Search NASA⌕ Search

SEARCH · Search NASA

Results for “planetary sampling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Independent Scientific Review of Biological Assumptions and Planned Ultraviolet Treatment for Mars Sample Return Backward Planetary Protection

The Backward Planetary Protection Study Team (“the Study Team”), assembled by the Office of the Chief Scientist (OCS) at the request of the Office of Planetary Protection (OPP), has conducted numerous detailed discussions on the potential use of an active ultraviolet (UV) approach for minimizing or eliminating biological contamination of the exterior of the planned Orbiting Sample container (OS) of the Mars Sample Return (MSR) mission. This review of the backward planetary protection (BPP) considerations for the MSR mission focused on two key parameters that are opportunities for further process development to support implementation of planetary protection practices in meeting mission requirements. These parameters include: 1) Sub-cellular biological assumptions – should Mars missions consider self-replicating organisms only or do they need to consider non-self-replicating entities without a cellular organization such as viruses, prions, etc. and macromolecules capable of genetic information transfer, as well? 2) UV biocidal impact – what is the UV fluence in the Mars atmosphere and its associated potential biocidal credit? The assembled subject matter experts (SMEs) in the Study Team are listed in Appendix A, with a brief description of each member’s relevant expertise.

Mamta Patel Nagaraja↗

Boeing: Arc Jet Exposure of Ablative Non-Oxide CMC TPS for Planetary Probe and Sample Return Applications

NASA Game Changing Development (GCD) provided Boeing support under a Space Act Agreement (SAA) for arc jet sample design, CFD support and arc jet test time of stagnation and shear models for 3 Boeing TPS materials: BLA (Boeing Lightweight Ablator, 18, 21 and 22 densities), BPA (Boeing Phenolic Ablator, standard, graded density, or without reinforcement) and Non-oxide high temperature ceramic composite for structurally integrated TPS (SITPS). Results: For BLA, tested successfully to 500 W/cm² heat flux and heat loads up to 12 kJ/cm² with shear loads up to 370 Pa. The BPA 2017 formulation tested successfully to 1500 W/cm² and 80 kJ/cm², with shear loads up to 250 Pa. For SITIPS, Boeing fabricated C/SiC laminate materials survived testing in shear.

commercial space↗

A High-Reliability Photoelectric Detection System for Mars Sample Return’s Orbiting Sample

The Mars Sample Return campaign is an endeavor of unprecedented technological complexity and coordination that attempts to answer fundamental questions about the habitability of Mars by returning the first samples of Martian material to Earth for analysis. The third mission in the campaign consists of the NASA-provided Capture, Containment, and Return System (CCRS) onboard the European Space Agency’s Earth Return Orbiter, which will retrieve the Orbiting Sample (OS) container from its orbit around Mars. Retrieving a passive sample container from a planetary orbit has never been attempted by any spacecraft and requires the development of new technology to succeed in this ambitious task. This paper introduces the high-reliability Capture Sensor Suite (CSS), a novel optical detection system that provides CCRS with the capability to autonomously detect the OS as it is captured. This article will discuss the challenges and requirements for the fault-tolerant design of the CSS.

planetary sampling↗

Developing a Relationship Between LIBS Ablation and Pit Volume for In Situ Dating of Geologic Samples

In planetary exploration, in situ absolute geochronology is an important measurement. Thus far, on Mars, the age of the surface has largely been determined by crater density counting, which gives relative ages. These ages can have significant uncertainty as they depend on many poorly constrained parameters. More than that, the curves must be tied to absolute ages to relate geologic timescales on Mars to the rest of the solar system. Thus far, only the lost lander Beagle 2 was designed to conduct absolute geochronology measurements, though some recent attempts using MSL Curiosity show that this investigation is feasible (Reference Farley here) and should be strongly encouraged for future flight.

ablation↗

Lunar and Planetary Science XXXV: Lunar Sample Analysis

The titles in this section include: 1) Global Mixing as a Mechanism for Compositional Anomalies of Agglutinitic Glasses; 2) Electron Microscopy of Apollo 12 Glass Spherules; 3) 40Ar-39Ar Geochronology on Apollo 12 Regolith; 4) LSCC Apollo and Luna Soil Analyses: Update of Soil Evolution Model; 5) Planetary Regolith Microstructure: An Unexpected Opposition Effect Result; 6) Infrared Spectroscopy on a Microscopic Scale: Investigating the Technique of Microspectroscopy and Its Application to a Lunar Breccia; 7) The Most Reduced Rock from the Moon - Apollo 14 Basalt 14053: Extreme Reduction Entirely from a Re-Heating Event.

Source record↗

Automation and AI in Space Drilling

Future planetary surface sampling missions, such as delving past the near-surface ice layers on Mars in search of organics and possibly signs of past/extant life, will require lightweight, low-mass planetary drilling and sample handling. Unlike terrestrial drills, these exploration drills must work dry (without drilling muds or gas), blind (no prior local or regional seismic or other surveys), and light (very low downward force or weight on bit, and perhaps 100 W available from solar power or batteries). Given the lightspeed transmission delays to Mars and outward, an exploratory planetary drill cannot be controlled directly from Earth. Drills that penetrate deeper than a few centimeters are likely to get stuck if operated open-loop (the MSL drill only penetrates 5 cm, and the MER Rock Abrasion Tools 5 mm by comparison), so some form of local drill control is required. In the relatively near-term, human crews cannot be presumed to be available for surface instrument teleoperation. Therefore highly automated drill and sample-transfer operations will be required, to explore the subsurface with the ability to safe robotic drilling systems and recover and continue on from the most probable fault conditions. Current automation, scheduling and diagnostic approaches will be discussed that roughly track the actions and roles of humans in terrestrial manual drilling operations.

drill automation↗

A Probabilistic Mass Estimation Algorithm for a Novel 7- Channel Capacitive Sample Verification Sensor

A document describes an algorithm created to estimate the mass placed on a sample verification sensor (SVS) designed for lunar or planetary robotic sample return missions. A novel SVS measures the capacitance between a rigid bottom plate and an elastic top membrane in seven locations. As additional sample material (soil and/or small rocks) is placed on the top membrane, the deformation of the membrane increases the capacitance. The mass estimation algorithm addresses both the calibration of each SVS channel, and also addresses how to combine the capacitances read from each of the seven channels into a single mass estimate. The probabilistic approach combines the channels according to the variance observed during the training phase, and provides not only the mass estimate, but also a value for the certainty of the estimate. SVS capacitance data is collected for known masses under a wide variety of possible loading scenarios, though in all cases, the distribution of sample within the canister is expected to be approximately uniform. A capacitance-vs-mass curve is fitted to this data, and is subsequently used to determine the mass estimate for the single channel s capacitance reading during the measurement phase. This results in seven different mass estimates, one for each SVS channel. Moreover, the variance of the calibration data is used to place a Gaussian probability distribution function (pdf) around this mass estimate. To blend these seven estimates, the seven pdfs are combined into a single Gaussian distribution function, providing the final mean and variance of the estimate. This blending technique essentially takes the final estimate as an average of the estimates of the seven channels, weighted by the inverse of the channel s variance.

Wolf, Michael↗