Search NASA⌕ Search

SEARCH · Search NASA

Results for “process and scheduling”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Orbit Transfers for Dawn's Vesta Operations : Navigation and Mission Design Experience

Dawn, a mission belonging to NASA's Discovery Program, was launched on September 27, 2007 to explore main belt asteroids in order to yield insights into important questions about the formation and evolution of the solar system. From July of 2011 to August of 2012, the Dawn spacecraft successfully returned valuable science data, collected during the four planned mapping orbits at its first target asteroid, Vesta. Each mapping orbit was designed to enable a different set of scientific observations. Such a mission would have been impossible without the low thrust ion propulsion system (IPS). Maneuvering a spacecraft using only the IPS for the transfers between the mapping orbits posed many technical challenges to Dawn's flight team at NASA's Jet Propulsion Laboratory. Each transfer needs a robust plan that accounts for uncertainties in maneuver execution, orbit determination, and physical characteristics of Vesta. This paper discusses the mission design and navigational experience during Dawn's Vesta operations. Topics include requirements and constraints from Dawn's science and spacecraft teams, orbit determination and maneuver design and building process for transfers, developing timelines for thrust sequence build cycles, and the process of scheduling very demanding coverage with ground antennae at NASA's Deep Space Network.

low thrust↗

Deep Space Optical Link ARQ Performance Analysis

Substantial advancements have been made toward the use of optical communications for deep space exploration missions, promising a much higher volume of data to be communicated in comparison with present -day Radio Frequency (RF) based systems. One or more ground-based optical terminals are assumed to communicate with the spacecraft. Both short-term and long-term link outages will arise due to weather at the ground station(s), space platform pointing stability, and other effects. To mitigate these outages, an Automatic Repeat Query (ARQ) retransmission method is assumed, together with a reliable back channel for acknowledgement traffic. Specifically, the Licklider Transmission Protocol (LTP) is used, which is a component of the Disruption-Tolerant Networking (DTN) protocol suite that is well suited for high bandwidth-delay product links subject to disruptions. We provide an analysis of envisioned deep space mission scenarios and quantify buffering, latency and throughput performance, using a simulation in which long-term weather effects are modeled with a Gilbert -Elliot Markov chain, short-term outages occur as a Bernoulli process, and scheduled outages arising from geometric visibility or operational constraints are represented. We find that both short- and long-term effects impact throughput, but long-term weather effects dominate buffer sizing and overflow losses as well as latency performance.

optical space communications↗

Deep Space Optical Link ARQ Performance Analysis

Substantial advancements have been made toward the use of optical communications for deep space exploration missions, promising a much higher volume of data to be communicated in comparison with present-day Radio Frequency (RF) based systems. One or more ground-based optical terminals are assumed to communicate with the spacecraft. Both short-term and long-term link outages will arise due to weather at the ground station(s), space platform pointing stability, and other effects. To mitigate these outages, an Automatic Repeat Query (ARQ) retransmission method is assumed, together with a reliable back channel for acknowledgement traffic. Specifically, the Licklider Transmission Protocol (LTP) is used, which is a component of the Disruption-Tolerant Networking (DTN) protocol suite that is well suited for high bandwidth-delay product links subject to disruptions. We provide an analysis of envisioned deep space mission scenarios and quantify buffering, latency and throughput performance, using a simulation in which longterm weather effects are modeled with a Gilbert-Elliot Markov chain, short-term outages occur as a Bernoulli process, and scheduled outages arising from geometric visibility or operational constraints are represented. We find that both short- and long-term effects impact throughput, but long-term weather effects dominate buffer sizing and overflow losses as well as latency performance.

