Search NASA⌕ Search

SEARCH · Search NASA

Results for “project procurement”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Preliminary design study of advanced composite blade and hub and nonmechanical control system for the tilt-rotor aircraft. Volume 2: Project planning data

Project planning data for a rotor and control system procurement and testing program for modifications to the XV-15 tilt-rotor research demonstrator aircraft is presented. The design, fabrication, and installation of advanced composite blades compatible with the existing hub, an advanced composite hub, and a nonmechanical control system are required.

Source record↗

Case for real-time systems development - Quo vadis?

The paper focuses on the distinctive issues of computer-aided software engineering (CASE) products for the development of real-time systems. CASE technologies and associated standardization efforts are evolving from sets of conflicting interests. The majority of case products are intended for use in the development of management information systems. CASE products to support the development of large, complex real-time systems must provide additional capabilities. Generic concerns include the quality of the implementation of the required method for the phase of the system's development and whether the vendor is stable and committed to evolving the products in parallel with nonproprietary standards. The CASE market is undergoing considerable consolidation. The paper describes the major forces, cooperating entities, and remaining uncertainties that need to be weighed in near-term CASE procurements to limit risk of loss of investment in project time, trianing, and money.

Erb, Dona M.↗

Machine Translation Project

The characteristics and capabilities of existing machine translation systems were examined and procurement recommendations were developed. Four systems, SYSTRAN, GLOBALINK, PC TRANSLATOR, and STYLUS, were determined to meet the NASA requirements for a machine translation system. Initially, four language pairs were selected for implementation. These are Russian-English, French-English, German-English, and Japanese-English.

Bajis, Katie↗

Customizable Technical Specifications for Lithium-Ion Battery Storage Projects

Learn how to navigate the FEMP Lithium-ion Battery Storage Technical Specifications, a key resource for federal agencies developing onsite energy storage projects. This webinar, led by technical experts, will provide a step-by-step walkthrough of the specifications, supplemented with a real-world case study. Gain practical insights to support successful battery storage project development and implementation.

25 ENERGY STORAGE↗

The pioneer projects: Economical exploration of the solar system

The interplanetary Pioneer missions are reviewed in terms of management implications and cost control. The responsibilities, organizational structure, and management practices of the Pioneer Projects are presented. The lines of authority and areas of responsibility of the principal organizational elements supporting the Pioneer missions are identified, and the methods employed for maintaining effective and timely interactions among these elements are indicated. The technical and administrative functions of the various organizational elements of the Pioneer Project Office at Ames Research Center are described in terms of their management responsibilities and interactions with other elements of the Project Office and with external organizations having Pioneer Project responsibilities. The management and control of activities prior to and during the hardware procurement phase are described to indicate the basis for obtaining visibility of the technical progress, utilization of resources, and cost performance of the contractors and other institutions supporting the Pioneer projects.

Spahr, J. R.↗

MARVEL Lessons Learned – 2026 Edition Fabrication, Fuel Procurement, Quality Assurance, and Safety Basis

The Microreactor Applications Research Validation and Evaluation (MARVEL) project is intended to be among the first U.S. advanced reactor demonstrations in four decades. By virtue of being sponsored directly by the U.S. Department of Energy (DOE), the reactor is expected to benefit the broader nuclear community by exercising design processes, safety reviews, and supply chains. This project is committed to publicly documenting key lessons learned along the way toward demonstration. Building on a 2025 report that focused on lessons learned from guard vessel fabrication and Primary Coolant Apparatus Test (PCAT) testing (Abou-Jaoude et al. 2025), this 2026 edition captures findings spanning structural fabrication, quality assurance (QA), reactivity control system (RCS) assembly, fuel fabrication and shipment, safety basis development, balance-of-plant design, and overall reactor design.

