Search NASA⌕ Search

SEARCH · Search NASA

Results for “planning scheduling optimization”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Analysis and Optimization of Test Plans for Advanced Exploration Systems Reliability and Supportability

Future crewed exploration missions beyond Low Earth Orbit (LEO) will operate farther from Earth and be logistically isolated for longer than any previous human spaceflight mission. Under these conditions, supportability and reliability willbestronger drivers of mission mass and risk than they have been in the past. Items with high failure rates, or uncertain failure rates, can result in high spares mass requirements and/or high risk on deep space missions. Testing is a critical element of system development which provides the opportunity to identify and resolve design issues, defects, or other failure modes before they cause problems during a mission. Reliability growth programs can reduce failure rates by identifying and remove failure modes via design changes, and long-duration life testing can provide valuable data to reduce failure rate estimate uncertainty and verify (to some level of confidence) that components are as reliable as expected. Testing activities take time and resources, however, and must be incorporated into program plans in order to be fully effective. This paper presents an integrated reliability test plan analysis and optimization methodology, which has been used to inform Advanced Exploration Systems (AES) Life Support Systems (LSS) ground test planning for future missions. The methodology determines the optimal number of test units to purchase and allocation of test time –split between reliability growth and uncertainty reduction testing –across a given set of items in order to minimize spares mass for a given mission under constraints on total test cost and schedule. Model outputs also include expected spares mass after testing and the expected number of modifications or refurbishments during testing, both of which can inform program planning. Discussion of the model, conclusions, and future work are also presented.

Testing↗

Practical considerations in aeroelastic design

The structural design process for large transport aircraft is described. Critical loads must be determined from a large number of load cases within the flight maneuver envelope. The structural design is also constrained by considerations of producibility, reliability, maintainability, durability, and damage tolerance, as well as impact dynamics and multiple constraints due to flutter and aeroelasticity. Aircraft aeroelastic design considerations in three distinct areas of product development (preliminary design, advanced design, and detailed design) are presented and contrasted. The present state of the art is challenged to solve the practical difficulties associated with design, analysis, and redesign within cost and schedule constraints. The current practice consists of largely independent engineering disciplines operating with unorganized data interfaces. The need is then demonstrated for a well-planned computerized aeroelastic structural design optimization system operating with a common interdisciplinary data base. This system must incorporate automated interfaces between modular programs. In each phase of the design process, a common finite-element model for static and dynamic optimization is required to reduce errors due to modeling discrepancies. As the design proceeds from the simple models in preliminary design to the more complex models in advanced and detailed design, a means of retrieving design data from the previous models must be established.

Rommel, B. A.↗

Software for Optimizing Quality Assurance of Other Software

Software assurance is the planned and systematic set of activities that ensures that software processes and products conform to requirements, standards, and procedures. Examples of such activities are the following: code inspections, unit tests, design reviews, performance analyses, construction of traceability matrices, etc. In practice, software development projects have only limited resources (e.g., schedule, budget, and availability of personnel) to cover the entire development effort, of which assurance is but a part. Projects must therefore select judiciously from among the possible assurance activities. At its heart, this can be viewed as an optimization problem; namely, to determine the allocation of limited resources (time, money, and personnel) to minimize risk or, alternatively, to minimize the resources needed to reduce risk to an acceptable level. The end result of the work reported here is a means to optimize quality-assurance processes used in developing software.