buffer analysis↗

Metrics for Flight Operations: Application to Europa Clipper Tour Selection

Objective measures are ubiquitous in the formulation, design and implementation of deep space missions. Tour durations, flyby altitudes, propellant budgets, power consumption, and other metrics are essential to developing and managing NASA missions. But beyond the simple metrics of cost and workforce, it has been difficult to identify objective, quantitative measures that assist in evaluating choices made during formulation or implementation phases in terms of their impact on flight operations. As part of the development of the Europa Clipper Mission system, a set of operations metrics have been defined along with the necessary design information and software tooling to calculate them. We have applied these methods and metrics to help assess the impact to the flight team on the six options for the Clipper Tour that are currently being vetted for selection in the fall of 2021. To generate these metrics, the Clipper MOS team first designed the set of essential processes by which flight operations will be conducted, using a standard approach and template to identify (among other aspects) timelines for each process, along with their time constraints (e.g., uplinks for sequence execution). Each of the resulting 50 processes is documented in a common format and concurred by stakeholders. Process timelines were converted into generic schedules and workforce-loaded using COTS scheduling software, based on the inputs of the process authors and domain experts. Custom code was generated to create an operations schedule for a specific portion of Clipper's prime mission, with instances of a given process scheduled based on specific timing rules (e.g., process X starts once per week on Thursdays) or relative to mission events (e.g., sequence generation process begins on a Monday, at least three weeks before each Europa closest approach). Over a 5-month period, and for each of six Clipper candidate tours, the result was a 20,000+ line, workforce-loaded schedule that documents all of the process-driven work effort at the level of individual roles, along with a significant portion of the level-of-effort work. Post-processing code calculated the absolute and relative number of work hours during a nominal 5 day / 40 hour work week, the work effort during 2nd and 3rd shift, as well as 1st shift on weekends. The resultant schedules and shift tables were used to generate objective measures that can be related to both human factors and to operational risk and showed that Clipper tours which utilize 6:1 resonant (21.25 day) orbits instead of 4:1 resonant (14.17 day) orbits during the first dozen or so Europa flybys are advantageous to flight operations. A similar approach can be extended to assist missions in more objective assessments of a number of mission issues and trades, including tour selection and spacecraft design for operability.

Sarrel, Marc↗

Stratospheric Aerosol and Gas Experiment, SAGE III on ISS, An Earth Science Mission on the International Space Station, Schedule Risk Analysis, A Project Perspective

The presentation provides insight into the schedule risk analysis process used by the Stratospheric Aerosol and Gas Experiment III on the International Space Station Project. The presentation focuses on the schedule risk analysis process highlighting the methods for identification of risk inputs, the inclusion of generic risks identified outside the traditional continuous risk management process, and the development of tailored analysis products used to improve risk informed decision making.

Bonine, Lauren↗

Space Shuttle processing - A case study in artificial intelligence

A scheduling system incorporating AI is described and applied to the automated processing of the Space Shuttle. The unique problem of addressing the temporal, resource, and orbiter-configuration requirements of shuttle processing is described with comparisons to traditional project management for manufacturing processes. The present scheduling system is developed to handle the late inputs and complex programs that characterize shuttle processing by incorporating fixed preemptive scheduling, constraint-based simulated annealing, and the characteristics of an 'anytime' algorithm. The Space-Shuttle processing environment is modeled with 500 activities broken down into 4000 subtasks and with 1600 temporal constraints, 8000 resource constraints, and 3900 state requirements. The algorithm is shown to scale to very large problems and maintain anytime characteristics suggesting that an automated scheduling process is achievable and potentially cost-effective.

Mollikarimi, Cindy↗

Production Process for Strong, Light Ceramic Tiles

Proportions of ingredients and sintering time/temperature schedule changed. Production process for lightweight, high-strength ceramic insulating tiles for Space Shuttle more than just scaled-up version of laboratory process for making small tiles. Boron in aluminum borosilicate fibers allows fusion at points where fibers contact each other during sintering, thereby greatly strengthening tiles structure.

Holmquist, G. R.↗

Space network scheduling benchmark: A proof-of-concept process for technology transfer

This paper describes a detailed proof-of-concept activity to evaluate flexible scheduling technology as implemented in the Request Oriented Scheduling Engine (ROSE) and applied to Space Network (SN) scheduling. The criteria developed for an operational evaluation of a reusable scheduling system is addressed including a methodology to prove that the proposed system performs at least as well as the current system in function and performance. The improvement of the new technology must be demonstrated and evaluated against the cost of making changes. Finally, there is a need to show significant improvement in SN operational procedures. Successful completion of a proof-of-concept would eventually lead to an operational concept and implementation transition plan, which is outside the scope of this paper. However, a high-fidelity benchmark using actual SN scheduling requests has been designed to test the ROSE scheduling tool. The benchmark evaluation methodology, scheduling data, and preliminary results are described.

Moe, Karen↗

Technology Estimating: A Process to Determine the Cost and Schedule of Space Technology Research and Development

NASA is investing in new technologies that include 14 primary technology roadmap areas, and aeronautics. Understanding the cost for research and development of these technologies and the time it takes to increase the maturity of the technology is important to the support of the ongoing and future NASA missions. Overall, technology estimating may help provide guidance to technology investment strategies to help improve evaluation of technology affordability, and aid in decision support. The research provides a summary of the framework development of a Technology Estimating process where four technology roadmap areas were selected to be studied. The framework includes definition of terms, discussion for narrowing the focus from 14 NASA Technology Roadmap areas to four, and further refinement to include technologies, TRL range of 2 to 6. Included in this paper is a discussion to address the evaluation of 20 unique technology parameters that were initially identified, evaluated and then subsequently reduced for use in characterizing these technologies. A discussion of data acquisition effort and criteria established for data quality are provided. The findings obtained during the research included gaps identified, and a description of a spreadsheet-based estimating tool initiated as a part of the Technology Estimating process.

