Search NASA⌕ Search

SEARCH · Search NASA

Results for “project procurement”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

The Human Research Program Grant Lifecycle & Data Integration Schedule: Infographic

The Human Research Program (HRP) Grant Lifecycle process can be described using information from several government authoritative sources with overlapping generalizations. It is the responsibility of the HRP Program Planning & Control (PP&C) Office and the Data Management Integration Office (DMIO)to interpret this information into a cohesive process that can be communicated to the human research organization. PP&C and DMIO have been exploring training opportunities to facilitate understanding through the form of infographics. This communication tool combines eye-catching visuals and text making complex information and data more digestible and shareable. The infographic poster tells a short story about a federally awarded grant and is intended to help both the new and experienced HRP workforce understand the timeline for a research procurement and where their specific tasks fall within the 4 phases of the grant lifecycle. The Pre-Award, Award, Post-Award, and Closeout phases are overlayed with business swimlanes so HRP stakeholders can see where they fit into the timeline rather than working in an isolated part. This includes the Chief Scientist Office (CSO), PP&C, the Data Management Integration Office (DMIO), the Principal Investigator (PI), the Element stakeholders, the LSDA Archivists, and the Research & Operations Integration (ROI) team along with the stakeholders in the Human Health and Performance Directorate. Additionally, the poster introduces (1) the HRP Data Integration Schedule identified in the HRP Data Management Plan HRP-48047, Table 8-2 and (2) a Smartsheet Solution to automate the grants tracking business process. Emphasis is given to the Data Integration Schedule which is the basis for the milestone tasks that are to be completed during the Post-Award phase in the grant lifecycle. The poster is also an opportunity to present the Smartsheet Solution, a software collaboration and work management tool used to assign tasks and track project progress. This PP&C FY24 effort will facilitate an end-to-end solution to track grants and provide insight to the health of HRP grant research procurements using metrics, reports, and dashboards.

J Peace↗

Artificial intelligence - New tools for aerospace project managers

Artificial Intelligence (AI) is currently being used for business-oriented, money-making applications, such as medical diagnosis, computer system configuration, and geological exploration. The present paper has the objective to assess new AI tools and techniques which will be available to assist aerospace managers in the accomplishment of their tasks. A study conducted by Brown and Cheeseman (1983) indicates that AI will be employed in all traditional management areas, taking into account goal setting, decision making, policy formulation, evaluation, planning, budgeting, auditing, personnel management, training, legal affairs, and procurement. Artificial intelligence/expert systems are discussed, giving attention to the three primary areas concerned with intelligent robots, natural language interfaces, and expert systems. Aspects of information retrieval are also considered along with the decision support system, and expert systems for project planning and scheduling.

Moja, D. C.↗

Identification and measurement of shrub type vegetation on large scale aerial photography

Important range-shrub species were identified at acceptable levels of accuracy on large-scale 70 mm color and color infrared aerial photographs. Identification of individual shrubs was significantly higher, however, on color infrared. Photoscales smaller than 1:2400 had limited value except for mature individuals of relatively tall species, and then only if crown margins did not overlap and sharp contrast was evident between the species and background. Larger scale photos were required for low-growing species in dense stands. The crown cover for individual species was estimated from the aerial photos either with a measuring magnifier or a projected-scale micrometer. These crown cover measurements provide techniques for earth-resource analyses when used in conjunction with space and high-altitude remotely procured photos.

Driscoll, R. S.↗

Battery Review Board

The topics covered are presented in viewgraph form: NASA Battery Review Board Charter; membership, board chronology; background; statement of problem; summary of problems with 50 AH standard Ni-Cd; activities for near term programs utilizing conventional Ni-Cd; present projects scheduled to use NASA standard Ni-Cd; other near-term NASA programs requiring secondary batteries; recommended direction for future programs; future cell/battery procurement strategy; and the NASA Battery Program.

