Search NASA⌕ Search

SEARCH · Search NASA

Results for “repair crew”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 109 records · Page 6

Simplified Aid For Crew Rescue (SAFR)

Viewgraphs and discussion of a Crew Emergency Rescue System (CERS) are presented. Topics covered include: functional description; operational description; interfaces with other subsystems/elements; simplified aid for crew rescue (SACR) characteristics; potential resource requirements; logistics, repair, and resupply; potential performance improvements; and automation impact.

Fisher, H. Thomas↗

Rescue Shuttle Flight Re-Entry: Controlling Astronaut Thermal Exposure

A rescue mission for the STS-125 Hubble Telescope Repair Mission requires reentry from space with 11 crew members aboard, exceeding past cabin thermal load experience and risking crew thermal stress potentially causing cognitive performance and physiological decrements. The space shuttle crew cabin air revitalization system (ARS) was designed to support a nominal crew complement of 4 to 7 crew and 10 persons in emergencies, all in a shirt-sleeve environment. Subsequent to the addition of full pressure suits with individual cooling units, the ARS cannot maintain a stable temperature in the crew cabin during reentry thermal loads. Bulk cabin thermal models, used for rescue mission planning and analysis of crew cabin air, were unable to accurately represent crew workstation values of air flow, carbon dioxide, and heat content for the middeck. Crew temperature models suggested significantly elevated core temperatures. Planning for an STS-400 potential rescue of seven stranded crew utilized computational fluid dynamics (CFD) models to demonstrate inhomogeneous cabin thermal properties and improve analysis compared to bulk models. In the absence of monitoring of crew temperature, heart rate, metabolic rate and incomplete engineering data on the performance of the integrated cooling garment/cooling unit (ICG/CU) at cabin temperatures above 75 degrees F, related systems & models were reevaluated and tests conducted with humans in the loop. Changes to the cabin ventilation, ICU placement, crew reentry suit-donning procedures, Orbiter Program wave-off policy and post-landing power down and crew extraction were adopted. A second CFD and core temperature model incorporated the proposed changes and confirmed satisfactory cabin temperature, improved air distribution, and estimated core temperatures within safe limits. CONCLUSIONS: These changes in equipment, in-flight and post-landing procedures, and policy were implemented for the STS-400 rescue shuttle & will be implemented in any future rescue flights from the International Space Station of stranded shuttle crews.

Gillis, David B.↗

OpTIIX: An ISS-Based Testbed Paving the Roadmap Toward a Next Generation Large Aperture UV/Optical Space Telescope

The next generation large aperture UV/Optical space telescope will need a diameter substantially larger than even that of JWST in order to address some of the most compelling unanswered scientific quests. These quests include understanding the earliest phases of the Universe and detecting life on exo-planets by studying spectra of their atmospheres. Such 8-16 meter telescopes face severe challenges in terms of cost and complexity and are unlikely to be affordable unless a new paradigm is adopted for their design and construction. The conventional approach is to use monolithic or preassembled segmented mirrors requiring complicated and risky deployments and relying on future heavy-lift vehicles, large fairings and complex geometry. The new paradigm is to launch component modules on relatively small vehicles and then perform in-orbit robotic assembly of those modules. The Optical Testbed and Integration on ISS eXperiment (OpTIIX) is designed to demonstrate, at low cost by leveraging the infrastructure provided by ISS, telescope assembly technologies and end-to-end optical system technologies. The use of ISS as a testbed permits the concentration of resources on reducing the technical risks associated with robotically integrating the components. These include laser metrology and wavefront sensing and control (WFS&C) systems, an imaging instrument, lightweight, low-cost deformable primary mirror segments and the secondary mirror. These elements are then aligned to a diffraction-limited optical system in space. The capability to assemble the optical system and remove and replace components via the existing ISS robotic systems like the Special Purpose Dexterous Manipulator (SPDM), or by the ISS flight crew, allows for future experimentation, as well as repair.

Carpenter, Kenneth G.↗

Development of an Accepted Medical Condition List for Exploration Medical Capability Scoping

Future NASA human spaceflight programs are on the verge of moving beyond Low Earth Orbit (LEO) to implement missions in lunar space and ultimately Mars. The mission constraints for these types of missions are expected to be progressively challenging for integration of Human Systems requirements into the vehicle and mission architectures. Mass and volume allocations are expected to become increasingly restrictive at the same time that mission realities will drive an increasing need for crew self-sufficiency in the maintenance and repair of both vehicle systems and human systems. To meet these challenges, a systematic, traceable, and repeatable approach to identifying, defining, and prioritizing medical capabilities is required. To provide a systematic and repeatable approach to defining and prioritizing clinical capabilities for spaceflight medicine, a clear process is required for delivering a list of prioritized medical capabilities to the Systems Engineering process that will delineate the mass, power, volume, and similar needs and the trade space analysis for a given space vehicle and mission architecture.

