Search NASA⌕ Search

SEARCH · Search NASA

Results for “records management requirements”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Underground Test Area (UGTA) Sampling Plan for Corrective Action Units 101 and 102: Central and Western Pahute Mesa, Nevada National Security Site, Nevada

The purpose of this groundwater sampling plan (referred to herein as “the Plan”) is to describe the approach for collecting and analyzing groundwater samples to meet the objectives of the U.S. Department of Energy (DOE), Environmental Management (EM) Nevada Program’s Underground Test Area (UGTA) Activity. The Plan is focused on the Central and Western Pahute Mesa corrective action units (CAUs 101 and 102). The remaining UGTA CAUs are in the final stage of the UGTA strategy (Closure Report [CR] stage), and monitoring requirements for these CAUs are described in their respective CRs. The Plan supersedes the Nevada National Security Site Integrated Groundwater Sampling Plan and its ensuing Record of Technical Change (ROTC) (DOE/EMNV, 2019b). The Plan is designed to ensure compliance with the UGTA Quality Assurance Plan (QAP) and its ensuing ROTC (DOE/EMNV, 2018), and the Federal Facility Agreement and Consent Order (FFACO) (1996, as amended). The Plan is implemented by the Environmental Program Services (EPS) contractor. Implementation of the Plan provides data to complete corrective actions prescribed by the FFACO to protect the public from groundwater contaminated by historical underground nuclear testing. The Plan’s scope comprises sample collection and analysis requirements for assessing the extent of groundwater contamination from underground nuclear testing. Sampling wells located in the communities surrounding the Nevada National Security Site (NNSS) is performed by other organizations (e.g., management and operating [M&O] contractor) and is therefore not included within the Plan. The results of the community sampling are presented in the annual NNSS environmental reports.

54 ENVIRONMENTAL SCIENCES↗

Feasibility Study of Millimeter Wave Radars For Safeguards Applications

Containment and surveillance are fundamental measures in nuclear safeguards. Techniques such as video surveillance and laser curtain for containment provide effective monitoring in areas where maintaining continuity of knowledge is required. These systems, however, can be susceptible to loss of monitoring capabilities under certain environmental conditions such as poor visibility (i.e. low light conditions, smoke, fog, etc.) or extended power loss past the duration that the backup power system is designed for. Brookhaven National Laboratory has been investigating the feasibility of millimeter waves (mmWave) as a new perimeter seal in which radio frequency waves in the range of 60-64 GHz are used to detect and monitor objects of interest. Signals in this frequency range are not susceptible to environmental conditions. For proof-of-concept tests, mmWave sensors from Texas Instruments (TI), specificallyIWR6843, are used in a test bed at BNL's Waste Management facility to simulate the operations at nuclear facilities. The unique design of TI mmWave sensors requires less memory and power consumption compared to counterpart systems. These devices are capable of exporting 3D point-cloud data, which is visualized graphically and compared to videos recorded at the same time to validate the performance of the mmWave sensor. A set of experiments were planned to test the feasibility of the mmWave in this application, including monitoring static containers in a storage area and detecting intrusions at the boundaries of the area. In addition, the experiments also identify potential blind spots relative to sensor position and utilize multiple operating sensors simultaneously to reduce or eliminate such blind spots. The optimal positioning of multiple sensors was determined for the experimental room configuration. In this paper, we will discuss the details of this novel perimeter sealing concept and present the test results.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Wood-to-Fuel Demonstration Project for California's Transportation Sector using Autothermal Pyrolysis (Non-Proprietary Summary Process Hazard Assessment)

Frontline has prioritized personnel safety, equipment preservation, and environmental protection throughout the design process of the autothermal pyrolysis unit. To facilitate a safe design, Frontline completed an informal hazards and operability (HAZOP) study and a formal HAZOP study, and employ management of change procedures. The result of these safety procedures is a plant that will function in a safe manner with a limited and acceptable amount of risk. Frontline took an approach it used in previous projects to execute a preliminary, internally facilitated hazards and operability (HAZOP) study. While this HAZOP study was performed without any subsequent change tracking, it enables a group of well-trained engineers to consider the safety implications of each part of the plant in a thorough and methodical manner. Frontline chose to bring in a pyrolysis consultant (Daren Daugaard of Burning Oak Energy) to participate in the review. Following the preliminary HAZOP and once the detailed design work was nearing completion, Frontline performed a formal HAZOP with a third-party facilitator, Jason Stittleburg of Novetus Engineering. Although the plant is not subject to process safety management (PSM) requirements, this formal HAZOP was performed in accordance with OSHA regulations deemed reasonable for PSM. Finally, after the formal HAZOP was conducted, Frontline maintained a safe system by implementing and following management of change procedures on each substantial change to the process. Frontline has kept a record of each subsequent change made to the formal HAZOP P&IDs. The process hazard assessment process allowed Frontline to find and correct several unacceptable configurations within the plant.

