Search NASA⌕ Search

SEARCH · Search NASA

Results for “priority effects”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Hydraulic model of the Chesapeake Bay

Preliminary planning for the formulation of the first year of hydraulic studies on the Chesapeake Bay model was recently completed. The primary purpose of this initial effort was to develop a study program that is both responsive to problems of immediate importance and at the same time ensure that from the very beginning of operation maximum economical use is made of the model. The formulation of this preliminary study plan involved an extensive analysis of the environmental, economic, and social aspects of a series of current problems in order to establish a priority listing of their importance. The study program that evolved is oriented towards the analysis of the effects of some of the works of man on the Chesapeake Bay estuarine environment.

Robinson, A. E., Jr.↗

Research on the International Space Station - An Overview

The International Space Station (ISS) celebrates ten years of operations in 2008. While the station did not support permanent human crews during the first two years of operations November 1998 to November 2000 it hosted a few early science experiments months before the first international crew took up residence. Since that time and simultaneous with the complicated task of ISS construction and overcoming impacts from the tragic Columbia accident science returns from the ISS have been growing at a steady pace. As of this writing, over 162 experiments have been operated on the ISS, supporting research for hundreds of ground-based investigators from the U.S. and international partners. This report summarizes the experimental results collected to date. Today, NASA's priorities for research aboard the ISS center on understanding human health during long-duration missions, researching effective countermeasures for long-duration crewmembers, and researching and testing new technologies that can be used for future exploration crews and spacecraft. Through the U.S. National Laboratory designation, the ISS is also a platform available to other government agencies. Research on ISS supports new understandings, methods or applications relevant to life on Earth, such as understanding effective protocols to protect against loss of bone density or better methods for producing stronger metal alloys. Experiment results have already been used in applications as diverse as the manufacture of solar cell and insulation materials for new spacecraft and the verification of complex numerical models for behavior of fluids in fuel tanks. A synoptic publication of these results will be forthcoming in 2009. At the 10-year point, the scientific returns from ISS should increase at a rapid pace. During the 2008 calendar year, the laboratory space and research facilities were tripled with the addition of ESA's Columbus and JAXA's Kibo scientific modules joining NASA's Destiny Laboratory. All three laboratories, together with external payload accommodations, support a wide variety of research racks and science and technology experiments. In 2009, the number of crewmembers will increase from three to six, greatly increasing the time available for research. The realization of the international scientific partnership provides new opportunities for scientific collaboration and broadens the research potential on the ISS. Engineers and scientists from around the world are working together to refine their operational relationships and build from their experiences conducting early science to ensure maximum utilization of the expanded capabilities aboard ISS. This paper will summarize science results and accomplishments, and discuss how the early science utilization provides the foundation for continuing research campaigns aboard the ISS that will benefit future exploration programs.

Evans, Cynthia A.↗

Long-Duration Human Habitation Beyond Low-Earth Orbit: Why is the Near Future Critical?

For more than a decade, habitation systems capable of comfortable human occupation and effective operations beyond low-Earth orbit (LEO) for more than a few weeks have been a priority recommendation to NASA. This capability is a lynch pin for human exploration beyond the Earth-Moon system. Here we describe briefly some relevant concepts and discuss justifications in the current political and financial environment for why near-term human habitation systems beyond LEO is an imperative.

Thronson, Harley A.↗

Analysis-Driven Design Optimization of a SMA-Based Slat-Cove Filler for Aeroacoustic Noise Reduction