Rebecca Blue↗

On-Site Fabrication Infrastructure to Enable Efficient Exploration and Utilization of Space

Unlike past one-at-a-time mission approaches, system-of-systems infrastructures will be needed to enable ambitious scenarios for sustainable future space exploration and utilization. So what do we do when we get to the moon for sustainable exploration. On-site fabrication infrastructure will be needed to support habitat structure development, tools and mechanical part fabrication, as well as repair and replacement of ground support and space mission hardware such as life support items, vehicle components and crew systems. The on-site fabrication infrastructure will need the In Situ Fabrication and Repair (ISFR) element, which is working in conjunction with the In Situ Resources Utilization (ISRU) element, to live off the land. The ISFR element has worked closely with the ISRU element in the past year to assess the ability of using lunar regolith as a viable feedstock for fabrication material. Preliminary work has shown promise and the ISFR Element will continue to concentrate on this activity. Fabrication capabilities have been furthered with the process certification effort that, when completed, will allow for space-qualified hardware to be manufactured. Materials being investigated include titanium and aluminum alloys as well as lunar regolith simulants with binders. This paper addresses the latest advancements made in the fabrication of infrastructures that support efficient, affordable, reliable infrastructures for both space exploration systems and logistics; infrastructures that allow sustained, affordable and highly effective operations on the Moon and beyond.

Howell, Joe T.↗

Future Homes in Space: Development of Concepts for Exploration Space Habitats

NASA’s Artemis campaign seeks to return humans to the moon and establish a sustained presence on the lunar surface. This session will emphasize how habitation capabilities on the moon and in cislunar space can potentially contribute to the sustainability objectives of Artemis. Habitable elements represent opportunities to enable longer duration stays, increase the number of crew members present, enhance science and utilization activities, drive technology development for future Mars exploration, perform analog missions, and fuel economic opportunities for US industry. Panelists include Paul Kessler (NASA Marshall Space Flight Center, deputy lead for lunar surface habitation); Andrew Choate (NASA Marshall Space Flight Center, Mars habitation lead); Krystofer Dudzinski (NASA Marshall Space Flight Center, a space architect within the MSFC Advanced Concepts Office); and Larry Toups (retired from NASA Johnson Space Center, currently an adjunct professor at University of Houston in space architecture). The panel is moderated by Tracie Prater (NASA Marshall Space Flight Center, Habitation Systems Development Office). The panel will begin with an overview of the history of habitation concepts and an academic perspective on general considerations in space habitat design (Larry Toups). Paul Kessler and Andrew Choate will introduce NASA’s principle of “architecting from the right” to help define objectives for Artemis missions, needs/characteristics, use cases, and functions (as published in the agency’s Architecture Definition Document) and provide perspective on how this principle informs habitation concept development work. NASA panelists will discuss key engineering challenges identified for developing, deploying, and operating habitable assets on the lunar surface and/or in deep space. These may include dust mitigation, outfitting of inflatable softgoods (for concepts which may use softgoods as a primary structural material), survival in lunar darkness, human health and performance considerations, maintenance/repair/sparing, and autonomy. These identified challenges represent risks for habitation systems development and relate closely to capability gaps identified by the agency. While the work of NASA Marshall Space Flight Center’s habitation development office is primarily focused on habitats which are launched from earth pre-integrated (referred to as Class I in the framework previously developed by NASA space architects Kennedy/Cohen) or launched from earth and deployed at the point of use (Class II), there is also extensive work in NASA, academia, and companies on constructed habitats, which would be built on a planetary surface using indigenous resources (Class III habitats). Panelist Krystopher Dudzinski will discuss potential evolutionary pathways from Class I and Class II habitats to Class III habitats, unique and common architectural challenges within each habitat class, and key gaps in implementing Class III habitats from an architectural perspective. NASA panelists and the moderator will also provide an overview of partnership opportunities and avenues for further engagement to advance habitation systems for the SpaceCom audience. NASA is currently developing notional concepts for a lunar surface habitat and Mars transit habitat, which will be discussed during this panel session and used as examples. These concepts represent options for habitation system design and are a point of departure. They do not represent a final plan or formal recommendation on the part of the agency. Based on the most recent analysis cycle, NASA’s lunar surface habitat (SH) concept nominally supports two crew members for 30 days, with the capacity to support four crew during a surge period where crew will swap between the SH and another surface asset, such as a pressurized rover. This example design has a metallic airlock for ingress/egress and the upper portion is an inflatable material system which serves as the habitation module. The notional interior of the habitat is a three-deck layout/configuration which supports all crew mission functions, including exercise, stowage, extravehicular activity (EVA), sleep, hygiene waste collection, maintenance and repair, and meal preparation. Under analysis assumptions for habitation, the Mars Transit Habitat (TH) concept would support four crew on an up to 1,200 day Mars mission. One option for the concept is to initially dock Transit Habitat at Gateway, where it can be used to increase the duration of crew stays in cislunar space and perform shakedown and analog missions prior to a Mars departure. One challenge in longer duration missions which involve both surface exploration and transit is understanding crew adaptation when transitioning between partial gravity and microgravity environments. TH at Gateway offers an opportunity to study this transition and in doing so reduce risks associated with future Mars exploration. Like lunar SH, the most recent analysis cycle concept of a Mars TH is a hybrid structure design, with a metallic section supporting EVAs, axial/radial docking, and Safe Haven capabilities, and an inflatable softgoods structure for the primary habitation function. Interior layouts to optimize crew usability and livability are currently under trade. The panel will include presentation material, but also seeks to engage the audience in a highly interactive conversation regarding the potential role for habitation in future exploration initiatives. Potential topics for discussion include the influence of the crew experience on habitation systems design and livability/usability considerations, the benefits of space habitation development in terrestrial applications, and challenges and opportunities in “feeding forward” lunar surface habitation systems development to Mars exploration.