21 - SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLAN↗

Wind Supply Chain Security: Hardware Enumeration and Analysis

This project, undertaken by Idaho National Laboratory (INL) for the Department of Energy (DOE) Wind Energy Technologies Office (WETO), focused on the enumeration and analysis of six key devices important to wind technologies. The devices analyzed included Beckhoff Bus Terminal Controllers (BK1120 and BC9000), a Beckhoff Economy Built-in Panel PC (CP6231), an N-Tron Managed Industrial Ethernet Switch (711FX3), a Bachmann M1 Gateway, and a Bachmann Smart Power Plant Controller. Device selection was driven by availability and budget constraints, with several components sourced from existing wind farms and others procured through a co-agreement with another WETO-funded project. The project's primary objective was to create a hardware bill of materials (HBOM) for each device, identifying and documenting all components to assess potential security and supply chain risks. A detailed analysis revealed over 750 unique components across the six devices, with 80% successfully identified and accompanied by datasheets. Notably, Texas Instruments emerged as the leading supplier, providing over 16% of the components, followed by ON Semiconductor at 11.3%, Analog Devices at 5.3%, and Renesas Electronics Corp at 4.1%. Other notable vendors included Toshiba Corporation, iC-Haus Corporation, Atmel, Vishay, and STMicroelectronics. The enumeration process involved thorough documentation of each component, including its designation, quantity, identifiers, pin package, description, vendor, model, and country of origin. This process provided valuable insights into the complexity and diversity of the electronic systems within these wind devices. It also highlighted the distinct separation of components between vendors, suggesting a trend of vendor-specific component usage. Key findings from the project emphasized the importance of broadening the scope of vendor analysis in future research to gain a comprehensive understanding of component distribution and commonality. The identification of vendor-specific component usage patterns offers new avenues for research and underscores the significance of continued investigation in this field. Overall, this project provides critical insights into the component composition of wind devices, aiding in the development of improved supply chain management and component sourcing strategies. The results contribute valuable knowledge to the wind technology sector, laying the groundwork for enhanced security and resilience in wind energy systems.

17 - WIND ENERGY↗

INFN LASA in-kind contribution to PIP-II

This paper reports the status and recent progress of INFN LASA’s in-kind contribution to the PIP-II project at Fermilab, with updates on key activities and major procurements. Production efforts for the 38 INFN LASA-designed, 5-cell cavities (β=0.61) for the LB650 section of the linac are underway and two pre-series prototypes are being realized as a first step to validate the manufacturing and treatment sequence. Concurrently, preliminary testing on existing prototypes is progressing to gain a deeper understanding of the surface preparation and qualification procedures, including cross-validation at different infrastructures. Series LB650 cavities will be industrially produced and surface-treated to achieve the stringent performance targets, qualified via vertical cold tests at DESY AMTF, and delivered installation-ready for string assembly.