Feather, Martin↗

Wind Tunnel Management and Resource Optimization: A Systems Modeling Approach

Time, money, and, personnel are becoming increasingly scarce resources within government agencies due to a reduction in funding and the desire to demonstrate responsible economic efficiency. The ability of an organization to plan and schedule resources effectively can provide the necessary leverage to improve productivity, provide continuous support to all projects, and insure flexibility in a rapidly changing environment. Without adequate internal controls the organization is forced to rely on external support, waste precious resources, and risk an inefficient response to change. Management systems must be developed and applied that strive to maximize the utility of existing resources in order to achieve the goal of "faster, cheaper, better". An area of concern within NASA Langley Research Center was the scheduling, planning, and resource management of the Wind Tunnel Enterprise operations. Nine wind tunnels make up the Enterprise. Prior to this research, these wind tunnel groups did not employ a rigorous or standardized management planning system. In addition, each wind tunnel unit operated from a position of autonomy, with little coordination of clients, resources, or project control. For operating and planning purposes, each wind tunnel operating unit must balance inputs from a variety of sources. Although each unit is managed by individual Facility Operations groups, other stakeholders influence wind tunnel operations. These groups include, for example, the various researchers and clients who use the facility, the Facility System Engineering Division (FSED) tasked with wind tunnel repair and upgrade, the Langley Research Center (LaRC) Fabrication (FAB) group which fabricates repair parts and provides test model upkeep, the NASA and LARC Strategic Plans, and unscheduled use of the facilities by important clients. Expanding these influences horizontally through nine wind tunnel operations and vertically along the NASA management structure greatly increases the complexity of developing a model that can be used for successfully implementing a standardized management planning tool. The objective of this study was to implement an Integrated Wind Tunnel Planning System to improve the operations within the aeronautics testing and research group, in particular Wind Tunnel Enterprise. The study included following steps: Conducted literature search and expert discussions (NASA and Old Dominion University faculty), Performed environmental scan of NASA Langley wind tunnel operations as foundation for problem definition. Established operation requirements and evaluation methodologies. Examined windtunnel operations to map out the common characteristics, critical components, and system structure. Reviewed and evaluated various project scheduling and management systems for implementation, Evaluated and implemented "Theory of Constraints (TOC)" project scheduling methodology at NASA Langley wind tunnel operations together with NASA staff.

Jacobs, Derya, A.↗

Air traffic management evaluation tool

Methods for evaluating and implementing air traffic management tools and approaches for managing and avoiding an air traffic incident before the incident occurs. A first system receives parameters for flight plan configurations (e.g., initial fuel carried, flight route, flight route segments followed, flight altitude for a given flight route segment, aircraft velocity for each flight route segment, flight route ascent rate, flight route descent route, flight departure site, flight departure time, flight arrival time, flight destination site and/or alternate flight destination site), flight plan schedule, expected weather along each flight route segment, aircraft specifics, airspace (altitude) bounds for each flight route segment, navigational aids available. The invention provides flight plan routing and direct routing or wind optimal routing, using great circle navigation and spherical Earth geometry. The invention provides for aircraft dynamics effects, such as wind effects at each altitude, altitude changes, airspeed changes and aircraft turns to provide predictions of aircraft trajectory (and, optionally, aircraft fuel use). A second system provides several aviation applications using the first system. Several classes of potential incidents are analyzed and averted, by appropriate change en route of one or more parameters in the flight plan configuration, as provided by a conflict detection and resolution module and/or traffic flow management modules. These applications include conflict detection and resolution, miles-in trail or minutes-in-trail aircraft separation, flight arrival management, flight re-routing, weather prediction and analysis and interpolation of weather variables based upon sparse measurements. The invention combines these features to provide an aircraft monitoring system and an aircraft user system that interact and negotiate changes with each other.

Sridhar, Banavar↗

Planning to Explore: Using a Coordinated Multisource Infrastructure to Overcome Present and Future Space Flight Planning Challenges

Few human endeavors present as much of a planning and scheduling challenge as space flight, particularly manned space flight. Just on the operational side of it, efforts of thousands of people across hundreds of organizations need to be coordinated. Numerous tasks of varying complexity and nature, from scientific to construction, need to be accomplished within limited mission time frames. Resources need to be carefully managed and contingencies worked out, often on a very short notice. From the beginning of the NASA space program, planning has been done by large teams of domain experts working months, sometimes years, to put together a single mission. This approach, while proven very reliable up to now, is becoming increasingly harder to sustain. Elevated levels of NASA space activities, from deployment of the new Crew Exploration Vehicle (CEV) and completion of the International Space Station (ISS), to the planned lunar missions and permanent lunar bases, will put an even greater strain on this largely manual process. While several attempts to automate it have been made in the past, none have fully succeeded. In this paper we describe the current NASA planning methods, outline their advantages and disadvantages, discuss the planning challenges of upcoming missions and propose a distributed planning/scheduling framework (CMMD) aimed at unifying and optimizing the planning effort. CMMD will not attempt to make the process completely automated, but rather serve in a decision support capacity for human managers and planners. It will help manage information gathering, creation of partial and consolidated schedules, inter-team negotiations, contingencies investigation, and rapid re-planning when the situation demands it. The fist area of CMMD application will be planning for Extravehicular Activities (EVA) and associated logistics. Other potential applications, not only in the space flight domain, and future research efforts will be discussed as well.