space habitats↗

Semi-Automated Diagnosis, Repair, and Rework of Spacecraft Electronics

NASA's Constellation Program for Exploration of the Moon and Mars places human crews in extreme isolation in resource scarce environments. Near Earth, the discontinuation of Space Shuttle flights after 2010 will alter the up- and down-mass capacity for the International Space Station (ISS). NASA is considering new options for logistics support strategies for future missions. Aerospace systems are often composed of replaceable modular blocks that minimize the need for complex service operations in the field. Such a strategy however, implies a robust and responsive logistics infrastructure with relatively low transportation costs. The modular Orbital Replacement Units (ORU) used for ISS requires relatively large blocks of replacement hardware even though the actual failed component may really be three orders of magnitude smaller. The ability to perform in-situ repair of electronics circuits at the component level can dramatically reduce the scale of spares and related logistics cost. This ability also reduces mission risk, increases crew independence and improves the overall supportability of the program. The Component-Level Electronics Assembly Repair (CLEAR) task under the NASA Supportability program was established to demonstrate the practicality of repair by first investigating widely used soldering materials and processes (M&P) performed by modest manual means. The work will result in program guidelines for performing manual repairs along with design guidance for circuit reparability. The next phase of CLEAR recognizes that manual repair has its limitations and some highly integrated devices are extremely difficult to handle and demand semi-automated equipment. Further, electronics repairs require a broad range of diagnostic capability to isolate the faulty components. Finally repairs must pass functional tests to determine that the repairs are successful and the circuit can be returned to service. To prevent equipment demands from exceeding spacecraft volume capacity and skill demands from exceeding crew time and training limits, the CLEAR project is examining options provided by non-real time tele-operations, robotics, and a new generation of diagnostic equipment. This paper outlines a strategy to create an effective repair environment where, with the support of ground based engineers, crewmembers can diagnose, repair and test flight electronics in-situ. This paper also discusses the implications of successful tele-robotic repairs when expanded to rework and reconfiguration of used flight assets for building Constellation infrastructure elements.

Struk, Peter M.↗

Follow-on programs.

Discussion of space activities planned for the 1980's and resulting from the use of the Space Shuttle in providing easy access to orbits around the earth. Illustrations and brief explanatory notes describe the uses of the Space Shuttle in supporting space lab operations; retrieval and delivery of propulsion stages; placement, repair, and service of satellites; transportation of passengers and crews; execution of short-duration orbital missions; and rescue of endangered personnel.

Culbertson, P. E.↗

Significance of Skylab

The major Skylab systems are considered, giving particular attention to the systems which represent significant advances. Questions of the control of the oxygen-nitrogen atmosphere are discussed along with the electrical power system, aspects of stabilization and attitude control, the elimination of contamination problems, advances in spacecraft habitability, the Skylab inflight maintenance and repair program, and details concerning the training of the crew.