Paparella, Rocco [INFN, Pisa; LASA, Segrate]↗

Potential State Regulatory Pathways to Facilitate Low-Carbon Fuels

States and the federal government are increasingly engaged in the challenges around decarbonizing the electric grid. In particular, regulators, consumers, stakeholders, and utilities recognize the need to carefully consider the role natural gas will play in a decarbonized future. A variety of technology and policy options to reduce greenhouse gas emissions associated with natural gas use are available, including energy efficiency programs, demand reduction tools, strategic electrification, and strategies to reduce emissions from natural gas production, transportation, and consumption. Low-carbon fuels – mainly renewable natural gas (RNG) and clean hydrogen – are being considered an important component of decarbonization goals. RNG and hydrogen may be able to meaningfully reduce emissions from processes independent of geologic natural gas, displacing emissions of methane, a powerful greenhouse gas. Although RNG and hydrogen are not cost-competitive today with geologic natural gas and are smaller in scale and potential than other decarbonization options, they can be explored as potential critical tools to decarbonize sectors that are difficult to electrify or shift off of natural gas entirely, such as air travel, industrial processes, maritime transport, long-distance trucking, space heating on cold days, and railroads (Nadel, 2022). The role of this report is to provide informational context for state utility regulators to understand the impacts of and challenges associated with broader integration of low-carbon fuels, followed by examples of state regulatory actions taken to date to facilitate the development of low-carbon fuels. Setting clear guidance to calculate the environmental benefits of low-carbon fuels and continuing federal and state investments in research and development to reduce costs relative to fossil fuels will be important steps to take to signal the desire to grow the market for these fuels. State public utility commissions may play a key role in setting regulatory frameworks for low-carbon fuels and ensuring that ratepayer funds, if utilized, are done so to further the public interest. This report is intended to summarize decisions that states have made to date on low-carbon fuels. In the spirit of understanding the current market and sharing information, this report provides success stories, and lessons learned across states as regulators implement varying strategies to achieve decarbonization objectives while maintaining their focus on affordability, safety, and reliability of the energy system. The report begins with an introduction of the role of natural gas in the U.S. economy (Section I) and background information on natural gas use, decarbonization, and low-carbon fuels (Section II). Next, the report describes the current market by discussing the scale of current production, emissions intensity, resource potential, and costs of low-carbon fuels compared to geologic natural gas (Section III). Following these sections, the report describes four strategies states have employed to facilitate low-carbon fuels: opening exploratory dockets, approving voluntary tariffs for customers, approving interconnection tariffs for producers, and considering portfolio-wide procurement targets (Section IV). This section lists states that have taken actions in each category, citing utility filings, commission decisions, stakeholder comments, and other relevant sources. Finally, the report concludes with suggested questions regulators may wish to consider regarding low-carbon fuels, in the interest of preparing to make decisions in the future (Section V). These questions include: Are there existing regulatory or technical barriers to voluntary purchases of low-carbon fuels? Can customers work with utilities to procure low-carbon fuels; are producers able to interconnect projects without significant barriers to entry? Should the infrastructure and/or commodity costs of low-carbon fuels be socialized among all ratepayers, or borne solely by the large commercial and industrial (C&I) customers currently driving the market? Should regulated natural gas and/or electric utilities own and operate low-carbon fuel production? How should regulators consider the unique decarbonization potential of low-carbon fuels, particularly for hard-to-abate sectors, in decision-making? Is additional direction or clarity from state policymakers needed? What no-regrets approaches can help facilitate both near-term RNG development and long-term development of hydrogen and other zero-carbon fuels? We collectively wish to express our gratitude to the U.S. Department of Energy, Office of Fossil Energy and Carbon Management, for supporting this report and other technical assistance resources for state regulators on natural gas topics. State regulators operate under a variety of policy environments, and states have vastly different types of energy resources, infrastructure, and customers. While there is no optimal regulatory, policy, or technological solution that will be successful in every state, state regulators can benefit by exchanging lessons learned with their peers across the country. We look forward to continued engagement with our fellow commissioners, commission staff, NARUC, the U.S. Department of Energy, and other stakeholders to develop sound regulation in the public interest.

03 NATURAL GAS↗

Analysis of Supply Chain Challenges in the U.S. Solar Industry: Focus on Build America, Buy America Act and Inverter Supply Issues

The United States (U.S.) solar industry has been undergoing significant transformation, driven largely by meeting U.S. climate goals while simultaneously maintaining national security. At the forefront of this movement is the Inflation Reduction Act (IRA) and the Build America, Buy America (BABA) Act. The IRA has driven investment in clean energy generation deployments while the BABA Act, enacted under Division G, Title IX of the Infrastructure Investment and Jobs Act (IIJA) establishes domestic content procurement preference for all federal financial assistance obligated for infrastructure projects. While these pieces of legislation aim to reduce reliance on foreign-made solar components and increase domestic production, the sector continues to face notable supply chain challenges. These are particularly pronounced with inverters, a critical component in solar photovoltaic (PV) systems. This report explores the current state of these supply chain challenges, with a specific focus on the impact of the BABA requirements and the associated complexities in inverter manufacturing and supply.

14 SOLAR ENERGY↗

The Pioneer Projects - Economical exploration of the solar system

The interplanetary Pioneer missions are reviewed in terms of management implications and cost control. The responsibilities, organizational structure, and management practices of the Pioneer Projects are presented. The lines of authority and areas of responsibility of the principal organizational elements supporting the Pioneer missions are identified, and the methods employed for maintaining effective and timely interactions among these elements are indicated. The technical and administrative functions of various organizational elements of the project are described. The management and control of activities prior to and during the hardware procurement phase are described to indicate the basis for obtaining visibility of the technical progress, utilization of resources, and cost performance of the contractors and other institutions supporting the Pioneer projects.