Vaughn, Chester↗

Software for Managing Inventory of Flight Hardware

The Flight Hardware Support Request System (FHSRS) is a computer program that relieves engineers at Marshall Space Flight Center (MSFC) of most of the non-engineering administrative burden of managing an inventory of flight hardware. The FHSRS can also be adapted to perform similar functions for other organizations. The FHSRS affords a combination of capabilities, including those formerly provided by three separate programs in purchasing, inventorying, and inspecting hardware. The FHSRS provides a Web-based interface with a server computer that supports a relational database of inventory; electronic routing of requests and approvals; and electronic documentation from initial request through implementation of quality criteria, acquisition, receipt, inspection, storage, and final issue of flight materials and components. The database lists both hardware acquired for current projects and residual hardware from previous projects. The increased visibility of residual flight components provided by the FHSRS has dramatically improved the re-utilization of materials in lieu of new procurements, resulting in a cost savings of over $1.7 million. The FHSRS includes subprograms for manipulating the data in the database, informing of the status of a request or an item of hardware, and searching the database on any physical or other technical characteristic of a component or material. The software structure forces normalization of the data to facilitate inquiries and searches for which users have entered mixed or inconsistent values.

Salisbury, John↗

Expanded Guidance for NASA Systems Engineering. Volume 2: Crosscutting Topics, Special Topics, and Appendices

Historically, most successful NASA projects have depended on effectively blending project management, systems engineering, and technical expertise among NASA, contractors, and third parties. Underlying these successes are a variety of agreements (e.g., contract, memorandum of understanding, grant, cooperative agreement) between NASA organizations or between NASA and other Government agencies, Government organizations, companies, universities, research laboratories, and so on. To simplify the discussions, the term "contract" is used to encompass these agreements. This section focuses on the NASA systems engineering activities pertinent to awarding a contract, managing contract performance, and completing a contract. In particular, NASA systems engineering interfaces to the procurement process are covered, since the NASA engineering technical team plays a key role in the development and evaluation of contract documentation. Contractors and third parties perform activities that supplement (or substitute for) the NASA project technical team accomplishment of the NASA common systems engineering technical process activities and requirements outlined in this guide. Since contractors might be involved in any part of the systems engineering life cycle, the NASA project technical team needs to know how to prepare for, allocate or perform, and implement surveillance of technical activities that are allocated to contractors.

Steven R Hirshorn↗

A Magnetically Coupled Cryogenic Pump

Historically, cryogenic pumps used for propellant loading at Kennedy Space Center (KSC) and other NASA Centers have a bellows mechanical seal and oil bath ball bearings, both of which can be problematic and require high maintenance. Because of the extremely low temperatures, the mechanical seals are made of special materials and design, have wearing surfaces, are subject to improper installation, and commonly are a potential leak path. The ball bearings are non-precision bearings [ABEC-1 (Annular Bearing Engineering Council)] and are lubricated using LOX compatible oil. This oil is compatible with the propellant to prevent explosions, but does not have good lubricating properties. Due to the poor lubricity, it has been a goal of the KSC cryogenics community for the last 15 years to develop a magnetically coupled pump, which would eliminate these two potential issues. A number of projects have been attempted, but none of the pumps was a success. An off-the-shelf magnetically coupled pump (typically used with corrosive fluids) was procured that has been used for hypergolic service at KSC. The KSC Cryogenics Test Lab (CTL) operated the pump in cryogenic LN2 as received to determine a baseline for modifications required. The pump bushing, bearings, and thrust rings failed, and the pump would not flow liquid (this is a typical failure mode that was experienced in the previous attempts). Using the knowledge gained over the years designing and building cryogenic pumps, the CTL determined alternative materials that would be suitable for use under the pump design conditions. The CTL procured alternative materials for the bearings (bronze, aluminum bronze, and glass filled PTFE) and machined new bearing bushings, sleeves, and thrust rings. The designed clearances among the bushings, sleeves, thrust rings, case, and case cover were altered once again using experience gained from previous cryogenic pump rebuilds and designs. The alternative material parts were assembled into the pump, and the pump was successfully operated meeting all expected operating parameters. Unique pump sub-assembly parts were designed and manufactured by the CTL using specialized materials determined to be superior for cryogenic thermal applications under the pump design conditions. This work is a proof-of-concept/proof-of-operation of the pump only. Other known internal design modifications to the pump should be accomplished for the long-term use of the pump. An upscaled version of this pump, which is under development and testing at the CTL, can be used either for current or future vehicle loading or for vehicle replenishment. Scaling of this pump can be easily accomplished.