Balaban, Edward↗

NASA Tech Briefs, July 2013

Dielectrophoresis-Based Particle Sensor Using Nanoelectrode Arrays; Multi-Dimensional Damage Detection for Surfaces and Structures; ULTRA: Underwater Localization for Transit and Reconnaissance Autonomy; Autonomous Cryogenic Leak Detector for Improving Launch Site Operations; Submillimeter Planetary Atmospheric Chemistry Exploration Sounder; Method for Reduction of Silver Biocide Plating on Metal Surfaces; Silicon Micromachined Microlens Array for THz Antennas; Forward-Looking IED Detector Ground Penetrating Radar; Fully Printed, Flexible, Phased Array Antenna for Lunar Surface Communication, Battery Charge Equalizer with Transformer Array; An Efficient, Highly Flexible Multi-Channel Digital Downconverter Architecture; Dimmable Electronic Ballast for a Gas Discharge Lamp; Conductive Carbon Nanotube Inks for Use with Desktop Inkjet Printing Technology; Enhanced Schapery Theory Software Development for Modeling Failure of Fiber-Reinforced Laminates; High-Performance, Low-Temperature-Operating, Long-Lifetime Aerospace Lubricants; Carbon Nanotube Microarrays Grown on Nanoflake Substrates; Differential Muon Tomography to Continuously Monitor Changes in the Composition of Subsurface Fluids; Microgravity Drill and Anchor System; 20 Granular Media-Based Tunable Passive Vibration Suppressor; 21 Miga Aero Actuator and 2D Machined Mechanical Binary Latch; Micro-XRF for In Situ Geological Exploration of Other Planets; Hydrogen-Enhanced Lunar Oxygen Extraction and Storage Using Only Solar Power; Uplift of Ionospheric Oxygen Ions During Extreme Magnetic Storms; Miniaturized, High-Speed, Modulated X-Ray Source; Hollow-Fiber Spacesuit Water Membrane Evaporator 25 High-Power Single-Mode 2.65-micrometers InGaAsSb/AlInGaAsSb Diode Lasers; Optical Device for Converting a Laser Beam Into Two Co-aligned but Oppositely Directed Beams; A Hybrid Fiber/Solid-State Regenerative Amplifier with Tunable Pulse Widths for Satellite Laser Ranging; X-Ray Diffractive Optics; SynGenics Optimization System (SynOptSys); 29 CFD Script for Rapid TPS Damage Assessment; radEq Add-On Module for CFD Solver Loci-CHEM; Science Opportunity Analyzer (SOA) Version 8; 30 Autonomous Byte Stream Randomizer; Distributed Engine Control Empirical/Analytical Verification Tools; Dynamic Server-Based KML Code Generator Method for Level-of-Detail Traversal of Geospatial Data; Automated Planning of Science Products Based on Nadir Overflights and Alerts for Onboard and Ground Processing; Linked Autonomous Interplanetary Satellite Orbit Navigation; Risk-Constrained Dynamic Programming for Optimal Mars Entry, Descent, and Landing; Scheduling Operations for Massive Heterogeneous Clusters; Deepak Condenser Model (DeCoM); Flight Software Math Library; Recirculating 1-K-Pot for Pulse-Tube Cryostats; 35 Method for Processing Lunar Regolith Using Microwaves; Wells for In Situ Extraction of Volatiles from Regolith (WIEVR); and Estimating the Backup Reaction Wheel Orientation Using Reaction Wheel Spin Rates Flight Telemetry from a Spacecraft.