Cole, Stuart K.↗

Stanford Hardware Development Program

Architectures for high performance, digital signal processing, particularly for high resolution, wide band spectrum analysis were developed. These developments are intended to provide instrumentation for NASA's Search for Extraterrestrial Intelligence (SETI) program. The real time signal processing is both formal and experimental. The efficient organization and optimal scheduling of signal processing algorithms were investigated. The work is complemented by efforts in processor architecture design and implementation. A high resolution, multichannel spectrometer that incorporates special purpose microcoded signal processors is being tested. A general purpose signal processor for the data from the multichannel spectrometer was designed to function as the processing element in a highly concurrent machine. The processor performance required for the spectrometer is in the range of 1000 to 10,000 million instructions per second (MIPS). Multiple node processor configurations, where each node performs at 100 MIPS, are sought. The nodes are microprogrammable and are interconnected through a network with high bandwidth for neighboring nodes, and medium bandwidth for nodes at larger distance. The implementation of both the current mutlichannel spectrometer and the signal processor as Very Large Scale Integration CMOS chip sets was commenced.

Peterson, A.↗

Expert mission planning and replanning scheduling system for NASA KSC payload operations

EMPRESS (Expert Mission Planning and REplanning Scheduling System) is an expert system created to assist payload mission planners at Kennedy in the long range planning and scheduling of horizontal payloads for space shuttle flights. Using the current flight manifest, these planners develop mission and payload schedules detailing all processing to be performed in the Operations and Checkout building at Kennedy. With the EMPRESS system, schedules are generated quickly using standard flows that represent the tasks and resources required to process a specific horizontal carrier. Resources can be tracked and resource conflicts can be determined and resolved interactively. Constraint relationships between tasks are maintained and can be enforced when a task is moved or rescheduled. The domain, structure, and functionality of the EMPRESS system is briefly designed. The limitations of the EMPRESS system are described as well as improvements expected with the EMPRESS-2 development.

Pierce, Roger↗

Deep space network resource scheduling approach and application

Deep Space Network (DSN) resource scheduling is the process of distributing ground-based facilities to track multiple spacecraft. The Jet Propulsion Laboratory has carried out extensive research to find ways of automating this process in an effort to reduce time and manpower costs. This paper presents a resource-scheduling system entitled PLAN-IT with a description of its design philosophy. The PLAN-IT's current on-line usage and limitations in scheduling the resources of the DSN are discussed, along with potential enhancements for DSN application.

Eggemeyer, William C.↗

Scheduling Software

Advanced Scheduling Environment is a software product designed and marketed by AVYX, Inc. to provide scheduling solutions for complex manufacturing environments. It can be adapted to specific scheduling and manufacturing processes and has led to substantial cost savings. The system was originally developed for NASA use in scheduling Space Shuttle flights and satellite activities. AVYX, Inc. is an offshoot of a company formed to provide computer-related services to NASA. TREES-plus, the company's initial product became the programming language for the advanced scheduling environment system.

Source record↗

Dynamic Scheduling: Target of Opportunity Observations of Gravitational Wave Events

The simultaneous detection of electromagnetic and gravitational waves from the coalescence of two neutron stars (GW170817 and GRB170817A) has ushered in a new era of ‘multimessenger’ astronomy, with electromagnetic detections spanning from gamma to radio. This great opportunity for new scientific investigations raises the issue of how the available multimessenger tools can best be integrated to constitute a powerful method to study the transient Universe in particular. To facilitate the classification of possible optical counterparts to gravitational wave events, it is important to optimize the scheduling of observations and the filtering of transients, both key elements of the follow-up process. In this work, we describe the existing workflow whereby telescope networks such as GRANDMA and GROWTH are currently scheduled; we then present modifications we have developed for the scheduling process specifically, so as to face the relevant challenges that have appeared during the latest observing run of Advanced LIGO and Advanced Virgo. We address issues with scheduling more than one epoch for multiple fields within a skymap, especially for large and disjointed localizations. This is done in two ways: by optimizing the maximum number of fields that can be scheduled and by splitting up the lobes within the skymap by right ascension to be scheduled individually. In addition, we implement the ability to take previously observed fields into consideration when rescheduling. We show the improvements that these modifications produce in making the search for optical counterparts more efficient, and we point to areas needing further improvement.