Hatfield, Walter↗

Benefits of Using a Mars Forward Strategy for Lunar Surface Systems

This paper identifies potential risk reduction, cost savings and programmatic procurement benefits of a Mars Forward Lunar Surface System architecture that provides commonality or evolutionary development paths for lunar surface system elements applicable to Mars surface systems. The objective of this paper is to identify the potential benefits for incorporating a Mars Forward development strategy into the planned Project Constellation Lunar Surface System Architecture. The benefits include cost savings, technology readiness, and design validation of systems that would be applicable to lunar and Mars surface systems. The paper presents a survey of previous lunar and Mars surface systems design concepts and provides an assessment of previous conclusions concerning those systems in light of the current Project Constellation Exploration Architectures. The operational requirements for current Project Constellation lunar and Mars surface system elements are compared and evaluated to identify the potential risk reduction strategies that build on lunar surface systems to reduce the technical and programmatic risks for Mars exploration. Risk reduction for rapidly evolving technologies is achieved through systematic evolution of technologies and components based on Moore's Law superimposed on the typical NASA systems engineering project development "V-cycle" described in NASA NPR 7120.5. Risk reduction for established or slowly evolving technologies is achieved through a process called the Mars-Ready Platform strategy in which incremental improvements lead from the initial lunar surface system components to Mars-Ready technologies. The potential programmatic benefits of the Mars Forward strategy are provided in terms of the transition from the lunar exploration campaign to the Mars exploration campaign. By utilizing a sequential combined procurement strategy for lunar and Mars exploration surface systems, the overall budget wedges for exploration systems are reduced and the costly technological development gap between the lunar and Mars programs can be eliminated. This provides a sustained level of technological competitiveness as well as maintaining a stable engineering and manufacturing capability throughout the entire duration of Project Constellation.

Mulqueen, Jack↗

The NASA Redox Storage System Development project, 1980

The technical accomplishments pertaining to the development of Redox systems and related technology are outlined in terms of the task elements: prototype systems development, application analyses, and supporting technology. Prototype systems development provides for a major procurement to develop an industrial capability to take the current NASA Lewis technology and go on to the design, development, and commercialization of iron-chromium Redox storage systems. Application analyses provides for the definition of application concepts and technology requirements, specific definition studies, and the identification of market sectors and their penetration potential. Supporting technology includes both in house and contractual efforts that encompass implementation of technology improvements in membranes, electrodes, reactant processing, and system design. The status of all elements is discussed.

Source record↗

A Tailored Concept of Operations for NASA LSP Integrated Operations

An integral part of the Systems Engineering process is the creation of a Concept of Operations (ConOps) for a given system, with the ConOps initially established early in the system design process and evolved as the system definition and design matures. As Integration Engineers in NASA's Launch Services Program (LSP) at Kennedy Space Center (KSC), our job is to manage the interface requirements for all the robotic space missions that come to our Program for a Launch Service. LSP procures and manages a launch service from one of our many commercial Launch Vehicle Contractors (LVCs) and these commercial companies are then responsible for developing the Interface Control Document (ICD), the verification of the requirements in that document, and all the services pertaining to integrating the spacecraft and launching it into orbit. However, one of the systems engineering tools that have not been employed within LSP to date is a Concept of Operations. The goal of this project is to research the format and content that goes into these various aerospace industry ConOps and tailor the format and content into template form, so the template may be used as an engineering tool for spacecraft integration with future LSP procured launch services.

