Search NASA⌕ Search

SEARCH · Search NASA

Results for “progress update”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Programmatic status of NASA's CSTI high capacity power Stirling space power converter program

An overview is presented of the NASA Lewis Research Center Free-Piston Stirling Space Power Converter Technology Development Program. This work is being conducted under NASA's Civil Space Technology Initiative (CSTI). The goal of the CSTI High Capacity Power element is to develop the technology base needed to meet the long duration, high capacity power requirements for future NASA space initiatives. Efforts are focused upon increasing system thermal and electric energy conversion efficiency at least fivefold over current SP-100 technology, and on achieving systems that are compatible with space nuclear reactors. The status of test activities with the Space Power Research Engine (SPRE) is discussed. Design deficiencies are gradually being corrected and the power converter is now outputting 11.5 kWe at a temperature ratio of 2 (design output is 12.5 kWe). Detail designs were completed for the 1050 K Component Test Power Converter (CTPC). The success of these and future designs is dependent upon supporting research and technology efforts including heat pipes, gas bearings, superalloy joining technologies and high efficiency alternators. An update of progress in these technologies is provided.

Dudenhoefer, James E.↗

Programmatic status of NASA's CSTI High Capacity Power Stirling Space Power Converter Program

An overview is presented of the NASA Lewis Research Center Free-Piston Stirling Space Power Converter Technology Department Program. This work is being conducted under NASA's Civil Space Technology Initiative (CSTI). The goal of the CSTI High Capacity Power element is to develop the technology base needed to meet the long duration, high capacity power requirements for future NASA space initiatives. Efforts are focused upon increasing system thermal and electric energy conversion efficiency at least fivefold over current SP-100 technology, and on achieving systems that are compatible with space nuclear reactors. The status of test activities with the Space Power Research Engine (SPRE) is discussed. Design deficiencies are gradually being corrected and the power converter is now outputting 11.5 kWe at a temperature ratio of 2 (design output is 12.5 kWe). Detail designs were completed for the 1050 K Component Test Power Converter (CTPC). The success of these and future designs is dependent upon supporting research and technology efforts including heat pipes, gas bearings, superalloy joining technologies and high efficiency alternators. An update of progress in these technologies is provided.

Dudenhoefer, James E.↗

Retrievable payload carrier. Next generation Long Duration Exposure Facility: Update 1992

Access to space and cost have been two major inhibitors of low Earth orbit research. The Retrievable Payload Carrier (RPC) Program is a commercial space program which strives to overcome these two barriers in space experimentation. The RPC Program's fleet of spacecraft, ground communications station, payload processing facility, and experienced integration and operations team will provide a convenient 'one stop shop' for investigators seeking to use the unique vantage point and environment of low Earth orbit for research. The RPC is a regularly launched and retrieved, free-flying spacecraft providing resources adequate to meet modest payload/experiment requirements, and presenting ample surface area, volume, mass, and growth capacity for investigator usage. Mission lengths of 6-18 months are envisioned. Presented here is an update on progress made on the RPC Program's development since the November 1991 LDEF Materials Workshop.

Perry, A. T.↗

Retrievable payload carrier, next generation Long Duration Exposure Facility: Update 1992

Access to space and cost have been two major inhibitors of low Earth orbit research. The Retrievable Payload Carrier (RPC) Program is a commercial space program which strives to overcome these two barriers to space experimentation. The RPC Program's fleet of spacecraft, ground communications station, payload processing facility, and experienced integration and operations team will provide a convenient 'one-stop shop' for investigators seeking to use the unique vantage point and environment of low Earth orbit for research. The RPC is a regularly launched and retrieved, free-flying spacecraft providing resources adequate to meet modest payload/experiment requirements, and presenting ample surface area, volume, mass, and growth capacity for investigator usage. Enhanced capabilities of ground communications, solar-array-supplied electrical power, central computing, and on-board data storage pick up on the path where NASA's Long Duration Exposure Facility (LDEF) blazed the original technology trail. Mission lengths of 6-18 months, or longer, are envisioned. The year 1992 was designated as the 'International Space Year' and coincides with the 500th anniversary of Christopher Columbus's voyage to the New World. This is a fitting year in which to launch the full scale development of our unique shop of discovery whose intent is to facilitate retrieving technological rewards from another new world: space. Presented is an update on progress made on the RPC Program's development since the November 1991 LDEF Materials Workshop.