09 BIOMASS FUELS↗

NOAA National Centers for Environmental Information Fisheries Acoustics Archive Network Deep Dive

EPOC uses the Deep Dive process to discuss and analyze current and planned science use cases and anticipated data output of a particular use case, site, or project to help inform the strategic planning of a campus or regional networking environment. This includes understanding future needs related to network operations, network capacity upgrades, and other technological service investments. A Deep Dive comprehensively surveys major research stakeholders’ plans and processes in order to investigate data management requirements over the next 5–10 years. Deep Dives help ensure that key stakeholders have a common understanding of the issues and the actions that a campus or regional network may need to undertake to offer solutions. The EPOC team leads the effort and relies on collaboration with the hosting site or network, and other affiliated entities that participate in the process. EPOC organizes, convenes, executes, and shares the outcomes of the review with all stakeholders. Between May 2021 and August 2021, staff members from the Engagement and Performance Operations Center (EPOC) met with researchers and staff from the National Oceanic and Atmospheric Administration (NOAA)'s N-Wave (the Enterprise network that supports the NOAA mission) and National Centers for Environmental Information (NCEI)'s Fisheries Acoustics Archive for the purpose of a recording a Deep Dive into research drivers. The goal of these meetings was to help characterize the requirements for the research use case, and to enable cyberinfrastructure support staff to better understand the needs of the researchers they support.

59 BASIC BIOLOGICAL SCIENCES↗

Flight deck engine advisor

The focus of this project is on alerting pilots to impending events in such a way as to provide the additional time required for the crew to make critical decisions concerning non-normal operations. The project addresses pilots' need for support in diagnosis and trend monitoring of faults as they affect decisions that must be made within the context of the current flight. Monitoring and diagnostic modules developed under the NASA Faultfinder program were restructured and enhanced using input data from an engine model and real engine fault data. Fault scenarios were prepared to support knowledge base development activities on the MONITAUR and DRAPhyS modules of Faultfinder. An analysis of the information requirements for fault management was included in each scenario. A conceptual framework was developed for systematic evaluation of the impact of context variables on pilot action alternatives as a function of event/fault combinations.

Shontz, W. D.↗

High Efficiency Inverted GaAs and GaInP/GaAs Solar Cells With Strain-Balanced GaInAs/GaAsP Quantum Wells

High-efficiency solar cells are essential for high-density terrestrial applications, as well as space and potentially vehicle applications. The optimum bandgap for the terrestrial spectrum lies beyond the absorption range of a traditional dual junction GaInP/GaAs cell, with the bottom GaAs cell having higher bandgap energy than necessary. Lower energy bandgaps can be achieved with multiple quantum wells (QWs), but such a pathway requires advanced management of the epitaxial growth conditions in order to be useful. Strain-balanced GaAsP/GaInAs QWs are incorporated into a single junction GaAs solar cell and a dual junction GaInP/GaAs solar cell, leading to 27.2% efficiency in the single junction device and a one-sun record 32.9% efficiency in the tandem device. Good carrier collection and low non-radiative recombination are observed in the cells with up to 80 QWs. The GaAs cells employ a rear-heterojunction architecture to boost the open-circuit voltage to over 1.04 V in the quantum well device, despite the large number of QWs.

14 SOLAR ENERGY↗

Space processing applications payload equipment study. Volume 2C: Data acquisition and process control

The services provided by the Spacelab Information Management System are discussed. The majority of the services are provided by the common-support subsystems in the Support Module furnished by the Spacelab manufacturer. The information processing requirements for the space processing applications (SPA) are identified. The requirements and capabilities for electric power, display and control panels, recording and telemetry, intercom, and closed circuit television are analyzed.