Systems↗

CompactPCI(Registered TradeMark) Connectors in Space Flight Applications

This report documents the current status of CompactPCI(Registered TradeMark) connectors in GSFC spaceflight applications. To the extent the information is known, this report summarizes to what component quality level each NASA contractor (referred to as OEM in this report) procured the parts, and what board level and system level testing was performed. The report also provides the current status of the reliability assessment for each GSFC project based on the results of testing and FMEA (Failure Mode Effects Analysis). This report addresses how the CompactPCI(Registered TradeMark) connectors came into existence, and how these became the connector style chosen by many designers of space flight hardware. It identifies the design philosophy and the lack of robustness which has led to several known failure modes. These failure modes include fretting of connector pins during vibration, shock and thermal cycling, exposure of underplating, and increased resistance, including brief excursions to very high resistance. Each of these are signs of aging, which becomes an increasing concern for long duration orbiting space flight applications. This report addresses the mitigation strategy to replace CompactPCI(Registered TradeMark) connectors with space qualified Hypertronics 2mm cPCI connectors. The Hypertronics 2mm cPCI connectors are pin-to-pin compatible with the CompactPCI(Registered TradeMark) connectors and meet all of the same technical requirements, except the ability to hot mate, and to mate directly with a CompactPCI of the opposite gender. A detailed comparison of the CompactPCI(Registered TradeMark) connector and the Hypertronics 2mm cPCI connector is provided to describe the ruggedness of Hypertronics connector for space flight applications. Finally, this report makes recommendations for flight hardware for the future missions where the hardware is yet to be built, as well as for the hardware which has already been built with CompactPCI(Registered TradeMark) connectors.

Williams, Richard↗

Knowledge-based operation and management of communications systems

Expert systems techniques are being applied in operation and control of the Defense Communications System (DCS), which has the mission of providing reliable worldwide voice, data and message services for U.S. forces and commands. Thousands of personnel operate DCS facilities, and many of their functions match the classical expert system scenario: complex, skill-intensive environments with a full spectrum of problems in training and retention, cost containment, modernization, and so on. Two of these functions are: (1) fault isolation and restoral of dedicated circuits at Tech Control Centers, and (2) network management for the Defense Switched Network (the modernized dial-up voice system currently replacing AUTOVON). An expert system for the first of these is deployed for evaluation purposes at Andrews Air Force Base, and plans are being made for procurement of operational systems. In the second area, knowledge obtained with a sophisticated simulator is being embedded in an expert system. The background, design and status of both projects are described.

Heggestad, Harold M.↗

Cost Controls in the Cloud

The pay-as-you-go model used by most Cloud Service Providers shifts ownership of resource procurement from finance and management teams to IT, engineering, development and other stakeholders. This requires individual contributors to adopt a more "cost conscious" approach to development, and for projects to invest time into the creation of automated cost controls and cost-focused monitoring. This talk will presents some patterns and examples of cost controls based on our experience managing a multi-tenant cloud environment.

circuit breaker↗

Composite Design and Manufacturing Development for Human Spacecrafts

The Structural Engineering Division at the NASA Johnson Space Center (JSC) has begun work on lightweight, multi‐functional pressurized composite structures. The first candidate vehicle for technology development is the Multi‐Mission Space Exploration Vehicle (MMSEV) cabin, known as the Gen 2B cabin, which has been built at JSC by the Robotics Division. Of the habitable MMSEV vehicle prototypes designed to date, this is the first one specifically analyzed and tested to hold internal pressure and the only one made out of composite materials. This design uses a laminate base with zoned reinforcement and external stringers, intended to demonstrate certain capabilities, and to prepare for the next cabin design, which will be a composite sandwich panel construction with multi‐functional capabilities. As part of this advanced development process, a number of new technologies were used to assist in the design and manufacturing process. One of the methods, new to JSC, was to build the Gen 2B cabin with Out of Autoclave technology to permit the creation of larger parts with fewer joints. An 8‐ply pre‐preg layup was constructed to form the cabin body. Prior to lay‐up, a design optimization software called FiberSIM was used to create each ply pattern. This software is integrated with Pro/Engineer to allow for customized draping of each fabric ply over the complex tool surface. Slits and darts are made in the software model to create an optimal design that maintains proper fiber placement and orientation. The flat pattern of each ply is then exported and sent to an automated cutting table where the patterns are cut out of graphite material. Additionally, to assist in lay‐up, a laser projection system (LPT) is used to project outlines of each ply directly onto the tool face for accurate fiber placement and ply build‐up. Finally, as part of the OoA process, a large oven was procured to post‐cure each part. After manufacturing complete, the cabin underwent modal and pressure testing (currently in progress at date of writing) and will go on to be outfitted and used for further ops usage.