Perry, A. T.↗

PEM regenerative fuel cells

This paper will update the progress in developing electrocatalyst systems and electrode structures primarily for the positive electrode of single-unit solid polymer proton exchange membrane (PEM) regenerative fuel cells. The work was done with DuPont Nafion 117 in complete fuel cells (40 sq cm electrodes). The cells were operated alternately in fuel cell mode and electrolysis mode at 80 C. In fuel cell mode, humidified hydrogen and oxygen were supplied at 207 kPa (30 psi); in electrolysis mode, water was pumped over the positive electrode and the gases were evolved at ambient pressure. Cycling data will be presented for Pt-Ir catalysts and limited bifunctional data will be presented for Pt, Ir, Ru, Rh, and Na(x)Pt3O4 catalysts as well as for electrode structure variations.

Swette, Larry L.↗

A Numerical Study of Hypersonic Fuel Injectors

The work conducted during the Summer of 1995 for the Langley Aerospace Research Summer Scholars, or LARSS, Program was a continuation of Master's Degree work being conducted for the Mechanical Engineering Department at Old Dominion University. Since this work is not yet complete, an update of progress is provided here along with a generalized background. The main emphasis of this research is to find predicted correlations in the database generated by the SHIP3D code, which modeled different scramjet combustor configurations.

Bush, Jason G.↗

ROSAT PSPC Observations of CL0016+16

This report is an update of progress on NASA grant NAG5-2156. The following papers which were published or submitted since April 1966 were supported by this grant. Preprints of each are attached: HST Observations of Oxygen-rich Supernova Remnants in the Magellanic Clouds, and SuperNova Remnants Associated with Molecular Clouds in the Large Magellanic Cloud.

Hughes, John P.↗

Why Not Space Tethers?

The Tethered Satellite System Space Shuttle missions, TSS-1 in 1993 and TSS-1R in 1996, were the height of space tether technology development. Since NASA's investment of some $200M and two Shuttle missions in those two pioneering missions, there have been several smaller tether flight experiments, but interest in this promising technology has waned within NASA as well as the DOD agencies. This is curious in view of the unique capabilities of space tether systems and the fact that they have been flight validated and shown to perform as, or better than, expected in earth orbit. While it is true that the TSS-1, TSS-1R and SEDS-2 missions experienced technical difficulties, the causes of these early developmental problems are now known to be design or materials flaws that are (1) unrelated to the basic viability of space tether technology, and (2) they are readily corrected. The purpose of this paper is to review the dynamic and electrodynamic fundamentals of space tethers and the unique capabilities they afford (that are enabling to certain types of space missions); to elucidate the nature, cause, and solution of the early developmental problems; and to provide an update on progress made in development of the technology. Finally, it is shown that (1) all problems experienced during early development of the technology now have solutions; and (2) the technology has been matured by advances made in strength and robustness of tether materials, high voltage engineering in the space environment, tether health and status monitoring, and the elimination of the broken tether hazard. In view of this, it is inexplicable why this flight-validated technology has not been utilized in the past decade, considering the powerful and unique capabilities that space tethers can afford that are, not only required to carryout, otherwise, unobtainable missions, but can also greatly reduce the cost of certain on-going space operations.

Stone, Noble H.↗

The GLACE-2 Experiment

A major motivation for the study of the coupled land-atmosphere system is the idea that soil moisture anomalies may affect future meteorological variables through their effects on future surface energy and water budgets. If true, the accurate initialization of soil moisture in a subseasonal or seasonal forecast system may improve forecast skill, making the forecast products more valuable to society. The Global Land-Atmosphere Coupling Experiment (GLACE-2) project is examining, with a wide variety of models, the degree to which subseasonal (out to two months) precipitation and air temperature forecasts improve through the realistic initialization of soil moisture. For the first time ever, a global consensus should emerge regarding the value of land initialization for forecasts, perhaps motivating national forecast centers to make full use of land moisture initialization in their operations. Participants in GLACE-2 perform two series of forecasts, each consisting of 100 2-month forecast ensembles (10 members per ensemble) covering ten boreal spring and summer start-dates in each of the years 1986-1995. Series 1 utilizes realistic land surface state initialization, provided through a decadal offline simulation using realistic meteorological forcing, as provided by the Global Soil Wetness Project - Phase 2 (GSWP-2), a research activity of the Global Land-Atmosphere System Study (GLASS) of GEWEX. Series 2 is identical to Series 1 in every way except for the fact that it does not benefit from realistic land state initialization. Through the comparison of Series 1 and 2, we isolate the impact of land initialization on the forecasts. Optional extensions to these base runs include forecasts covering additional years, using alternative meteorological forcing for the land initialization. To date, GLACE-2 has garnered participation from eleven modeling groups, covering 13 atmospheric models. Analysis of available results is already well underway, both at the individual modeling institutions and at the NASA Goddard Space Flight Center, which is coordinating the project. Analysis focuses on two elements of the forecast problem: (i) the quantification of model-specific "predictability" (i.e., the degree to which simulated atmospheric chaos will foil a forecast, even under the assumption of"perfect" model physics, initialization data, and validation data) and its decay with time; and (ii) the quantification of forecast skill, determined through a comparison of predicted precipitation and air temperature against observations. Indeed, the specific contribution of land initialization to both these elements is isolated through a comparison of the Series 1 and 2 forecasts. We examine the two elements at four different forecast leads: 1-15, 16-30, 31-45, and 46-60 days. Statistics-based approaches for enhancing skill (essentially using observational statistics to reduce the impact of the models' climatic biases) are also tested. In the present talk, we provide an update of progress in GLACE-2, featuring quantifications of predictability and forecast skill for a number of the participating models and providing a "first look" at the desired consensus view of land impacts on subseasonal forecasts.