Source record↗

Collaborative Arrival Planning: Data Sharing and User Preference Tools

Air traffic growth and air carrier economic pressures have motivated efforts to increase the flexibility of the air traffic management process and change the relationship between the air traffic control service provider and the system user. One of the most visible of these efforts is the U.S. government/industry "free flight" initiative, in which the service provider concentrates on safety and cross-airline fairness, and the user on their business objectives and operating preferences, including selecting their own path and speed in real-time. In the terminal arrival phase of flight, severe restrictions and rigid control are currently placed on system users, typically without regard for individual user operational preferences. Airborne delays applied to arriving aircraft into capacity constrained airports are imposed on a first-come, first-serve basis, and thus do not allow the system user to plan for or prioritize late arrivals, or to economically optimize their arrival sequence. A central tenant of the free-flight operating paradigm is collaboration between service providers and users in reaching air traffic management decisions. Such collaboration would be particularly beneficial to an airline's "hub" operation, where off-schedule arrival aircraft are a consistent problem, as they cause serious air-port ramp difficulties, rippling airline scheduling effects, and result in large economic inefficiencies. Greater collaboration can also lead to increased airport capacity and decrease the severity of over-capacity rush periods. In the NASA Collaborative Arrival Planning (CAP) project, both independent exchange of real-time data between the service provider and system user and collaborative decision support tools are addressed. Data exchange of real-time arrival scheduling, airspace management, and air carrier fleet data between the FAA service provider and an air carrier is being conducted and evaluated. Collaborative arrival decision support tools to allow intra-airline arrival preferences are being developed and simulated. The CAP project is part of and leveraged from the NASA/FAA Center TRACON Automation System (CTAS), a fielded set of decision support tools that provide computer generated advisories for both enroute and terminal area controllers to manage and control arrival traffic more efficiently. In this paper, the NASA Collaborative Arrival Planning project is outlined and recent results detailed, including the real-time use of CTAS arrival scheduling data by a major air carrier and simulations of tactical and strategic user preference decision support tools.

Zelenka, Richard E.↗

Design and Operational Evaluation of the Traffic Management Advisor at the Ft. Worth Air Route Traffic Control Center

NASA and the FAA have designed and developed and an automation tool known as the Traffic Management Advisor (TMA). The system was operationally evaluated at the Ft. Worth Air Route Traffic Control Center (ARTCC). The TMA is a time-based strategic planning tool that provides Traffic Management Coordinators and En Route Air Traffic Controllers the ability to efficiently optimize the capacity of a demand impacted airport. The TMA consists of trajectory prediction, constraint-based runway scheduling, traffic flow visualization and controllers advisories. The TMA was used and operationally evaluated for forty-one rush traffic periods during a one month period in the Summer of 1996. The evaluations included all shifts of air traffic operations as well as periods of inclement weather. Performance data was collected for engineering and human factor analysis and compared with similar operations without the TMA. The engineering data indicates that the operations with the TMA show a one to two minute per aircraft delay reduction during rush periods. The human factor data indicate a perceived reduction in en route controller workload as well as an increase in job satisfaction. Upon completion of the evaluation, the TMA has become part of the normal operations at the Ft. Worth ARTCC.

Swenson, Harry N.↗

Scheduling Results for the THEMIS Observation Scheduling Tool

We describe a scheduling system intended to assist in the development of instrument data acquisitions for the THEMIS instrument, onboard the Mars Odyssey spacecraft, and compare results from multiple scheduling algorithms. This tool creates observations of both (a) targeted geographical regions of interest and (b) general mapping observations, while respecting spacecraft constraints such as data volume, observation timing, visibility, lighting, season, and science priorities. This tool therefore must address both geometric and state/timing/resource constraints. We describe a tool that maps geometric polygon overlap constraints to set covering constraints using a grid-based approach. These set covering constraints are then incorporated into a greedy optimization scheduling algorithm incorporating operations constraints to generate feasible schedules. The resultant tool generates schedules of hundreds of observations per week out of potential thousands of observations. This tool is currently under evaluation by the THEMIS observation planning team at Arizona State University.

Thermal Emission Imaging System (THEMIS)↗

Cryogenic cooling study for the advanced limb scanner

The cryogenic operating requirements for a VM refrigerator to be used for detector cooling of the advanced limb scanner (ALS) instrument are defined. Determination of these requirements include consideration of mission and environmental constraints. Based on the operating requirements a detailed refrigerator design and performance analysis is conducted resulting in an optimized VM refrigerator conceptual design. The cooler-instrument-spacecraft interfaces are evaluated resulting in recommendations as to the best approach and most effective concepts resulting in simple and satisfactory interfaces. A preliminary implementation plan and schedule describing the general tasks required to develop, design, manufacture, test, and deliver three VM coolers and required support equipment to support an ALS flight experiment are presented. The result of this effort shows that existing VM cooler technology is sufficient to satisfy ALS mission requirements and schedules.