Litteken, Douglas↗

Investigating Laser Beam Welding as an In-Space Joining Technique via Thermal Vacuum and Microgravity and Vacuum Experiments

In-space joining technologies are crucial for stimulating an in-space economy and for enabling sustained space exploration by in-space manufacturing and repair of metallic structures. Compared to brazing or soldering, in-space welding (ISW) can provide highly hermetic, strong, and complex joints, potentially without introducing additional material. However, the influence of extreme temperatures, reduced pressure, and reduced gravity on ISW is not yet fully elucidated. Several efforts at NASA are investigating laser beam welding (LBW) as a joining and repair method in both thermal vacuum (TVAC) and combined vacuum & reduced gravity environments. NASA Marshall Space Flight Center (MSFC) shepherded several ISW projects in its past, including the 1973 electron beam welding on Skylab, the 1989 low-power LBW on parabolic flights, and the unflown 1990s-era In-Space Welding Experiment. Recent parabolic flights and 3 degree-of-freedom ground testing build upon this heritage. A collaboration with the Ohio State University using NASA Langley Research Center (LaRC) hardware retrofitted for LBW achieved the first high-powered laser welds under vacuum and low gravity and developed a workforce capable developing such experimental hardware. A ground testing campaign at the MSFC Flat Floor simulated fit-up and welding representative of ISW in 3 degrees of freedom to emulate microgravity effects on inertial systems. One ongoing effort is a NASA Early Career Initiative project – Lunar Assembly and Servicing by Autonomous Robotics (LASAR). Ruggedized LBW components were developed by an external partner for use in TVAC. A TVAC-rated robotic arm was procured by MSFC and used in the first known robotic laser weld where all components save the laser generator were under vacuum. NASA Johnson Space Center (JSC) is advancing supervised autonomy of ISW. NASA LaRC continues to adapt their unique snowflake joint geometry, suitable for connecting segments in trusses and other structures, to LBW. Upcoming TVAC campaigns will focus on testing extreme temperatures, proving out autonomous operations, and demonstrating weld repair. Weld inspection will occur via a non-contact nondestructive evaluation (NDE) technique – electromagnetic acoustic transduction (EMAT). Another ongoing effort based at MSFC is the DISCMAN -- DIsk-Shaped Configurable and Modular vAcuum uNit – which seeks to development a compact, modular payload that can provide a vacuum environment while in a reduced gravity condition. This payload could support multiple in-space manufacturing developmental efforts, with the first demonstration technology being LBW. Currently, the design is targeting operations in the pressurized volume of a space station, but the payload could readily be adapted to other flight platforms such as parabolic or even suborbital vehicles. LASAR elucidates the effects of temperature and vacuum on LBW while DISCMAN probes those of vacuum and gravity. Through these complementary efforts, NASA is addressing the primary challenges of ISW across the space environment while simultaneously developing and maturing technologies including robotic systems and inspection methodologies for future practical implementation on the Moon and beyond. This approach is timely, as upcoming missions requiring sustained human presence in space will depend on reliable ISW capabilities to create robust metallic joints currently unproven in the space environment and to perform repairs in situ .

hypogravity↗

Creating Innovative Frameworks to Spur Cultural Change at NASA Armstrong Flight Research Center

