with HEMs are likely to include energy markets participation and customer bill management offerings. Campus demonstrations are adopting diverse sets of DERs to emphasize renewable generation, paired with centralized control. This section also describes technologies that were considered during project planning but ultimately excluded from final deployment. These demonstrations reveal that effective DER package design should be tailored to building type, customer segment, and construction vintage. Multifamily buildings benefit from centralized HVAC upgrades and supervisory controls, while single-family homes are well-suited for individualized technologies like solar, storage, and smart home energy monitors. Commercial and campus settings prioritize EMIS integration and load optimization. New construction enables cost-effective integration of DER-ready infrastructure, whereas retrofits require deployments aligned with owner and tenant value streams. For utility program planners, early coordination with developers and building owners, paired with segmented and modular program offerings, can improve adoption, scalability, and grid impact.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Cost Drivers for a Tokamak-Based Compact Pilot Plant

A comprehensive systems code that includes a range of physics and engineering considerations along with a simplified costing model has been utilized to evaluate the primary cost drivers for a compact tokamak pilot plant. The systems code has been benchmarked against several tokamak reactor designs and is utilized with sophisticated optimization algorithms to develop optimal solutions for a set of user-specified assumptions and design constraints. Here, in contrast to previous models that have focused on the cost of electricity as the key cost metric, this study uses the estimated capital cost of the facility. The analysis suggests that a pilot plant with the following features may offer potential for a cost-attractive pilot plant: A ~ 3, H 98y2 > 1.5, P net = 200 MW, 𝜏 𝑝⁢𝑢⁢𝑙⁢𝑠⁢𝑒 ~ 1 to 2 h utilizing rare-earth barium copper oxide (REBCO) magnet technology and a plug-bucked central solenoid/toroidal field (CS/TF) magnet support structure. While REBCO magnets offer some advantages relative to Nb 3 Sn magnets in all cases, the most gain is obtained when combined with the plug-bucked CS/TF bucking solution. Pulsed operation reduces capital cost requirements relative to steady-state operation, especially at low confinement. Cost sensitivity studies indicate that there are significant cost uncertainties associated with the achievable confinement quality, tritium breeding capability, attainable thermal efficiency, and achievable neutron wall loading, suggesting that these areas are the most critical areas in reducing the cost risk for a compact tokamak pilot plant. Further cost sensitivity studies indicate that the estimated cost is most sensitive to the underlying cost of the magnetic coils, providing further impetus to better establish cost-effective means for producing fusion magnets.

Compact pilot plant↗