Spahr, J. R.↗

Space transportation - Reflections and projections

The history of U.S. manned spaceflight and the vehicles used is discussed. The programs began with low budgets and handwritten charts, then proceeded through the Redstone Mercury launch in 1961 and the Atlas Mercury orbital mission in 1962, with the decision to begin the Apollo project coming between those flights. Use of a sole source procurement with a nonprofit institution like the MIT Draper Laboratory for the Apollo guidance system is noted to have expedited the speed of paperwork. A lunar orbital rendezvous was chosen in October 1962 for the Saturn CV-launched Apollo. The Gemini capsule, eliminated early as a lunar module, served to expose problems of operation in a zero-g environment. The benefits of humans in space were made apparent in the process of fixing the Skylab solar panels. The Shuttle capabilities are reviewed, and the necessity for a vehicle for access and return from GEO is emphasized. Finally, attention is given to a single stage to orbit vehicle and launch systems for a Solar Power Satellite.

Disher, J. H.↗

Mars Geoscience Climatology Orbiter (MGCO) extended study: Technical volume

The FLTSATCOM Earth orbiting communications satellite is a prominent candidate to serve as the Mars Geoscience Climatology Orbiter (MGCO) spacecraft. Major aspects directly applicable are: (1) the incorporation of solid orbit insertion motor; (2) the ability to cruise to Mars in the spin-stabilized mode; (3) ample capability for payload mass and power; (4) attitude control tried to nadir and orbit plane coordinates; (5) exemplary Earth orbital performance record and projected lifetime; and (6) existence of an on-going procurement into the MGCO time period.

Source record↗

The Building Blocks for JWST I and T (Integrations and Test) to Operations - From Simulator to Flight Units

The James Webb Space Telescope (JWST) Project has an extended integration and test (I&T) phase due to long procurement and development times of various components as well as recent launch delays. The JWST Ground Segment and Operations group has developed a roadmap of the various ground and flight elements and their use in the various JWST I&T test programs. The JWST Project s building block approach to the eventual operational systems, while not new, is complex and challenging; a large-scale mission like JWST involves international partners, many vendors across the United States, and competing needs for the same systems. One of the challenges is resource balancing so simulators and flight products for various elements congeal into integrated systems used for I&T and flight operations activities. This building block approach to an incremental buildup provides for early problem identification with simulators and exercises the flight operations systems, products, and interfaces during the JWST I&T test programs. The JWST Project has completed some early I&T with the simulators, engineering models and some components of the operational ground system. The JWST Project is testing the various flight units as they are delivered and will continue to do so for the entire flight and operational system. The JWST Project has already and will continue to reap the value of the building block approach on the road to launch and flight operations.

Fatig, Curtis↗

Recommendations on the Use of Commercial-Off-The-Shelf (COTS) Electrical, Electronic, and Electromechanical (EEE) Parts for NASA Missions - Phase II