Changing the culture of an organization is a monumental task that often takes years and has no set formula. Steps can be taken, however, to spur cultural change by creating spaces and infrastructure to serve as the initial driving force. An innovation space and a bicycle sharing (bike share) program were implemented at the National Aeronautics and Space Administration (NASA) Armstrong Flight Research Center (AFRC) (Edwards, California) with a vision toward connecting Center personnel, fostering collaboration and innovation, retaining newer employees, promoting flexibility, and improving the culture and workplace atmosphere. This paper discusses the steps taken, challenges faced, novel culture-change-focused design elements, lessons learned, acquired metrics, and how these initiated cultural change at AFRC. For both the innovation space and the bike share program, funding was negotiated and provided through the NASA Convergent Aeronautics Solutions (CAS) project, which was seeking to improve the innovation and collaboration capabilities at each of the four NASA aeronautics Centers. Key stakeholders across AFRC from upper management, facilities, safety, engineering, and procurement were identified early in the process and were consulted and included throughout execution to ensure that any encountered roadblocks could be easily navigated. Research was then conducted by attending conferences and visiting culture-changing organizations both inside and outside United States Government agencies. Distilling the research, identifying available space, and deciding on specific design elements for the space was conducted by a subset of individuals of diverse backgrounds to enable quick, effective decision-making. Decisions were made with the intent to increase usage and diversity of users of the space; care was taken to ensure a well-crafted atmosphere that would foster the desired culture change. The allocated physical space required major structural modifications, new furniture, and new capabilities that would bring people in. Decisions and desires underwent a rapid reiterative process in order to stay within budget and short deadlines, while holding firm to what was seen as fundamental elements of an innovation space. The framework for cultural change being established, the more difficult task began: incubating the desired culture. Intentional workday use of the innovation space was encouraged, and organized events coordinated in order to truly foster culture change. Such incubation supports the organic spread of culture change to all areas of AFRC. This framework was complemented and expanded by the implementation of the bike share program. Steps for implementation included bike selection based on lessons learned, creating bike stations and signage, implementing bike share rules, and building a volunteer maintenance infrastructure. A novel user-reporting feedback system at each bike station is a low-impact method of capturing usage metrics. Due to the nature of the work conducted at AFRC, the bike share program and feedback system were negotiated and vetted through various organizations including legal, safety, and operations. The innovation space and the bike share program together are an effective initial framework for innovation and collaboration. Culture change takes time, but the innovation space and the bike share program are already showing signs of making a positive impact on the AFRC workforce.

rooms↗

Electrical, Electronic, and Electromechanical (EEE) parts management and control requirements for NASA space flight programs

This document establishes electrical, electronic, and electromechanical (EEE) parts management and control requirements for contractors providing and maintaining space flight and mission-essential or critical ground support equipment for NASA space flight programs. Although the text is worded 'the contractor shall,' the requirements are also to be used by NASA Headquarters and field installations for developing program/project parts management and control requirements for in-house and contracted efforts. This document places increased emphasis on parts programs to ensure that reliability and quality are considered through adequate consideration of the selection, control, and application of parts. It is the intent of this document to identify disciplines that can be implemented to obtain reliable parts which meet mission needs. The parts management and control requirements described in this document are to be selectively applied, based on equipment class and mission needs. Individual equipment needs should be evaluated to determine the extent to which each requirement should be implemented on a procurement. Utilization of this document does not preclude the usage of other documents. The entire process of developing and implementing requirements is referred to as 'tailoring' the program for a specific project. Some factors that should be considered in this tailoring process include program phase, equipment category and criticality, equipment complexity, and mission requirements. Parts management and control requirements advocated by this document directly support the concept of 'reliability by design' and are an integral part of system reliability and maintainability. Achieving the required availability and mission success objectives during operation depends on the attention given reliability and maintainability in the design phase. Consequently, it is intended that the requirements described in this document are consistent with those of NASA publications, 'Reliability Program Requirements for Aeronautical and Space System Contractors,' NHB 5300.4(1A-l); 'Maintainability Program Requirements for Space Systems,' NHB 5300.4(1E); and 'Quality Program Provisions for Aeronautical and Space System Contractors,' NHB 5300.4(1B).

Source record↗