Gravitational waves↗

Navigation accuracy analysis for the TDRSS Onboard Navigation System (TONS) experiment on EP/EUVE

A navigation accuracy analysis of the TONS (TDRSS Onboard Navigation System) experiment on the Explorer Platform/Extreme Ultraviolet Explorer (EP/EUVE) is reported. The analysis process includes both sequential estimation covariance analysis and the processing of 'realistic' simulated tracking data. The sensitivity of the navigation accuracy to force modeling and measurement errors is evaluated as a function of the tracking schedule and the process noise model tuning parameters.

Gramling, C. J.↗

Cloud-Based Demodulation and Data Distribution of a Satellite Downlink

Ground station networks connected to the cloud allow space missions to have global communications coverage without operating their own infrastructure. In this work, we describe the communications architecture for the TechEdSat-13 mission, which performed the first in-space characterization of a neuromorphic processor. The mission utilizes a commercial provider for S-band downlinks. A suite of cloud services and open-source software such as GNU Radio are leveraged to demodulate signals received by an AWS ground station during passes with TechEdSat-13 and store recovered data. Once a pass is scheduled, the entire process takes place without human intervention. On-orbit results the past year of operations are presented, demonstrating the advantages of this approach over traditional operator-owned ground stations. Use of software-defined radio makes possible custom signal processing. The homogeneity of apertures and their interfaces to the cloud simplifies scaling across many sites. This abundance of candidate links lays the groundwork for intelligent scheduling agents to optimize pass selection across several factors, automatically recover from failed contacts, and gather metrics to learn from past performance.

cloud demodulation↗

Evaluating Liftoff Debris for NASA’s Space Launch System (SLS) Prior to the Artemis I Launch

The SLS Artemis I launch vehicle is the first of several planned Artemis launch vehicles, with a number of design differences from earlier NASA missions that incur liftoff debris risk to the mission. As a test vehicle, the Artemis I hardware also endured environments and tests not planned for future missions, which led to several additional factors contributing to an evolving liftoff debris risk to the SLS vehicle. This paper will summarize these risk factors and address the processes used to evaluate and communicate the risks to support a successful Artemis I launch. It will discuss how the evolving risks that were quantified and evaluated by a Cross-Program team of debris Subject Matter Experts to mitigate liftoff debris hazards and communicate updated risk to the SLS vehicle. This process was performed through the inaugural use of an SLS debris day-of-launch (DOL) standard operating procedure that will be used for subsequent Artemis missions. This paper addresses the risk of liftoff debris, debris released by the vehicle or from the launch pad during liftoff through vehicle tower clear. Expected liftoff debris is well understood from previous NASA programs’ experience and from tests of materials, processes and functions that are known to release liftoff debris. These expected sources were assessed and cleared well ahead of launch day. However, given the ever-changing schedules and environments, processes were in place to evaluate any additional potential liftoff debris risks identified during launch countdown. Although many of the Artemis vehicle hardware components are similar to those on the NASA Shuttle Program, there are important differences in the architecture of the Artemis I vehicle which require new assessments of liftoff debris risk for the Artemis missions. The more favorable Artemis crew module location and surfaces are far less vulnerable to debris impacts; however, the longer vehicle can result in higher liftoff debris impact energies to those components on the aft end of the vehicle. Additionally, the positional change of the RS-25 liquid engines to nearer the Booster nozzle exit plane along with the change in Booster throat plug design is a disadvantage to the overall liftoff debris risk which resulted in additional test and analysis efforts for evaluating the integrated vehicle debris risk. In spite of the comprehensive tests and analyses of Artemis I expected liftoff debris, a number of additional tests/processes were completed prior to the Artemis I mission that were required to support a complete understanding of a new launch vehicle, but increased the risk of releasing liftoff debris. The hardware endured several additional cryogenic loading cycles, including the Green Run tests at Stennis Space Center, Wet Dress Rehearsals at Kennedy Space Center, and multiple launch attempts. Each of these cycles induced stresses in the thermal protection system (TPS) materials, increasing the risk of damage to and release of the TPS. Additionally, induced and weather environmental factors that could increase the likelihood of debris release were significant. Vibrations and stresses in the TPS were induced by a required roll-back to the Vehicle Assembly Building before Hurricane Ian to protect the vehicle from damage by high winds. Wind damage and potential internal stresses to several outer mold line materials on the integrated SLS vehicle and mobile launcher were caused by weathering Hurricane Nicole at Pad 39B the week before launch. A thorough imagery scan of the vehicle was performed after each event and the damage observed was repaired, removed, or assessed and the risk to the mission evaluated. Mitigation of debris risk can occur by tests and analyses to show debris impacted components as damage tolerant, by new/improved processes for prevention of debris availability, or redesign. Risk mitigation processes for Artemis I-specific liftoff debris events and the development and use of the SLS debris day of launch (DOL) procedures that will be used for subsequent Artemis missions will be described.

Space Launch System↗