Airframe noise is a significant component of environmental noise in the vicinity of airports. The noise associated with the leading-edge slat of typical transport aircraft is a prominent source of airframe noise. Previous work suggests that a slat-cove filler (SCF) may be an effective noise treatment. Hence, development and optimization of a practical slat-cove-filler structure is a priority. The objectives of this work are to optimize the design of a functioning SCF which incorporates superelastic shape memory alloy (SMA) materials as flexures that permit the deformations involved in the configuration change. The goal of the optimization is to minimize the actuation force needed to retract the slat-SCF assembly while satisfying constraints on the maximum SMA stress and on the SCF deflection under static aerodynamic pressure loads, while also satisfying the condition that the SCF self-deploy during slat extension. A finite element analysis model based on a physical bench-top model is created in Abaqus such that automated iterative analysis of the design could be performed. In order to achieve an optimized design, several design variables associated with the current SCF configuration are considered, such as the thicknesses of SMA flexures and the dimensions of various components, SMA and conventional. Designs of experiment (DOE) are performed to investigate structural response to an aerodynamic pressure load and to slat retraction and deployment. DOE results are then used to inform the optimization process, which determines a design minimizing actuator forces while satisfying the required constraints.

Scholten, William↗

CLARREO Approach for Reference Intercalibration of Reflected Solar Sensors: On-Orbit Data Matching and Sampling

The implementation of the Climate Absolute Radiance and Refractivity Observatory (CLARREO) mission was recommended by the National Research Council in 2007 to provide an on-orbit intercalibration standard with accuracy of 0.3% (k = 2) for relevant Earth observing sensors. The goal of reference intercalibration, as established in the Decadal Survey, is to enable rigorous high-accuracy observations of critical climate change parameters, including reflected broadband radiation [Clouds and Earth's Radiant Energy System (CERES)], cloud properties [Visible Infrared Imaging Radiometer Suite (VIIRS)], and changes in surface albedo, including snow and ice albedo feedback. In this paper, we describe the CLARREO approach for performing intercalibration on orbit in the reflected solar (RS) wavelength domain. It is based on providing highly accurate spectral reflectance and reflected radiance measurements from the CLARREO Reflected Solar Spectrometer (RSS) to establish an on-orbit reference for existing sensors, namely, CERES and VIIRS on Joint Polar Satellite System satellites, Advanced Very High Resolution Radiometer and follow-on imagers on MetOp, Landsat imagers, and imagers on geostationary platforms. One of two fundamental CLARREO mission goals is to provide sufficient sampling of high-accuracy observations that are matched in time, space, and viewing angles with measurements made by existing instruments, to a degree that overcomes the random error sources from imperfect data matching and instrument noise. The data matching is achieved through CLARREO RSS pointing operations on orbit that align its line of sight with the intercalibrated sensor. These operations must be planned in advance; therefore, intercalibration events must be predicted by orbital modeling. If two competing opportunities are identified, one target sensor must be given priority over the other. The intercalibration method is to monitor changes in targeted sensor response function parameters: effective offset, gain, nonlinearity, optics spectral response, and sensitivity to polarization. In this paper, we use existing satellite data and orbital simulationmethods to determinemission requirements for CLARREO, its instrument pointing ability, methodology, and needed intercalibration sampling and data matching for accurate intercalibration of RS radiation sensors on orbit.

radiometry↗

NASA/SDIO Space Environmental Effects on Materials Workshop, part 1

The present state of knowledge regarding space environmental effects on materials is described and the knowledge gaps that prevent informed decisions on the best use of advanced materials in space for long-duration NASA and Strategic Defense Initiative Organization (SDIO) missions are identified. Establishing priorities for future ground-based and space-based materials research was a major goal. The end product was an assessment of the current state-of-the-art in space environmental effects on materials in order to develop a national plan for spaceflight experiments.