Koster, Randal↗

Evaluation of the Air Quality Monitor's Performance on the International Space Station

The Air Quality Monitor (AQM) was flown to the International Space Station (ISS) as an experiment to evaluate its potential to replace the aging Volatile Organic Analyzer (VOA), which ceased operations in August 2009. The AQM (Figure 1) is a small gas chromatography/differential mobility spectrometer (GC/DMS) manufactured by Sionex. Data was presented at last year s ISIMS conference that detailed the preparation of the AQM for flight, including instrument calibration. Furthermore, initial AQM data was compared to VOA results from simultaneous runs of the two instruments. Although comparison with VOA data provided a measure of confidence in the AQM performance, it is the comparison with results from simultaneously acquired air samples (grab sample containers-GSCs) that will define the success (or failure) of the AQM performance. This paper will update the progress in the AQM investigation by comparing AQM data to results from the analyses of GSC samples, returned from ISS. Additionally, a couple of example will illustrate the AQM s ability to detect disruptions in the spacecraft s air quality. Discussion will also focus upon a few unexpected issues that have arisen and how these will be a addressed in the final operational unit now being built.

Limero, Thomas↗

Advanced CMOS Radiation Effects Testing and Analysis

Presentation at the annual NASA Electronic Parts and Packaging (NEPP) Program Electronic Technology Workshop (ETW). The material includes an update of progress in this NEPP task area over the past year, which includes testing, evaluation, and analysis of radiation effects data on the IBM 32 nm silicon-on-insulator (SOI) complementary metal oxide semiconductor (CMOS) process. The testing was conducted using test vehicles supplied by directly by IBM.

cmos↗

Recent Results from Epitaxial Growth on Step Free 4H-SiC Mesas

This paper updates recent progress made in growth, characterization, and understanding of high quality homoepitaxial and heteroepitaxial films grown on step-free 4H-SiC mesas. First, we report initial achievement of step-free 4H-SiC surfaces with carbon-face surface polarity. Next, we will describe further observations of how step-free 4H-SiC thin lateral cantilever evolution is significantly impacted by crystal faceting behavior that imposes non-uniform film thickness on cantilever undersides. Finally, recent investigations of in-plane lattice constant mismatch strain relief mechanisms observed for heteroepitaxial growth of 3C-SiC as well as 2H-AlN/GaN heterofilms on step-free 4H-SiC mesas will be reviewed. In both cases, the complete elimination of atomic heterointerface steps on the mesa structure enables uniquely well-ordered misfit dislocation arrays to form near the heterointerfaces with remarkable lack of dislocations threading vertically into the heteroepilayers. In the case of 3C-SiC heterofilms, it has been proposed that dislocation half-loops nucleate at mesa edges and glide laterally along the step-free 3C/4H interfaces. In contrast, 3C-SiC and 2H-AlN/GaN heterofilms grown on 4H-SiC mesas with steps exhibit highly disordered interface misfit dislocation structure coupled with 100X greater density of dislocations threading through the thickness of the heteroepilayers. These results indicate that the presence of steps at the heteroepitaxial interface (i.e., on the initial heteroepitaxial nucleation surface) plays a highly important role in the defect structure, quality, and relaxation mechanisms of single-crystal heteroepitaxial films.