This assessment had two Phases. Phase I captured NASA Centers’ current practices for commercial-off-the-shelf (COTS) Electrical, Electronic, and Electromechanical (EEE) parts 1 used in spaceflight systems and ground support equipment (available at https://ntrs.nasa.gov/citations/20205011579) [ref. 1]. The Phase II report provides guidance for selecting and using COTS parts in NASA missions. The approaches proposed in this report differ from current agency practices. This top-level executive summary touches on these new approaches for using COTS parts but does not provide the detailed information that is critical in understanding the rationale behind these new approaches. Readers will need to read the entire report to gain full understanding and effectively use the recommendations herein. NASA’s historical approach to selecting and applying parts has been to define certain parts, primarily specific classes of military specification (MIL-SPEC) parts, as “standard”, leaving all others, including COTS parts, as nonstandard. Standard parts typically are used without further testing (“use-as-is”). Nonstandard parts are subjected to initial screening and subsequent lot acceptance testing of representative samples from each procured lot per MIL-SPEC or similar requirements. Decades later, top-tier commercial part manufacturers have evolved significant manufacturing, statistical control, and technological improvements that can now provide parts as reliable or more reliable than MIL-SPEC parts, when used within their datasheet limits. Concurrently, the space science and exploration community’s needs demand technological advances unavailable with MIL-SPEC parts. This ongoing change necessitates using COTS parts for space missions. Properly selected COTS parts in appropriate applications can offer performance and supply availability advantages compared to MIL-SPEC parts. Their utility and demonstrated reliability result from large volumes and automated production and testing processes. However, careful review and a thorough understanding of their specifications (i.e., datasheet limitations) is needed, and verifying that manufacturer specifications and reliability meet space hardware application needs are necessary. This report recommends MIL-SPEC screening and non-radiation-related lot acceptance testing be reduced or eliminated in cases where evidence of sufficient quality and reliability exists for COTS parts. The extent of NASA's insight into COTS manufacturers and the amount and nature of the needed evidence will differ by mission and will likely be driven by a mission's resources and associated risk posture. To facilitate this goal, two new terminologies have been defined and described: “Industry Leading Parts Manufacturer (ILPM)” and “Established COTS parts.” An ILPM is a COTS manufacturer that produces high quality and reliable parts. Some parts produced by ILPMs, defined as Established COTS parts, do not need any additional MIL-SPEC or NASA screening and lot acceptance testing to be used in space applications. This report provides guidance for selecting, procuring, and applying COTS parts and for performing part-, board-, and system-level COTS parts verification. The recommendation to select Established COTS parts from ILPMs will assure those COTS parts will have comparable quality to corresponding MIL-SPEC parts. Selecting, applying, and verifying Established COTS parts from ILPMs requires a holistic team approach, engaging parts engineers, circuit designers, quality, reliability, and systems engineers, procurement specialists, radiation specialists, avionics leads, and program/project managers. A mission-specific approach tailored to a project’s Mission, Environment, Applications and Lifetime (MEAL) [ref. 2] requirements should be developed and approved by program/project managers. Any associated risks should be clearly identified, quantified, mitigated, and/or accepted. Different approaches are recommended according to program/project Risk Classes A, B, C, and D [ref. 3] and human-rated missions [ref. 4]: 1. Recommend Classes A and B and human-rated missions consider a “MIL-SPEC parts- based design” approach. ”MIL-SPEC parts-based design” approach is one in which most parts are MIL-SPEC parts and Established COTS parts from ILPMs are used only when an equivalent MIL-SPEC part does not meet functional or size, weight, and power (SWaP) or performance requirements, or is not available. 2. Recommend Classes D and Sub-D missions consider a “System of COTS” approach. “System of COTS” approach is one which most parts are Established COTS parts from ILPMs. 3. Recommend Class C missions determine which approach is the best for their projects; that is, use either a “MIL-SPEC parts-based design” approach, “System of COTS” approach, or a combined approach utilizing elements of both. This report intends to provide guidance in using COTS parts for NASA missions with risk classifications of A through D and human-rated missions; but it does not address the costs of using COTS parts. Costs of using COTS parts in different NASA mission classes can vary significantly even if the same parts are used in different risk postures, due to differing verification levels needed. The guidance does not distinguish between critical or non-critical systems, and a given project will need to apply the appropriate guidance based on their risk posture. The intended audience of this report are NASA personnel and commercial practitioners who support NASA’s spaceflight missions, including spaceflight program or project managers, parts engineers, parts manufacturers, radiation engineers, avionics engineers, system engineers, circuit design engineers, reliability engineers, safety and mission assurance (SMA) personnel, and parts procurement specialists. The NEPP Program will perform a pathfinder study to explore implementing the guidance in this NESC report. An ILPM verification process is not the same as conventional vendor qualification processes performed according to military standards and specifications. This NESC report intends to provide guidance in utilizing available parts data from ILPM manufacturers for parts assurance assessments needed for NASA missions. The report also captured the current practices from DoD and Federal Aviation Administration (FAA) in Section 10. Note each DoD and FAA report was provided by the corresponding agencies regarding their practices, which are independent from the NESC recommendations in the report.

Commercial-Off-The-Shelf↗

Managing the mariner mars project.

Mariner Mars project management noting role in system design, launch period establishment, parts procurement, etc

MARINER IV SPACE PROBE↗

Computer tools for systems engineering at LaRC

The Systems Engineering Office (SEO) has been established to provide life cycle systems engineering support to Langley research Center projects. over the last two years, the computing market has been reviewed for tools which could enhance the effectiveness and efficiency of activities directed towards this mission. A group of interrelated applications have been procured, or are under development including a requirements management tool, a system design and simulation tool, and project and engineering data base. This paper will review the current configuration of these tools and provide information on future milestones and directions.

Walters, J. Milam↗