Teichman, Louis A.↗

Using Arcane Data: Past Performance in NASA Science’s Principal Investigator (PI) Development Programs and Improving Future Peer Review for Space Flight Missions

This panel will explore challenges and initial findings from three qualitative studies that use the National Aeronautics and Space Administration's (NASA) Science Mission Directorate's(SMD) internal administrative data to begin to assess program effectiveness and document outputs and outcomes. SMD has funded both at and outside NASA, projects that promotethe development of SMD's future principal investigators (PI) workforce and science and technology investigations on space flight missions that advance the high priority science,technology, and exploration objectives. NASA's internal administrative data are arcane because they developed outside of relational databases. The studies reveal unique challenges to locating and using these data to document effective program processes, i.e.,peer review criteria for large flight missions, and results from the PI-development projects,e.g. the Hands-On Project Experience (HOPE) Training Opportunity solicitations limited to NASA Centers the Jet Propulsion Laboratory; and graduate student/postdoctoral opportunities at higher education institutions.

Sladek, Mary Frances↗

Analysis of a longitudinal pilot-induced oscillation experienced on the approach and landing test of the space shuttle

During the final free flight (FF-5) of the shuttle's approach and landing tests, the vehicle experienced pilot-induced oscillations near touchdown. The light test data showed that pilot inputs to the hand controller reached peak-to-peak amplitudes of 20 deg at a frequency between 3 and 3.5 radians per second. The controller inputs were sufficient to exceed the priority rate limit set in the pitch axis. A nonlinear analytical study was conducted to investigate the combined effects of pilot input, rate limiting, and time delays. The frequency response of the total system is presented parametrically as a function of the three variables. In general, with no dead time, for controller inputs of 5 deg or less, the total system behaves in a linear fashion. For 10 deg of controller input, independent of the delay time, the elevon loop will be rate saturated above a frequency of 4 radians per second.

Smith, J. W.↗

The Presence of Methane in the Atmosphere of an Extrasolar Planet

Molecules present in the atmospheres of extrasolar planets are expected to influence strongly the balance of atmospheric radiation, to trace dynamical and chemical processes, and to indicate the presence of disequilibrium effects. As molecules have the potential to reveal atmospheric conditions and chemistry, searching for them is a high priority. The rotational-vibrational transition bands of water, carbon monoxide and methane are anticipated to be the primary sources of non-continuum opacity in hot-Jupiter planets. As these bands can overlap in wavelength, and the corresponding signatures from them are weak, decisive identification requires precision infrared spectroscopy. Here we report a near-infrared transmission spectrum of the planet HD 189733b that shows the presence of methane. Additionally, a resolved water vapour band at 1.9 (micro)m confirms the recent claim4 of water in this object. On thermochemical grounds, carbon monoxide is expected to be abundant in the upper atmosphere of hot-Jupiter planets, but is not identifiable here; therefore the detection of methane rather than carbon monoxide in such a hot planet could signal the presence of a horizontal chemical gradient away from the permanent dayside, or it may imply an ill-understood photochemical mechanism that leads to an enhancement of methane.

atmospheric radiation↗

NEEMO 18-20: Analog Testing for Mitigation of Communication Latency During Human Space Exploration

NASA Extreme Environment Mission Operations (NEEMO) is an underwater spaceflight analog that allows a true mission-like operational environment and uses buoyancy effects and added weight to simulate different gravity levels. Three missions were undertaken from 2014-2015, NEEMO's 18-20. All missions were performed at the Aquarius undersea research habitat. During each mission, the effects of communication latencies on operations concepts, timelines, and tasks were studied. METHODS: Twelve subjects (4 per mission) were weighed out to simulate near-zero or partial gravity extravehicular activity (EVA) and evaluated different operations concepts for integration and management of a simulated Earth-based science team (ST) to provide input and direction during exploration activities. Exploration traverses were preplanned based on precursor data. Subjects completed science-related tasks including pre-sampling surveys, geologic-based sampling, and marine-based sampling as a portion of their tasks on saturation dives up to 4 hours in duration that were designed to simulate extravehicular activity (EVA) on Mars or the moons of Mars. One-way communication latencies, 5 and 10 minutes between space and mission control, were simulated throughout the missions. Objective data included task completion times, total EVA times, crew idle time, translation time, ST assimilation time (defined as time available for ST to discuss data/imagery after data acquisition). Subjective data included acceptability, simulation quality, capability assessment ratings, and comments. RESULTS: Precursor data can be used effectively to plan and execute exploration traverse EVAs (plans included detailed location of science sites, high-fidelity imagery of the sites, and directions to landmarks of interest within a site). Operations concepts that allow for pre-sampling surveys enable efficient traverse execution and meaningful Mission Control Center (MCC) interaction across communication latencies and can be done with minimal crew idle time. Imagery and contextual information from the EVA crew that is transmitted real-time to the intravehicular (IV) crewmember(s) can be used to verify that exploration traverse plans are being executed correctly. That same data can be effectively used by MCC (across comm latency) to provide meaningful feedback and instruction to the crew regarding sampling priorities, additional tasks, and changes to the EVA timeline. Text / data capabilities are preferred over voice capabilities between MCC and IV when executing exploration traverse plans over communication latency.