Neudeck, Philip G.↗

Unique Results and Lessons Learned From the TSS Missions

The Tethered Satellite System (TSS) Space Shuttle missions, TSS-1 in 1993 and TSS-1R in 1996, were the height of space tether technology development in the U.S. Altogether, the investment made by NASA and the Italian Space Agency (ASI) over the thirteen-year period of the TSS Program totaled approximately $400M-exclusive of the two Space Shuttle flights provided by NASA. Since those two pioneering missions, there have been several smaller tether flight experiments, but interest in this promising technology has waned within NASA as well as the DOD agencies. This is curious in view of the unique capabilities of space tether systems and the fact that they have been flight validated in earth orbit and shown to perform better than the preflight dynamic or electrodynamic theoretical predictions. While it is true that the TSS-1 and TSS-1R missions experienced technical difficulties, the causes of these early developmental problems are now known to have been engineering design flaws, material selection, and procedural issues that (1) are unrelated to the basic viability of space tether technology, and (2) can be readily corrected. The purpose of this paper is to review the dynamic and electrodynamic fundamentals of space tethers and the unique capabilities they afford (that are enabling to certain types of space missions); to elucidate the nature, cause, and solution of the early developmental problems; and to provide an update on progress made in development of the technology.

Stone, Nobie H.↗

TPSAS-NF1676L-13501-DND

The presentation gives an overview of the Air Force Research Laboratory (AFR) concept and flight-deck technology and it discusses updates in progress on capabilities and display changes.

David Wing↗

Learjet Flight Test Update

The presentation provides an update on progress towards an acoustic test with a Lear 25 aircraft. The intent of the test is to acquire data that will be used to determine the ability to predict jet noise for future supersonic aircraft at takeoff from scale-model data acquired in wind tunnels. Flight and instrumentation details are provided for the flight test planned for 2022.

Electric Motor Noise↗

Advanced Composite Solar Sail System (ACS3) Mission Update

The Advanced Composite Solar Sail System (ACS3) will be the first practical solar sail for the National Aeronautics and Space Administration. [1] ACS3 will also be the first spaceflight demonstration of NASA compact deployable composite boom technology.[2] The primary mission objective of ACS3 will be to deploy and characterize an 80-m2 composite boom structure solar sail technology in low Earth orbit. Extended mission goals will be to demonstrate controlled solar sailing flight via a series of orbit raising and lowering maneuvers. Target mission orbit is a 1000 km x 1000 km midnight-noon sun-synchronous orbit. Launch of ACS3 is scheduled for July 2023 with sail deployment in September 2023. Mission duration is expected to be six to nine months. The ACS3 solar sail vehicle is a 12U Cubesat consisting of a bus module, containing flight and solar sail control avionics, and a solar sail module, containing the composite booms and metallized polymer solar sail membranes of the solar sail structure stowed within a boom deployer mechanism. A four-camera instrument suite for 360-degree imaging of the ACS3 solar sail during and after deployment is also housed within the bus module. The ACS3 80-m2 solar sail design is a sub-scale version of an intermediate-size 500-m2 solar sail using NASA deployable composite boom technology. The sail consists of four metallized 2-m thick polyethylene naphthalate (PEN) 20-m2 triangular quadrants supported by four 7-m long lenticular cross-section composite booms. Booms are flattened and co-coiled for stowage within a tape-spool driven deployer mechanism. Total mass of the ACS3 space vehicle including solar sail is 16 kg. An overview of the ACS3 mission and mission systems will be provided in this presentation. This overview will include descriptions of the solar sail structures and materials technology used with ACS3, and discussion of the scalability and extensibility of the ACS3 solar sail to future larger-scale solar sailing mission requirements. An update on progress towards the launch of ACS3 in July 2023 will also be provided. References [1] https://www.nasa.gov/directorates/spacetech/small_spacecraft/ACS3 [2] https://www.nasa.gov/directorates/spacetech/game_changing_development/projects/dcb

Solar sail↗

Development of the Miniature Total Organic Carbon Analyzer

Monitoring the Total Organic Carbon (TOC) in spacecraft potable water will be of major importance in long-duration human space exploration. In-flight analysis of potable water produced from a regenerative water processor provides immediate feedback on the quality of reclaimed water for crew health as well as water processing system health monitoring. This paper updates the progress in development of the next generation Total Organic Carbon Analyzer (TOCA) designed for the unique requirements of an exploration-class mission. The current objective is to design, build, certify, deliver, and operate a TOCA technology demonstration on the International Space Station (ISS). The next generation analyzer system technology was previously developed and selected among a feasibility study of other options. The new system provides primary advantages of reduced mass and volume through reduced system complexity and reduced need for consumables; therefore, the flight project is named MiniTOCA. The project has recently completed design of the tech demo instrument and assembled and tested a flight-like engineering development unit. The engineering unit has undergone performance testing and environmental testing which provides confidence for the project to move forward with flight unit production and certification activities. Test results are summarized in this paper. The flight unit is targeted for delivery to ISS in late 2025.

TOC↗