Disher, J. H.↗

Space Station needs, attributes and architectural options: Summary briefing

Computerized data sorting and analysis techniques were used with a data base accumulated in over 20 years of space station studies to evaluate candidate missions and select a final model of 88 missions. The social, cultural, scientific, technical, and commercial benefits to be accrued from each mission were identified. Requirements were determined for satellite servicing; payload placement and retrieval; refueling; repair; testing; assembly; and construction. Missions drivers determined include crew, remote manipulating system, external parts, instrumentation, extravehicular activity/manned maneuvering unit, and voice/video equipment. User interest for commercial applications were determined. Variable architecture based on a modular concept with multi-use elements is proposed.

Source record↗

Field repair of AH-16 helicopter window cutting assemblies

The U.S. Army uses explosively actuated window cutting assemblies to provide emergency crew ground egress. Gaps between the system's explosive cords and acrylic windows caused a concern about functional reliability for a fleet of several hundred aircraft. A field repair method, using room temperature vulcanizing silicone compound (RTV), was developed and demonstrated to fill gaps as large as 0.250 inch.

Bement, L. J.↗

STS-114 Flight Day 13 and 14 Highlights

On Flight Day 13, the crew of Space Shuttle Discovery on the STS-114 Return to Flight mission (Commander Eileen Collins, Pilot James Kelly, Mission Specialists Soichi Noguchi, Stephen Robinson, Andrew Thomas, Wendy Lawrence, and Charles Camarda) hear a weather report from Mission Control on conditions at the shuttle's possible landing sites. The video includes a view of a storm at sea. Noguchi appears in front of a banner for the Japanese Space Agency JAXA, displaying a baseball signed by Japanese MLB players, demonstrating origami, displaying other crafts, and playing the keyboard. The primary event on the video is an interview of the whole crew, in which they discuss the importance of their mission, lessons learned, shuttle operations, shuttle safety and repair, extravehicular activities (EVAs), astronaut training, and shuttle landing. Mission Control dedicates the song "A Piece of Sky" to the Shuttle crew, while the Earth is visible below the orbiter. The video ends with a view of the Earth limb lit against a dark background.

Source record↗

Self-Examination

The operation of the new U.S./Canadian Orbiter Boom Sensor System (OBSS) by the STS-114 Discovery's crew "will be the most complicated space robotics job of the shuttle program," say Paul Hill, lead flight director. The OBSS is a laser-and-imaging-sensor- equipped 50-ft. extension to the existing 50-ft. arm, increasing the shuttle's reach to 100 ft. The return-to-flight mission will debut the autonomous robotic self-inspection capability to detect and possibly aid the repair of the type of damage that doomed Columbia and her crew, were it to occur again. With 3D imaging and laser contour-mapping capability, the OBSS will enable the diagnosis of cracks in reinforced carbon-carbon (RCC) wing and nose areas and thermal protection system (TPS) tiles beyond the view of the standard manipulator arm. Given the major changes to the shuttle external tank, no damage is expected. But the OBSS is a direct response to the Columbia Accident Investigation Board's recommendations. The new boom and a significant amount of its supporting software was developed by MacDonald Dettwiler heads. Space and Advanced Robotics Ltd. (MD Robotics) in Brampton, Ontario, a key contractor in the shuttle program for 25 years. The Canadian Space Agency is also heavily involved in supporting shuttle and International Space Station (ISS) robotics.

Covault, Craig↗

Study of EVA operations associated with satellite services

Extravehicular mobility unit (EMU) factors associated with satellite servicing activities are identified and the EMU improvements necessary to enhance satellite servicing operations are outlined. Areas of EMU capabilities, equipment and structural interfaces, time lines, EMU modifications for satellite servicing, environmental hazards, and crew training are vital to manned Eva/satellite services and as such are detailed. Evaluation of EMU capabilities indicates that the EMU can be used in performing near term, basic satellite servicing tasks; however, satellite servicing is greatly enhanced by incorporating key modifications into the EMU. The servicing missions involved in contamination sensitive payload repair are illustrated. EVA procedures and equipment can be standardized, reducing both crew training time and in orbit operations time. By standardizing and coordinating procedures, mission cumulative time lines fall well within the EMU capability.

Nash, J. O.↗

Supportability Issues and Approaches for Exploration Missions

Maintaining and repairing spacecraft systems hardware to achieve required levels of operational availability during long-duration exploration missions will be challenged by limited resupply opportunities, constraints on the mass and volume available for spares and other maintenance-related provisions, and extended communications times. These factors will force the adoption of new approaches to the integrated logistics support of spacecraft systems hardware. For missions beyond the Moon, all spares, equipment, and supplies must either be prepositioned prior to departure from Earth of human crews or carried with the crews. The mass and volume of spares must be minimized by enabling repair at the lowest hardware levels, imposing commonality and standardization across all mission elements at all hardware levels, and providing the capability to fabricate structural and mechanical spares as required. Long round-trip communications times will require increasing levels of autonomy by the crews for most operations including spacecraft maintenance. Effective implementation of these approaches will only be possible when their need is recognized at the earliest stages of the program, when they are incorporated in operational concepts and programmatic requirements, and when diligence is applied in enforcing these requirements throughout system design in an integrated way across all contractors and suppliers. These approaches will be essential for the success of missions to Mars. Although limited duration lunar missions may be successfully accomplished with more traditional approaches to supportability, those missions will offer an opportunity to refine these concepts, associated technologies, and programmatic implementation methodologies so that they can be most effectively applied to later missions.