Kayton, M.↗

Remote sensing for urban planning

Utility companies are challenged to provide services to a highly dynamic customer base. With factory closures and shifts in employment becoming a routine occurrence, the utility industry must develop new techniques to maintain records and plan for expected growth. BellSouth Telecommunications, the largest of the Bell telephone companies, currently serves over 13 million residences and 2 million commercial customers. Tracking the movement of customers and scheduling the delivery of service are major tasks for BellSouth that require intensive manpower and sophisticated information management techniques. Through NASA's Commercial Remote Sensing Program Office, BellSouth is investigating the utility of remote sensing and geographic information system techniques to forecast residential development. This paper highlights the initial results of this project, which indicate a high correlation between the U.S. Bureau of Census block group statistics and statistics derived from remote sensing data.

Davis, Bruce A.↗

A parallel data management system for large-scale NASA datasets

The past decade has experienced a phenomenal growth in the amount of data and resultant information generated by NASA's operations and research projects. A key application is the reprocessing problem which has been identified to require data management capabilities beyond those available today (PRAT93). The Intelligent Information Fusion (IIF) system (ROEL91) is an ongoing NASA project which has similar requirements. Deriving our understanding of NASA's future data management needs based on the above, this paper describes an approach to using parallel computer systems (processor and I/O architectures) to develop an efficient parallel database management system to address the needs. Specifically, we propose to investigate issues in low-level record organizations and management, complex query processing, and query compilation and scheduling.

Srivastava, Jaideep↗

Surveillance LANL-ASMT-2026-0059 Procurement – NNSS Supplier Review

The Institutional Quality and Performance Assurance Division's Quality Support Services Group conducted a surveillance of IQPA-IQ Supplier Evaluation group's required assessments of suppliers providing items and services relevant to the Nevada National Security Site. Based upon records examined, the surveillance team has determined that all supplier evaluation/oversight requirements are being met, and no Findings or Opportunities for Improvement are noted.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Upgrades to Common Data Acquisition System Software Development for NASA's Rocket Propulsion Test Facilities and Software Reuse

Approximately five years ago, the National Aeronautics and Space Administration (NASA) Stennis Space Center (SSC) resumed operation of its large rocket engine test facilities after thirty years of contractor control. During this period, contactors used their own proprietary Data Acquisition System (DAS) to record and process rocket propulsion test data. The transition from a contractor managed facility to a NASA managed facility posed a difficult challenge. In order to support the commercial space launch initiative, SSC needed to develop a software replacement for the contractor proprietary DAS. This replacement software would enable SSC to operate propulsion test facilities more cost effectively and to be more readily able to adapt software for reuse, while at the same time provide internal and external customers with reliable population test data. Therefore, SSC developed in-house, a non-proprietary software suite of applications to replace the previously used proprietary DAS. The requirements for the DAS suite included recording and processing propulsion test data. This capability eliminates the necessity for customers to provide a DAS or rely on a competitor's DAS. An additional benefit of owning the software suite included enabling the ability to add additional features and functionality at a lower cost. The Rocket Propulsion Test (RPT) Program Office reviewed consideration for funding this project with the caveat that development of the software included availability for use with minimal modifications to all SSC test facilities and RPT centers: Marshall Space Flight Center (MSFC), White Sands Test Facility (WSTF), and Glenn Research Center (GRC) Plum Brook Station. Based upon this guideline, SSC created the NASA Data Acquisition System (NDAS) software suite. The ability to use the software at multiple centers, even though each field center uses differing DAS hardware with different capabilities, drove a requirement that the software design be portable with minimal modifications to the software. Then, with software release requirements, evaluations, and approvals completed, the NDAS software suite could also become available to other government agencies, corporations, universities, and the general United States public.

Herbert, Phillip W., Sr.↗

Managing the Implementation of Mission Operations Automation

Reducing the cost of mission operations has necessitated a high level of automation both on spacecraft and ground systems. While automation on spacecraft is implemented during the design phase, ground system automation tends to be implemented during the prime mission operations phase. Experience has shown that this tendency for late automation development can be hindered by several factors: additional hardware and software resources may need to be procured; software must be developed and tested on a non-interference basis with primary operations with limited manpower; and established procedures may not be suited for automation requiring substantial rework. In this paper we will review the experience of successfully automating mission operations for seven on-orbit missions: the Compton Gamma Ray Observatory (CGRO), the Rossi X-Ray Timing Explorer (RXTE), the Advanced Composition Explorer (ACE), the Far Ultraviolet Spectroscopic Explorer (FUSE), Interplanetary Physics Laboratory (WIND), Polar Plasma Laboratory (POLAR), and the Imager for Magnetopause-to-Aurora Global Exploration (IMAGE). We will provide lessons learned in areas such as: spacecraft recorder management, procedure development, lights out commanding from the ground system vs. stored command loads, spacecraft contingency response time, and ground station interfaces. Implementing automation strategies during the mission concept and spacecraft integration and test phase as the most efficient method will be discussed.