Chappell, Steven P.↗

NASA JSC EV2 Intern Spring 2016 - Jennie Chung

Exploration Mission 2 (EM-2) is a mission to resume the manned exploration of the Solar System. This mission is the first crewed mission of NASA’s Orion on the Space Launch System. The target for EM-2 is to perform a flyby of a captured asteroid in lunar orbit, which NASA plans to launch in 2023. As an intern working with EV-2 – Avionics Systems Division in Johnson Space Center, we are developing flight instrumentation systems for EM-2 (MISL & RFID). The Modular Integrated Stackable Layer (MISL) is a compact space-related computer system that is modular, scalable and reconfigurable. The RFID (radio frequency identification) sensors are used to take lower frequency (TC) type measurements and be able to stream data real-time to an RF (radio frequency) interrogator upon demand. Our job, in EV-2, is to certify, test, manufacture/assemble and deliver flight EM-2 DFI System (MISL & RFID). Our goal is to propose a development effort to design low-mass wire and wireless data acquisition and sensor solutions for EM-2 DFI (Development Flight Instrumentation). The team is tasked to provide the most effective use of 75 pounds to acquire DFI data and to collect sensor data for 100-200 high priority DFI channels (mass driven).

Chung, Jennie↗

Reliability Constrained Priority Load Shedding for Aerospace Power System Automation

The need for improving load shedding on board the space station is one of the goals of aerospace power system automation. To accelerate the optimum load-shedding functions, several constraints must be involved. These constraints include congestion margin determined by weighted probability contingency, component/system reliability index, generation rescheduling. The impact of different faults and indices for computing reliability were defined before optimization. The optimum load schedule is done based on priority, value and location of loads. An optimization strategy capable of handling discrete decision making, such as Everett optimization, is proposed. We extended Everett method to handle expected congestion margin and reliability index as constraints. To make it effective for real time load dispatch process, a rule-based scheme is presented in the optimization method. It assists in selecting which feeder load to be shed, the location of the load, the value, priority of the load and cost benefit analysis of the load profile is included in the scheme. The scheme is tested using a benchmark NASA system consisting of generators, loads and network.