Russo, S. C.↗

Assessing Relay Communications for Mars Sample Return Surface Mission Concepts

The Mars Sample Return (MSR) Campaign would be a 3-mission campaign concept supported by NASA and ESA to return samples from the Mars surface. MSR would, for the first time ever, present a need to communicate with multiple surface assets that are co-located on Mars in a coordinated effort to accomplish the unified objective of fetching, transporting, and returning samples from Mars. Currently, Mars surface assets relay data to and from Earth using a number of orbiters in what’s known as the Mars Relay Network (MRN). This network is characterized by a small number of surface assets distributed across the Martian globe and a larger number of orbiters to provide relay services. As of June 2020, there are two surface assets for which five orbiters are providing relay. During the MSR Campaign, there would be two rovers and a lander that all would require relay communication from a small number of Mars orbiters to meet the aggressive MSR timeline. The inversion of the current MRN paradigm, a system of many surface assets requiring relay and few orbiters to provide relay, necessitates the unique challenge of optimally allocating relay passes to maximize the operational capability of all assets. The allocation must consider a large number of trade variables including Mars asset operational requirements and Earth ground system constraints, including staffing schedules, operations planning across time zones, and more. To address these telecommunication challenges, the Mars Asset Relay Mission Link Allocation Design Environment (MARMLADE) tool was developed. It is a MATLAB-based tool to assign orbiter passes or Direct-From-Earth (DFE) links to each of the three surface assets and quantify the operational efficiency of each surface asset.MARMLADE uses a data set of simulated Mars relay orbiter geometry and telecommunication capabilities provided by JPL’s Telecom Orbit Analysis and Simulation Tool (TOAST) software to compute which asset should get each pass based on a series of heuristics and predictions of all assets’ states. Within MARMLADE, the user can provide inputs including the option for time-based pass splitting, fixed FWD data rate capabilities, DFE communication capabilities, and link parameters allowing for the assessment of complex operations and hardware trades using surface mission operational efficiency as a primary figure of merit. As the MSR mission concepts continue to mature, MARMLADE is being used to assess ability of all MSR elements to meet the surface mission timeline requirements and to provide relay link allocations to each of the MSR surface assets.This paper will describe the motivation and design of the MARMLADE tool and how it is being used to perform campaign and mission level trades, generate requirements, and support development of the MSR surface mission scenarios.

Lee, Charles↗

Applications of artificial intelligence 1993: Knowledge-based systems in aerospace and industry; Proceedings of the Meeting, Orlando, FL, Apr. 13-15, 1993

The present volume on applications of artificial intelligence with regard to knowledge-based systems in aerospace and industry discusses machine learning and clustering, expert systems and optimization techniques, monitoring and diagnosis, and automated design and expert systems. Attention is given to the integration of AI reasoning systems and hardware description languages, care-based reasoning, knowledge, retrieval, and training systems, and scheduling and planning. Topics addressed include the preprocessing of remotely sensed data for efficient analysis and classification, autonomous agents as air combat simulation adversaries, intelligent data presentation for real-time spacecraft monitoring, and an integrated reasoner for diagnosis in satellite control. Also discussed are a knowledge-based system for the design of heat exchangers, reuse of design information for model-based diagnosis, automatic compilation of expert systems, and a case-based approach to handling aircraft malfunctions.

Fayyad, Usama M.↗

Performance of the Spacecraft Propulsion Research Facility During Altitude Firing Tests of the Delta 3 Upper Stage

The Spacecraft Propulsion Research Facility at the NASA Lewis Research Center's Plum Brook Station was reactivated in order to conduct flight simulation ground tests of the Delta 3 cryogenic upper stage. The tests were a cooperative effort between The Boeing Company, Pratt and Whitney, and NASA. They included demonstration of tanking and detanking of liquid hydrogen, liquid oxygen and helium pressurant gas as well as 12 engine firings simulating first, second, and third burns at altitude conditions. A key to the success of these tests was the performance of the primary facility systems and their interfaces with the vehicle. These systems included the structural support of the vehicle, propellant supplies, data acquisition, facility control systems, and the altitude exhaust system. While the facility connections to the vehicle umbilical panel simulated the performance of the launch pad systems, additional purge and electrical connections were also required which were unique to ground testing of the vehicle. The altitude exhaust system permitted an approximate simulation of the boost-phase pressure profile by rapidly pumping the test chamber from 13 psia to 0.5 psia as well as maintaining altitude conditions during extended steady-state firings. The performance of the steam driven ejector exhaust system has been correlated with variations in cooling water temperature during these tests. This correlation and comparisons to limited data available from Centaur tests conducted in the facility from 1969-1971 provided insight into optimizing the operation of the exhaust system for future tests. Overall, the facility proved to be robust and flexible for vehicle space simulation engine firings and enabled all test objectives to be successfully completed within the planned schedule.