Sodano, R.↗

Subcriticality Measurements for a Changing Concentration Uranyl Nitrate Solution Tank by Californium Source-Driven Noise Analysis

Subcritical californium source-driven noise analysis (CSDNA) measurements were performed at the Oak Ridge Critical Experiments Facility in 1983 using a stainless-steel tank with an inside diameter of 76.2 cm and a height of 91.4 cm but only filled with a uranyl (93.16 wt.% 235 U) nitrate solution to a height of 76.2 cm for all measurements. The free acid content of the uranyl nitrate solution was less than 0.01 N to minimize hazards in handling. The total available highly enriched uranium for these measurements was 5,296 g. The concentration of the solution was varied from the highest density of 14.71 grams of uranium per liter (g U/L) initially in 16 steps, lowering the concentration to 0.3492 g U/L, and finally using a tank filled with only water. The tank had a Plexiglas lid to minimize evaporation. The Cf source was contained in a re-entrant Lexan tube which could be in the solution parallel to the axis of the cylindrical tank. The detectors were 3 He proportional counters in the solution in shrink-fit tubing to isolate the counters from the fissile solution and adjacent to the outside of the tank. In some cases, the detectors were scintillators adjacent to the outside of the tank. In other cases, the source was external to the tank. Some data presented in this report are from notes and are not in the logbook. The prompt neutron decay constant was obtained from fitting the date from the CSDNA measurements. The purpose of this report is to document the experimental information for the measurements performed so that later, researchers could perform the required uncertainty and calculational analyses and documentation to use these data for an International Nuclear Criticality Safety Benchmark Program (ICSBEP) or a Nuclear Energy Agency benchmark. The prompt neutron decay measurements could be the basis of as International Reactor Physic Benchmark Program. The data from these measurements are available from the Records Management Services Department of Oak Ridge National Laboratory, and the logbook is also available from the ICSBEP at Idaho National Laboratory. Preparation of the present report is part of a larger cooperative effort between Idaho National Laboratory (INL) and Oak Ridge National Laboratory (ORNL) to document more than 15 undocumented critical and subcritical experiments enumerated in ORNL/TM-2019/18 and performed by ORNL at ORCEF and other USDOE critical experiments facilities using more than 500 operational days of critical facility time.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Closure Report for Corrective Action Unit 116: Area 25 Test Cell C Facility, Nevada National Security Site, Nevada with ROTC-1

CR loaded to this OSTI record. Just adding new file which includes CR plus new ROTC 1 and update the metadata to the following: This Closure Report (CR) presents information supporting closure of Corrective Action Unit (CAU) 116, Area 25 Test Cell C Facility. This CR complies with the requirements of the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the State of Nevada; the U.S. Department of Energy (DOE), Environmental Management; the U.S. Department of Defense; and DOE, Legacy Management (FFACO, 1996 [as amended March 2010]). CAU 116 consists of the following two Corrective Action Sites (CASs), located in Area 25 of the Nevada National Security Site: (1) CAS 25-23-20, Nuclear Furnace Piping and (2) CAS 25-41-05, Test Cell C Facility. CAS 25-41-05 consisted of Building 3210 and the attached concrete shield wall. CAS 25-23-20 consisted of the nuclear furnace piping and tanks. Closure activities began in January 2007 and were completed in August 2011. Activities were conducted according to Revision 1 of the Streamlined Approach for Environmental Restoration Plan for CAU 116 (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office [NNSA/NSO], 2008). This CR provides documentation supporting the completed corrective actions and provides data confirming that closure objectives for CAU 116 were met. Site characterization data and process knowledge indicated that surface areas were radiologically contaminated above release limits and that regulated and/or hazardous wastes were present in the facility. The Record of Technical Change 1 updated the use restriction information.