Momoh, James A.↗

Design of the Active Elevon Rotor for Low Vibration

Helicopter fuselages vibrate more than desired, and traditional solutions have limited effectiveness and can impose an appreciable weight penalty. Alternative methods of combating high vibration, including Higher Harmonic Control (HHC) via harmonic swashplate motion and Individual Blade Control (IBC) via active pitch links, have been studied for several decades. HHC via an on-blade control surface was tested in 1977 on a full scale rotor using a secondary active swashplate and a mechanical control system. Recent smart material advances have prompted new research into the use of on-blade control concepts. Recent analytical studies have indicated that the use of on-blade control surfaces produces vibration reduction comparable to swashplate-based HHC but for less power. Furthermore, smart materials (such as piezoceramics) have been shown to provide sufficient control authority for preliminary rotor experiments. These experiments were initially performed at small scale for reduced tip speeds. More recent experiments have been conducted at or near full tip speeds, and a full-scale active rotor is under development by Boeing with Eurocopter et al. pursuing a similarly advanced full-scale implementation. The US Army Aeroflightdynamics Directorate has undertaken a new research program called the Active Elevon Rotor (AER) Focus Demo. This program includes the design, fabrication, and wind. tunnel testing of a four-bladed, 12.96 ft diameter rotor with one or two on-blade elevons per blade. The rotor, which will be Mach scaled, will use 2-5/rev elevon motion for closed-loop control and :will be tested in late 2001. The primary goal of the AER Focus Demo is the reduction of vibratory hub loads by 80% and the reduction of vibratory blade structural loads. A secondary goal is the reduction of rotor power. The third priority is the measurement and possible reduction of Blade Vortex Interaction (BVI) noise. The present study is focused on elevon effectiveness, that is, the elevon's ability to reduce all six components of the nonrotating 4/rev hub loads. Some design parameters have been kept fixed in this study, while others have been varied to determine their influence - on elevon effectiveness. The fixed parameters include all blade structural properties except for torsion stiffness; the varied parameters include torsion stiffness, elevon aerodynamic location, and the number and individual authority of elevon aerodynamic surfaces. This paper describes the preliminary design process being used for the AER, and describes and quantifies the emerging active rotor characteristics.

Fulton, Mark V.↗

Advanced spacecraft fire safety: Proposed projects and program plan

A detailed review identifies spacecraft fire safety issues and the efforts for their resolution, particularly for the threats posed by the increased on-orbit duration, size, and complexity of the Space Station Freedom. Suggestions provided by a survey of Wyle consultants and outside fire safety experts were combined into 30 research and engineering projects. The projects were then prioritized with respect to urgency to meet Freedom design goals, status of enabling technology, cost, and so on, to yield 14 highest priority projects, described in terms of background, work breakdown structure, and schedule. These highest priority projects can be grouped into the thematic areas of fire detection, fire extinguishment, risk assessment, toxicology and human effects, and ground based testing. Recommendations for overall program management stress the need for NASA Headquarters and field center coordination, with information exchange through spacecraft fire safety oversight committees.

Youngblood, Wallace W.↗

The charge spectra of solar cosmic rays

An approach to measuring charged spectra of solar cosmic rays is considered. These observations were made by a telescope on the IMP 6 satellite. The charge range was extended beyond charge 2 up to charge 26, and the energy range was extended to lower energies. The experiment preferentially selects rare events above charge 2 and gives them top priority for telemetry readout, thus breaking the monopoly that protons and helium nuclei otherwise would have on the telemetry. This effectively increases the number of nuclei observed above charge 2 by a factor of several hundred.

Vonrosenvinge, T. T.↗

A Study of Technical Engineering Peer Reviews at NASA

This report describes the state of practices of design reviews at NASA and research into what can be done to improve peer review practices. There are many types of reviews at NASA: required and not, formalized and informal, programmatic and technical. Standing project formal reviews such as the Preliminary Design Review and Critical Design Review are a required part of every project and mission development. However, the technical, engineering peer reviews that support teams' work on such projects are informal, some times ad hoc, and inconsistent across the organization. The goal of this work is to identify best practices and lessons learned from NASA's experience, supported by academic research and methodologies to ultimately improve the process. This research has determined that the organization, composition, scope, and approach of the reviews impact their success. Failure Modes and Effects Analysis (FMEA) can identify key areas of concern before or in the reviews. Product definition tools like the Project Priority Matrix, engineering-focused Customer Value Chain Analysis (CVCA), and project or system-based Quality Function Deployment (QFD) help prioritize resources in reviews. The use of information technology and structured design methodologies can strengthen the engineering peer review process to help NASA work towards error-proofing the design process.