Meyer, Michael L.↗

A Model-based Approach to Reactive Self-Configuring Systems

This paper describes Livingstone, an implemented kernel for a self-reconfiguring autonomous system, that is reactive and uses component-based declarative models. The paper presents a formal characterization of the representation formalism used in Livingstone, and reports on our experience with the implementation in a variety of domains. Livingstone's representation formalism achieves broad coverage of hybrid software/hardware systems by coupling the concurrent transition system models underlying concurrent reactive languages with the discrete qualitative representations developed in model-based reasoning. We achieve a reactive system that performs significant deductions in the sense/response loop by drawing on our past experience at building fast prepositional conflict-based algorithms for model-based diagnosis, and by framing a model-based configuration manager as a prepositional, conflict-based feedback controller that generates focused, optimal responses. Livingstone automates all these tasks using a single model and a single core deductive engine, thus making significant progress towards achieving a central goal of model-based reasoning. Livingstone, together with the HSTS planning and scheduling engine and the RAPS executive, has been selected as the core autonomy architecture for Deep Space One, the first spacecraft for NASA's New Millennium program.

Williams, Brian C.↗

A Hybrid Traveling Salesman Problem - Squeaky Wheel Optimization Planner for Earth Observational Scheduling

We outline a hybrid planner for scheduling Observa- tion Requests on an Earth observing satellite, subject to a variety of constraints for the ASPEN (Chien et al. 2000) Eagle Eye adaptation (Knight, Donnellan, and Green 2013) that combines Squeaky Wheel Optimiza- tion (Joslin and Clements 1999) with sliding observa- tion planning (Aldinger et al. 2013). The Earth Ob- serving Satellite (EOS) planning problem (Globus et al. 2004) is reformulated as time-varying travel time TSP with interval constraints (Ichoua, Gendreau, and Potvin 2003). The replanning/ ll stage of the hybrid scheduler marginally improves schedule quality for all bus agilities examined, but has more impact on lower agility observers. The squeaky wheel stage primarily a ects overall schedule quality by satisfying high pri- ority requests, while the replanner reduces starvation of lower value requests.

Trowbridge, Michael↗

Use of Taguchi design of experiments to optimize and increase robustness of preliminary designs

The research performed this summer includes the completion of work begun last summer in support of the Air Launched Personnel Launch System parametric study, providing support on the development of the test matrices for the plume experiments in the Plume Model Investigation Team Project, and aiding in the conceptual design of a lunar habitat. After the conclusion of last years Summer Program, the Systems Definition Branch continued with the Air Launched Personnel Launch System (ALPLS) study by running three experiments defined by L27 Orthogonal Arrays. Although the data was evaluated during the academic year, the analysis of variance and the final project review were completed this summer. The Plume Model Investigation Team (PLUMMIT) was formed by the Engineering Directorate to develop a consensus position on plume impingement loads and to validate plume flowfield models. In order to obtain a large number of individual correlated data sets for model validation, a series of plume experiments was planned. A preliminary 'full factorial' test matrix indicated that 73,024 jet firings would be necessary to obtain all of the information requested. As this was approximately 100 times more firings than the scheduled use of Vacuum Chamber A would permit, considerable effort was needed to reduce the test matrix and optimize it with respect to the specific objectives of the program. Part of the First Lunar Outpost Project deals with Lunar Habitat. Requirements for the habitat include radiation protection, a safe haven for occasional solar flare storms, an airlock module as well as consumables to support 34 extra vehicular activities during a 45 day mission. The objective for the proposed work was to collaborate with the Habitat Team on the development and reusability of the Logistics Modules.

Carrasco, Hector R.↗

Advancements in the Camera Setup for Unsteady Pressure Sensitive Paint at NASA Ames Research Center

A test in the Unitary Plan Wind Tunnel at NASA Ames Research Center is scheduled for early 2024 with the intent of showcasing improvements made to unsteady Pressure Sensitive Paint technology. Analysis was performed to investigate how to maximize the system resolving power by optimizing the camera parameters, specifically focal length and focusing distance, while still subject to other system requirements such as field of view and relatively low illumination from the paint. Additionally, the system is upgrading to an 8-camera system from a 4-camera system, so analysis was performed to determine the best way to extend that system to maximize camera coverage and how to most effective reduce the system uncertainty by averaging multiple measurement using camera overlap. These analyses have uncovered new opportunities to improve the unsteady Pressure Sensitive Paint technology without the need for new or expensive hardware and will allow the system to collect better data with simple changes to the design process.

Camera Calibration↗