Watson, J. K.↗

Space Telescope maintenance and refurbishment

The Space Telescope (ST) represents a new concept regarding spaceborne astronomical observatories. Maintenance crews will be brought to the orbital worksite to make repairs and replace scientific instruments. For major overhauls the telescope can be temporarily returned to earth with the aid of the Shuttle. It will, thus, be possible to conduct astronomical studies with the ST for two decades or more. The five first-generation scientific instruments used with the ST include a wide field/planetary camera, a faint object camera, a faint object spectrograph, a high resolution spectrograph, and a high speed photometer. Attention is given to the optical telescope assembly, the support systems module, aspects of mission and science operations, unscheduled maintenance, contingency orbital maintenance, planned on-orbit maintenance, ground maintenance, ground refurbishment, and ground logistics.

Trucks, H. F.↗

One Year Old and Growing: A Status Report on the International Space Station and Its Partners

The first elements of the International Space Station have been launched and docked together, and are performing well on-orbit. The Station is currently being operated jointly by NASA and Russian space organizations. In May 1999, the Space Shuttle was the first vehicle to dock to the International, Space Station. A crew of seven U.S. and Russian astronauts delivered 4000 pounds of supplies, made repairs to communications and battery systems, and installed external hardware during an EVA. The next module, the Russian Service Module, is due to join the orbital complex this year. This will initiate a period of rapid growth, with new modules and equipment continually added for the next five to six years, through assembly complete. The first crew is scheduled to begin permanent occupation of the International Space Station early next year. Hardware is being developed by Space Station partners and participants around the world and is largely on schedule for launch. Mission control centers are fully functioning in Houston and Moscow, with operations centers in St. Hubert, Darmstadt, Tsukuba, Turino, and Huntsville going on line as they are required. International crews are selected and in training. Coordination efforts continue with each of the five partners and two participants, involving 16 nations. All of them continue to face their own challenges and have achieved their own successes. This paper will discuss the status of the ISS partners and participants, their contributions and accomplished milestones, and upcoming events. It will also give a status report on the developments of the remainder of the ISS modules and components by each partner and participant. The ISS, the largest and most complicated peacetime project in history, is flying, and, with the help of all the ISS members, will continue to grow.

Bartoe, John-David F.↗

EVA Hazards due to TPS Inspection and Repair

Tile inspection and repair activities have implicit hazards associated with them. When an Extra Vehicular Activities (EVA) crewmember and associated hardware are added into the equation, additional hazards are introduced. Potential hazards to the Extravehicular Mobility Unit (EMU), the Orbiter or the crew member themselves are created. In order to accurately assess the risk of performing a TPS inspection or repair, an accurate evaluation of potential hazards and how adequately these hazards are controlled is essential. The EMU could become damaged due to sharp edges, protrusions, thermal extremes, molten metal or impact with the Orbiter. Tools, tethers and the presence of a crew member in the vicinity of the Orbiter Thermal Protection System (TPS) pose hazards to the Orbiter. Hazards such as additional tile or Reinforced Carbon-Carbon (RCC) damage from a loose tool, safety tethers, crewmember or arm impact are introduced. Additionally, there are hazards to the crew which should be addressed. Crew hazards include laser injury, electrical shock, inability to return to the airlock for EMU failures or Orbiter rapid safing scenarios, as well as the potential inadvertent release of a crew member from the arm/boom. The aforementioned hazards are controlled in various ways. Generally, these controls are addressed operationally versus by design, as the majority of the interfaces are to the Orbiter and the Orbiter design did not originally account for tile repair. The Shuttle Remote Manipulator System (SRMS), for instance, was originally designed to deploy experiments, and therefore has insufficient design controls for retention of the Orbiter Boom Sensor System (OBSS). Although multiple methods to repair the Orbiter TPS exist, the majority of the hazards are applicable no matter which specific repair method is being performed. TPS Inspection performed via EVA also presents some of the same hazards. Therefore, the hazards common to all TPS inspection or repair methods will be addressed.

Stewart, Christine E.↗