Chao, Lawrence P.↗

Mission Adaptive UAS Platform for Earth Science Resource Assessment

NASA Ames Research Center has led a number of important Earth science remote sensing missions including several directed at the assessment of natural resources. A key asset for accessing high risk airspace has been the 180 kg class SIERRA UAS platform, providing mission durations of up to 8 hrs at altitudes up to 3 km. Recent improvements to this mission capability are embodied in the incipient SIERRA-B variant. Two resource mapping problems having unusual mission characteristics requiring a mission adaptive capability are explored here. One example involves the requirement for careful control over solar angle geometry for passive reflectance measurements. This challenges the management of resources in the coastal ocean where solar angle combines with sea state to produce surface glint that can obscure the ocean color signal. Furthermore, as for all scanning imager applications, the primary flight control priority to fly the UAS directly to the next waypoint should compromise with the requirement to minimize roll and crab effects in the imagery. A second example involves the mapping of natural resources in the Earth's crust using precision magnetometry. In this case the vehicle flight path must be oriented to optimize magnetic flux gradients over a spatial domain having continually emerging features, while optimizing the efficiency of the spatial mapping task. These requirements were highlighted in several recent Earth Science missions including the October 2013 OCEANIA mission directed at improving the capability for hyperspectral reflectance measurements in the coastal ocean, and the Surprise Valley Mission directed at mapping sub-surface mineral composition and faults, using high-sensitivity magentometry. This paper reports the development of specific aircraft control approaches to incorporate the unusual and demanding requirements to manage solar angle, aircraft attitude and flight path orientation, and efficient (directly geo-rectified) surface and sub-surface mapping, including the near-time optimization of these sometimes conflicting requirements. *

Flight Control↗

A Performance Assessment of NASA's Heliophysics Program

Recognizing the importance of distributed observations of all elements of the Sun-to-Earth system and the synergies between observation and theory and between basic and targeted research, the National Research Council's 2003 solar and space physics decadal survey laid out an integrated research strategy that sought to extend and augment what has now become the Heliophysics Great Observatory as well as to enhance NASA, NOAA, NSF, and DOD's other solar and space physics research activities. The Integrated Research Strategy provided a prioritized list of flight missions and theory and modeling programs that would advance the relevant physical theories, incorporate those theories in models that describe a system of interactions between the Sun and the space environment, obtain data on the system, and analyze and test the adequacy of the theories and models. As directed by Congress in the NASA Authorization Act of 2005, the purpose of this report is to assess the progress of NASA's Heliophysics Division at the 5-year mark against the NASA goals and priorities laid out in the decadal survey. In addition to the Integrated Research Strategy, the decadal survey also considered non-mission-specific initiatives to foster a robust solar and space physics program. The decadal survey set forth driving science challenges as well as recommendations devoted to the need for technology development, collaborations and cooperation with other disciplines, understanding the effects of the space environment on technology and society, education and public outreach, and steps that could strengthen and enhance the research enterprise. Unfortunately, very little of the recommended NASA program priorities from the decadal survey s Integrated Research Strategy will be realized during the period (2004-2013) covered by the survey. Mission cost growth, reordering of survey mission priorities, and unrealized budget assumptions have delayed or deferred nearly all of the NASA spacecraft missions recommended in the survey. As a result, the status of the Integrated Research Strategy going forward is in jeopardy, and the loss of synergistic capabilities in space will constitute a serious impediment to future progress. Some of these factors were largely outside NASA's control, but as the assessments in Chapter 2 of this report detail, many factors were driven by subsequent NASA decisions about mission science content, mission size, and mission sequence. Overcoming these challenges, as well as other key issues like launch vehicle availability, will be critical if NASA is to realize more of the decadal survey's priorities over the next 5 years as well as priorities in solar and space physics research in the long term. Chapter 3 of this report provides recommendations about how NASA can better fulfill the 2003 decadal survey and improve future decadal surveys in solar and space physics.

Source record↗