54 ENVIRONMENTAL SCIENCES↗

Guidance and Control Software Project Data - Volume 3: Verification Documents

The Guidance and Control Software (GCS) project was the last in a series of software reliability studies conducted at Langley Research Center between 1977 and 1994. The technical results of the GCS project were recorded after the experiment was completed. Some of the support documentation produced as part of the experiment, however, is serving an unexpected role far beyond its original project context. Some of the software used as part of the GCS project was developed to conform to the RTCA/DO-178B software standard, "Software Considerations in Airborne Systems and Equipment Certification," used in the civil aviation industry. That standard requires extensive documentation throughout the software development life cycle, including plans, software requirements, design and source code, verification cases and results, and configuration management and quality control data. The project documentation that includes this information is open for public scrutiny without the legal or safety implications associated with comparable data from an avionics manufacturer. This public availability has afforded an opportunity to use the GCS project documents for DO-178B training. This report provides a brief overview of the GCS project, describes the 4-volume set of documents and the role they are playing in training, and includes the verification documents from the GCS project. Volume 3 contains four appendices: A. Software Verification Cases and Procedures for the Guidance and Control Software Project; B. Software Verification Results for the Pluto Implementation of the Guidance and Control Software; C. Review Records for the Pluto Implementation of the Guidance and Control Software; and D. Test Results Logs for the Pluto Implementation of the Guidance and Control Software.

Hayhurst, Kelly J.↗

Life-Cycle Baseline Customization for the Formerly Utilized Sites Remedial Action Program - 20304

One of the responsibilities of the federal government is to estimate sound and defensible life-cycle baseline costs for use in federal budget estimates and to meet federal financial reporting requirements. To accomplish this, the US Department of Energy (DOE) Office of Legacy Management (LM) and the US Army Corps of Engineers (USACE) have partnered together to ensure that the liabilities documented in each Formerly Utilized Sites Remedial Action Program (FUSRAP) site's life-cycle baseline are specifically tailored. FUSRAP was created in the mid-1970's to clean up radiological contamination resulting from the early development of nuclear weapons. DOE was responsible for FUSRAP until October 1997, when Congress transferred the administration and execution of FUSRAP site cleanups to USACE. By 1997, DOE had completed the cleanup of 25 of the 46 sites that were active within the program and had begun cleanup at 13 additional sites. USACE was assigned responsibility for the cleanup of the 21 remaining FUSRAP sites, and at 8 additional sites that had since been referred for cleanup. The LM mission for the FUSRAP sites is to perform long-term surveillance and maintenance (LTS and M). Currently, LM provides long-term stewardship for 34 completed FUSRAP sites. Another 20 sites are under active remediation by USACE. Within the last 5 years, USACE has completed the cleanup at five FUSRAP sites and the LTS and M responsibility has been transferred to LM. By 2029, USACE will compete remediation at eight additional sites and LTS and M for those sites will transfer to LM. Because responsibilities for the FUSRAP sites transfer between USACE and LM upon completion of remedial actions, both agencies maintain life-cycle baselines for different stages of the project and both must have a strong understanding of the needs and requirements for each site. This understanding ensures that the life-cycle baselines form a complete and accurate picture of what is required for the site and for the FUSRAP program. LM focuses on several things when customizing the life-cycle baseline estimates for the FUSRAP sites, including (1) Understanding the unique requirements for each site. By reviewing site-specific documents prepared by USACE, such as Feasibility Studies and Records of Decision, and partnering with USACE to gain additional insight about site conditions and requirements for stewardship, as well as potential risks, LM can better develop the life-cycle baselines. (2) Developing site-specific labor breakdowns. This ensures the required labor mix is baselined for specific activities by comparing the labor mix required to perform activities at (a) other LM-managed FUSRAP sites and (b) non-FUSRAP LM sites and (c) by USACE at active FUSRAP sites. (3) Taking a tiered approach to life-cycle baseline planning. Estimates for sites transferring to LM in the near term (5 years) are more definitive than for sites transferring in the out-year period. Remedial actions at the near-term sites are at or near completion, providing LM a strong understanding of the LTS and M requirements and remaining liabilities. This in turn allows for site-specific customization of the baseline. (4) Using a robust risk management approach to ensure that liabilities specific to each site are identified, evaluated by probability and severity, and documented in relation to the impact to cost or schedule. To ensure the most accuracy within all the baselines, the FUSRAP life-cycle baselines are updated as needed to support program, project, and contract management needs. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Data management, archiving, visualization and analysis of space physics data

A series of programs for the visualization and analysis of space physics data has been developed at UCLA. In the course of those developments, a number of lessons have been learned regarding data management and data archiving, as well as data analysis. The issues now facing those wishing to develop such software, as well as the lessons learned, are reviewed. Modern media have eased many of the earlier problems of the physical volume required to store data, the speed of access, and the permanence of the records. However, the ultimate longevity of these media is still a question of debate. Finally, while software development has become easier, cost is still a limiting factor in developing visualization and analysis software.

Russell, C. T.↗